DESIGN REGULATION
ADMINISTRATION AND
APPLICATION
By Chandimal Jayakody
BSc.(Eng), CEng., MIE(SL)., MLABSE.
• Application
• The provisions of the new Fire regulation shall apply to the construction,
alteration, repair, equipment, use and occupancy, maintenance, relocation of
every building or structure within the area of jurisdiction.
• Additions, alterations, repairs and changes of use or occupancy in all buildings
and structures shall comply with the provisions for new buildings.
• Organization
• There shall be a unit under the Technology Development subdivision of CIDA
for formulating regulations, standards, specifications and codes of practice.
• Implementing monitoring and approval shall be under the control of the
respective fire authorities under the local bodies.
• Delegation of authority
• The AHJ shall have the authority to delegate powers and assignments to
Qualified persons to carry out and implement relevant provisions of this
regulation. Such qualified persons shall have the powers to execute the duties
as delegated by the AHJ.
• Qualified person
• Sri Lankan national who has obtained his professional qualification in the
specified field as listed below as recognized by the relevant professional
institute.
• Chartered or Registered Architect registered with Architectural Registration Board
• Competent Engineer Shall be an active Corporate Member of Institution Fire Engineers
(UK)
• Corporate Member of Institution of Engineers Sri Lanka, listed in the Directory of
Building Services Engineers under the discipline of Fire protection and detection
• Corporate Member of any other recognized institution as accepted by CIDA
• System Designer
• The system designer shall be identified on the system design documents.
Acceptable minimum evidence of qualifications or certification shall be
provided when requested by the authority having jurisdiction. Qualified
personnel shall include, but not be limited to the following:
• Personnel who are certified by a nationally recognized fire protection certification
organization acceptable to the Authority Having Jurisdiction.
• Personnel who are registered, licensed, or certified by CIDA.
• Technical and Compliance Committee on Fire Regulations (TCCFR)
• A Technical and Compliance Committee on Fire Regulations (TCCFR) shall be
appointed by CIDA. The committee shall consist of minimum of five members
suitably qualified and having adequate training and experience.
• The committee shall,
• Advise the AHJ on any technical matters where such advice is required for taking a final
decision.
• Investigate and recommend corrective actions for violations of and non-compliances
with the regulations brought to the notice of CIDA.
• Investigate and recommend the courses of action to be taken with respect to any dispute
referred to CIDA.
• Responsibility of the Technical and Compliance Committee on Fire
Regulations (TCCFR)
• Technical and Compliance Committee on Fire Regulations (TCCFR) shall
perform the functions of the appeal board for any appeals made by the
relevant parties.
• Whenever the AHJ reject or refuse to approve proposed construction, the
owner or his/her duly authorized agent can make an appeal to the AHJ. The
AHJ shall refer such appeals to the above committee for advice.
• System Installer
• The installation of the system shall be carried out by a Contractor/ Agency
registered with CIDA, under the Fire Detection, Protection & Suppression
(FDPS) System speciality of Electro Mechanical (EM) field.
• Reports and records
• The AHJ shall keep permanent records, including but not limited to,
recommended fire requirements, design drawings, approved drawings, test
certificates and approvals giving complete details of premises
• Maintenance of buildings
• All Active and Passive fire systems in buildings and structures and all parts
thereof shall be maintained in a safe condition, and all devices and safeguards
required by new regulation shall be maintained in good and proper operating
condition
• Owners/occupiers of the designated buildings falling under the categories of
super high rise and high rise buildings which require Fire Risk Assessment as
per this regulation shall be required to produce a report issued by a qualified
person or body once in every three years, to demonstrate the efficiency of
the Fire Protection systems, means of escape and conditions of refuge floors
etc.
• Stop Work orders
• Whenever any building work is being done contrary to provisions of this
regulation or is being done in an unsafe or dangerous manner, the AHJ shall
order such work stopped forthwith.
• Such violations shall be noticed in writing served on the person(s) engaged in
doing or causing such work to be done and such persons shall immediately
stop work until authorized by the AHJ to proceed.
• On receipt of such a notice of stoppage of work the concerned parties shall
take action to correct/ rectify all defects listed and inform the AHJ in writing.
• AHJ on receipt of such notification shall carry out further inspections and
withdraw the notice of stoppage of work if the necessary rectification works
has been carried out satisfactorily.
• Certificate of compliance
• Certificate of compliance with the regulation shall be issued by AHJ or by a
qualified person registered with CIDA.
• Certificate of conformity with the fire regulation shall not be issued by any
party other than AHJ or qualified person registered with CIDA
• Equivalency
• The use of equivalent or superior Standards systems, equipment and devices
complying with this regulation as a basic minimum, is permitted under new
fire regulations.
• The AHJ has the authority in taking the final decision regarding the use of
such alternatives.

