CONTENT
1. Introduction to the Site
2. Location, Key Plan and Site Plan
3. Existing Condition
4. Site Context
5. Site Analysis, Site Inventory and Site Observation
6. Development Proposal (Jiji Ng)
7. Development Proposal (Leong Li Jing)
3ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Introduction to the Site
The site for this development is alongJalan Yap Kwan Seng. It is
currentlya landmark for sale and temporarily managedby an authority
available for its tertiary services - car parking. We find the functionality of
this landmark covers a very high potential of beingdesigned due to its
surrounding commercial development.We claimed to propose a
beneficial landscapeplanningfor the advanced city line.
4ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Location and Key Plan
Location: Jalan Yap Kwan Seng,
KLCC, 50450, Kuala
Lumpur, Wilayah
Persekutuan.
5ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Site Plan
B
C
A
View A
View B
View C
6ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Existing Condition
→ The subject land is located along
the bustling Jalan Yap Kwan Seng.
↓ It is surroundedby a commercial building,
AmBank Tower and Ampang Elevated Highway.
→ There are a few types of
development projects being
carry out opposite of
and beside this landmark.
7ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Site Context
8ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Site Analysis, Site Inventory and
Site Observation
9ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Circulation
Circulation 1
→ The entrance and exit of the site as
seen from internal of the site.
The site can be easily accessed from the main road – Jalan Yap Kwan
Seng. The specific circulation of peoples are mainly the employees of the
commercial areas, bank towers and business buildings near the site.
There is only one entrance and exit on the site. People can enter to the
site through circulation1 as figured in the plan.
10ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Microclimate
SUNSET SUNRISE
The site is moderately hot because the site is exposed to maximum sunlight
throughout the entire year. It is cooler in the early morning(6-8am) and late
evening(6-8pm), warmer at afternoon (12-2pm).
Wind flow from two direction which is north-east and south-east.
11ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Drainage
There is only one drainage is
identified along the site.
12ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Site Analysis
Site Context Images Distance Time
KL Tower 2.4 km 8 mins
ShoppingMall
Suria KLCC 0.65 km 2 mins
Pavillion 3.1 km 7 mins
Berjaya
Times
Square
5.9 km 13 mins
13ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Ampang
Point
Shopping
Mall
5.8 km 10 mins
Education
Aquaria
KLCC
2.1 km 6 mins
Raffles
Laselle
International
Design
School
1.5 km 5 mins
Raffles
Design
School
1.6 km 5 mins
14ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Primrose
Hill Nursery
1.1 km 4 mins
UTM 0.8 km 2 mins
Sayfol
International
School
2.1 km 6 mins
Petrosains,
The
Discovery
Centre
0.8 km 3 mins
15ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Hospital
Gleneagles
Intan
Medical
Centre
3.6 km 7 mins
Hospital
Pakar
Ampang
Puteri
5.9 km 11 mins
Kuala
Lumpur
General
Hospital
4.1 km 11 mins
National
Heart
Institute
3.7 km 7 mins
16ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Prince Court
Medical
Centre
2.3 km 9 mins
Sports and Recreation
Royal
Selangor
Golf Club
3.4 km 8 mins
Merdeka
Square
3.7 km 11 mins
Stadium
Merdeka
6.7 km 10 mins
17ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
The Royal
Selangor
Polo Club
3.7 km 10 mins
Cemetery
Ampang
Road Islam
Cemetery
3.5 km 6 mins
Kwong Tong
Cemetery
8.8 km 16 mins
National and InternationalInstitution
Embassy of
Republic of
Poland
1.9 km 6 mins
18ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Embassy of
Romania
2.3 km 6 mins
Royal Thai
Embassy
1.8 km 6 mins
FELDA 1.6 km 4 mins
Department
of Fisheries
Malaysia
6.6 km 9 mins
19ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Green Landscapes
KL City Park 0.9 km 4 mins
Titiwangsa
Lake Garden
3.3 km 7 mins
Hotel
Shangri-La
Hotel
3.8 km 10 mins
The Ritz-
Carlton
Kuala
Lumpur
3.5 km 12 mins
20ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Final Project:
A Mini Theme Park Development Proposal
Name: Jiji Ng
Student ID: 0904Y72861
Tutor: Pn. Hasmanira Mokhtar
Course: Foundation in Natural and Built Environment
(FNBE)
Module: Introduction to the Constructed Industry
(QSB30105)
Intake: March 2015
21ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
CONTENT
1. Introduction and Objective of the Construction
2. Conceptual Studies
3. Concept and Ideas Sketches
4. Sketch Plan of Proposal
5. Rationale, Benefits and Impacts
6. Professions and Tasks
22ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Introduction
I have decided to develop a recreational area on the designated land,
2601 square meter downgradedsite along Jalan Yap Kwan Seng, KLCC,
50450, Kuala Lumpur, Wilayah Persekutuan.I plan to build a mini theme
park because it’s surroundedby significant landmarks from the commercial
area, educational area and tourism area.
The diversity of people in the centre of the city makes the landscape
design to be embraced, appreciated, formulatedand publicisedin a
harmonization of old-culture patterns – a new make-up for the
modernizationand globalization of the world.
Nowadays, people in the bustlingcity should came across an
extraordinaryatmosphere that increase the productivity of revolutionized
world by means of cultural diversity. People needto have confidence about
the history of cultural formation which brought forward the cultural
differencesinto the global mechanism that changes the world. The
communication of this concept starts from the mini theme park that
concerns on the blend-culture of a multi-racial country.
Objective of the Construction
- To entertain the nearby employee with new approachof copingthe
growth of multi-culture in the working field.
- To nurture the morals of respect towards the cultural art among
youngart generations.
- To raise awareness of the importance of culture harmonization
among professionals in the working field.
- To increase public interests on usingnational art culture as an
implementation on communication, risk and global management,
and professional training.
23ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Conceptual Studies
The mini them park reflect the culture and tradition of Malaysian
culture.
As it located near the national institutions, the park symbolize the
culture preferences and nationality of Malaysia.
As it situated near the worldwide education centres, international
institutions and hotels, the park promote the distinctivenessof national
identity to the international hospitality and tourism in Malaysia.
As it located near the cemeteries, the park upright the ancestor’s
traditional spirit and designed a memorial for their patriotism.
As it situated near the other national-class green landscapes,the park
serves as an elaboration for the greeneries, establishinga fresh significance
– the modernizedcultural and traditional signature of the green spaces in
Kuala Lumpur.
As it located near the hospitals and medical institutions, the park
functions as an extra circulation which communicatespatients to the nature
