SlideShare a Scribd company logo
1 of 12
Download to read offline
Scale
Date
QUARTER
INSTRUCTOR
INSTITUTION
AYAT
ENVIRONMENTAL DESIGN
SERVICES
12/11/20151:15:39PM
ID-000
COVER SHEET
COMMERCIAL
PROJECT
ERIOLA
Author
3,23, 2015
Art Institute of Houston
I-6 DETAILS - ADA CORE RESTROOMS
XXXXX
REVISION#3
REVISION#2
REVISION#1
ORIGINALISSUE
DRAWING NAME
THIRD FLOOR PLAN
THIRD FLOOR POWER PLAN
COVER SHEET/GENERAL NOTES
DETAILS - PARTITION
DETAILED RECEPTION AND BREAK ROOM
THIRD FLOOR FURNITURE PLAN
THIRD FLOOR RCP
REVISION#4
DWG. NO.
1-9
I-0
I-3
1-1
I-7
I-5
I-2
1-4
ORIGINAL ISSUE
REVISED AND REISSUE OF ORIGINAL DRAWINGS
REVISED AND ISSUED ON 8 1/2" X 11" SHEET (S)
INDEX OF DRAWINGS
LONGITUDINAL AND TRANSVERSE BUILDING SECTIONS
I-10 MISCELLANEOUS CAMERA VIEWS
APPROVAL SIGNATURE DATE OF SIGNATURE
3 PAIR BUTTS
1 EACH LATCHSET
3 PAIR BUTTS
1 EACH LOCKSET
1 EACH SURFACE MOUNTED CLOSER
1 EACH DOOR STOP
1 EACH DOOR STOP (FLOOR MOUNTED)
SET "A"
SET "B"
1.
3.
2.
6.
5.
4. ALL DOOR FRAMES TO HAVE BUILDING STANDARD SILENCERS.
REFER TO DOOR SCHEDULE FOR HARDWARE COMBINATIONS.
ALL DOUBLE DOORS ARE TO HAVE DUMMY HARDWARE ON THE INACTIVE LEAF.
ALL DOORS TO BE UNDERCUT 5/8" FOR CARPET CLEARANCE.
ALL DOORS, HARDWARE AND FRAMES ARE TO BE BUILDING STANDARD UNLESS NOTED OTHERWISE.
ALL DOORS IN FIRE RATED WALLS SHALL HAVE HARDWARE AS REQUIRED TO MEET FIRE RATINGS.
DOOR HDWR. COMBINATIONS DOOR NOTES
MULLION
MANUFACTURER
MINIMUM
HORIZONTAL
HEATING, VENTILATION, & AIR CONDITIONING
INFORMATION TO FOLLOW
AMPERE
ABOVE FINISHED FLOOR
CENTER LINE
CEILING
COLUMN
CASED OPENING
H.V.A.C.
HORZ.
I.T.F.
MIN.
MFR.
MUL.
OVER HEAD DOOR
NOT IN CONTRACT
ON CENTER
TELEPHONE BOARD
REFRIGERATOR
SOLID CORE
REQUIRED
SECTION
VERIFY IN FIELD
WITH
VOLT
WITHOUT
VERTICAL
VINYL COMPOSITION TILE
UNLESS NOTED OTHERWISE
STAINLESS STEEL
TB
DOOR
DRAWING
CONTRACTOR
EQUAL
ELEVATION
ELECTRICAL PANEL
ELECTRIC WATER COOLER
ELECTRICAL
W/
V.
GUAGE
FINISH
FIRE HOSE CABINET
FIRE EXTINGUISHER CABINET
HARDWARE
HOLLOW METAL
GYSUM BOARD
GLASS
O.H. DOOR
REF.
O.C.
N.I.C.
REQD.
SECT.
S.S.
U.N.O.
S.C.
V.C.T.
V.I.F.
VERT.
W/O
CONTINUOUS
AMP.
A.F.F.
CL
CLG.
COL.
C.O.
DR.
CONTR.
DWG.
EP
E.W.C.
ELEV.
EQ.
ELEC.
GA.
FIN.
F.H.C.
F.E.C.
HDWR
GYP. BD.
H.M.
GL.
CONT.
ABBREVIATIONS
WATER HEATER
HEATER
WH
HTR.
HT. HEIGHT
WD. WOOD
1.
3.
2.
4.
5.
7.
FABRICATION.
6.
9.
10.
CONTRACTOR.
11.
12.
8.
13.
CONTRACTOR.
15.
14.
16.
17.
DEFECTIVE.
19.
OF THE WORK.
20.
18.
DESIGNER PRIOR TO INSTALLATION (TO BE INCLUDED IN BASE BID OF CONSTRUCTION)
COORDINATE HOLES FOR PLUMBING CLEANOUTS AND ACCESS PANELS WITH INTERIOR
TO PROCEEDING WITH THE WORK.
COORDINATE IN ALL PORTIONS OF THE WORK.
BEHIND, UNLESS NOTED OTHERWISE.
PERMITS AND CERTIFICATES OF OCCUPANCY.
HOURS OF OPERATION, ETC.
ALL CONSTRUCTION TO BE IN COMPLIANCE WITH LEGAL AND LOCAL CODES.
SKILL AND ATTENTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL
OPENED WITHOUT THE USE OF A KEY FROM THE SIDE FROM WHICH EGRESS IS MADE.
ALL CUSTOM CABINET WORK TO BE FURNISHED, DELIVERED, AND INSTALLED BY THE CABINET
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES: AND SHALL
THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK, USING THE CONTRACTOR'S BEST
ALL DOORS USED IN CONJUNCTION WITH EXITS, SHALL BE SO ARRANGED AS TO BE READILY
WHERE DROPPED FASCIA IS INDICATED, GYPSUM BOARD SOFFIT IS TO BE RETURNED TO WALL
CONTRACTOR TO COORDINATE REQUIREMENTS WITH MILLWORKERS.
DO NOT SCALE DRAWINGS, DIMENSIONS GOVERN.
PARTITIONS SHALL BE DIMENSIONED FROM FINISH TO FINISH, UNLESS NOTED OTHERWISE.
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON AT THE JOB SITE
GENERAL CONTRACTOR SHALL REMIT ALL REQUIRED SHOP DRAWINGS (1 SET OF REPRODUCIBLES
CONTRACTOR FOR THE PROJECT SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED BUILDING
AND SHALL NOTIFY INTERIOR DESIGNER OF ANY ERROR, INCONSISTENCY OR OMMISIONS PRIOR
ALL MILLWORK, BLOCKING, GROUNDS, ROUGH BUCKS, AND MISCELLANEOUS BLOCKING TO BE
U.L. APPROVED NON-COMBUSTIBLE MATERIAL IN ACCORDANCE WITH LOCAL MUNICIPAL CODES.
GENERAL CONTRACTOR TO COORDINATE WITH INTERIOR DESIGNER IN REGARD TO BUILDING
AND 1 SET OF BLUE LINE PRINTS) TO INTERIOR DESIGNER FOR APPROVAL PRIOR TO
AT THE TIME OF CONSTRUCTION.
ANYONE NOT SKILLED IN THE TASK ASSIGNED THEM.
PROPER EXECUTION AND COMPLETION OF THE WORK.
WITH THE CONTRACT DOCUMENTS. ALL WORK NOT CONFORMING TO THESE REQUIRMENTS,
THE CONTRACTOR WARRANTS TO THE OWNER THAT ALL MATERIALS AND EQUIPMENT
THE WORK OR PORTIONS THEROF PROVIDED BY THE CONTRACTOR WHICH ARE LEGALLY ENACTED
