SlideShare a Scribd company logo
1 of 10
CURRICULUM VITAE
JOHANNES JAKOBUS MYNHARDT
(Toks)
I.D. 7105045310083
PERSONAL INFORMATION
• Full name: Johannes Jakobus Mynhardt
• ID Number: 7105045310083
• Passport : 480388212
• Date of birth: 04 May 1971
• Marital Status: Married
• Dependants: Two
• Nationality: South African
• Languages: English, Afrikaans
• Drivers Licence: Code EB
• Health: Excellent
• Postal Address: Suite no 71
Private Bag x5
Hartenbos
Mosselbay
South Africa
6520
• Residential Address: 25 A Ananda Singel
Island View
Mosselbay
South Africa
6520
• Mobile No. +27 (0) 82 879 4921
• Email Personal: toks.mynhardt@hotmail.com
• Email Home: toks4@mweb.co.za
• Hobbies: Golf and Fishing
SECONDARY EDUCATION
• Last School Attended: HTS Carel de Wet
• Highest Grade Passed: Technical Grade 12
COURSES ATTENDED
• Marian Material Management System
• Uhde Material Management System
• JDE Edwards Material Management System
• Ariba E -procurement System
• CSWIP Level 1 visual welding inspectors
• Nace Coating inspectors level 1.
• Degree in Supply chain (Kwazulu Natal University.)
EMPLOYMENT HISTORY
Employer: Sadara Chemical company/KBR
Project: Sadara Petro Chemical refinery
Saudi Arabia
(May 2015 - Present)
Position: Maintenance Material Coordinator/Preservation
• Job Description: Enters materials, tools, equipment requests via
Procurement System or Pro-card and confirms delivery date. Please refer
to Global Maintenance Business Rules for Pro-card usage
• Communicates the order and delivery status, typically by setting various
material status/flags throughout the work order cycle in the Computerized
Maintenance Management System
• Communicates both ways any potential changes in material specifications
between supplier and requestor and initiates system updates as
appropriate.
• Shares and raises awareness of MRO potential whether for stock or non-
stock item coding.
• Forwards non-coded items to PPM Coordinator
• Coordinates the disposition of all surplus material
• Monitors/tracks materials, tools and equipment orders upon receipt
• May provide requisitioning support for requirements outside of
maintenance: operation supplies, projects, etc.
• Arranges materials, tools and equipment in a manner, that it can be
identified and picked up according to job needs
• Gather information and input into the appropriate maintenance
measures/KPI's such as Hot Shots (abnormal cost of rush delivery),
Receipt backlog, material delays
• Communicate vendor performance to procurement services
• Coordinate the repair and or return of materials, tools and equipment
obtained on a value added work order
• Uses class/codes to obtain contract pricing, where available
• Works closely with procurement, coding, planning, scheduling and work
coordination to provide seamless execution of the GMWP
• Tracks progress versus required delivery date until receipt and expedites
when progress is behind schedule.
• Follows-up as focal point on all issues with material, orders, delays.
• Periodically reviews material status report tools to assure on-time delivery
including refurbishment items
• Requisitioning of off-site resources depending on organizational design and
role availability
• Supports WAC/Planner in sending unused material back to warehouse
and/or vendor
• Uses Metrics to measure MC task (hot shot, delays, etc.) and develops
action to improve the process.
Employer: Arup/Transnet Capital projects
Project: New Multi-Product Pipeline Project by Transnet
South Africa
(October 2009 to April 2015)
Position: Expeditor and Logistics/Materials
Job Description:
- Tracking progress from suppliers in the manufacturing of material, plant and equipment.
- Liaising with internal stakeholders at the agreed levels regarding manufacturing progress
in accordance with the agreed delivery schedules.
- Compiling and maintaining accurate and regular reports at and to the agreed levels to all
Identified internal and external stakeholders regarding manufacturing and delivery progress.
- Receipt and issue of material, plant and equipment.
- Ensuring that all necessary documentation requirements are adhered to during the
manufacturing process and subsequent deliveries.
- Identification and rectification of over supply, shortages and/ or damages.
- Protection and preservation of material, plant and equipment which is either in storage or
installed and awaiting commissioning in accordance with the relevant storage and handling
procedures.
- Instructing the removal of material, plant and equipment from site where applicable.
- Witness of FAT tests at suppliers and do final inspections and releases of all equipment.
Employer: Shaw Stone and Webster Saudi Arabia
Project: SHARQ 3
RD
Expansion Project Al-Jubail
(January 2009 to September 2009)
Position: Materials Manager
Job Description:
Provide information to Engineering
• and Construction Departments regarding current and future material availability
• Generate computer records for all materials movements and availability