of authenticity that lies within this symbolical landscape of Malaysia.
24ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Concept and Ideas Sketches
Sketch Plan of Proposal
25ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Sketch Plan of Proposal
26ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Rationale
Accordingto my research and experiencelivingin Malaysia, I aware
that in the working field, there are a great deal of graduates who are
compassionate about the national art culture or with high spirit of
patriotism nurturedby schools. The spirit of this group of people
diminishes alongwith the era of politics and cultures in the working
field. The mini theme park could stimulated the thoughtsand awareness
on these people to take the importance of preservingtheir own interests
towards the uniquenessof national culture.
Benefits
The green landscape of the city is mostly covered with greeneries and
the diversity of nature. To create a new generation’s park, I used the
essence of culture harmonizationto initiate the new trend in teenagers.
They will be attracted to share with, inspire and impress the
unconcerned groups. This bringforth the modernizationin the way that
can bringharmony, and enlighteningand effective changesto the world
that perishingin each second.
I also use this culture in teenagers to tackle the outdated thoughts
among adults, as to create new potential to adjust themselvesto the new
trend of culture in everyday life of the world.
Impacts
The buildingof this mini theme park creates a networkingrest place
that can diffuses the tension, conflicts and anguishes in employees
caused by the hectic environment of the working field. This leisure
networkingbrings differentway of living to the surroundingareas, as it
increases the prospectiveof divergent thinkingamongthe professionals.
27ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Professions and Their Tasks
1. Structural Engineer: Drawplans, examine and plan the structures
of rigid features in the park.
2. Landscape architect:Design and coordinate the natural and built
environment in the park to create an atmosphere that fulfil the
green drive of city.
3. Traditional carpenters: Assist landscape architect in the design of
park. Fabricated the rigid features involvingbeams, columns and
wooden trims.
4. Constructionmanager: Oversee the constructionproject and
supervise the constructionteam. Took responsibility in keeping
schedules,delegatingjobs and prioritizing.
5. Material Engineer: Choose and identify the kind of materials that
highlighted the quality of the cultural features in Malaysia.
6. Interior Designer: Design and associate the space of interior with
new trend of cultural attributes depicted in the exterior design of
the park.
7. Quantity Surveyor: Responsible for the cost management
meanwhile create a budget balance that maintains the standards
and quality of the park.
8. Contractor:Performmultiple fields’ duties in construction sites,
hire and coordinate subcontractorssuch as excavation manager,
cement and brick masons, constructionlabourers, glaziers et
cetera.
9. Local authorities: Ensure the objectives of this landscape design
as such is beneficial to the nearby community; ensure this planning
and constructionare based on the set of buildingstandard.
28ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Final Project:
Fitness Recreation Centre and Commercial Block
Development Proposal
Name: Leong Li Jing
Student ID: 0323628
Tutor: Pn. Hasmanira Mokhtar
Course: Foundation in Natural and Built Environment
(FNBE)
Module: Introduction to the Constructed Industry
(QSB30105)
Intake: March 2015
29ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
CONTENT
1. Introduction
2. Concept and ideas
3. Sketch plan of proposal
4. Rationale, benefits and impacts
5. Professions involved and tasks
6. Reference list
30ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
INTRODUCTION
In this final project, we are given a task to find a specific empty land with a maximum size of
3500m2 to initiate a small construction project on it in a group of two people. For our group, we
came out with an outcome to use the empty land located along Jalan Yap Kwan Seng.
After surveying, I found that there is no any other place nearer provided for the public to
exercise in this area and are forced to take different means of transportation to travel to another
places. Thus, I decided to propose a fitness centre on this empty land, which accommodate with
commercial block to provide public to enjoy exercising under a complete equipped environment.
The land is a waste of space as it was originally a parking area because public seldom use it.
Hence, it is good to have a fitness centre and commercial block to put this empty land in a good
use.
This fitness centre is a one stop place for people that are into sports and fitness. The Fitness
Centre is a health, recreational, and social facilitygeared towards exercise, sports, and other
physical activities. This is where people can work out and relax and also they can find all types of
sports accessories and facilities. This commercial block is a building consists of grocery shops
and convenience store. This is much easier and convenience for people to get the needed stuff
quickly.
Objective of construction
- To put the empty land in a good use
- To provide a recreation and leisure venue
- To provide a standard and high quality sports environment
- To provide a comfortable and convenient place which is equipped with complete
facilities for exercise
- To raise awareness about importance of exercise for health
- To improve public interests in sports
- To solve the problem of car park
31ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
CONCEPT AND IDEAS
The land of site will be fully used for parking area, fitness centre and commercial block.
The land outside the fitness centre and commercial block will be remained as car park as the
building occupies more spaces.
The fitness centre consists of three floors which is basement, ground floor and first floor. The
basement is car park because there are not enough land to provide spaces for car park outside
the building as it was originally a car park area. Ground floor consists of fitness area, shower and
washroom area, office room and waiting area. For the first floor, it consists of gym area, first aid
room area and some convenience store.
The commercial block consists of basement car park and ground floor. Ground floor consists of
convenience stores for commercial purpose.
32ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
SKETCH PLAN OF PROPOSAL
Diagram above shows the plan view of the site.
The land is occupied with parking area, fitness centre and commercial block.
As the original circulation in and out the site is narrow, it changed into bigger entrance and exits for
vehicles to avoid traffic congestion.
33ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Diagram above shows the plan view of basement car park.
Example of the view of basement car park with entrance and exits.
34ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Diagram above shows the plan view of ground floor.
Potential Fitness Centre spaces are numerous and varied. Small facilities may have little more than a
fitness area with group exercise room, locker rooms, and a small support/administrative area.