FURNISHED UNDER THIS CONTRACT WILL BE NEW UNLESS OTHERWISE SPECIFIED, AND THAT ALL
INCLUDING SUBSTITUTIONS NOT PROPERLY APPROVED AND AUTHORIZED, MAY BE CONSIDERED
THE CONTRACTOR SHALL PAY ALL SALES, CONSUMER, USE AND OTHER SIMILAR TAXES FOR
WORK WILL BE OF GOOD QUALITY, FREE FROM FAULTS AND DEFECTS AND IN CONFORMANCE
ANY OTHER PERSONS PERFORMING ANY OF THE WORK UNDER A CONTRACT WITH THE
UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL
AND MACHINERY, TRANSPORTATION, AND OTHER FACILITIES AND SERVICES NECESSARY FOR THE
THE CONTRACTOR SHALL AT ALL TIMES ENFORCE STRICT DICIPLINE AND GOOD ORDER AMONG
THE CONTRACTOR'S EMPLOYEES AND SHALL NOT EMPLOY ON THE WORK ANY UNFIT PERSON OR
PROVIDE AND PAY FOR ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, CONSTRUCTION EQUIPMENT
THE CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES, AND
IN NO WAY RELIEVE THE CONTRACTOR FROM ANY OBLIGATION IN RESECT TO THEIR WORK.
THE CONTRACTOR WILL BE PRESUMED TO HAVE INSPECTED THE SITE AND TO HAVE READ AND
REGULATIONS AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY BEARING ON THE PERFORMANCE
THE CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES,
OR OMISSION OF ANY CONTRACTOR TO EXAMINE ANY FORM, INSTRUMENT OR DOCUMENT SHALL
TO BE THOROUGHLY FAMILIAR WITH PLANS, SPECIFICATIONS, AND DOCUMENTS. THE FAILURE
THE CONTRACTOR SHALL BE RESPONSIBLE TO THE OWNER FOR THE ACTS AND OMISSIONS OF
GENERAL NOTES
EXTERIOR ELEVATIONSI-8
No. Description Date
Room Legend
Break Room
Bull Pen
Common Lobby
Coppy Center
Fire Escape 1
Fire Escape 2
Launge Area
M WC
Maintanance
Office
Overflow Waiting
Area
Reception 1
Room
W WC
Waiting Area 1
Office
1
Office
2
Office
3
Coppy Center
37
Overflow Waiting
Area
38
Waiting Area 1
39
Reception 1
40
Bull Pen
35
Fire Escape 1
59
Launge Area
34
Break Room
33
Maintanance
48
W WC
50
M WC
51
Common Lobby
60
Fire Escape 2
58
Scale
Date
QUARTER
INSTRUCTOR
INSTITUTION
AYAT
ENVIRONMENTAL DESIGN
SERVICES
3/16" = 1'-0"
12/11/20151:20:14PM
ID-100
ROOM LEGEND
COMMERCIAL
PROJECT
Checker
Author
3,23, 2015
Art Institute of Houston
3/16" = 1'-0"
1
ROOM LEGEND
No. Description Date
ID-200
2
ID-2001
A
AA
A
A
A A A
A A
A
1
ID-300
ID-400
1
Office
3
Office
2
Office
1
Break Room
33
Launge Area
34
Bull Pen
35
Coppy Center
37
Overflow Waiting
Area
38
Waiting Area 1
39
Reception 1
40
Maintanance
48
W WC
50
M WC
51
Fire Escape 2
58
Fire Escape 1
59
Common Lobby
60
Room
61
5' - 5" 9' - 6 1/4" 9' - 8 1/2" 16' - 10" 17' - 0"53' - 3 3/4" 5' - 5"
14'-0"14'-61/4"
16' - 10" 17' - 9 3/4"
2
ID-300
Scale
Date
QUARTER
INSTRUCTOR
INSTITUTION
AYAT
ENVIRONMENTAL DESIGN
SERVICES
3/16" = 1'-0"
12/11/20151:21:17PM
ID-101
FLOOR PLAN
COMMERCIAL
PROJECT
Checker
Author
3,23, 2015
Art Institute of Houston
ARCHITECTURAL NOTES
1. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO PRICING
AND CONSTRUCTION.
2. CONTRACTOR SHALL PROVIDE AND INSTALL BLOCKING AS REQUIRED IN ALL
WALLS WITH NEW SHELVING AND MILLWORK.
3. ALL DOORS ARE TO HAVE 6" RETURNS UNLESS NOTED OTHERWISE.
150 SF
Room name
101
DRAWING NUMBER
SHEET NUMBER
A101
1DRAWING NUMBER
SHEET NUMBER
DRAWING NUMBER
SHEET NUMBER
EXTERIOR ELEVATION (NORTH, SOUTH, EAST, OR WEST)
TRANSVERSE OR LONGITUDINAL SECTION FLAGS
NORTH ARROW
DOOR TAG (REFER TO DOOR SCHEDULE)ENLARGED PLAN CALLOUT AREA
ROOM / AREA TAG
FLOOR PLAN SYMBOL LEGEND
SIM
A101
1
SIM
1
A101
1t WINDOW TAG (REFER TO WINDOW SCHEDULE)
3RD DOOR SCHEDULE
Type Mark Count Type Description Width Height Finish
Frame
Material Function Level
A 14 36" x 84" SINGLE-FLUSH 3' - 0" 7' - 0" Interior Level 3
E 1 5'-4"W. x
7'-2"H.
2' - 8" 7' - 2" Interior Level 3
F 1 30" x 84" 2' - 6" 7' - 0" Interior Level 3
3/16" = 1'-0"
1
FLOOR PLAN
No. Description Date
Office
3
Office
2
Office
1
Break Room
33
Launge Area
34
Bull Pen
35
Coppy Center
37
Overflow Waiting
Area
38
Waiting Area 1
39
Reception 1
40
Maintanance
48
W WC
50
M WC
51
Fire Escape 2
58
Fire Escape 1
59
Common Lobby
60
Room
61
01 01 01 01
01010101
020202
010101
03 0304 04
0404
05
06
06
06
06
06
06
04
03
04
07
08
09 09 09 09 09
10
10
17
16
01
26 26
26 26 26
26
2626
26 26 2626
272727 27
272727 27
31
31
2828
30
Scale
Date
QUARTER
INSTRUCTOR
INSTITUTION
AYAT
ENVIRONMENTAL DESIGN
SERVICES
3/16" = 1'-0"
12/11/20151:21:58PM
ID-102
FURNITURE PLAN
COMMERCIAL
PROJECT
Checker
Author
3,23, 2015
Art Institute of Houston
3/16" = 1'-0"
1
FURNITURE PLAN
No. Description Date
Scale
Date
QUARTER
INSTRUCTOR
INSTITUTION
AYAT
ENVIRONMENTAL DESIGN
SERVICES
3/16" = 1'-0"
12/11/20151:22:21PM
ID-103
