1. ISSUEFORFINALSUBMISSION,Date04/19/17
PROJECTNo.:2017-01
NAITDORMITORY
A0.1 COVER SHEET
A1.1 SITE PLAN
A2.1 MAIN FLOOR PLAN
A2.2 SECOND, THIRD FLOOR PLANS
A2.3 MAIN FLOOR RCP
A3.1 BUILDING ELEVATIONS
A3.2 BUILDING SECTIONS
A4.1 WALL SECTIONS
A5.1 SECTION DETAILS
A6.1 PLAN DETAILS
A7.1 ENLARGED STAIR PLANS - DETAILS
A8.1 ENLARGED PLAN - INTERIOR ELEVATIONS
A9.1 DOORS - WINDOWS SCHEDULES
DRAWING TAG
ELEVATION SYMBOL
SECTION SYMBOLS
GRID SYMBOLS
ROOM NAME/NUMBER TAG
CONSTRUCTION TAG
DOOR TAG
GLAZING TAG
KEYNOTE TAG
DOORSWALLSWINDOWS
SYMBOL LEGEND
NAIT DORMITORY
BUILDING CODE ANALYSIS
S1.1 SECOND FLOOR FRAMING PLAN
S2.1 STRUCTURAL DETAILS
ARCHITECTURAL
STRUCTURAL
DRAWINGS AS PER MECHANICAL
MECHANICAL
DRAWINGS AS PER ELECTRICAL
ELECTRICAL
THUC TRINH
ISSUE FOR FINAL SUBMISSION,
Date: April 19,2017
PROJECT No.1: 2017-01
CONCRETE
MATERIALS LEGEND
EARTH / BACKFILL
GRAVEL
GYPSUM BOARD
RIGID INSULATION
CONCRETE BLOCK
BRICK
BATT INSULATION
PLYWOOD
MEHDI ZAHED
CLASS - X02
COURSE - ARCT2400
00 00
X
A-X
ROOM NAME
ROOM NAME
RMNO
XX
EL. 100 000
TOP OF SLAB
X
A-X
X
A-X
A701
SCALE:
X
A-X
DETAIL
1:100
XXX
XX
SECTION SYMBOLS
GRID SYMBOLS
PRECAST CONCRETE
2. B C D E
1
2
3
4
A GF
SITE PLAN2
KEY PLAN1
PLUG - IN DETAIL3
CL
CURB CUT DETAIL4
SCHOOL OF SUSTAINABLE BUILDING
ARCHITECTURAL TECHNOLOGY
AND ENVIRONMENTAL MANAGEMENT
NAIT
DORMITORY
SITE PLAN
AND
DETAILS
A1.1
4. B C D E
1
2
3
SECOND FLOOR PLAN1
LAUNDRY
SUITE
SUITE
BARRIER FREE
CORRIDOR
4
SUITE SUITE
SUITE
SUITE
COMMON
AREA
ST-2ST-1
A GF
B C D E
1
2
3
THIRD FLOOR PLAN1
LAUNDRY
SUITE
SUITE
BARRIER FREE
CORRIDOR
4
SUITE SUITE
SUITE
SUITE
COMMON
AREA
ST-3ST-1
A GF
WALL CONSTRUCTION
PARTITION CONSTRUCTION
SCHOOL OF SUSTAINABLE BUILDING
ARCHITECTURAL TECHNOLOGY
AND ENVIRONMENTAL MANAGEMENT
NAIT
DORMITORY
SECOND AND
THIRD
FLOOR PLANS
A2.2
6. SOUTH ELEVATION1
NORTH ELEVATION3 EAST ELEVATION4
WEST ELEVATION2
B C D EA GF
1 2 3 4
234 1
BCDE AG F
SCHOOL OF SUSTAINABLE BUILDING
ARCHITECTURAL TECHNOLOGY
AND ENVIRONMENTAL MANAGEMENT
NAIT
DORMITORY
BUILDING
ELEVATIONS
A3.1
7. BUILDING SECTIONA
B C D EA GF
41 2 3
BUILDING SECTIONB
OFFICE
LOBBY
SUITE
SUITE
OFFICE
VEST
LOBBY
VEST
RESTAURANT
CORRIDOR
CORRIDOR
SUITESUITE
SUITE
SUITE
SUITESUITE SUITE
SUITE
WALL CONSTRUCTION
PARTITION CONSTRUCTION
CEILING CONSTRUCTION
FLOOR CONSTRUCTION
PARAPET CONSTRUCTION
ROOF CONSTRUCTION
SOFFIT CONSTRUCTION
SCHOOL OF SUSTAINABLE BUILDING
ARCHITECTURAL TECHNOLOGY
AND ENVIRONMENTAL MANAGEMENT
NAIT
DORMITORY
BUILDING
SECTIONS
A3.2
8. WALL SECTION1 WALL SECTION2
WALL SECTION3
1 1
1
WALL SECTION4
1
PARAPET CONSTRUCTION
CEILING CONSTRUCTION
FLOOR CONSTRUCTION