Group exercise
room/studio. These
rooms accommodate
organized fitness class
activities.
Locker rooms and associated functions. These spaces are typically
separated by gender and accommodate the basic functions of
changing, storing clothes, patron showers, and toilets.
35ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Administrative and support
spaces. These staff spaces
accommodate the operation and
administration of the facility and
include Reception/control counter
and equipment issue and offices.
Lobby entrance.
A commercial area is real estate intended for use by for-profit businesses. The building itself consists of
convenience store and food court.
Food court.
Convenience store.
36ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
Diagram above shows the plan view of first floor.
Large facilities may add food service and retail spaces, washroom, first aid room, gender-specific gym
area, public gym area and child care spaces.
Washroom.
Juice bar and food service.
Sport retail stores.
37ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
First aid room.
Fitness spaces. Provide
proper impact flooring
for each space for fall
attenuation and
appropriate cushioning
for bone and joint
health.
Visual access for
all fitness and
gym spaces.
Ensure good
indoor air quality
and natural light.
38ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
RATIONALE, BENEFITS AND IMPACTS
Rationale
- Distance with other sport and recreation centre is far
- Population increased within that area
- People surrounding can have a place to work out for stress relief
- Awareness of the importance of health raised nowadays
- Car park slots need to be added as the circulation will be increased
Benefits
- Increase aggregate demand of the economy, creating new jobs, thus increasing
employment.
- Empty land can be functional
- Raise awareness about importance of exercise for health
- Public interests in sports improved
- Provide a nearer fitness centre for public
- Stress can be relieved through work out
- Have a comfortable fitness centre for people to work out
- Completed sport equipment and other facilities
- 24 hours operation which allow people exercise in a quiet condition
- Car park problem solved with the addition of basement car park
- People can get the needed stuff from convenience store easily
- First aid area in building increase the safety of the people who work out
Impacts
- Causes traffic congestion as the road in front of the site is narrow
- Rate of pollution may increase
- Safety of the area may be decreased as the location is surrounded by commercial
buildings such as bank
- Direction of wind flow are blocked
- Air is not fresh for people who work out because it is located beside highway
39ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
PROFESSIONS INVOLVED AND TASKS
1. Architect
- Ascertaining, interpreting and formulating requirements
- Coordinate necessary environmental and engineering service to building design
- Prepare probable costs and the project timeline
- Awarding tenders, contract administration and in helping to obtain Certificate of
Fitness for Occupation (CFO)
- Administrating building contract – mediating between clients and contractor
2. Client
- Co-operative and participative
- Understand the construction process
3. Project manager
- Ensure maximum efficiency of the construction project
- Ability to adapt to the various internal procedures of the contracting party
- Ensuring the key issues of cost, time, quality and above all, client satisfaction can be
realized.
- Plan, organize, evaluate, direct, control and lead project
- Produce the end product within the cost schedule, specifications and technical
limitations
- Fully aware with the ethnical cost and the schedule objectives will be met
4. Contractor
- Responsible for the supplying of all materials, labours, equipment and tools necessary
- Responsible for the construction execution in accordance with the contract
documents
5. Interior designer
- Developing initial ideas and acquiring key information about potential projects
- Setting project schedules
- Considering materials and costs
- Sourcing products
- Preparing detailed working drawings, designs, plans, models and schemes
6. Quantity surveyor
- Conducting feasibility studies to estimatematerials, time and labor costs
- Preparing, negotiating and analyzing costs for tenders and contracts
- Advising on a range of legal and contractual issues
- Valuing completed work and arranging for payments
7. Engineers
- Assess its suitability for construction
- Develop a brief for the building
- Detailed design of the system
- Monitor the progress at site and ensure compliant to the design
- Manage the maintenance of the services
40ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
8. Civil engineer
- Analyse survey reports, maps, drawings, blueprints, aerial photography, and other
topographical or geologic data to plan projects
- Plan and design transportation or hydraulic systems and structures, following
construction and government standards
- Test soil and materials to determine the adequacy and strength of foundations,
concrete, asphalt or steel
- Conduct studies of traffic patterns or environmental condition to identify
engineering problems and assess the potential impact of projects
- Provide technical advice regarding design, construction, or program modifications
and structural repairs to industrial and managerial personnel
- Direct or participate in surveying to lay out installations and establish reference
points, grades, and elevations to guide construction
- Inspect project sites to monitor progress and ensure conformance to design
specification and safety or sanitation standards
- Direct construction, operations and maintenance activities at project site
9. Structural engineer
- Dealing with the analysis and design of structures that support or resist loads
- May design the individual structural elements if a structure
- Identifying the loads with act upon structure and the forces and stresses
- Advise employer and the architect of the most efficient, economical and practical
method of providing their specialist service
- Prepare design calculations and material specifications
- Prepare detailed drawings within the architect’s design
10.Buildingengineer (mechanical & electrical)
- Read and interpret blueprints, technical drawings, schematics and computer-
generated reports
- Research and analyse design proposals, specifications, manuals, and other data
- Confer with engineers and other personnel to implement operating procedures,
resolve system malfunctions and provide technical information
- Specify system components or direct modification of products to ensure
conformance with engineering design and performance specifications
- Perform detailed calculations to compute and establish manufacturing, construction
and installation in accordance with standards and specifications
11. Authorities
- approve and ensure professions are licensed such as first aider
- ensure facilities are completed and safe for public
41ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015
JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR
REFERENCES LIST
http://www.wbdg.org/design/fitness_centers.php
http://www.safeguardeurope.com/applications/undergro
und_car_parks

