HEALTH & SAFETY
HEALTH & SAFETY:
• POWERGRID recognizes its statutory and moral responsibilities for ensuring safe Design,
Construction, Operation and Maintenance of its Transmission Lines & Sub-stations, and provision
of safe methods of work and healthy working condition, for ensuring safety of its personnel and
those of its contractors as well as the general public.
• POWERGRID has developed and implemented systems and procedures aligned with OHSAS
18001 for Occupational Health and Safety Management System which are audited & certified to
the above standard by BSI Management Systems.
• The Transmission Lines & Sub-stations of POWERGRID are constructed, operated and maintained
in accordance with the requirements of Indian Electricity Act, 2003, and the Regulations
thereunder, as well as Indian & International standards.
• Compliance of the above are verified during the Inspections by Central Electricity Authority (CEA),
who are the Statutory Authority for inspecting and clearing the EHV Power Transmission
installations, before commissioning as well as during periodical Inspections after commissioning.
• The requisite guidelines regarding limiting exposure to Electric & Magnetic Fields (EMF), as
specified by International Commission on Non-Ionizing Radiation Protection (ICNIRP) are
followed by POWERGRID.
• Minimum electrical clearance, as required by the Indian Electricity Rules & Regulations, are
maintained with respect to the ground, roads, railway lines and other habitats, in the
Transmission Lines of POWERGRID, to ensure safety of human beings & livestock moving, living
or working in the vicinity.
• In addition, anti-climbing devices & danger boards are installed at all towers, to warn and
dissuade the general public from climbing the EHV transmission towers.
• Appropriate earthing / grounding has been provided in all EHV Transmission Lines and Towers,
and fast acting Protection Relays have been installed in the terminal sub-stations to protect the
men and equipments / installations. The Protection Relays ensure that the charged Line / Circuit
automatically trips in case of any earth fault anywhere in the Transmission Lines.
• All the EHV Sub-stations have been securely fenced with round the clock security & surveillance
to ensure that undesignated persons and general public do not enter into charged areas,
endangering themselves.
• POWERGRID Apex Safety Board, with CMD as Chairman and the functional Directors as members,
has been established at Corporate Centre to periodically review the safety performance of the
Corporation / Construction Agencies, and advise appropriate additional measures, as required,
for effective safety & accident prevention.
• A Safety Cell is established under Corporate Asset Management Dept. to coordinate all safety
promotion & accident prevention related activities of Transmission Lines and Sub-stations under
construction as well as under operation, and to provide Technical support to sites for ensuring
proper implementation of the Safety Policy & Procedures of the Company and applicable safety
requirements during various activities.
• Safety Guidelines / Check Lists have been formulated for O&M as well as Construction activities,
which are reviewed periodically and amended / updated, as required.
• Appropriate provisions have been incorporated in the Contractual documents to bind the
Construction Agencies to ensure the safety requirements at their work sites and also to meet the
various statutory requirements and payment of compensation to legal heirs of the victims arising
out of accidents.
• To make the Bidders / Construction Agencies to be conscious of implementing the safety
requirements seriously during construction of the Transmission Projects being executed by them,
by providing safe methods of work and safe working conditions, a “Safety Pact” is required to be
submitted by all the Bidders, without which their bids are considered as invalid and rejected.
• To monitor compliance of the various safety requirements and accident prevention measures,
Site Surveillance Inspections are carried out in the construction sites to identify the hazardous
conditions / activities and the concerned Construction Agencies are notified for rectification of
the same.
• A detailed procedure for reporting of incidents / accidents, Investigation and Analysis has been
established. The root cause for the incidents / accidents are identified and remedial actions to
prevent recurrence of such accidents are recommended by the Committee.
• Training programmes / Awareness Programmes are held periodically covering all areas of O&M /
Construction / Safety / First Aid / Fire Fighting / use of Personal Protective Equipments, etc.,
wherein the Engineers, Supervisors & Technicians are imparted refresher training.
• Tool Box meetings / briefings are conducted at the construction sites to re-emphasise the
precautionary measures and the need for safe working by the gangs.