POWER PLAN
COMMERCIAL
PROJECT
Checker
Author
3,23, 2015
Art Institute of Houston
3/16" = 1'-0"
1
POWER PLAN
No. Description Date
33
Scale
Date
QUARTER
INSTRUCTOR
INSTITUTION
AYAT
ENVIRONMENTAL DESIGN
SERVICES
3/16" = 1'-0"
12/11/20151:22:39PM
ID-104
RCP
COMMERCIAL
PROJECT
Checker
Author
3,23, 2015
Art Institute of Houston
3/16" = 1'-0"
1
LEVEL 3
No. Description Date
Level 1
0"
Roof
36' - 0"
Level 2
12' - 0"
Level 3
24' - 0"
2
ID-300
Level 1
0"
Roof
36' - 0"
Level 2
12' - 0"
Level 3
24' - 0"
4'-0"
Scale
Date
QUARTER
INSTRUCTOR
INSTITUTION
AYAT
ENVIRONMENTAL DESIGN
SERVICES
3/16" = 1'-0"
12/11/20151:23:51PM
ID-200
EXTERIOR
ELEVATIONS
COMMERCIAL
PROJECT
Checker
Author
3,23, 2015
Art Institute of Houston
3/16" = 1'-0"
1
EAST
3/16" = 1'-0"
2
SOUTH
No. Description Date
Level 1
0"
Roof
36' - 0"
Level 2
12' - 0"
Level 3
24' - 0"
2
ID-300
Level 1
0"
Roof
36' - 0"
Level 2
12' - 0"
Level 3
24' - 0"
1
ID-300
Scale
Date
QUARTER
INSTRUCTOR
INSTITUTION
AYAT
ENVIRONMENTAL DESIGN
SERVICES
3/16" = 1'-0"
12/11/20151:24:23PM
ID-300
BUILDING
SECTIONS
COMMERCIAL
PROJECT
Checker
Author
3,23, 2015
Art Institute of Houston
3/16" = 1'-0"
1
TRANSVERSE
3/16" = 1'-0"
2
Section 1
No. Description Date
ID-4002
2
ID-300
Level 3
24' - 0"
2
ID-300
Scale
Date
QUARTER
INSTRUCTOR
INSTITUTION
AYAT
ENVIRONMENTAL DESIGN
SERVICES
As indicated
12/11/20151:24:50PM
ID-400
ENLARGED PLANS
AND ELEVATIONS
COMMERCIAL
PROJECT
Checker
Author
3,23, 2015
Art Institute of Houston3/8" = 1'-0"
1
MENS BATHROOM
1/2" = 1'-0"
2
ADA MENS BATHROOM
No. Description Date
Scale
Date
QUARTER
INSTRUCTOR
INSTITUTION
AYAT
ENVIRONMENTAL DESIGN
SERVICES
12/11/20151:25:48PM
ID-500
DETAILS
COMMERCIAL
PROJECT
Checker
Author
3,23, 2015
Art Institute of Houston
No. Description Date
Scale
Date
QUARTER
INSTRUCTOR
INSTITUTION
AYAT
ENVIRONMENTAL DESIGN
SERVICES
12/11/20151:26:40PM
ID-600
SCHEDULES AND
DIAGRAMS
COMMERCIAL
PROJECT
Checker
Author
3,23, 2015
Art Institute of Houston
3rd floor Furniture System Schedule
e Type Count
27 96" x 96" 8
28 66w 2
30 72" x One
and One
Half High
1
31 Standard 2
Grand total: 13
3RDFLOOR FURNITURE PLAN
Type Mark Family and Type Count
111
01 Haworth_Chair_Zody-Task: Height Adjustable Arms 12
02 Modern_Office_Desk_8428: Modern_Office_Desk_8428 3
03 Haworth_Collaborate_Table_Round: 18 High - 4 Star
Base
3
04 Haworth_Chair_Crossoft: No Arms 6
05 Haworth_Chair_Elan-Lounge: 3 Seater Wide 1
6 Table-Dining1: 24" x 36" x 36" 1
06 Chair-Breuer: Chair-Breuer 6
07 Modern_Buffet_w_Glass_Center_7283: Buffet 1
8 Commercial_Sink_1: Commercial Sink Flexible 1
08 Modern_Reception_Desk_9191: modern reception 1
9 Commercial_Kitchen_Prep_Table_1:
Commercial_Kitchen_Prep_Table_8425
6
09 Waiting_Room_Chair_-_Single_2811:
Waiting_Room_Chair_-_Single_2811
5
10 Dining_Table_w_2Chair - Copy: 762 mm x 1525 mm 2
16 Shelving: 96" x 12" x 84" 1
17 Shelving: 36" x 10" x 72" 1
20 Stool - Bar: Bar Stool 6
26 iMac_20quot_Intel_Computer_4508:
iMac_20quot_Intel_Computer_4508
12
Grand total: 179
Door Schedule
Door
Number Type
Door
Fire Rating Hardware
Frame
CommentsWidth Height Thickness Material Finish Under Cut Type Material Finish Jamb Head
71 A 3' - 0" 7' - 0" 2"
72 A 3' - 0" 7' - 0" 2"
73 A 3' - 0" 7' - 0" 2"
74 A 3' - 0" 7' - 0" 2"
75 A 3' - 0" 7' - 0" 2"
76 A 3' - 0" 7' - 0" 2"
77 A 3' - 0" 7' - 0" 2"
79 A 3' - 0" 7' - 0" 2"
80 A 3' - 0" 7' - 0" 2"
81 A 3' - 0" 7' - 0" 2"
91 A 3' - 0" 7' - 0" 2"
96 A 3' - 0" 7' - 0" 2"
97 A 3' - 0" 7' - 0" 2"
103 F 2' - 6" 7' - 0" 2"
104 E 2' - 8" 7' - 2"
105 A 3' - 0" 7' - 0" 2"
FURNITURE SCHEDULE
Type Mark Type Description Count
111
01 Height Adjustable Arms Haworth_Chair_Zody-Task 12
02 Modern_Office_Desk_8428 3
03 18 High - 4 Star Base Haworth_Collaborate_Table_Round 3
04 No Arms Haworth_Chair_Crossoft 6
05 3 Seater Wide Haworth_Chair_Elan-Lounge 1
6 24" x 36" x 36" TABLE DINING 1
06 Chair-Breuer 6
07 Buffet BUFFET WITH GLASS CENTER 1
8 Commercial Sink Flexible COMMERCIAL SINK 1
08 modern reception 1
9 Commercial_Kitchen_Prep_Table_8425 STAINLESS STEEL PREP TABLE 6
09 Waiting_Room_Chair_-_Single_2811 GUEST CHAIR 5
10 762 mm x 1525 mm 2
16 96" x 12" x 84" 1
17 36" x 10" x 72" 1
20 Bar Stool 6
26 iMac_20quot_Intel_Computer_4508 12
Grand total: 179 179
No. Description Date
Scale
Date
QUARTER
INSTRUCTOR
INSTITUTION
AYAT
ENVIRONMENTAL DESIGN
SERVICES
12/11/20151:27:22PM
ID-900
3D
VIZUALIZATIONS
COMMERCIAL
PROJECT
Checker
Author
3,23, 2015
Art Institute of Houston
1
COUNSELOR OFFICE
2
RECEPTION2
3
RECEPTION
4
DIRECTORS OFFICE
No. Description Date

