Loading Facility Concept.pptx
- 2. Legend:
1. Pipe Support
2. Rigid pipeline
3. Flexible line
4. Mooring Buoy
5. Soft mooring line
6. LNG Carrier
7. Assist Tug
LOADING FACILITY
- 3. Mooring Buoy
Required data
1. Bathymetric for proposed
terminal location
2. LNG Vessel particular
3. Design lifetime
4. Environmental force/Met
ocean Data
5. Geotechnical data
Engineering Output
1. Unloading Terminal Location
(distance to shore & water depth)
2. LNG vessel Mooring Analysis
3. Buoy and anchoring system design
4. Mooring line/Mooring hawser
design
5. Quick release/bollard/buoy
accessories design
6. Vessel mooring un mooring
operation procedure
Rigid Pipeline
Required data
1. Hydrocarbon or chemical
Product physical characteristic
and behaviour
2. Operation Pressure
3. Design lifetime
4. Protection requirement
5. Pigging requirement
6. Geotechnical Survey
7. Environmental force/Met
ocean Data
Engineering Output
1. Pipeline Route & Sizing design
2. Pipe material and wall
thickness
3. Pipeline span Analysis
4. Stress and buckling analysis
5. Pipeline expansion analysis
6. Pigging, corrosion, stability etc
- 4. Pipe Support
Required data
1. Pipeline Properties
2. Pipeline Load
3. Pipeline Span
4. Design lifetime
5. Geotechnical data
6. Geophysical data
7. Met ocean Data
Engineering Output
1. Pipe Support Structure design
2. Pipe Clamp design
3. Pile Drive Ability analysis/soil
bearing capacity check
4. Pile sizing
5. Material/Structural
Specification
6. Corrosion Protection
specification
7. Etc
Flexible line
Required data
1. Hydrocarbon or chemical
Product physical characteristic
and behaviour
2. Operation Pressure
3. Design lifetime
4. Flange type
5. Pigging requirement
6. Environmental force/Met
ocean Data
7. Quick release system
Engineering Output
1. Line Sizing design
2. Flexible line manufacture
engineering output