1. HEALTH & SAFETY
HEALTH & SAFETY:
• POWERGRID recognizes its statutory and moral responsibilities for ensuring safe Design,
Construction, Operation and Maintenance of its Transmission Lines & Sub-stations, and provision
of safe methods of work and healthy working condition, for ensuring safety of its personnel and
those of its contractors as well as the general public.
• POWERGRID has developed and implemented systems and procedures aligned with OHSAS
18001 for Occupational Health and Safety Management System which are audited & certified to
the above standard by BSI Management Systems.
• The Transmission Lines & Sub-stations of POWERGRID are constructed, operated and maintained
in accordance with the requirements of Indian Electricity Act, 2003, and the Regulations
thereunder, as well as Indian & International standards.
• Compliance of the above are verified during the Inspections by Central Electricity Authority (CEA),
who are the Statutory Authority for inspecting and clearing the EHV Power Transmission
installations, before commissioning as well as during periodical Inspections after commissioning.
• The requisite guidelines regarding limiting exposure to Electric & Magnetic Fields (EMF), as
specified by International Commission on Non-Ionizing Radiation Protection (ICNIRP) are
followed by POWERGRID.
• Minimum electrical clearance, as required by the Indian Electricity Rules & Regulations, are
maintained with respect to the ground, roads, railway lines and other habitats, in the
Transmission Lines of POWERGRID, to ensure safety of human beings & livestock moving, living
or working in the vicinity.
• In addition, anti-climbing devices & danger boards are installed at all towers, to warn and
dissuade the general public from climbing the EHV transmission towers.
• Appropriate earthing / grounding has been provided in all EHV Transmission Lines and Towers,
and fast acting Protection Relays have been installed in the terminal sub-stations to protect the
men and equipments / installations. The Protection Relays ensure that the charged Line / Circuit
automatically trips in case of any earth fault anywhere in the Transmission Lines.
• All the EHV Sub-stations have been securely fenced with round the clock security & surveillance
to ensure that undesignated persons and general public do not enter into charged areas,
endangering themselves.
• POWERGRID Apex Safety Board, with CMD as Chairman and the functional Directors as members,
has been established at Corporate Centre to periodically review the safety performance of the
Corporation / Construction Agencies, and advise appropriate additional measures, as required,
for effective safety & accident prevention.
• A Safety Cell is established under Corporate Asset Management Dept. to coordinate all safety
promotion & accident prevention related activities of Transmission Lines and Sub-stations under
2. construction as well as under operation, and to provide Technical support to sites for ensuring
proper implementation of the Safety Policy & Procedures of the Company and applicable safety
requirements during various activities.
• Safety Guidelines / Check Lists have been formulated for O&M as well as Construction activities,
which are reviewed periodically and amended / updated, as required.
• Appropriate provisions have been incorporated in the Contractual documents to bind the
Construction Agencies to ensure the safety requirements at their work sites and also to meet the
various statutory requirements and payment of compensation to legal heirs of the victims arising
out of accidents.
• To make the Bidders / Construction Agencies to be conscious of implementing the safety
requirements seriously during construction of the Transmission Projects being executed by them,
by providing safe methods of work and safe working conditions, a “Safety Pact” is required to be
submitted by all the Bidders, without which their bids are considered as invalid and rejected.
• To monitor compliance of the various safety requirements and accident prevention measures,
Site Surveillance Inspections are carried out in the construction sites to identify the hazardous
conditions / activities and the concerned Construction Agencies are notified for rectification of
the same.
• A detailed procedure for reporting of incidents / accidents, Investigation and Analysis has been
established. The root cause for the incidents / accidents are identified and remedial actions to
prevent recurrence of such accidents are recommended by the Committee.
• Training programmes / Awareness Programmes are held periodically covering all areas of O&M /
Construction / Safety / First Aid / Fire Fighting / use of Personal Protective Equipments, etc.,
wherein the Engineers, Supervisors & Technicians are imparted refresher training.
• Tool Box meetings / briefings are conducted at the construction sites to re-emphasise the
precautionary measures and the need for safe working by the gangs.