More Related Content

What's hot

BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksMaja Myall
 
Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603Shin Kameyama
 
The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15Antoinette Pope
 
KASSIN TRELLIS
KASSIN TRELLISKASSIN TRELLIS
KASSIN TRELLISSean Roper
 
bdorsey_MassTimber_FinalCDs
bdorsey_MassTimber_FinalCDsbdorsey_MassTimber_FinalCDs
bdorsey_MassTimber_FinalCDsBryan Dorsey
 
BURTON REMODEL 10-07-16
BURTON REMODEL 10-07-16BURTON REMODEL 10-07-16
BURTON REMODEL 10-07-16Cesar Salinas
 
Work samples TALA JAZZY
Work samples TALA JAZZYWork samples TALA JAZZY
Work samples TALA JAZZYTala Jazzy
 
159_TOMPKINS_residential 8X11
159_TOMPKINS_residential 8X11159_TOMPKINS_residential 8X11
159_TOMPKINS_residential 8X11Gerald E. Marquez
 
Reach - Brickell City Centre Floorplans
Reach - Brickell City Centre FloorplansReach - Brickell City Centre Floorplans
Reach - Brickell City Centre FloorplansMiami Luxury Homes
 
ELLIS_K_ARC541_FINAL_PANEL_SET_edit
ELLIS_K_ARC541_FINAL_PANEL_SET_editELLIS_K_ARC541_FINAL_PANEL_SET_edit
ELLIS_K_ARC541_FINAL_PANEL_SET_editKristen Ellis
 
BAKER_Week8Project6Officedesigncontinue
BAKER_Week8Project6OfficedesigncontinueBAKER_Week8Project6Officedesigncontinue
BAKER_Week8Project6OfficedesigncontinueChristopher Baker
 

What's hot (18)

22
2222
22
 
TechTown 1st Floor Renovation
TechTown 1st Floor RenovationTechTown 1st Floor Renovation
TechTown 1st Floor Renovation
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders Works
 
Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603
 
Final printout
Final printoutFinal printout
Final printout
 
KASSIN GYM
KASSIN GYMKASSIN GYM
KASSIN GYM
 
Bryant Residence
Bryant ResidenceBryant Residence
Bryant Residence
 
The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15
 
KASSIN TRELLIS
KASSIN TRELLISKASSIN TRELLIS
KASSIN TRELLIS
 
bdorsey_MassTimber_FinalCDs
bdorsey_MassTimber_FinalCDsbdorsey_MassTimber_FinalCDs
bdorsey_MassTimber_FinalCDs
 
Gem residences
Gem residencesGem residences
Gem residences
 
BURTON REMODEL 10-07-16
BURTON REMODEL 10-07-16BURTON REMODEL 10-07-16
BURTON REMODEL 10-07-16
 
Work samples TALA JAZZY
Work samples TALA JAZZYWork samples TALA JAZZY
Work samples TALA JAZZY
 
159_TOMPKINS_residential 8X11
159_TOMPKINS_residential 8X11159_TOMPKINS_residential 8X11
159_TOMPKINS_residential 8X11
 
Reach - Brickell City Centre Floorplans
Reach - Brickell City Centre FloorplansReach - Brickell City Centre Floorplans
Reach - Brickell City Centre Floorplans
 
New Residence in Sullivan County, NY
New Residence in Sullivan County, NYNew Residence in Sullivan County, NY
New Residence in Sullivan County, NY
 
ELLIS_K_ARC541_FINAL_PANEL_SET_edit
ELLIS_K_ARC541_FINAL_PANEL_SET_editELLIS_K_ARC541_FINAL_PANEL_SET_edit
ELLIS_K_ARC541_FINAL_PANEL_SET_edit
 
BAKER_Week8Project6Officedesigncontinue
BAKER_Week8Project6OfficedesigncontinueBAKER_Week8Project6Officedesigncontinue
BAKER_Week8Project6Officedesigncontinue
 

Viewers also liked

DAP Fisheries Reform
DAP Fisheries ReformDAP Fisheries Reform
DAP Fisheries Reformmingng
 
Commercial Design Project
Commercial Design ProjectCommercial Design Project
Commercial Design Projectdezyneecole
 
Kalamazoo Nature Center
Kalamazoo Nature CenterKalamazoo Nature Center
Kalamazoo Nature CenterCurt Clayton
 
Suny Cortland Recreational Sports Spm466 Final Project
Suny Cortland Recreational Sports Spm466 Final ProjectSuny Cortland Recreational Sports Spm466 Final Project
Suny Cortland Recreational Sports Spm466 Final Projectnickw8081
 
Project 2 (Springfield, MA) - Assessing Low Income And Recreational Areas
Project 2 (Springfield, MA) - Assessing Low Income And Recreational AreasProject 2 (Springfield, MA) - Assessing Low Income And Recreational Areas
Project 2 (Springfield, MA) - Assessing Low Income And Recreational Areasguestcab2225
 
Proposal on recreational activity center
Proposal on recreational activity centerProposal on recreational activity center
Proposal on recreational activity centerDiLip ChauDhary
 
Recreation & leisure
Recreation & leisureRecreation & leisure
Recreation & leisureBean Malicse
 
Recreational spaces
Recreational spacesRecreational spaces
Recreational spaceshushaam
 
Thesis presentation 2013
Thesis presentation 2013Thesis presentation 2013
Thesis presentation 2013ROHIT SINGLA
 

Viewers also liked (10)

DAP Fisheries Reform
DAP Fisheries ReformDAP Fisheries Reform
DAP Fisheries Reform
 
Commercial Design Project
Commercial Design ProjectCommercial Design Project
Commercial Design Project
 
Kalamazoo Nature Center
Kalamazoo Nature CenterKalamazoo Nature Center
Kalamazoo Nature Center
 