More Related Content

What's hot

Lifting Equipment
Lifting Equipment Lifting Equipment
Lifting Equipment Manish Yadav
 
Electricallockoutsop 717
Electricallockoutsop 717Electricallockoutsop 717
Electricallockoutsop 717MUHAMMAD ISHFAQ
 
15 10 13 idle redundant plant inspections
15 10 13 idle redundant plant inspections15 10 13 idle redundant plant inspections
15 10 13 idle redundant plant inspectionsAlan Bassett
 
SAFETY REQUIREMENTS & GUIDELINES AT SITE
SAFETY REQUIREMENTS & GUIDELINES AT SITESAFETY REQUIREMENTS & GUIDELINES AT SITE
SAFETY REQUIREMENTS & GUIDELINES AT SITEHasnizam Md Saad
 
12.industrial safety engineering
12.industrial safety engineering12.industrial safety engineering
12.industrial safety engineeringkarthikmechgod
 
Industrial safety final
Industrial safety finalIndustrial safety final
Industrial safety finalARUNAYESUDAS
 
Pipeline Construction Safety
Pipeline Construction SafetyPipeline Construction Safety
Pipeline Construction Safetyenergypipeline
 
Control of Hazardous Energy
Control of Hazardous EnergyControl of Hazardous Energy
Control of Hazardous EnergyAndy Mihans
 
3 -industrial safety-pp beura
3 -industrial safety-pp beura3 -industrial safety-pp beura
3 -industrial safety-pp beuraSivaranjan
 

What's hot (14)

Lifting Equipment
Lifting Equipment Lifting Equipment
Lifting Equipment
 
Electricallockoutsop 717
Electricallockoutsop 717Electricallockoutsop 717
Electricallockoutsop 717
 
Safety in manufacturing
Safety in manufacturingSafety in manufacturing
Safety in manufacturing
 
FT WTT Brochure New
FT WTT Brochure NewFT WTT Brochure New
FT WTT Brochure New
 
15 10 13 idle redundant plant inspections
15 10 13 idle redundant plant inspections15 10 13 idle redundant plant inspections
15 10 13 idle redundant plant inspections
 
Industrial safety engineering
Industrial safety engineeringIndustrial safety engineering
Industrial safety engineering
 
SAFETY REQUIREMENTS & GUIDELINES AT SITE
SAFETY REQUIREMENTS & GUIDELINES AT SITESAFETY REQUIREMENTS & GUIDELINES AT SITE
SAFETY REQUIREMENTS & GUIDELINES AT SITE
 
Industrial safety
Industrial safetyIndustrial safety
Industrial safety
 
12.industrial safety engineering
12.industrial safety engineering12.industrial safety engineering
12.industrial safety engineering
 
Industrial safety final
Industrial safety finalIndustrial safety final
Industrial safety final
 
Industrial Safety
Industrial SafetyIndustrial Safety
Industrial Safety
 
Pipeline Construction Safety
Pipeline Construction SafetyPipeline Construction Safety
Pipeline Construction Safety
 
Control of Hazardous Energy
Control of Hazardous EnergyControl of Hazardous Energy
Control of Hazardous Energy
 
3 -industrial safety-pp beura
3 -industrial safety-pp beura3 -industrial safety-pp beura
3 -industrial safety-pp beura
 

Similar to POWERGRID Health and Safety Standards

PRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - CopyPRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - CopyPRAVEENKUMAR MANE
 
Firstcool electromechanical works llc
Firstcool electromechanical works llcFirstcool electromechanical works llc
Firstcool electromechanical works llcMohamedAwaad23
 
First engineering contracting
First engineering contractingFirst engineering contracting
First engineering contractingMohamedAwaad23
 
Dam construction safety management (group 2, 7th reporter)
Dam construction safety management (group 2, 7th reporter)Dam construction safety management (group 2, 7th reporter)
Dam construction safety management (group 2, 7th reporter)Jefferson Pura Basista
 
Operations integritydesignconstructioncommissioning
Operations integritydesignconstructioncommissioningOperations integritydesignconstructioncommissioning
Operations integritydesignconstructioncommissioningGiancarlo Scotti
 
presentation thesis kanios hse 0.5
presentation thesis kanios hse 0.5presentation thesis kanios hse 0.5
presentation thesis kanios hse 0.5Stathis Kanios
 
