SlideShare a Scribd company logo
1 of 4
MD DANISH AHSAN
Personal Detail
Date Of Birth:
4th feb 1989
Sex: Male
Religion: Islam
Nationality: Indian
Language Known:
English, Hindi, Arabic, Urdu
Marital Status:
Married
PassportStatus:
Passport No:-G5639869
Date of Issue:-05/11/2007
Date of Expery:-04/11/2017
Local Residence:
Sulmaniya talatin
State- Riyadh,Saudi Arbia
Contact Details
S/0 Hazi Md Mustafa Ahsan,
Shekhana kalan, Bihar Sharif,
Dist-Nalanda, Pin Code-803101
State-Bihar
E-mail ID
danish.abwa@gmail.com
Skype ID
Danish.ahsan6
Contact Number:
+966 530481958
+91 7677133194
Career Objective
Seeking a position to utilize my skills and abilities in a challenging environment that offers
professional growth while being resourceful, innovative and flexible.
Academic Profile
Bachelors Degree in Electrical & Electronics Engineering
 Institute: Ghousia college of Engineering, Karanataka
 University : Visvesvaraya Technological University, Belgaum.
Total Work Experience – 6.5 Year
Professional Experience (Total Experience: 6.5 years)
1) 25th
November 2014 to Till date
Job Role: Electrical Project Engineer
ABWA CONTRACTING CO. LTD.
Project Title:1. Residence ofH.R.H Prince Bandar Bin Sultan Bin Abdulaziz.
Project Title:2. Fast Riyadh Metro Alliance MEP Offices.
Job Responsibility
 Responsible for the overall implementation of quantity price
estimation,shop drawing,quality assurance and control related to electrical
works.
 Developed project documentation including equipment layout and
specification cost estimates and schematic diagrams.
 Implemented lower cost machinery with additional features.
 Handle the tasks of preparing detailed scope of work and interpreting
engineering drawings for assigned projects.
 Taking full responsibility for all electrical works and handing over the
project to the complete satisfaction of the clients.
 Managed the coordination of all electro-mechanical works.
 Installation of Electrical M.V panels,L.V panels, 2000 KVA,1500 KVA
Transformer,13.8KVA,625kVA Genset,chillers, pumps, fire system
,booster pumps, cables, switches, Building Automation, UPS systems etc .
 Prepare all construction electrical cable tray layouts like earthing layouts,
area classification layouts, cable schedule and electrical connection
diagram.
 Coordinating with Vendors and Contractors for the timely Completion of
the Projects.
 Managing the Projects and try to reduce the Expenditure.
 Quality checking of all the activities.
 Resolving the electrical issues raised by client,vendor or construction team
or by other department.
 Explaning the electrical scope to construction team and guiding them
wherever it is required.
1)5th
August 2013 to 31 October 2014
Job Role: Electrical Site Engineer
PRATIKSHA ELECTRICALS PVT LTD.
Project Title:1. Mango Suits Hotel, Airoli MUMBAI
Project Title:2. Ashok Nirvan project,Lonavala,district pune.
Job Responsibility
 Analyzing the drawing and allocating the space & raw material required for the job
 Instructing the supervisors and electricians to carry out the job according to the drawing.
 Preparation of daily progress report (DPR).
 Installation and assembling of Electrical panels, cables, switches, Building Automation, UPS systems
etc .
 Prepare all construction electrical cable tray layouts like earthing layouts, area classification layouts,
cable schedule and electrical connection diagram.
 Prepare particular data sheet for electrical tools and equipments.
 Prepare specific electrical system for construction.
 Responsible for overall execution of work/job at site.
 Coordinating with other fellow contractors for clearance to work.
 Managing the Projects and try to reduce the Expenditure.
 Quality checking of all the activities.
 Responsible for maintaining complete information of lighting database system.
 Resolving the electrical issues raised by client,vendor or construction team or by other department.
 Explaning the electrical scope to construction team and guiding them wherever it is required.
2) January 2012 to June 2013
Job Role:Electrical Site Engineer
Company Name: Rohini Industrial Electricals Pvt. Ltd.
Project Site-M/s. Indorama Synthetic Pvt. Ltd,Buttibori, Nagpur, Maharashtra
Job Responsibility
Overall Voltage drop calculations and drawing Submittal for consultants for approval.
Load Sharing, Breakers Selections, Lighting Arresters Calculations for Approvals from Clients
and Consultants.
Erection, Testing and Commissioning of 22 KV HV Breakers, LV Breakers.
Erection, Installation, Testing and Commissioning of transformer 2.5 MVA.
Erection and Installation of UPS 800kva system.
Erection, Installation, Testing and Commissioning of PCC panel.
Erection , Installation, Testing of HVAC Panel.
Erection, Installation, testing and Commissioning of MCC panel.
Erection, Installation, Testing and Commissioning of DOL Starter Motor for AHU.
Erection, Installation, testing and Commissioning of Power Distribution Board(PDB).
Erection, Installation, testing and Commissioning of Power Distribution unit(PDU).
Supervise the installations of electrical systems on a daily/regular basis to ensure quality Control
and compliance with contract documents and approved material and shop drawings.
Co ordination for overall site activities to satisfy the client and customer
Review of the Project Specification for Preparation of Material Submittals, Drawings and
Engineering Data of all Specialist Systems in order to procure the required system materials to
cope up with the Project Program.
Supervise the installations of electrical systems on a daily/regular basis to ensure quality control
and compliance with contract documents and approved material and shop drawings.
Preparation of Daily, Weekly and Monthly Progress reports,Mobilization of Material,
Man Power & Site setup.
Concealed wiring works in Control Building, Control Building Lighting Works Outdoor
Lighting works.
Attending Site review & Project progress Meetings
Managing the Projects and try to reduce the Expenditure
 Quality checking of all the activities.
3) July2010 to Dec2011
Job Role: Asst Engineer
Company Name: Chamundeswari Electrical Contractors
Client: karanataka power transmission corporation, kanakapura
Project Title :- 220/66 kvsubstation, karanataka power transmission corporation, kanakapura Ramanagarm.
Job Responsibility
 Managing overall activities pertaining to erection, testing, commissioning and maintenance of a wide
range of Electrical equipments like Transformers, Generators, Motors, PLC Systems and process
control & Instrumentation equipments.
 Periodical maintenance of transformers,circuit breakers and various switch gears.
 Daily checking of the lighting and other electrical panel.
 Responsibilities of providing technical expertise to support substation operations.
 Identify and update plant electrical related operational and equipment issues to the senior electrical
engineer.
 Responsible for the maintenance of switch gears, breakers,electrical equipment,
DC distribution systems.
 Handle the responsibilities of maintenance 220/66 kv substation.
 Executing cost saving and energy.
Career Level
Career Level - Medium Level
Notice Period to work- Within 2 month
Computer Skills
MS Office 2003, 2007, Ms Word, Excel ,PPT ,DELUX for lux calculation
Electrical AutoCAD (2D), Pspice ,Basic of C
Strengths:
 Staff management skills and cheerful persistence in all technical pursuits.
 Methodical application of scientific fundamentals to effect solutions to various engineering problems.
 Hard working, quick achievement of concepts and ability to work under pressure.
 Particular ability to seek out and correct technical, presentational, and cross-referencing flaws in
construction bid packages.
 Superior documentation, publishing, and training skills.
I hereby declare that the above mentioned details are true to the best of my knowledge.
Name: Md Danish Ahsan
Date Signature