Suny Cortland Recreational Sports Spm466 Final Project
Suny Cortland Recreational Sports Spm466 Final ProjectSuny Cortland Recreational Sports Spm466 Final Project
Suny Cortland Recreational Sports Spm466 Final Project
 
Project 2 (Springfield, MA) - Assessing Low Income And Recreational Areas
Project 2 (Springfield, MA) - Assessing Low Income And Recreational AreasProject 2 (Springfield, MA) - Assessing Low Income And Recreational Areas
Project 2 (Springfield, MA) - Assessing Low Income And Recreational Areas
 
ACADEMIC WORK PORTFOLIO
ACADEMIC WORK PORTFOLIOACADEMIC WORK PORTFOLIO
ACADEMIC WORK PORTFOLIO
 
Proposal on recreational activity center
Proposal on recreational activity centerProposal on recreational activity center
Proposal on recreational activity center
 
Recreation & leisure
Recreation & leisureRecreation & leisure
Recreation & leisure
 
Recreational spaces
Recreational spacesRecreational spaces
Recreational spaces
 
Thesis presentation 2013
Thesis presentation 2013Thesis presentation 2013
Thesis presentation 2013
 

Similar to Commercial project

Final Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur IndiaFinal Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur IndiaNIZAM ISMAIL
 
Working drawing of the civil engineering building, Faculty of Engineering, Ta...
Working drawing of the civil engineering building, Faculty of Engineering, Ta...Working drawing of the civil engineering building, Faculty of Engineering, Ta...
Working drawing of the civil engineering building, Faculty of Engineering, Ta...Ahmed El Ashry
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdfMin Khant Kyaw
 
Item vi.a. doyle street mews pc 09 28-2017
Item vi.a. doyle street mews pc 09 28-2017Item vi.a. doyle street mews pc 09 28-2017
Item vi.a. doyle street mews pc 09 28-2017E'ville Eye
 
NMohamed_PortfolioExtract
NMohamed_PortfolioExtractNMohamed_PortfolioExtract
NMohamed_PortfolioExtractNazima Mohamed
 
DCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfDCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfRoshelleStahl1
 
Farmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeFarmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeRichard Clark
 
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309Altamash Khan
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignmentashleyyeap
 
Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Sean Roper
 
North Campus Parking Garage
North Campus Parking GarageNorth Campus Parking Garage
North Campus Parking GarageTurner Solterman
 
Final Construction Documents
Final Construction DocumentsFinal Construction Documents
Final Construction DocumentsKaitlin Mergler
 
01 architectural cycle 2 interactive
01 architectural   cycle 2 interactive01 architectural   cycle 2 interactive
01 architectural cycle 2 interactivesergencad sergencad
 
PL-KE019 REPLACE RUNWAY AIRFIELD LIGHTING KEWANEE AIRPORT AUTHORITY KEWANEE M...
PL-KE019 REPLACE RUNWAY AIRFIELD LIGHTING KEWANEE AIRPORT AUTHORITY KEWANEE M...PL-KE019 REPLACE RUNWAY AIRFIELD LIGHTING KEWANEE AIRPORT AUTHORITY KEWANEE M...
PL-KE019 REPLACE RUNWAY AIRFIELD LIGHTING KEWANEE AIRPORT AUTHORITY KEWANEE M...YosefChabud1
 
Holly Hill Drive Plans 4-11-13
Holly Hill Drive Plans 4-11-13Holly Hill Drive Plans 4-11-13
Holly Hill Drive Plans 4-11-13Chad Henry
 

Similar to Commercial project (20)

PROFOLYO
PROFOLYOPROFOLYO
PROFOLYO
 
Final Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur IndiaFinal Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur India
 
Working drawing of the civil engineering building, Faculty of Engineering, Ta...
Working drawing of the civil engineering building, Faculty of Engineering, Ta...Working drawing of the civil engineering building, Faculty of Engineering, Ta...
Working drawing of the civil engineering building, Faculty of Engineering, Ta...
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
 
Item vi.a. doyle street mews pc 09 28-2017
Item vi.a. doyle street mews pc 09 28-2017Item vi.a. doyle street mews pc 09 28-2017
Item vi.a. doyle street mews pc 09 28-2017
 
Plan addendum sheets
Plan addendum sheetsPlan addendum sheets
Plan addendum sheets
 
Plan addendum sheets
Plan addendum  sheetsPlan addendum  sheets
Plan addendum sheets
 
NMohamed_PortfolioExtract
NMohamed_PortfolioExtractNMohamed_PortfolioExtract
NMohamed_PortfolioExtract
 
DCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfDCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdf
 
Farmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeFarmers Agoura Hills CEO Office
Farmers Agoura Hills CEO Office
 
SAMPLE PORTFOLIO
SAMPLE PORTFOLIOSAMPLE PORTFOLIO
SAMPLE PORTFOLIO
 
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
 
KFC - Surprise, AZ
KFC - Surprise, AZKFC - Surprise, AZ
KFC - Surprise, AZ
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
 
Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)
 
North Campus Parking Garage
North Campus Parking GarageNorth Campus Parking Garage
North Campus Parking Garage
 
Final Construction Documents
Final Construction DocumentsFinal Construction Documents
Final Construction Documents
 
01 architectural cycle 2 interactive
01 architectural   cycle 2 interactive01 architectural   cycle 2 interactive
01 architectural cycle 2 interactive
 
PL-KE019 REPLACE RUNWAY AIRFIELD LIGHTING KEWANEE AIRPORT AUTHORITY KEWANEE M...
PL-KE019 REPLACE RUNWAY AIRFIELD LIGHTING KEWANEE AIRPORT AUTHORITY KEWANEE M...PL-KE019 REPLACE RUNWAY AIRFIELD LIGHTING KEWANEE AIRPORT AUTHORITY KEWANEE M...
PL-KE019 REPLACE RUNWAY AIRFIELD LIGHTING KEWANEE AIRPORT AUTHORITY KEWANEE M...
 