Electrical Safety Audit for Risk Management.pptx
Electrical Safety Audit for Risk Management.pptxElectrical Safety Audit for Risk Management.pptx
Electrical Safety Audit for Risk Management.pptxURS Certification
 
Construction Engineering Management Entrepreneur.pptx
Construction Engineering Management Entrepreneur.pptxConstruction Engineering Management Entrepreneur.pptx
Construction Engineering Management Entrepreneur.pptxHIRA466344
 
Hse new microsoft power point presentation
Hse new microsoft power point presentationHse new microsoft power point presentation
Hse new microsoft power point presentationSamip Nathani nathani
 
Ajit Kumar Singh - BMS Specialist
Ajit Kumar Singh - BMS SpecialistAjit Kumar Singh - BMS Specialist
Ajit Kumar Singh - BMS SpecialistAjit Singh
 
afzal malick updated HSE RESUME 30-08-2016
afzal malick updated HSE RESUME 30-08-2016afzal malick updated HSE RESUME 30-08-2016
afzal malick updated HSE RESUME 30-08-2016Afzal Malick
 
Phy Sy CTPAT.pptx-ctpat training for supply chain managers.
Phy Sy CTPAT.pptx-ctpat training for supply chain managers.Phy Sy CTPAT.pptx-ctpat training for supply chain managers.
Phy Sy CTPAT.pptx-ctpat training for supply chain managers.Major K. Subramaniam Kmaravehlu
 

Similar to POWERGRID Health and Safety Standards (20)

PRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - CopyPRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - Copy
 
Firstcool electromechanical works llc
Firstcool electromechanical works llcFirstcool electromechanical works llc
Firstcool electromechanical works llc
 
First engineering contracting
First engineering contractingFirst engineering contracting
First engineering contracting
 
Dam construction safety management (group 2, 7th reporter)
Dam construction safety management (group 2, 7th reporter)Dam construction safety management (group 2, 7th reporter)
Dam construction safety management (group 2, 7th reporter)
 
AHMET ARAYICI CV
AHMET ARAYICI CVAHMET ARAYICI CV
AHMET ARAYICI CV
 
Operations integritydesignconstructioncommissioning
Operations integritydesignconstructioncommissioningOperations integritydesignconstructioncommissioning
Operations integritydesignconstructioncommissioning
 
m khalf
m khalfm khalf
m khalf
 
presentation thesis kanios hse 0.5
presentation thesis kanios hse 0.5presentation thesis kanios hse 0.5
presentation thesis kanios hse 0.5
 
Safety plan
Safety planSafety plan
Safety plan
 
Electrical Safety Audit for Risk Management.pptx
Electrical Safety Audit for Risk Management.pptxElectrical Safety Audit for Risk Management.pptx
Electrical Safety Audit for Risk Management.pptx
 
Construction Engineering Management Entrepreneur.pptx
Construction Engineering Management Entrepreneur.pptxConstruction Engineering Management Entrepreneur.pptx
Construction Engineering Management Entrepreneur.pptx
 
m khalf
m khalfm khalf
m khalf
 
Mechanical hazard control
Mechanical hazard controlMechanical hazard control
Mechanical hazard control
 
Hse new microsoft power point presentation
Hse new microsoft power point presentationHse new microsoft power point presentation
Hse new microsoft power point presentation
 
Ajit Kumar Singh - BMS Specialist
Ajit Kumar Singh - BMS SpecialistAjit Kumar Singh - BMS Specialist
Ajit Kumar Singh - BMS Specialist
 
afzal malick updated HSE RESUME 30-08-2016
afzal malick updated HSE RESUME 30-08-2016afzal malick updated HSE RESUME 30-08-2016
afzal malick updated HSE RESUME 30-08-2016
 
HSE Engineer Resume
HSE Engineer ResumeHSE Engineer Resume
HSE Engineer Resume
 
Phy Sy CTPAT.pptx-ctpat training for supply chain managers.
Phy Sy CTPAT.pptx-ctpat training for supply chain managers.Phy Sy CTPAT.pptx-ctpat training for supply chain managers.
Phy Sy CTPAT.pptx-ctpat training for supply chain managers.
 