• Monitoring and cataloguing of all OSD records generated by Sub Contractor / Liaising
with Procurement Department through to closure
• Ensuring that all work carried out within the Project Warehouse and Laydown Areas
is carried in a safe and efficient manner
• Supervise and direct both the SSWACL and ARCC Sub Contractor Material
Controllers / Warehouse Chiefs
• Arrange and supervise the controlled transfer and handover of Capital Spares, 2
Years Spares, Commissioning Spares and Operating Spares via ARCC to Sharq
• Organize transport for delivery of materials to subcontractor / vendor sites for material
repairs, fabrication
• Monitor the materials / waste being taken offsite by Project Subcontractors and action
Gate Passes accordingly
• Arrange and supervise the controlled reconciliation and handover of all materials
between ARCC and Sharq
• Attend all related Project Meetings which require a Materials Presence / Input
• Attend SSWACL Daily morning meeting 7.00am prompt
• Manage and direct project stores in relation to Construction Activities
• Liaise with Foster Wheeler / SSWACL Staff in relation to the handover of Free Issue
Materials in relation to Telecommunications Equipment being supplied by U & O
• Liaise with QA / QC Engineering in relation to all quarantined materials and bring to
conclusion
• Monitor and track the delivery of all project related materials being supplied by vendor
/ subcontractor / fabricator and inform Construction Departmental heads accordingly
• Provide up to date answers on any material query / issue / request raised at previous
Project meetings and report back accordingly to SSW / Sharq / ARCC Management
• Liaise daily with Procurement Department in relation to delivery requirements /
delivery dates. Latest promise dates should be relayed to all concerned parties
• Keep all records and inputs up to date on the Marian Data base.
Employer: WORLEY PARSONS-KAZAKHSTAN
Project: Crude Tank Farm/Gas and compressor Unit
(June 2006 to December 2008)
Position: Materials Manager
Job Description: -Managing Material Warehouse
-Issuing of Mechanical and Electrical
Equipment to Sub-Contractors
-Issuing of all Piping Materials
-Supervision over Material Control
Personnel
-Processing of Material Certification
Documents
-Controlling of all Civil Materials
-Co-ordination with Customs
-Do all expediting on all shipments
-Controlling of all structural steels
-Oversee all personnel and control all materials issue
and receiving on Marian data base.
Employer: TECHNIP FRANCE
Project: OBL PP3, Project Turbo
(January 2005 to May 2006)
Position: Warehouse Supervisor/Lead Marian Operator
Job Description: Supervision over Material Warehouse
 Issuing of Mechanical and Electrical
 Equipment to Sub-Contractors
 Issuing of Fabrication and Erection material
 Supervision over Material Control
personnel
 Processing of Material Certification
 Documents
Employer: THYSSENKRUPP ENGINEERING
Projects: -DA Revamp Project
-TNPE Project
-Poly 3 LDPE Plant
(November 2003 to December 2004)
Position: Warehouse Supervisor
Job Description: -Supervision over Material Warehouse
-Issuing of Mechanical and Electrical
Equipment to Sub-Contractors
-Issuing of Fabrication and Erection material
-Supervision over Material Control
personnel
-Processing of Material Certification
Documents
Employer: FRASER & CHALMERS
Project: -C-Contracts Secunda
-Oxygen Plant Secunda
-PP1 Phase 1
-Oxygen Plant Saldanha
-Hexene Train
-PP1 Fire Damage Rebuild
-Detergent Alcohols Plant
-Butanol Plant
-AAA Plant
-Octene Plant
(January 1996 to October 2003)
Position: Material Manager
Job Description: -Document control
-Material identification
-Issuing of fabrication & erection material
-Controlling of consumables
-Inspection on all mechanical equipment
Employer: STEINMÚLLER AFRICA
Projects: -C-Contracts Secunda
(April 1995 to December 1995)
Position: Material Manager
Job Description: -Document control
-Material identification
-Issuing of fabrication & erection material
-Controlling of consumables
-Inspection on all mechanical equipment
Employer: BABCOCK AFRICA
Projects: -C-Contracts Secunda
-ACN Plant
-Columbus Stainless Steel
(April 1991 to March 1995)
Position: Material Controller
Job Description: -Document control
-Material identification
-Issuing of fabrication & erection material
-Controlling of consumables
-Inspection on all mechanical equipment
Employer: SASDIENS
Sasol Laboratory
(January 1996 to October 2003)
Position: Analyst
Job Description: -Analyzing of various Sasol Products
REFERENCES
Gary Steward (Shell) 073 657 3739
Juan Treurnich (Shell) 082 853 8142
Herminio De Sousa (G/LTA) 082 801 3070
Tienie Prinsloo (G/LTA) 082 570 2845
Jose Soares (Uhde) 082 855 6345
Jose Faria (G/LTA) 082 445 9937
Rocky Booyzen (Uhde) 082 453 6475
Paul de Charmoy (WorleyParsons) 082 682 1743/+77123025293
Gary Nelson (Chevron) +77123027100
Ray Fletcher (Shaw) +966 (0)505818261
Robert Deming (KBR) +966(0)503223541
Nick Uys (Transnet capital Projects) +27(0) 73899092