Holly Hill Drive Plans 4-11-13
Holly Hill Drive Plans 4-11-13Holly Hill Drive Plans 4-11-13
Holly Hill Drive Plans 4-11-13
 

More from Ayat Aljafar

More from Ayat Aljafar (10)

interior design
interior designinterior design
interior design
 
TYPOGRAPHY TRADITIONAL
TYPOGRAPHY TRADITIONALTYPOGRAPHY TRADITIONAL
TYPOGRAPHY TRADITIONAL
 
AYAT BYC
AYAT BYCAYAT BYC
AYAT BYC
 
DTG270 ASSEMBLY DRAWING IDEAS
DTG270 ASSEMBLY DRAWING IDEASDTG270 ASSEMBLY DRAWING IDEAS
DTG270 ASSEMBLY DRAWING IDEAS
 
DTG 210 Co Ai Indesterial Design
DTG 210 Co Ai Indesterial DesignDTG 210 Co Ai Indesterial Design
DTG 210 Co Ai Indesterial Design
 
FOTOFEST PROJECT
FOTOFEST PROJECTFOTOFEST PROJECT
FOTOFEST PROJECT
 
APPLE
APPLEAPPLE
APPLE
 
cellphone 2
cellphone 2cellphone 2
cellphone 2
 
CAMERA
CAMERACAMERA
CAMERA
 
Thai House Presentation
Thai House PresentationThai House Presentation
Thai House Presentation
 