More Related Content

Viewers also liked

нурсейит рысты идея красоты
нурсейит рысты идея красотынурсейит рысты идея красоты
нурсейит рысты идея красотыРысты Нұрсейіт
 
Guidelines for Boosting Productivity — Part 1
Guidelines for Boosting Productivity — Part 1Guidelines for Boosting Productivity — Part 1
Guidelines for Boosting Productivity — Part 1Adam Sicinski
 
eStandards conference: Next steps for standardization in large scale eHealth ...
eStandards conference: Next steps for standardization in large scale eHealth ...eStandards conference: Next steps for standardization in large scale eHealth ...
eStandards conference: Next steps for standardization in large scale eHealth ...chronaki
 
Duanes retraction syndrome ..
Duanes retraction syndrome ..Duanes retraction syndrome ..
Duanes retraction syndrome ..SSSIHMS-PG
 

Viewers also liked (6)

PITG 2012 Performance2
PITG 2012 Performance2PITG 2012 Performance2
PITG 2012 Performance2
 
нурсейит рысты идея красоты
нурсейит рысты идея красотынурсейит рысты идея красоты
нурсейит рысты идея красоты
 
Guidelines for Boosting Productivity — Part 1
Guidelines for Boosting Productivity — Part 1Guidelines for Boosting Productivity — Part 1
Guidelines for Boosting Productivity — Part 1
 
eStandards conference: Next steps for standardization in large scale eHealth ...
eStandards conference: Next steps for standardization in large scale eHealth ...eStandards conference: Next steps for standardization in large scale eHealth ...
eStandards conference: Next steps for standardization in large scale eHealth ...
 
CV Yvette
CV YvetteCV Yvette
CV Yvette
 
Duanes retraction syndrome ..
Duanes retraction syndrome ..Duanes retraction syndrome ..
Duanes retraction syndrome ..
 

Similar to ICI FINAL PROJECT

ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT Arissa Loh
 
ICI Development Proposal
ICI Development ProposalICI Development Proposal
ICI Development Proposaljisunfoo
 
Ici proposal final project
Ici proposal final projectIci proposal final project
Ici proposal final projectjlwc
 
Project 2 : Documentation For A Medium-Sized Project
Project 2 : Documentation For A Medium-Sized ProjectProject 2 : Documentation For A Medium-Sized Project
Project 2 : Documentation For A Medium-Sized ProjectBryan Yeoh
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management ReportCarmen Chan
 
PROJECT MANAGEMENT PROJECT 2 REPORT
PROJECT MANAGEMENT PROJECT 2 REPORTPROJECT MANAGEMENT PROJECT 2 REPORT
PROJECT MANAGEMENT PROJECT 2 REPORTAdibah Awang
 
Project management(roro)
Project management(roro)Project management(roro)
Project management(roro)AwZhiXuan
 
Sansiri Business Direction 2014
Sansiri Business Direction 2014Sansiri Business Direction 2014
Sansiri Business Direction 2014SansiriPLC
 
Project Management Project 2
Project Management Project 2Project Management Project 2
Project Management Project 2Clement Seong
 
10657284 10201912537654101 877687459_n
10657284 10201912537654101 877687459_n10657284 10201912537654101 877687459_n
10657284 10201912537654101 877687459_nJson96
 
FNBE 0814 ICI FINAL PROJECT
FNBE 0814 ICI FINAL PROJECT FNBE 0814 ICI FINAL PROJECT
FNBE 0814 ICI FINAL PROJECT yangkanglim
 
JSK Explorers- Profile
JSK Explorers- ProfileJSK Explorers- Profile
JSK Explorers- ProfileMohit Kalani
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Reportzerospaces_
 
Ici final project
Ici   final projectIci   final project
Ici final projectJoeylau97
 
Ici - final project
Ici - final projectIci - final project
Ici - final projectleejanett3
 

Similar to ICI FINAL PROJECT (20)

ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT
 
ICI Development Proposal
ICI Development ProposalICI Development Proposal
ICI Development Proposal
 
group ici
group icigroup ici
group ici
 
Ici proposal final project
Ici proposal final projectIci proposal final project
Ici proposal final project
 
Project 2 : Documentation For A Medium-Sized Project
Project 2 : Documentation For A Medium-Sized ProjectProject 2 : Documentation For A Medium-Sized Project
Project 2 : Documentation For A Medium-Sized Project
 
Proposal
ProposalProposal
Proposal
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Report
 
PROJECT MANAGEMENT PROJECT 2 REPORT
PROJECT MANAGEMENT PROJECT 2 REPORTPROJECT MANAGEMENT PROJECT 2 REPORT
PROJECT MANAGEMENT PROJECT 2 REPORT
 
Project management(roro)
Project management(roro)Project management(roro)
Project management(roro)
 
chun's
chun'schun's
chun's
 
Sansiri Business Direction 2014
Sansiri Business Direction 2014Sansiri Business Direction 2014
Sansiri Business Direction 2014
 
Project Management Project 2
Project Management Project 2Project Management Project 2
Project Management Project 2
 