More Related Content

What's hot

WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1William Brown
 
Punch List Coordinator - (ICAPS Specialist) Onshore/Offshore
Punch List Coordinator - (ICAPS Specialist)  Onshore/OffshorePunch List Coordinator - (ICAPS Specialist)  Onshore/Offshore
Punch List Coordinator - (ICAPS Specialist) Onshore/OffshoreRenold Pereira
 
CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...Azhar Niazi
 
Phil hoggett cv 19-aug16
Phil hoggett cv 19-aug16Phil hoggett cv 19-aug16
Phil hoggett cv 19-aug16Phil Hoggett
 
MJ Burke CV 31 May 2016
MJ Burke CV 31 May 2016MJ Burke CV 31 May 2016
MJ Burke CV 31 May 2016Mick Burke
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume Arun Das
 
Andrew LaGrone Resume
Andrew LaGrone ResumeAndrew LaGrone Resume
Andrew LaGrone ResumeLagrone Andy
 
ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1uche ibekwe
 
Wayne Vig CV - September 2015
Wayne Vig CV - September 2015Wayne Vig CV - September 2015
Wayne Vig CV - September 2015Wayne Vig
 

What's hot (20)

WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1
 
CV-ES Enslin
CV-ES EnslinCV-ES Enslin
CV-ES Enslin
 
Punch List Coordinator - (ICAPS Specialist) Onshore/Offshore
Punch List Coordinator - (ICAPS Specialist)  Onshore/OffshorePunch List Coordinator - (ICAPS Specialist)  Onshore/Offshore
Punch List Coordinator - (ICAPS Specialist) Onshore/Offshore
 
sfricano resume 7-13-16
sfricano resume 7-13-16sfricano resume 7-13-16
sfricano resume 7-13-16
 
Resume
ResumeResume
Resume
 
Anthony_M._Antigulas
Anthony_M._AntigulasAnthony_M._Antigulas
Anthony_M._Antigulas
 
Peter L. Cabbab.
Peter L. Cabbab.Peter L. Cabbab.
Peter L. Cabbab.
 
CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...
 
Phil hoggett cv 19-aug16
Phil hoggett cv 19-aug16Phil hoggett cv 19-aug16
Phil hoggett cv 19-aug16
 
MJ Burke CV 31 May 2016
MJ Burke CV 31 May 2016MJ Burke CV 31 May 2016
MJ Burke CV 31 May 2016
 
Harley's CV1
Harley's  CV1Harley's  CV1
Harley's CV1
 
Resume Jaime Lopez 2016
Resume Jaime Lopez 2016Resume Jaime Lopez 2016
Resume Jaime Lopez 2016
 
cv
cvcv
cv
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
resumelarry
resumelarryresumelarry
resumelarry
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
Andrew LaGrone Resume
Andrew LaGrone ResumeAndrew LaGrone Resume
Andrew LaGrone Resume
 
ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1
 
Resume Jun-2015
Resume Jun-2015Resume Jun-2015
Resume Jun-2015
 
Wayne Vig CV - September 2015
Wayne Vig CV - September 2015Wayne Vig CV - September 2015
Wayne Vig CV - September 2015
 