ANAND HSE- CV
ANAND HSE- CVANAND HSE- CV
ANAND HSE- CV
 
Roberto-CV-F
Roberto-CV-FRoberto-CV-F
Roberto-CV-F
 

POWERGRID Health and Safety Standards

  • 1. HEALTH & SAFETY HEALTH & SAFETY: • POWERGRID recognizes its statutory and moral responsibilities for ensuring safe Design, Construction, Operation and Maintenance of its Transmission Lines & Sub-stations, and provision of safe methods of work and healthy working condition, for ensuring safety of its personnel and those of its contractors as well as the general public. • POWERGRID has developed and implemented systems and procedures aligned with OHSAS 18001 for Occupational Health and Safety Management System which are audited & certified to the above standard by BSI Management Systems. • The Transmission Lines & Sub-stations of POWERGRID are constructed, operated and maintained in accordance with the requirements of Indian Electricity Act, 2003, and the Regulations thereunder, as well as Indian & International standards. • Compliance of the above are verified during the Inspections by Central Electricity Authority (CEA), who are the Statutory Authority for inspecting and clearing the EHV Power Transmission installations, before commissioning as well as during periodical Inspections after commissioning. • The requisite guidelines regarding limiting exposure to Electric & Magnetic Fields (EMF), as specified by International Commission on Non-Ionizing Radiation Protection (ICNIRP) are followed by POWERGRID. • Minimum electrical clearance, as required by the Indian Electricity Rules & Regulations, are maintained with respect to the ground, roads, railway lines and other habitats, in the Transmission Lines of POWERGRID, to ensure safety of human beings & livestock moving, living or working in the vicinity. • In addition, anti-climbing devices & danger boards are installed at all towers, to warn and dissuade the general public from climbing the EHV transmission towers. • Appropriate earthing / grounding has been provided in all EHV Transmission Lines and Towers, and fast acting Protection Relays have been installed in the terminal sub-stations to protect the men and equipments / installations. The Protection Relays ensure that the charged Line / Circuit automatically trips in case of any earth fault anywhere in the Transmission Lines. • All the EHV Sub-stations have been securely fenced with round the clock security & surveillance to ensure that undesignated persons and general public do not enter into charged areas, endangering themselves. • POWERGRID Apex Safety Board, with CMD as Chairman and the functional Directors as members, has been established at Corporate Centre to periodically review the safety performance of the Corporation / Construction Agencies, and advise appropriate additional measures, as required, for effective safety & accident prevention. • A Safety Cell is established under Corporate Asset Management Dept. to coordinate all safety promotion & accident prevention related activities of Transmission Lines and Sub-stations under
  • 2. construction as well as under operation, and to provide Technical support to sites for ensuring proper implementation of the Safety Policy & Procedures of the Company and applicable safety requirements during various activities. • Safety Guidelines / Check Lists have been formulated for O&M as well as Construction activities, which are reviewed periodically and amended / updated, as required. • Appropriate provisions have been incorporated in the Contractual documents to bind the Construction Agencies to ensure the safety requirements at their work sites and also to meet the various statutory requirements and payment of compensation to legal heirs of the victims arising out of accidents. • To make the Bidders / Construction Agencies to be conscious of implementing the safety requirements seriously during construction of the Transmission Projects being executed by them, by providing safe methods of work and safe working conditions, a “Safety Pact” is required to be submitted by all the Bidders, without which their bids are considered as invalid and rejected. • To monitor compliance of the various safety requirements and accident prevention measures, Site Surveillance Inspections are carried out in the construction sites to identify the hazardous conditions / activities and the concerned Construction Agencies are notified for rectification of the same. • A detailed procedure for reporting of incidents / accidents, Investigation and Analysis has been established. The root cause for the incidents / accidents are identified and remedial actions to prevent recurrence of such accidents are recommended by the Committee. • Training programmes / Awareness Programmes are held periodically covering all areas of O&M / Construction / Safety / First Aid / Fire Fighting / use of Personal Protective Equipments, etc., wherein the Engineers, Supervisors & Technicians are imparted refresher training. • Tool Box meetings / briefings are conducted at the construction sites to re-emphasise the precautionary measures and the need for safe working by the gangs.