Irda presentation
Irda presentationIrda presentation
Irda presentation
 
10657284 10201912537654101 877687459_n
10657284 10201912537654101 877687459_n10657284 10201912537654101 877687459_n
10657284 10201912537654101 877687459_n
 
FNBE 0814 ICI FINAL PROJECT
FNBE 0814 ICI FINAL PROJECT FNBE 0814 ICI FINAL PROJECT
FNBE 0814 ICI FINAL PROJECT
 
JSK Explorers- Profile
JSK Explorers- ProfileJSK Explorers- Profile
JSK Explorers- Profile
 
Sem 6 studio report
Sem  6 studio reportSem  6 studio report
Sem 6 studio report
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Report
 
Ici final project
Ici   final projectIci   final project
Ici final project
 
Ici - final project
Ici - final projectIci - final project
Ici - final project
 

More from Li Jing

TITAS Assignment Guidelines
TITAS Assignment GuidelinesTITAS Assignment Guidelines
TITAS Assignment GuidelinesLi Jing
 
biz final brief
biz final briefbiz final brief
biz final briefLi Jing
 
biz ass brief
biz ass briefbiz ass brief
biz ass briefLi Jing
 
Biz presentation
Biz presentationBiz presentation
Biz presentationLi Jing
 
econ ass brief
econ ass briefecon ass brief
econ ass briefLi Jing
 
Acc report
Acc reportAcc report
Acc reportLi Jing
 
Acc ass brief
Acc ass briefAcc ass brief
Acc ass briefLi Jing
 
eng2 ass2
eng2 ass2eng2 ass2
eng2 ass2Li Jing
 
psy ass3 report
psy ass3 reportpsy ass3 report
psy ass3 reportLi Jing
 
Psy ass2 ppt
Psy ass2 pptPsy ass2 ppt
Psy ass2 pptLi Jing
 
psy assessment
psy assessmentpsy assessment
psy assessmentLi Jing
 
psy ass3 ppt
psy ass3 pptpsy ass3 ppt
psy ass3 pptLi Jing
 
psy ass3 brief
psy ass3 briefpsy ass3 brief
psy ass3 briefLi Jing
 
Psy ass1 journal
Psy ass1 journalPsy ass1 journal
Psy ass1 journalLi Jing
 
Epc ass2 ppt
Epc ass2 pptEpc ass2 ppt
Epc ass2 pptLi Jing
 
epc ass1 brief
epc ass1 briefepc ass1 brief
epc ass1 briefLi Jing
 
epc ass2 brief
epc ass2 briefepc ass2 brief
epc ass2 briefLi Jing
 
eng2 assignment 2 brief
eng2 assignment 2 briefeng2 assignment 2 brief
eng2 assignment 2 briefLi Jing
 
english2 Assignment 2 ppt
english2 Assignment 2 pptenglish2 Assignment 2 ppt
english2 Assignment 2 pptLi Jing
 
Fnbe september 2015 assignment 1
Fnbe september 2015 assignment 1Fnbe september 2015 assignment 1
Fnbe september 2015 assignment 1Li Jing
 

More from Li Jing (20)

TITAS Assignment Guidelines
TITAS Assignment GuidelinesTITAS Assignment Guidelines
TITAS Assignment Guidelines
 
biz final brief
biz final briefbiz final brief
biz final brief
 
biz ass brief
biz ass briefbiz ass brief
biz ass brief
 
Biz presentation
Biz presentationBiz presentation
Biz presentation
 
econ ass brief
econ ass briefecon ass brief
econ ass brief
 
Acc report
Acc reportAcc report
Acc report
 
Acc ass brief
Acc ass briefAcc ass brief
Acc ass brief
 
eng2 ass2
eng2 ass2eng2 ass2
eng2 ass2
 
psy ass3 report
psy ass3 reportpsy ass3 report
psy ass3 report
 
Psy ass2 ppt
Psy ass2 pptPsy ass2 ppt
Psy ass2 ppt
 
psy assessment
psy assessmentpsy assessment
psy assessment
 
psy ass3 ppt
psy ass3 pptpsy ass3 ppt
psy ass3 ppt
 
psy ass3 brief
psy ass3 briefpsy ass3 brief
psy ass3 brief
 
Psy ass1 journal
Psy ass1 journalPsy ass1 journal
Psy ass1 journal
 
Epc ass2 ppt
Epc ass2 pptEpc ass2 ppt
Epc ass2 ppt
 
epc ass1 brief
epc ass1 briefepc ass1 brief
epc ass1 brief
 
epc ass2 brief
epc ass2 briefepc ass2 brief
epc ass2 brief
 
eng2 assignment 2 brief
eng2 assignment 2 briefeng2 assignment 2 brief
eng2 assignment 2 brief
 
english2 Assignment 2 ppt
english2 Assignment 2 pptenglish2 Assignment 2 ppt
english2 Assignment 2 ppt
 
Fnbe september 2015 assignment 1
Fnbe september 2015 assignment 1Fnbe september 2015 assignment 1
Fnbe september 2015 assignment 1
 

Recently uploaded

Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 

Recently uploaded (20)

Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 

ICI FINAL PROJECT

  • 1. 1ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR FINAL PROJECT: DEVELOPMENT PROPOSAL Introduction to the Construction Industry [QSB30105] JIJI NG | 0904Y72861 LEONG LI JING|0323628 FNBE MARCH 2015
  • 2. 2ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR CONTENT 1. Introduction to the Site 2. Location, Key Plan and Site Plan 3. Existing Condition 4. Site Context 5. Site Analysis, Site Inventory and Site Observation 6. Development Proposal (Jiji Ng) 7. Development Proposal (Leong Li Jing)
  • 3. 3ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Introduction to the Site The site for this development is alongJalan Yap Kwan Seng. It is currentlya landmark for sale and temporarily managedby an authority available for its tertiary services - car parking. We find the functionality of this landmark covers a very high potential of beingdesigned due to its surrounding commercial development.We claimed to propose a beneficial landscapeplanningfor the advanced city line.
  • 4. 4ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Location and Key Plan Location: Jalan Yap Kwan Seng, KLCC, 50450, Kuala Lumpur, Wilayah Persekutuan.
  • 5. 5ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Site Plan B C A View A View B View C
  • 6. 6ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Existing Condition → The subject land is located along the bustling Jalan Yap Kwan Seng. ↓ It is surroundedby a commercial building, AmBank Tower and Ampang Elevated Highway. → There are a few types of development projects being carry out opposite of and beside this landmark.
  • 7. 7ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Site Context
  • 8. 8ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Site Analysis, Site Inventory and Site Observation
  • 9. 9ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Circulation Circulation 1 → The entrance and exit of the site as seen from internal of the site. The site can be easily accessed from the main road – Jalan Yap Kwan Seng. The specific circulation of peoples are mainly the employees of the commercial areas, bank towers and business buildings near the site. There is only one entrance and exit on the site. People can enter to the site through circulation1 as figured in the plan.
  • 10. 10ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Microclimate SUNSET SUNRISE The site is moderately hot because the site is exposed to maximum sunlight throughout the entire year. It is cooler in the early morning(6-8am) and late evening(6-8pm), warmer at afternoon (12-2pm). Wind flow from two direction which is north-east and south-east.
  • 11. 11ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Drainage There is only one drainage is identified along the site.
  • 12. 12ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Site Analysis Site Context Images Distance Time KL Tower 2.4 km 8 mins ShoppingMall Suria KLCC 0.65 km 2 mins Pavillion 3.1 km 7 mins Berjaya Times Square 5.9 km 13 mins
  • 13. 13ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Ampang Point Shopping Mall 5.8 km 10 mins Education Aquaria KLCC 2.1 km 6 mins Raffles Laselle International Design School 1.5 km 5 mins Raffles Design School 1.6 km 5 mins
  • 14. 14ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Primrose Hill Nursery 1.1 km 4 mins UTM 0.8 km 2 mins Sayfol International School 2.1 km 6 mins Petrosains, The Discovery Centre 0.8 km 3 mins
  • 15. 15ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Hospital Gleneagles Intan Medical Centre 3.6 km 7 mins Hospital Pakar Ampang Puteri 5.9 km 11 mins Kuala Lumpur General Hospital 4.1 km 11 mins National Heart Institute 3.7 km 7 mins
  • 16. 16ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Prince Court Medical Centre 2.3 km 9 mins Sports and Recreation Royal Selangor Golf Club 3.4 km 8 mins Merdeka Square 3.7 km 11 mins Stadium Merdeka 6.7 km 10 mins
  • 17. 17ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR The Royal Selangor Polo Club 3.7 km 10 mins Cemetery Ampang Road Islam Cemetery 3.5 km 6 mins Kwong Tong Cemetery 8.8 km 16 mins National and InternationalInstitution Embassy of Republic of Poland 1.9 km 6 mins
  • 18. 18ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Embassy of Romania 2.3 km 6 mins Royal Thai Embassy 1.8 km 6 mins FELDA 1.6 km 4 mins Department of Fisheries Malaysia 6.6 km 9 mins
  • 19. 19ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Green Landscapes KL City Park 0.9 km 4 mins Titiwangsa Lake Garden 3.3 km 7 mins Hotel Shangri-La Hotel 3.8 km 10 mins The Ritz- Carlton Kuala Lumpur 3.5 km 12 mins
  • 20. 20ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Final Project: A Mini Theme Park Development Proposal Name: Jiji Ng Student ID: 0904Y72861 Tutor: Pn. Hasmanira Mokhtar Course: Foundation in Natural and Built Environment (FNBE) Module: Introduction to the Constructed Industry (QSB30105) Intake: March 2015
  • 21. 21ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR CONTENT 1. Introduction and Objective of the Construction 2. Conceptual Studies 3. Concept and Ideas Sketches 4. Sketch Plan of Proposal 5. Rationale, Benefits and Impacts 6. Professions and Tasks
  • 22. 22ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Introduction I have decided to develop a recreational area on the designated land, 2601 square meter downgradedsite along Jalan Yap Kwan Seng, KLCC, 50450, Kuala Lumpur, Wilayah Persekutuan.I plan to build a mini theme park because it’s surroundedby significant landmarks from the commercial area, educational area and tourism area. The diversity of people in the centre of the city makes the landscape design to be embraced, appreciated, formulatedand publicisedin a harmonization of old-culture patterns – a new make-up for the modernizationand globalization of the world. Nowadays, people in the bustlingcity should came across an extraordinaryatmosphere that increase the productivity of revolutionized world by means of cultural diversity. People needto have confidence about the history of cultural formation which brought forward the cultural differencesinto the global mechanism that changes the world. The communication of this concept starts from the mini theme park that concerns on the blend-culture of a multi-racial country. Objective of the Construction - To entertain the nearby employee with new approachof copingthe growth of multi-culture in the working field. - To nurture the morals of respect towards the cultural art among youngart generations. - To raise awareness of the importance of culture harmonization among professionals in the working field. - To increase public interests on usingnational art culture as an implementation on communication, risk and global management, and professional training.
  • 23. 23ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Conceptual Studies The mini them park reflect the culture and tradition of Malaysian culture. As it located near the national institutions, the park symbolize the culture preferences and nationality of Malaysia. As it situated near the worldwide education centres, international institutions and hotels, the park promote the distinctivenessof national identity to the international hospitality and tourism in Malaysia. As it located near the cemeteries, the park upright the ancestor’s traditional spirit and designed a memorial for their patriotism. As it situated near the other national-class green landscapes,the park serves as an elaboration for the greeneries, establishinga fresh significance – the modernizedcultural and traditional signature of the green spaces in Kuala Lumpur. As it located near the hospitals and medical institutions, the park functions as an extra circulation which communicatespatients to the nature of authenticity that lies within this symbolical landscape of Malaysia.