Similar to CV of Toks Mynardt updated

Resume-Zainal Mohamad
Resume-Zainal MohamadResume-Zainal Mohamad
Resume-Zainal Mohamadyes zainal
 
CV Logistic Coordinator_Material Controller -1
CV Logistic Coordinator_Material Controller -1CV Logistic Coordinator_Material Controller -1
CV Logistic Coordinator_Material Controller -1Muhammed Shoukath Ali
 
Akpobaro Lincoln CV 27-09-2015
Akpobaro Lincoln CV 27-09-2015Akpobaro Lincoln CV 27-09-2015
Akpobaro Lincoln CV 27-09-2015Akpobaro Lincoln
 
CV of Donervon Gounden 30-4-2015
CV of Donervon Gounden  30-4-2015CV of Donervon Gounden  30-4-2015
CV of Donervon Gounden 30-4-2015Donervon Gounden
 
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)Phillip Ballinger
 
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)Phillip Ballinger
 
Ariel Awayan CV updated
Ariel Awayan CV updatedAriel Awayan CV updated
Ariel Awayan CV updatedariel awayan
 
Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Abdulkader Sayed
 
Rocky Nash Resume A
Rocky Nash Resume ARocky Nash Resume A
Rocky Nash Resume ARocky Nash
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016zuraidi Ismail
 
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain
 

Similar to CV of Toks Mynardt updated (20)

Resume-Zainal Mohamad
Resume-Zainal MohamadResume-Zainal Mohamad
Resume-Zainal Mohamad
 
CV Logistic Coordinator_Material Controller -1
CV Logistic Coordinator_Material Controller -1CV Logistic Coordinator_Material Controller -1
CV Logistic Coordinator_Material Controller -1
 
Akpobaro Lincoln CV 27-09-2015
Akpobaro Lincoln CV 27-09-2015Akpobaro Lincoln CV 27-09-2015
Akpobaro Lincoln CV 27-09-2015
 
Latest Revised Resume
Latest Revised ResumeLatest Revised Resume
Latest Revised Resume
 
Hairi Mohd Noor_Resume
Hairi Mohd Noor_ResumeHairi Mohd Noor_Resume
Hairi Mohd Noor_Resume
 
CV of Donervon Gounden 30-4-2015
CV of Donervon Gounden  30-4-2015CV of Donervon Gounden  30-4-2015
CV of Donervon Gounden 30-4-2015
 
Azamat Sarsenbayev CV (eng)
Azamat Sarsenbayev CV (eng)Azamat Sarsenbayev CV (eng)
Azamat Sarsenbayev CV (eng)
 
CV of Emmanuel Sumaylo
CV of Emmanuel SumayloCV of Emmanuel Sumaylo
CV of Emmanuel Sumaylo
 
Chetty G.doc
Chetty G.docChetty G.doc
Chetty G.doc
 
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
 
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
 
Ariel Awayan CV updated
Ariel Awayan CV updatedAriel Awayan CV updated
Ariel Awayan CV updated
 
Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -
 
Rocky Nash Resume A
Rocky Nash Resume ARocky Nash Resume A
Rocky Nash Resume A
 
Gerald L. Adarlo CV
Gerald L. Adarlo CVGerald L. Adarlo CV
Gerald L. Adarlo CV
 
Gerald L. Adarlo CV
Gerald L. Adarlo CVGerald L. Adarlo CV
Gerald L. Adarlo CV
 
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical Engineer
 
Christoph Sinaga_CV 2015
Christoph Sinaga_CV 2015Christoph Sinaga_CV 2015
Christoph Sinaga_CV 2015
 