WALL CONSTRUCTION
ROOF CONSTRUCTION
SOFFIT CONSTRUCTION
SCHOOL OF SUSTAINABLE BUILDING
ARCHITECTURAL TECHNOLOGY
AND ENVIRONMENTAL MANAGEMENT
NAIT
DORMITORY
WALL
SECTIONS
A4.1
9. SECTION DETAIL5
1
SECTION DETAIL2
1
SECTION DETAIL8
1
SECTION DETAIL3
1
SECTION DETAIL6
1
SECTION DETAIL9
1
1
SECTION DETAIL1
SECTION DETAIL4
1
SECTION DETAIL7
WALL CONSTRUCTION
CEILING CONSTRUCTION
FLOOR CONSTRUCTION
ROOF CONSTRUCTION
SOFFIT CONSTRUCTION
PARAPET CONSTRUCTION
SCHOOL OF SUSTAINABLE BUILDING
ARCHITECTURAL TECHNOLOGY
AND ENVIRONMENTAL MANAGEMENT
NAIT
DORMITORY
SECTION
DETAILS
A5.1
10. PLAN DETAIL3
AC
PLAN DETAIL2
A
PLAN DETAIL6
1
PLAN DETAIL4
1
PLAN DETAIL5
B
PLAN DETAIL1
A
3
PLAN DETAIL7
1
PLAN DETAIL8 PLAN DETAIL9
1
C
WALL CONSTRUCTION
PARTITION CONSTRUCTION
SCHOOL OF SUSTAINABLE BUILDING
ARCHITECTURAL TECHNOLOGY
AND ENVIRONMENTAL MANAGEMENT
NAIT
DORMITORY
PLAN
DETAILS
A6.1
11. ST-1
MAIN FLOOR STAIR PLAN3
ST-1
SECOND FLOOR STAIR PLAN2
ST-1
1
A
THIRD FLOOR STAIR PLAN1
2
B
SUITE
SUITE CORRIDOR
A
B
SUITE CORRIDOR
SUITE
A
B
VEST
MEN'S
RESTAURANT
1 2
1 2
STAIR SECTION4
1 2 SCHOOL OF SUSTAINABLE BUILDING
ARCHITECTURAL TECHNOLOGY
AND ENVIRONMENTAL MANAGEMENT
NAIT
DORMITORY
ENLARGED
STAIR PLANS
AND DETAILS
A7.1
SECTION DETAIL5
SECTION DETAIL6
SECTION DETAIL7
12. B C
1
2
WASHROOM PLAN1
VEST
MEN'S
JANITOR
WOMEN'S
VEST
RESTAURANT
WEST INTERIOR ELEVATION5EAST INTERIOR ELEVATION3 SOUTH INTERIOR ELEVATION4
NORTH INTERIOR ELEVATION2
SCHOOL OF SUSTAINABLE BUILDING
ARCHITECTURAL TECHNOLOGY
AND ENVIRONMENTAL MANAGEMENT
NAIT
DORMITORY
ENLARGED PLAN
AND
INTERIOR ELEVATIONS
A8.1
13. ROOM FINISH SCHEDULE
ROOM
NO.:
ROOM NAME
FLOOR BASE NORTH SOUTH EAST WEST CEILING
GENERAL NOTES: FINISH NOTES
DOOR SCHEDULE
MARK DOOR LOCATION
DOOR
TYPE
DOOR
WIDTH
DOOR
HEIGHT
DOOR FRAME
TYPE
FRAME FRAME
DETAIL
RATING HDWR. REMARKS
A B C D E F
1 2 3
4 5 6
SCHOOL OF SUSTAINABLE BUILDING
ARCHITECTURAL TECHNOLOGY
AND ENVIRONMENTAL MANAGEMENT
NAIT
DORMITORY
DOORS
WINDOWS
SCHEDULES
A9.1
WINDOW SCHEDULE1
FRAME SCHEDULE2DOOR SCHEDULE3
14. B C D E F
1
2
3
2ND FLOOR STRUCTURAL PLAN1
A G
GENERAL NOTES
4
SCHOOL OF SUSTAINABLE BUILDING
ARCHITECTURAL TECHNOLOGY
AND ENVIRONMENTAL MANAGEMENT
NAIT
DORMITORY
SECOND FLOOR
STRUCTURAL
FRAMING PLAN
S1.1
15. EXTERIOR BEAM SECTION1
1
INTERIOR BEAM SECTION2
2
ONE-WAY SLAB SECTION4
1 2
INTERIOR COLUMN7
Gr
COLUMN SECTION (TYP.)8A
F
2
COLUMN SECTION (TYP.)8B
Gr
Gr
EXTERIOR BEAM ELEVATION3
C
ONE-WAY JOIST5
Gr
DISTRIBUTION RIBS6
D
SLAB SCHEDULE
BEAM AND JOIST SCHEDULE
SCHOOL OF SUSTAINABLE BUILDING
ARCHITECTURAL TECHNOLOGY
AND ENVIRONMENTAL MANAGEMENT
NAIT
DORMITORY
STRUCTURAL DETAILS
S2.1