More Related Content

What's hot

B. tech Electrical and Electronics Engineer with 2 and half year experience i...
B. tech Electrical and Electronics Engineer with 2 and half year experience i...B. tech Electrical and Electronics Engineer with 2 and half year experience i...
B. tech Electrical and Electronics Engineer with 2 and half year experience i...anas pareed
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
Electrical Engineer Mafijur Rahman
Electrical Engineer Mafijur RahmanElectrical Engineer Mafijur Rahman
Electrical Engineer Mafijur RahmanRazu Khan
 
Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016ZUBER AHAMED
 
EE - ejaz cv (dubai) june 2016
EE - ejaz cv (dubai) june 2016EE - ejaz cv (dubai) june 2016
EE - ejaz cv (dubai) june 2016Ejaz Wagi
 
Electrical engineer cv.
Electrical engineer cv.Electrical engineer cv.
Electrical engineer cv.Aqib Bin aqeel
 
Shujaat Updated CV New
Shujaat Updated CV NewShujaat Updated CV New
Shujaat Updated CV NewShujaat Jan
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CVHosam Elbanna
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Prashant Maulikar
 
Resume of suvendu senapati
Resume of suvendu senapatiResume of suvendu senapati
Resume of suvendu senapatiSuvendu Senapati
 
Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014Srandev2014
 

What's hot (20)

B. tech Electrical and Electronics Engineer with 2 and half year experience i...
B. tech Electrical and Electronics Engineer with 2 and half year experience i...B. tech Electrical and Electronics Engineer with 2 and half year experience i...
B. tech Electrical and Electronics Engineer with 2 and half year experience i...
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
lakhwinder_Singh_CV_
lakhwinder_Singh_CV_lakhwinder_Singh_CV_
lakhwinder_Singh_CV_
 