  • 24. 24ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Concept and Ideas Sketches Sketch Plan of Proposal
  • 25. 25ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Sketch Plan of Proposal
  • 26. 26ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Rationale Accordingto my research and experiencelivingin Malaysia, I aware that in the working field, there are a great deal of graduates who are compassionate about the national art culture or with high spirit of patriotism nurturedby schools. The spirit of this group of people diminishes alongwith the era of politics and cultures in the working field. The mini theme park could stimulated the thoughtsand awareness on these people to take the importance of preservingtheir own interests towards the uniquenessof national culture. Benefits The green landscape of the city is mostly covered with greeneries and the diversity of nature. To create a new generation’s park, I used the essence of culture harmonizationto initiate the new trend in teenagers. They will be attracted to share with, inspire and impress the unconcerned groups. This bringforth the modernizationin the way that can bringharmony, and enlighteningand effective changesto the world that perishingin each second. I also use this culture in teenagers to tackle the outdated thoughts among adults, as to create new potential to adjust themselvesto the new trend of culture in everyday life of the world. Impacts The buildingof this mini theme park creates a networkingrest place that can diffuses the tension, conflicts and anguishes in employees caused by the hectic environment of the working field. This leisure networkingbrings differentway of living to the surroundingareas, as it increases the prospectiveof divergent thinkingamongthe professionals.
  • 27. 27ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Professions and Their Tasks 1. Structural Engineer: Drawplans, examine and plan the structures of rigid features in the park. 2. Landscape architect:Design and coordinate the natural and built environment in the park to create an atmosphere that fulfil the green drive of city. 3. Traditional carpenters: Assist landscape architect in the design of park. Fabricated the rigid features involvingbeams, columns and wooden trims. 4. Constructionmanager: Oversee the constructionproject and supervise the constructionteam. Took responsibility in keeping schedules,delegatingjobs and prioritizing. 5. Material Engineer: Choose and identify the kind of materials that highlighted the quality of the cultural features in Malaysia. 6. Interior Designer: Design and associate the space of interior with new trend of cultural attributes depicted in the exterior design of the park. 7. Quantity Surveyor: Responsible for the cost management meanwhile create a budget balance that maintains the standards and quality of the park. 8. Contractor:Performmultiple fields’ duties in construction sites, hire and coordinate subcontractorssuch as excavation manager, cement and brick masons, constructionlabourers, glaziers et cetera. 9. Local authorities: Ensure the objectives of this landscape design as such is beneficial to the nearby community; ensure this planning and constructionare based on the set of buildingstandard.
  • 28. 28ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Final Project: Fitness Recreation Centre and Commercial Block Development Proposal Name: Leong Li Jing Student ID: 0323628 Tutor: Pn. Hasmanira Mokhtar Course: Foundation in Natural and Built Environment (FNBE) Module: Introduction to the Constructed Industry (QSB30105) Intake: March 2015
  • 29. 29ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR CONTENT 1. Introduction 2. Concept and ideas 3. Sketch plan of proposal 4. Rationale, benefits and impacts 5. Professions involved and tasks 6. Reference list
  • 30. 30ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR INTRODUCTION In this final project, we are given a task to find a specific empty land with a maximum size of 3500m2 to initiate a small construction project on it in a group of two people. For our group, we came out with an outcome to use the empty land located along Jalan Yap Kwan Seng. After surveying, I found that there is no any other place nearer provided for the public to exercise in this area and are forced to take different means of transportation to travel to another places. Thus, I decided to propose a fitness centre on this empty land, which accommodate with commercial block to provide public to enjoy exercising under a complete equipped environment. The land is a waste of space as it was originally a parking area because public seldom use it. Hence, it is good to have a fitness centre and commercial block to put this empty land in a good use. This fitness centre is a one stop place for people that are into sports and fitness. The Fitness Centre is a health, recreational, and social facilitygeared towards exercise, sports, and other physical activities. This is where people can work out and relax and also they can find all types of sports accessories and facilities. This commercial block is a building consists of grocery shops and convenience store. This is much easier and convenience for people to get the needed stuff quickly. Objective of construction - To put the empty land in a good use - To provide a recreation and leisure venue - To provide a standard and high quality sports environment - To provide a comfortable and convenient place which is equipped with complete facilities for exercise - To raise awareness about importance of exercise for health - To improve public interests in sports - To solve the problem of car park
  • 31. 31ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR CONCEPT AND IDEAS The land of site will be fully used for parking area, fitness centre and commercial block. The land outside the fitness centre and commercial block will be remained as car park as the building occupies more spaces. The fitness centre consists of three floors which is basement, ground floor and first floor. The basement is car park because there are not enough land to provide spaces for car park outside the building as it was originally a car park area. Ground floor consists of fitness area, shower and washroom area, office room and waiting area. For the first floor, it consists of gym area, first aid room area and some convenience store. The commercial block consists of basement car park and ground floor. Ground floor consists of convenience stores for commercial purpose.
  • 32. 32ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR SKETCH PLAN OF PROPOSAL Diagram above shows the plan view of the site. The land is occupied with parking area, fitness centre and commercial block. As the original circulation in and out the site is narrow, it changed into bigger entrance and exits for vehicles to avoid traffic congestion.
  • 33. 33ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Diagram above shows the plan view of basement car park. Example of the view of basement car park with entrance and exits.