CV of Toks Mynardt updated

  • 1. CURRICULUM VITAE JOHANNES JAKOBUS MYNHARDT (Toks) I.D. 7105045310083
  • 2. PERSONAL INFORMATION • Full name: Johannes Jakobus Mynhardt • ID Number: 7105045310083 • Passport : 480388212 • Date of birth: 04 May 1971 • Marital Status: Married • Dependants: Two • Nationality: South African • Languages: English, Afrikaans • Drivers Licence: Code EB • Health: Excellent • Postal Address: Suite no 71 Private Bag x5 Hartenbos Mosselbay South Africa 6520 • Residential Address: 25 A Ananda Singel Island View
  • 3. Mosselbay South Africa 6520 • Mobile No. +27 (0) 82 879 4921 • Email Personal: toks.mynhardt@hotmail.com • Email Home: toks4@mweb.co.za • Hobbies: Golf and Fishing SECONDARY EDUCATION • Last School Attended: HTS Carel de Wet • Highest Grade Passed: Technical Grade 12 COURSES ATTENDED • Marian Material Management System • Uhde Material Management System • JDE Edwards Material Management System • Ariba E -procurement System • CSWIP Level 1 visual welding inspectors • Nace Coating inspectors level 1. • Degree in Supply chain (Kwazulu Natal University.)
  • 4. EMPLOYMENT HISTORY Employer: Sadara Chemical company/KBR Project: Sadara Petro Chemical refinery Saudi Arabia (May 2015 - Present) Position: Maintenance Material Coordinator/Preservation • Job Description: Enters materials, tools, equipment requests via Procurement System or Pro-card and confirms delivery date. Please refer to Global Maintenance Business Rules for Pro-card usage • Communicates the order and delivery status, typically by setting various material status/flags throughout the work order cycle in the Computerized Maintenance Management System • Communicates both ways any potential changes in material specifications between supplier and requestor and initiates system updates as appropriate. • Shares and raises awareness of MRO potential whether for stock or non- stock item coding. • Forwards non-coded items to PPM Coordinator • Coordinates the disposition of all surplus material • Monitors/tracks materials, tools and equipment orders upon receipt • May provide requisitioning support for requirements outside of maintenance: operation supplies, projects, etc. • Arranges materials, tools and equipment in a manner, that it can be identified and picked up according to job needs • Gather information and input into the appropriate maintenance measures/KPI's such as Hot Shots (abnormal cost of rush delivery), Receipt backlog, material delays
  • 5. • Communicate vendor performance to procurement services • Coordinate the repair and or return of materials, tools and equipment obtained on a value added work order • Uses class/codes to obtain contract pricing, where available • Works closely with procurement, coding, planning, scheduling and work coordination to provide seamless execution of the GMWP • Tracks progress versus required delivery date until receipt and expedites when progress is behind schedule. • Follows-up as focal point on all issues with material, orders, delays. • Periodically reviews material status report tools to assure on-time delivery including refurbishment items • Requisitioning of off-site resources depending on organizational design and role availability • Supports WAC/Planner in sending unused material back to warehouse and/or vendor • Uses Metrics to measure MC task (hot shot, delays, etc.) and develops action to improve the process. Employer: Arup/Transnet Capital projects Project: New Multi-Product Pipeline Project by Transnet South Africa (October 2009 to April 2015) Position: Expeditor and Logistics/Materials Job Description: - Tracking progress from suppliers in the manufacturing of material, plant and equipment. - Liaising with internal stakeholders at the agreed levels regarding manufacturing progress in accordance with the agreed delivery schedules. - Compiling and maintaining accurate and regular reports at and to the agreed levels to all Identified internal and external stakeholders regarding manufacturing and delivery progress. - Receipt and issue of material, plant and equipment. - Ensuring that all necessary documentation requirements are adhered to during the manufacturing process and subsequent deliveries. - Identification and rectification of over supply, shortages and/ or damages.