More Related Content

Similar to Design Regulation Administration and Application

New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxTaushifulHoque
 
Important of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfImportant of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfRazFazwan
 
DOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureDOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureHENRY EROMOSELE OIGIANGBE
 
Hse new microsoft power point presentation
Hse new microsoft power point presentationHse new microsoft power point presentation
Hse new microsoft power point presentationSamip Nathani nathani
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work trainingKarnav Rana
 
PTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of GasPTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of GasKUNALKHANDELWAL44
 
Fire safety awareness sections 7 11
Fire safety awareness sections 7 11Fire safety awareness sections 7 11
Fire safety awareness sections 7 11fireawareness
 
010 Permit To Work.ppt
010 Permit To Work.ppt010 Permit To Work.ppt
010 Permit To Work.pptGamingHero6
 
HSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.pptHSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.pptGkMechanical
 
Cleaning method statements 2004 uk
Cleaning method statements 2004 ukCleaning method statements 2004 uk
Cleaning method statements 2004 ukManel Ferreira
 
Residential Install Standards
Residential Install StandardsResidential Install Standards
Residential Install StandardsJim Sutton
 
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergrRigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergrLuisValente37
 
Saltex the sud and turf manager
Saltex the sud and turf managerSaltex the sud and turf manager
Saltex the sud and turf managerBritRiskSafety
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsKHUSHBU SHAH
 
Fire Safety Systems and Measures - Governance
Fire Safety Systems and Measures - GovernanceFire Safety Systems and Measures - Governance
Fire Safety Systems and Measures - GovernanceGeoffrey Vick
 
Duties and Responsibilities of RCO
Duties and Responsibilities of  RCODuties and Responsibilities of  RCO
Duties and Responsibilities of RCOmahbubul hassan
 
Work Permit System.pptx
Work Permit System.pptxWork Permit System.pptx
Work Permit System.pptxssuserb8f3fd2
 

Similar to Design Regulation Administration and Application (20)

New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
 
Important of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfImportant of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdf
 
DOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureDOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work Procedure
 
Presentation on safety
Presentation on safetyPresentation on safety
Presentation on safety
 
Hse new microsoft power point presentation
Hse new microsoft power point presentationHse new microsoft power point presentation
Hse new microsoft power point presentation
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
PTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of GasPTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of Gas
 
Fire safety awareness sections 7 11
Fire safety awareness sections 7 11Fire safety awareness sections 7 11
Fire safety awareness sections 7 11
 
Occupational health and safety in hospitals and health centers
Occupational health and safety in hospitals and health centersOccupational health and safety in hospitals and health centers
Occupational health and safety in hospitals and health centers
 
Work permit
Work permitWork permit
Work permit
 
010 Permit To Work.ppt
010 Permit To Work.ppt010 Permit To Work.ppt
010 Permit To Work.ppt
 
HSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.pptHSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.ppt
 
Cleaning method statements 2004 uk
Cleaning method statements 2004 ukCleaning method statements 2004 uk
Cleaning method statements 2004 uk
 
Residential Install Standards
Residential Install StandardsResidential Install Standards
Residential Install Standards
 
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergrRigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergr
 
Saltex the sud and turf manager
Saltex the sud and turf managerSaltex the sud and turf manager
Saltex the sud and turf manager
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipments
 