  • 34. 34ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Diagram above shows the plan view of ground floor. Potential Fitness Centre spaces are numerous and varied. Small facilities may have little more than a fitness area with group exercise room, locker rooms, and a small support/administrative area. Group exercise room/studio. These rooms accommodate organized fitness class activities. Locker rooms and associated functions. These spaces are typically separated by gender and accommodate the basic functions of changing, storing clothes, patron showers, and toilets.
  • 35. 35ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Administrative and support spaces. These staff spaces accommodate the operation and administration of the facility and include Reception/control counter and equipment issue and offices. Lobby entrance. A commercial area is real estate intended for use by for-profit businesses. The building itself consists of convenience store and food court. Food court. Convenience store.
  • 36. 36ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR Diagram above shows the plan view of first floor. Large facilities may add food service and retail spaces, washroom, first aid room, gender-specific gym area, public gym area and child care spaces. Washroom. Juice bar and food service. Sport retail stores.
  • 37. 37ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR First aid room. Fitness spaces. Provide proper impact flooring for each space for fall attenuation and appropriate cushioning for bone and joint health. Visual access for all fitness and gym spaces. Ensure good indoor air quality and natural light.
  • 38. 38ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR RATIONALE, BENEFITS AND IMPACTS Rationale - Distance with other sport and recreation centre is far - Population increased within that area - People surrounding can have a place to work out for stress relief - Awareness of the importance of health raised nowadays - Car park slots need to be added as the circulation will be increased Benefits - Increase aggregate demand of the economy, creating new jobs, thus increasing employment. - Empty land can be functional - Raise awareness about importance of exercise for health - Public interests in sports improved - Provide a nearer fitness centre for public - Stress can be relieved through work out - Have a comfortable fitness centre for people to work out - Completed sport equipment and other facilities - 24 hours operation which allow people exercise in a quiet condition - Car park problem solved with the addition of basement car park - People can get the needed stuff from convenience store easily - First aid area in building increase the safety of the people who work out Impacts - Causes traffic congestion as the road in front of the site is narrow - Rate of pollution may increase - Safety of the area may be decreased as the location is surrounded by commercial buildings such as bank - Direction of wind flow are blocked - Air is not fresh for people who work out because it is located beside highway
  • 39. 39ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR PROFESSIONS INVOLVED AND TASKS 1. Architect - Ascertaining, interpreting and formulating requirements - Coordinate necessary environmental and engineering service to building design - Prepare probable costs and the project timeline - Awarding tenders, contract administration and in helping to obtain Certificate of Fitness for Occupation (CFO) - Administrating building contract – mediating between clients and contractor 2. Client - Co-operative and participative - Understand the construction process 3. Project manager - Ensure maximum efficiency of the construction project - Ability to adapt to the various internal procedures of the contracting party - Ensuring the key issues of cost, time, quality and above all, client satisfaction can be realized. - Plan, organize, evaluate, direct, control and lead project - Produce the end product within the cost schedule, specifications and technical limitations - Fully aware with the ethnical cost and the schedule objectives will be met 4. Contractor - Responsible for the supplying of all materials, labours, equipment and tools necessary - Responsible for the construction execution in accordance with the contract documents 5. Interior designer - Developing initial ideas and acquiring key information about potential projects - Setting project schedules - Considering materials and costs - Sourcing products - Preparing detailed working drawings, designs, plans, models and schemes 6. Quantity surveyor - Conducting feasibility studies to estimatematerials, time and labor costs - Preparing, negotiating and analyzing costs for tenders and contracts - Advising on a range of legal and contractual issues - Valuing completed work and arranging for payments 7. Engineers - Assess its suitability for construction - Develop a brief for the building - Detailed design of the system - Monitor the progress at site and ensure compliant to the design - Manage the maintenance of the services
  • 40. 40ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR 8. Civil engineer - Analyse survey reports, maps, drawings, blueprints, aerial photography, and other topographical or geologic data to plan projects - Plan and design transportation or hydraulic systems and structures, following construction and government standards - Test soil and materials to determine the adequacy and strength of foundations, concrete, asphalt or steel - Conduct studies of traffic patterns or environmental condition to identify engineering problems and assess the potential impact of projects - Provide technical advice regarding design, construction, or program modifications and structural repairs to industrial and managerial personnel - Direct or participate in surveying to lay out installations and establish reference points, grades, and elevations to guide construction - Inspect project sites to monitor progress and ensure conformance to design specification and safety or sanitation standards - Direct construction, operations and maintenance activities at project site 9. Structural engineer - Dealing with the analysis and design of structures that support or resist loads - May design the individual structural elements if a structure - Identifying the loads with act upon structure and the forces and stresses - Advise employer and the architect of the most efficient, economical and practical method of providing their specialist service - Prepare design calculations and material specifications - Prepare detailed drawings within the architect’s design 10.Buildingengineer (mechanical & electrical) - Read and interpret blueprints, technical drawings, schematics and computer- generated reports - Research and analyse design proposals, specifications, manuals, and other data - Confer with engineers and other personnel to implement operating procedures, resolve system malfunctions and provide technical information - Specify system components or direct modification of products to ensure conformance with engineering design and performance specifications - Perform detailed calculations to compute and establish manufacturing, construction and installation in accordance with standards and specifications 11. Authorities - approve and ensure professions are licensed such as first aider - ensure facilities are completed and safe for public
  • 41. 41ICI FINALPROJECT| DEVELOPMENT PROPOSAL|FNBE MARCH 2015 JIJING – 0904Y72861 | LEONG LI JING - 0323628 | PN HASMANIRA MOKHTAR REFERENCES LIST http://www.wbdg.org/design/fitness_centers.php http://www.safeguardeurope.com/applications/undergro und_car_parks