Commercial project

  • 1. Scale Date QUARTER INSTRUCTOR INSTITUTION AYAT ENVIRONMENTAL DESIGN SERVICES 12/11/20151:15:39PM ID-000 COVER SHEET COMMERCIAL PROJECT ERIOLA Author 3,23, 2015 Art Institute of Houston I-6 DETAILS - ADA CORE RESTROOMS XXXXX REVISION#3 REVISION#2 REVISION#1 ORIGINALISSUE DRAWING NAME THIRD FLOOR PLAN THIRD FLOOR POWER PLAN COVER SHEET/GENERAL NOTES DETAILS - PARTITION DETAILED RECEPTION AND BREAK ROOM THIRD FLOOR FURNITURE PLAN THIRD FLOOR RCP REVISION#4 DWG. NO. 1-9 I-0 I-3 1-1 I-7 I-5 I-2 1-4 ORIGINAL ISSUE REVISED AND REISSUE OF ORIGINAL DRAWINGS REVISED AND ISSUED ON 8 1/2" X 11" SHEET (S) INDEX OF DRAWINGS LONGITUDINAL AND TRANSVERSE BUILDING SECTIONS I-10 MISCELLANEOUS CAMERA VIEWS APPROVAL SIGNATURE DATE OF SIGNATURE 3 PAIR BUTTS 1 EACH LATCHSET 3 PAIR BUTTS 1 EACH LOCKSET 1 EACH SURFACE MOUNTED CLOSER 1 EACH DOOR STOP 1 EACH DOOR STOP (FLOOR MOUNTED) SET "A" SET "B" 1. 3. 2. 6. 5. 4. ALL DOOR FRAMES TO HAVE BUILDING STANDARD SILENCERS. REFER TO DOOR SCHEDULE FOR HARDWARE COMBINATIONS. ALL DOUBLE DOORS ARE TO HAVE DUMMY HARDWARE ON THE INACTIVE LEAF. ALL DOORS TO BE UNDERCUT 5/8" FOR CARPET CLEARANCE. ALL DOORS, HARDWARE AND FRAMES ARE TO BE BUILDING STANDARD UNLESS NOTED OTHERWISE. ALL DOORS IN FIRE RATED WALLS SHALL HAVE HARDWARE AS REQUIRED TO MEET FIRE RATINGS. DOOR HDWR. COMBINATIONS DOOR NOTES MULLION MANUFACTURER MINIMUM HORIZONTAL HEATING, VENTILATION, & AIR CONDITIONING INFORMATION TO FOLLOW AMPERE ABOVE FINISHED FLOOR CENTER LINE CEILING COLUMN CASED OPENING H.V.A.C. HORZ. I.T.F. MIN. MFR. MUL. OVER HEAD DOOR NOT IN CONTRACT ON CENTER TELEPHONE BOARD REFRIGERATOR SOLID CORE REQUIRED SECTION VERIFY IN FIELD WITH VOLT WITHOUT VERTICAL VINYL COMPOSITION TILE UNLESS NOTED OTHERWISE STAINLESS STEEL TB DOOR DRAWING CONTRACTOR EQUAL ELEVATION ELECTRICAL PANEL ELECTRIC WATER COOLER ELECTRICAL W/ V. GUAGE FINISH FIRE HOSE CABINET FIRE EXTINGUISHER CABINET HARDWARE HOLLOW METAL GYSUM BOARD GLASS O.H. DOOR REF. O.C. N.I.C. REQD. SECT. S.S. U.N.O. S.C. V.C.T. V.I.F. VERT. W/O CONTINUOUS AMP. A.F.F. CL CLG. COL. C.O. DR. CONTR. DWG. EP E.W.C. ELEV. EQ. ELEC. GA. FIN. F.H.C. F.E.C. HDWR GYP. BD. H.M. GL. CONT. ABBREVIATIONS WATER HEATER HEATER WH HTR. HT. HEIGHT WD. WOOD 1. 3. 2. 4. 5. 7. FABRICATION. 6. 9. 10. CONTRACTOR. 11. 12. 8. 13. CONTRACTOR. 15. 14. 16. 17. DEFECTIVE. 19. OF THE WORK. 20. 18. DESIGNER PRIOR TO INSTALLATION (TO BE INCLUDED IN BASE BID OF CONSTRUCTION) COORDINATE HOLES FOR PLUMBING CLEANOUTS AND ACCESS PANELS WITH INTERIOR TO PROCEEDING WITH THE WORK. COORDINATE IN ALL PORTIONS OF THE WORK. BEHIND, UNLESS NOTED OTHERWISE. PERMITS AND CERTIFICATES OF OCCUPANCY. HOURS OF OPERATION, ETC. ALL CONSTRUCTION TO BE IN COMPLIANCE WITH LEGAL AND LOCAL CODES. SKILL AND ATTENTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL OPENED WITHOUT THE USE OF A KEY FROM THE SIDE FROM WHICH EGRESS IS MADE. ALL CUSTOM CABINET WORK TO BE FURNISHED, DELIVERED, AND INSTALLED BY THE CABINET CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES: AND SHALL THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK, USING THE CONTRACTOR'S BEST ALL DOORS USED IN CONJUNCTION WITH EXITS, SHALL BE SO ARRANGED AS TO BE READILY WHERE DROPPED FASCIA IS INDICATED, GYPSUM BOARD SOFFIT IS TO BE RETURNED TO WALL CONTRACTOR TO COORDINATE REQUIREMENTS WITH MILLWORKERS. DO NOT SCALE DRAWINGS, DIMENSIONS GOVERN. PARTITIONS SHALL BE DIMENSIONED FROM FINISH TO FINISH, UNLESS NOTED OTHERWISE. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON AT THE JOB SITE GENERAL CONTRACTOR SHALL REMIT ALL REQUIRED SHOP DRAWINGS (1 SET OF REPRODUCIBLES CONTRACTOR FOR THE PROJECT SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED BUILDING AND SHALL NOTIFY INTERIOR DESIGNER OF ANY ERROR, INCONSISTENCY OR OMMISIONS PRIOR ALL MILLWORK, BLOCKING, GROUNDS, ROUGH BUCKS, AND MISCELLANEOUS BLOCKING TO BE U.L. APPROVED NON-COMBUSTIBLE MATERIAL IN ACCORDANCE WITH LOCAL MUNICIPAL CODES. GENERAL CONTRACTOR TO COORDINATE WITH INTERIOR DESIGNER IN REGARD TO BUILDING AND 1 SET OF BLUE LINE PRINTS) TO INTERIOR DESIGNER FOR APPROVAL PRIOR TO AT THE TIME OF CONSTRUCTION. ANYONE NOT SKILLED IN THE TASK ASSIGNED THEM. PROPER EXECUTION AND COMPLETION OF THE WORK. WITH THE CONTRACT DOCUMENTS. ALL WORK NOT CONFORMING TO THESE REQUIRMENTS, THE CONTRACTOR WARRANTS TO THE OWNER THAT ALL MATERIALS AND EQUIPMENT THE WORK OR PORTIONS THEROF PROVIDED BY THE CONTRACTOR WHICH ARE LEGALLY ENACTED FURNISHED UNDER THIS CONTRACT WILL BE NEW UNLESS OTHERWISE SPECIFIED, AND THAT ALL INCLUDING SUBSTITUTIONS NOT PROPERLY APPROVED AND AUTHORIZED, MAY BE CONSIDERED THE CONTRACTOR SHALL PAY ALL SALES, CONSUMER, USE AND OTHER SIMILAR TAXES FOR WORK WILL BE OF GOOD QUALITY, FREE FROM FAULTS AND DEFECTS AND IN CONFORMANCE ANY OTHER PERSONS PERFORMING ANY OF THE WORK UNDER A CONTRACT WITH THE UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL AND MACHINERY, TRANSPORTATION, AND OTHER FACILITIES AND SERVICES NECESSARY FOR THE THE CONTRACTOR SHALL AT ALL TIMES ENFORCE STRICT DICIPLINE AND GOOD ORDER AMONG THE CONTRACTOR'S EMPLOYEES AND SHALL NOT EMPLOY ON THE WORK ANY UNFIT PERSON OR PROVIDE AND PAY FOR ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, CONSTRUCTION EQUIPMENT THE CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES, AND IN NO WAY RELIEVE THE CONTRACTOR FROM ANY OBLIGATION IN RESECT TO THEIR WORK. THE CONTRACTOR WILL BE PRESUMED TO HAVE INSPECTED THE SITE AND TO HAVE READ AND REGULATIONS AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY BEARING ON THE PERFORMANCE THE CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, OR OMISSION OF ANY CONTRACTOR TO EXAMINE ANY FORM, INSTRUMENT OR DOCUMENT SHALL TO BE THOROUGHLY FAMILIAR WITH PLANS, SPECIFICATIONS, AND DOCUMENTS. THE FAILURE THE CONTRACTOR SHALL BE RESPONSIBLE TO THE OWNER FOR THE ACTS AND OMISSIONS OF GENERAL NOTES EXTERIOR ELEVATIONSI-8 No. Description Date
  • 2. Room Legend Break Room Bull Pen Common Lobby Coppy Center Fire Escape 1 Fire Escape 2 Launge Area M WC Maintanance Office Overflow Waiting Area Reception 1 Room W WC Waiting Area 1 Office 1 Office 2 Office 3 Coppy Center 37 Overflow Waiting Area 38 Waiting Area 1 39 Reception 1 40 Bull Pen 35 Fire Escape 1 59 Launge Area 34 Break Room 33 Maintanance 48 W WC 50 M WC 51 Common Lobby 60 Fire Escape 2 58 Scale Date QUARTER INSTRUCTOR INSTITUTION AYAT ENVIRONMENTAL DESIGN SERVICES 3/16" = 1'-0" 12/11/20151:20:14PM ID-100 ROOM LEGEND COMMERCIAL PROJECT Checker Author 3,23, 2015 Art Institute of Houston 3/16" = 1'-0" 1 ROOM LEGEND No. Description Date