Fire Safety Systems and Measures - Governance
Fire Safety Systems and Measures - GovernanceFire Safety Systems and Measures - Governance
Fire Safety Systems and Measures - Governance
 
Duties and Responsibilities of RCO
Duties and Responsibilities of  RCODuties and Responsibilities of  RCO
Duties and Responsibilities of RCO
 
Work Permit System.pptx
Work Permit System.pptxWork Permit System.pptx
Work Permit System.pptx
 

More from Thushan9

acoustics Notes1.pptx
acoustics Notes1.pptxacoustics Notes1.pptx
acoustics Notes1.pptxThushan9
 
Fire Pump Presentation.pptx
Fire Pump Presentation.pptxFire Pump Presentation.pptx
Fire Pump Presentation.pptxThushan9
 
TOTAL AUTOMATIC FLOODING SYSTEMS.pptx
TOTAL AUTOMATIC FLOODING SYSTEMS.pptxTOTAL AUTOMATIC FLOODING SYSTEMS.pptx
TOTAL AUTOMATIC FLOODING SYSTEMS.pptxThushan9
 
Combine systems.pptx
Combine systems.pptxCombine systems.pptx
Combine systems.pptxThushan9
 
sewer treatment proposal.pptx
sewer treatment proposal.pptxsewer treatment proposal.pptx
sewer treatment proposal.pptxThushan9
 
FINAL EV5ALUATION.pptx
FINAL EV5ALUATION.pptxFINAL EV5ALUATION.pptx
FINAL EV5ALUATION.pptxThushan9
 
Lecture-7-High Performance Building Case Study-1.pptx
Lecture-7-High Performance Building Case Study-1.pptxLecture-7-High Performance Building Case Study-1.pptx
Lecture-7-High Performance Building Case Study-1.pptxThushan9
 
Lecture 1.2.ppt
Lecture 1.2.pptLecture 1.2.ppt
Lecture 1.2.pptThushan9
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptThushan9
 

More from Thushan9 (9)

acoustics Notes1.pptx
acoustics Notes1.pptxacoustics Notes1.pptx
acoustics Notes1.pptx
 
Fire Pump Presentation.pptx
Fire Pump Presentation.pptxFire Pump Presentation.pptx
Fire Pump Presentation.pptx
 
TOTAL AUTOMATIC FLOODING SYSTEMS.pptx
TOTAL AUTOMATIC FLOODING SYSTEMS.pptxTOTAL AUTOMATIC FLOODING SYSTEMS.pptx
TOTAL AUTOMATIC FLOODING SYSTEMS.pptx
 
Combine systems.pptx
Combine systems.pptxCombine systems.pptx
Combine systems.pptx
 
sewer treatment proposal.pptx
sewer treatment proposal.pptxsewer treatment proposal.pptx
sewer treatment proposal.pptx
 
FINAL EV5ALUATION.pptx
FINAL EV5ALUATION.pptxFINAL EV5ALUATION.pptx
FINAL EV5ALUATION.pptx
 
Lecture-7-High Performance Building Case Study-1.pptx
Lecture-7-High Performance Building Case Study-1.pptxLecture-7-High Performance Building Case Study-1.pptx
Lecture-7-High Performance Building Case Study-1.pptx
 
Lecture 1.2.ppt
Lecture 1.2.pptLecture 1.2.ppt
Lecture 1.2.ppt
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.ppt
 