  • 6. - Protection and preservation of material, plant and equipment which is either in storage or installed and awaiting commissioning in accordance with the relevant storage and handling procedures. - Instructing the removal of material, plant and equipment from site where applicable. - Witness of FAT tests at suppliers and do final inspections and releases of all equipment. Employer: Shaw Stone and Webster Saudi Arabia Project: SHARQ 3 RD Expansion Project Al-Jubail (January 2009 to September 2009) Position: Materials Manager Job Description: Provide information to Engineering • and Construction Departments regarding current and future material availability • Generate computer records for all materials movements and availability • Monitoring and cataloguing of all OSD records generated by Sub Contractor / Liaising with Procurement Department through to closure • Ensuring that all work carried out within the Project Warehouse and Laydown Areas is carried in a safe and efficient manner • Supervise and direct both the SSWACL and ARCC Sub Contractor Material Controllers / Warehouse Chiefs • Arrange and supervise the controlled transfer and handover of Capital Spares, 2 Years Spares, Commissioning Spares and Operating Spares via ARCC to Sharq • Organize transport for delivery of materials to subcontractor / vendor sites for material repairs, fabrication • Monitor the materials / waste being taken offsite by Project Subcontractors and action Gate Passes accordingly • Arrange and supervise the controlled reconciliation and handover of all materials between ARCC and Sharq • Attend all related Project Meetings which require a Materials Presence / Input • Attend SSWACL Daily morning meeting 7.00am prompt • Manage and direct project stores in relation to Construction Activities • Liaise with Foster Wheeler / SSWACL Staff in relation to the handover of Free Issue Materials in relation to Telecommunications Equipment being supplied by U & O • Liaise with QA / QC Engineering in relation to all quarantined materials and bring to conclusion • Monitor and track the delivery of all project related materials being supplied by vendor / subcontractor / fabricator and inform Construction Departmental heads accordingly • Provide up to date answers on any material query / issue / request raised at previous Project meetings and report back accordingly to SSW / Sharq / ARCC Management • Liaise daily with Procurement Department in relation to delivery requirements / delivery dates. Latest promise dates should be relayed to all concerned parties • Keep all records and inputs up to date on the Marian Data base.
  • 7. Employer: WORLEY PARSONS-KAZAKHSTAN Project: Crude Tank Farm/Gas and compressor Unit (June 2006 to December 2008) Position: Materials Manager Job Description: -Managing Material Warehouse -Issuing of Mechanical and Electrical Equipment to Sub-Contractors -Issuing of all Piping Materials -Supervision over Material Control Personnel -Processing of Material Certification Documents -Controlling of all Civil Materials -Co-ordination with Customs -Do all expediting on all shipments -Controlling of all structural steels -Oversee all personnel and control all materials issue and receiving on Marian data base. Employer: TECHNIP FRANCE Project: OBL PP3, Project Turbo (January 2005 to May 2006) Position: Warehouse Supervisor/Lead Marian Operator Job Description: Supervision over Material Warehouse  Issuing of Mechanical and Electrical  Equipment to Sub-Contractors  Issuing of Fabrication and Erection material  Supervision over Material Control personnel  Processing of Material Certification  Documents
  • 8. Employer: THYSSENKRUPP ENGINEERING Projects: -DA Revamp Project -TNPE Project -Poly 3 LDPE Plant (November 2003 to December 2004) Position: Warehouse Supervisor Job Description: -Supervision over Material Warehouse -Issuing of Mechanical and Electrical Equipment to Sub-Contractors -Issuing of Fabrication and Erection material -Supervision over Material Control personnel -Processing of Material Certification Documents Employer: FRASER & CHALMERS Project: -C-Contracts Secunda -Oxygen Plant Secunda -PP1 Phase 1 -Oxygen Plant Saldanha -Hexene Train -PP1 Fire Damage Rebuild -Detergent Alcohols Plant -Butanol Plant -AAA Plant -Octene Plant (January 1996 to October 2003) Position: Material Manager Job Description: -Document control -Material identification -Issuing of fabrication & erection material -Controlling of consumables -Inspection on all mechanical equipment
  • 9. Employer: STEINMÚLLER AFRICA Projects: -C-Contracts Secunda (April 1995 to December 1995) Position: Material Manager Job Description: -Document control -Material identification -Issuing of fabrication & erection material -Controlling of consumables -Inspection on all mechanical equipment Employer: BABCOCK AFRICA Projects: -C-Contracts Secunda -ACN Plant -Columbus Stainless Steel (April 1991 to March 1995) Position: Material Controller Job Description: -Document control -Material identification -Issuing of fabrication & erection material -Controlling of consumables -Inspection on all mechanical equipment Employer: SASDIENS Sasol Laboratory (January 1996 to October 2003) Position: Analyst Job Description: -Analyzing of various Sasol Products REFERENCES
  • 10. Gary Steward (Shell) 073 657 3739 Juan Treurnich (Shell) 082 853 8142 Herminio De Sousa (G/LTA) 082 801 3070 Tienie Prinsloo (G/LTA) 082 570 2845 Jose Soares (Uhde) 082 855 6345 Jose Faria (G/LTA) 082 445 9937 Rocky Booyzen (Uhde) 082 453 6475 Paul de Charmoy (WorleyParsons) 082 682 1743/+77123025293 Gary Nelson (Chevron) +77123027100 Ray Fletcher (Shaw) +966 (0)505818261 Robert Deming (KBR) +966(0)503223541 Nick Uys (Transnet capital Projects) +27(0) 73899092