  • 3. ID-200 2 ID-2001 A AA A A A A A A A A 1 ID-300 ID-400 1 Office 3 Office 2 Office 1 Break Room 33 Launge Area 34 Bull Pen 35 Coppy Center 37 Overflow Waiting Area 38 Waiting Area 1 39 Reception 1 40 Maintanance 48 W WC 50 M WC 51 Fire Escape 2 58 Fire Escape 1 59 Common Lobby 60 Room 61 5' - 5" 9' - 6 1/4" 9' - 8 1/2" 16' - 10" 17' - 0"53' - 3 3/4" 5' - 5" 14'-0"14'-61/4" 16' - 10" 17' - 9 3/4" 2 ID-300 Scale Date QUARTER INSTRUCTOR INSTITUTION AYAT ENVIRONMENTAL DESIGN SERVICES 3/16" = 1'-0" 12/11/20151:21:17PM ID-101 FLOOR PLAN COMMERCIAL PROJECT Checker Author 3,23, 2015 Art Institute of Houston ARCHITECTURAL NOTES 1. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO PRICING AND CONSTRUCTION. 2. CONTRACTOR SHALL PROVIDE AND INSTALL BLOCKING AS REQUIRED IN ALL WALLS WITH NEW SHELVING AND MILLWORK. 3. ALL DOORS ARE TO HAVE 6" RETURNS UNLESS NOTED OTHERWISE. 150 SF Room name 101 DRAWING NUMBER SHEET NUMBER A101 1DRAWING NUMBER SHEET NUMBER DRAWING NUMBER SHEET NUMBER EXTERIOR ELEVATION (NORTH, SOUTH, EAST, OR WEST) TRANSVERSE OR LONGITUDINAL SECTION FLAGS NORTH ARROW DOOR TAG (REFER TO DOOR SCHEDULE)ENLARGED PLAN CALLOUT AREA ROOM / AREA TAG FLOOR PLAN SYMBOL LEGEND SIM A101 1 SIM 1 A101 1t WINDOW TAG (REFER TO WINDOW SCHEDULE) 3RD DOOR SCHEDULE Type Mark Count Type Description Width Height Finish Frame Material Function Level A 14 36" x 84" SINGLE-FLUSH 3' - 0" 7' - 0" Interior Level 3 E 1 5'-4"W. x 7'-2"H. 2' - 8" 7' - 2" Interior Level 3 F 1 30" x 84" 2' - 6" 7' - 0" Interior Level 3 3/16" = 1'-0" 1 FLOOR PLAN No. Description Date
  • 4. Office 3 Office 2 Office 1 Break Room 33 Launge Area 34 Bull Pen 35 Coppy Center 37 Overflow Waiting Area 38 Waiting Area 1 39 Reception 1 40 Maintanance 48 W WC 50 M WC 51 Fire Escape 2 58 Fire Escape 1 59 Common Lobby 60 Room 61 01 01 01 01 01010101 020202 010101 03 0304 04 0404 05 06 06 06 06 06 06 04 03 04 07 08 09 09 09 09 09 10 10 17 16 01 26 26 26 26 26 26 2626 26 26 2626 272727 27 272727 27 31 31 2828 30 Scale Date QUARTER INSTRUCTOR INSTITUTION AYAT ENVIRONMENTAL DESIGN SERVICES 3/16" = 1'-0" 12/11/20151:21:58PM ID-102 FURNITURE PLAN COMMERCIAL PROJECT Checker Author 3,23, 2015 Art Institute of Houston 3/16" = 1'-0" 1 FURNITURE PLAN No. Description Date
  • 5. Scale Date QUARTER INSTRUCTOR INSTITUTION AYAT ENVIRONMENTAL DESIGN SERVICES 3/16" = 1'-0" 12/11/20151:22:21PM ID-103 POWER PLAN COMMERCIAL PROJECT Checker Author 3,23, 2015 Art Institute of Houston 3/16" = 1'-0" 1 POWER PLAN No. Description Date
  • 6. 33 Scale Date QUARTER INSTRUCTOR INSTITUTION AYAT ENVIRONMENTAL DESIGN SERVICES 3/16" = 1'-0" 12/11/20151:22:39PM ID-104 RCP COMMERCIAL PROJECT Checker Author 3,23, 2015 Art Institute of Houston 3/16" = 1'-0" 1 LEVEL 3 No. Description Date
  • 7. Level 1 0" Roof 36' - 0" Level 2 12' - 0" Level 3 24' - 0" 2 ID-300 Level 1 0" Roof 36' - 0" Level 2 12' - 0" Level 3 24' - 0" 4'-0" Scale Date QUARTER INSTRUCTOR INSTITUTION AYAT ENVIRONMENTAL DESIGN SERVICES 3/16" = 1'-0" 12/11/20151:23:51PM ID-200 EXTERIOR ELEVATIONS COMMERCIAL PROJECT Checker Author 3,23, 2015 Art Institute of Houston 3/16" = 1'-0" 1 EAST 3/16" = 1'-0" 2 SOUTH No. Description Date
  • 8. Level 1 0" Roof 36' - 0" Level 2 12' - 0" Level 3 24' - 0" 2 ID-300 Level 1 0" Roof 36' - 0" Level 2 12' - 0" Level 3 24' - 0" 1 ID-300 Scale Date QUARTER INSTRUCTOR INSTITUTION AYAT ENVIRONMENTAL DESIGN SERVICES 3/16" = 1'-0" 12/11/20151:24:23PM ID-300 BUILDING SECTIONS COMMERCIAL PROJECT Checker Author 3,23, 2015 Art Institute of Houston 3/16" = 1'-0" 1 TRANSVERSE 3/16" = 1'-0" 2 Section 1 No. Description Date
  • 9. ID-4002 2 ID-300 Level 3 24' - 0" 2 ID-300 Scale Date QUARTER INSTRUCTOR INSTITUTION AYAT ENVIRONMENTAL DESIGN SERVICES As indicated 12/11/20151:24:50PM ID-400 ENLARGED PLANS AND ELEVATIONS COMMERCIAL PROJECT Checker Author 3,23, 2015 Art Institute of Houston3/8" = 1'-0" 1 MENS BATHROOM 1/2" = 1'-0" 2 ADA MENS BATHROOM No. Description Date
  • 11. Scale Date QUARTER INSTRUCTOR INSTITUTION AYAT ENVIRONMENTAL DESIGN SERVICES 12/11/20151:26:40PM ID-600 SCHEDULES AND DIAGRAMS COMMERCIAL PROJECT Checker Author 3,23, 2015 Art Institute of Houston 3rd floor Furniture System Schedule e Type Count 27 96" x 96" 8 28 66w 2 30 72" x One and One Half High 1 31 Standard 2 Grand total: 13 3RDFLOOR FURNITURE PLAN Type Mark Family and Type Count 111 01 Haworth_Chair_Zody-Task: Height Adjustable Arms 12 02 Modern_Office_Desk_8428: Modern_Office_Desk_8428 3 03 Haworth_Collaborate_Table_Round: 18 High - 4 Star Base 3 04 Haworth_Chair_Crossoft: No Arms 6 05 Haworth_Chair_Elan-Lounge: 3 Seater Wide 1 6 Table-Dining1: 24" x 36" x 36" 1 06 Chair-Breuer: Chair-Breuer 6 07 Modern_Buffet_w_Glass_Center_7283: Buffet 1 8 Commercial_Sink_1: Commercial Sink Flexible 1 08 Modern_Reception_Desk_9191: modern reception 1 9 Commercial_Kitchen_Prep_Table_1: Commercial_Kitchen_Prep_Table_8425 6 09 Waiting_Room_Chair_-_Single_2811: Waiting_Room_Chair_-_Single_2811 5 10 Dining_Table_w_2Chair - Copy: 762 mm x 1525 mm 2 16 Shelving: 96" x 12" x 84" 1 17 Shelving: 36" x 10" x 72" 1 20 Stool - Bar: Bar Stool 6 26 iMac_20quot_Intel_Computer_4508: iMac_20quot_Intel_Computer_4508 12 Grand total: 179 Door Schedule Door Number Type Door Fire Rating Hardware Frame CommentsWidth Height Thickness Material Finish Under Cut Type Material Finish Jamb Head 71 A 3' - 0" 7' - 0" 2" 72 A 3' - 0" 7' - 0" 2" 73 A 3' - 0" 7' - 0" 2" 74 A 3' - 0" 7' - 0" 2" 75 A 3' - 0" 7' - 0" 2" 76 A 3' - 0" 7' - 0" 2" 77 A 3' - 0" 7' - 0" 2" 79 A 3' - 0" 7' - 0" 2" 80 A 3' - 0" 7' - 0" 2" 81 A 3' - 0" 7' - 0" 2" 91 A 3' - 0" 7' - 0" 2" 96 A 3' - 0" 7' - 0" 2" 97 A 3' - 0" 7' - 0" 2" 103 F 2' - 6" 7' - 0" 2" 104 E 2' - 8" 7' - 2" 105 A 3' - 0" 7' - 0" 2" FURNITURE SCHEDULE Type Mark Type Description Count 111 01 Height Adjustable Arms Haworth_Chair_Zody-Task 12 02 Modern_Office_Desk_8428 3 03 18 High - 4 Star Base Haworth_Collaborate_Table_Round 3 04 No Arms Haworth_Chair_Crossoft 6 05 3 Seater Wide Haworth_Chair_Elan-Lounge 1 6 24" x 36" x 36" TABLE DINING 1 06 Chair-Breuer 6 07 Buffet BUFFET WITH GLASS CENTER 1 8 Commercial Sink Flexible COMMERCIAL SINK 1 08 modern reception 1 9 Commercial_Kitchen_Prep_Table_8425 STAINLESS STEEL PREP TABLE 6 09 Waiting_Room_Chair_-_Single_2811 GUEST CHAIR 5 10 762 mm x 1525 mm 2 16 96" x 12" x 84" 1 17 36" x 10" x 72" 1 20 Bar Stool 6 26 iMac_20quot_Intel_Computer_4508 12 Grand total: 179 179 No. Description Date