Recently uploaded

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 

Design Regulation Administration and Application

  • 1. DESIGN REGULATION ADMINISTRATION AND APPLICATION By Chandimal Jayakody BSc.(Eng), CEng., MIE(SL)., MLABSE.
  • 2. • Application • The provisions of the new Fire regulation shall apply to the construction, alteration, repair, equipment, use and occupancy, maintenance, relocation of every building or structure within the area of jurisdiction. • Additions, alterations, repairs and changes of use or occupancy in all buildings and structures shall comply with the provisions for new buildings. • Organization • There shall be a unit under the Technology Development subdivision of CIDA for formulating regulations, standards, specifications and codes of practice. • Implementing monitoring and approval shall be under the control of the respective fire authorities under the local bodies. • Delegation of authority • The AHJ shall have the authority to delegate powers and assignments to Qualified persons to carry out and implement relevant provisions of this regulation. Such qualified persons shall have the powers to execute the duties as delegated by the AHJ.
  • 3. • Qualified person • Sri Lankan national who has obtained his professional qualification in the specified field as listed below as recognized by the relevant professional institute. • Chartered or Registered Architect registered with Architectural Registration Board • Competent Engineer Shall be an active Corporate Member of Institution Fire Engineers (UK) • Corporate Member of Institution of Engineers Sri Lanka, listed in the Directory of Building Services Engineers under the discipline of Fire protection and detection • Corporate Member of any other recognized institution as accepted by CIDA • System Designer • The system designer shall be identified on the system design documents. Acceptable minimum evidence of qualifications or certification shall be provided when requested by the authority having jurisdiction. Qualified personnel shall include, but not be limited to the following: • Personnel who are certified by a nationally recognized fire protection certification organization acceptable to the Authority Having Jurisdiction. • Personnel who are registered, licensed, or certified by CIDA.
  • 4. • Technical and Compliance Committee on Fire Regulations (TCCFR) • A Technical and Compliance Committee on Fire Regulations (TCCFR) shall be appointed by CIDA. The committee shall consist of minimum of five members suitably qualified and having adequate training and experience. • The committee shall, • Advise the AHJ on any technical matters where such advice is required for taking a final decision. • Investigate and recommend corrective actions for violations of and non-compliances with the regulations brought to the notice of CIDA. • Investigate and recommend the courses of action to be taken with respect to any dispute referred to CIDA.
  • 5. • Responsibility of the Technical and Compliance Committee on Fire Regulations (TCCFR) • Technical and Compliance Committee on Fire Regulations (TCCFR) shall perform the functions of the appeal board for any appeals made by the relevant parties. • Whenever the AHJ reject or refuse to approve proposed construction, the owner or his/her duly authorized agent can make an appeal to the AHJ. The AHJ shall refer such appeals to the above committee for advice. • System Installer • The installation of the system shall be carried out by a Contractor/ Agency registered with CIDA, under the Fire Detection, Protection & Suppression (FDPS) System speciality of Electro Mechanical (EM) field.
  • 6. • Reports and records • The AHJ shall keep permanent records, including but not limited to, recommended fire requirements, design drawings, approved drawings, test certificates and approvals giving complete details of premises • Maintenance of buildings • All Active and Passive fire systems in buildings and structures and all parts thereof shall be maintained in a safe condition, and all devices and safeguards required by new regulation shall be maintained in good and proper operating condition • Owners/occupiers of the designated buildings falling under the categories of super high rise and high rise buildings which require Fire Risk Assessment as per this regulation shall be required to produce a report issued by a qualified person or body once in every three years, to demonstrate the efficiency of the Fire Protection systems, means of escape and conditions of refuge floors etc.
  • 7. • Stop Work orders • Whenever any building work is being done contrary to provisions of this regulation or is being done in an unsafe or dangerous manner, the AHJ shall order such work stopped forthwith. • Such violations shall be noticed in writing served on the person(s) engaged in doing or causing such work to be done and such persons shall immediately stop work until authorized by the AHJ to proceed. • On receipt of such a notice of stoppage of work the concerned parties shall take action to correct/ rectify all defects listed and inform the AHJ in writing. • AHJ on receipt of such notification shall carry out further inspections and withdraw the notice of stoppage of work if the necessary rectification works has been carried out satisfactorily.
  • 8. • Certificate of compliance • Certificate of compliance with the regulation shall be issued by AHJ or by a qualified person registered with CIDA. • Certificate of conformity with the fire regulation shall not be issued by any party other than AHJ or qualified person registered with CIDA • Equivalency • The use of equivalent or superior Standards systems, equipment and devices complying with this regulation as a basic minimum, is permitted under new fire regulations. • The AHJ has the authority in taking the final decision regarding the use of such alternatives.