Electrical site Engineer
Electrical site EngineerElectrical site Engineer
Electrical site Engineer
 
Electrical Engineer Mafijur Rahman
Electrical Engineer Mafijur RahmanElectrical Engineer Mafijur Rahman
Electrical Engineer Mafijur Rahman
 
Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016
 
Rama Rao MW CV
Rama Rao  MW CVRama Rao  MW CV
Rama Rao MW CV
 
Resume_Sunil kumar Singh
Resume_Sunil kumar SinghResume_Sunil kumar Singh
Resume_Sunil kumar Singh
 
EE - ejaz cv (dubai) june 2016
EE - ejaz cv (dubai) june 2016EE - ejaz cv (dubai) june 2016
EE - ejaz cv (dubai) june 2016
 
Engr.Bilal cv
Engr.Bilal cvEngr.Bilal cv
Engr.Bilal cv
 
Sudheer_CV
Sudheer_CVSudheer_CV
Sudheer_CV
 
LOHGESH2
LOHGESH2LOHGESH2
LOHGESH2
 
Electrical engineer cv.
Electrical engineer cv.Electrical engineer cv.
Electrical engineer cv.
 
Shujaat Updated CV New
Shujaat Updated CV NewShujaat Updated CV New
Shujaat Updated CV New
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
 
Resume of suvendu senapati
Resume of suvendu senapatiResume of suvendu senapati
Resume of suvendu senapati
 
Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014
 
Electrical engineer CV
Electrical engineer CVElectrical engineer CV
Electrical engineer CV
 

Similar to danish resume (20)

Pritom_Ghosh_Curriculum_Vitae
Pritom_Ghosh_Curriculum_VitaePritom_Ghosh_Curriculum_Vitae
Pritom_Ghosh_Curriculum_Vitae
 
CV
CVCV
CV
 
Engr Qamar R
Engr Qamar REngr Qamar R
Engr Qamar R
 
Resume new
Resume newResume new
Resume new
 
Subrat dash.credential
Subrat dash.credentialSubrat dash.credential
Subrat dash.credential
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
Navaneeth New CV
Navaneeth New CVNavaneeth New CV
Navaneeth New CV
 
danish resume
danish resumedanish resume
danish resume
 
SK RABANI Electrical engg
SK RABANI  Electrical enggSK RABANI  Electrical engg
SK RABANI Electrical engg
 
c.v. SURAJ CHANDANGIRIWAR new -NCC
c.v. SURAJ CHANDANGIRIWAR new -NCCc.v. SURAJ CHANDANGIRIWAR new -NCC
c.v. SURAJ CHANDANGIRIWAR new -NCC
 
Navnath_Electrical_Engg_CV
Navnath_Electrical_Engg_CVNavnath_Electrical_Engg_CV
Navnath_Electrical_Engg_CV
 
Resume GM (2)
Resume GM (2)Resume GM (2)
Resume GM (2)
 
MY Resume
MY Resume MY Resume
MY Resume
 
Udai
UdaiUdai
Udai
 
tufail CV dxb
tufail CV dxbtufail CV dxb
tufail CV dxb
 
Resume
Resume Resume
Resume
 
Akhlaque Ahmad
Akhlaque AhmadAkhlaque Ahmad
Akhlaque Ahmad
 
junaid cv
junaid cvjunaid cv
junaid cv
 
Kaustubh Pimputkar RESUME
Kaustubh Pimputkar  RESUMEKaustubh Pimputkar  RESUME
Kaustubh Pimputkar RESUME
 
Kaustubh Pimputkar RESUME
Kaustubh Pimputkar  RESUMEKaustubh Pimputkar  RESUME
Kaustubh Pimputkar RESUME
 

danish resume

  • 1. MD DANISH AHSAN Personal Detail Date Of Birth: 4th feb 1989 Sex: Male Religion: Islam Nationality: Indian Language Known: English, Hindi, Arabic, Urdu Marital Status: Married PassportStatus: Passport No:-G5639869 Date of Issue:-05/11/2007 Date of Expery:-04/11/2017 Local Residence: Sulmaniya talatin State- Riyadh,Saudi Arbia Contact Details S/0 Hazi Md Mustafa Ahsan, Shekhana kalan, Bihar Sharif, Dist-Nalanda, Pin Code-803101 State-Bihar E-mail ID danish.abwa@gmail.com Skype ID Danish.ahsan6 Contact Number: +966 530481958 +91 7677133194 Career Objective Seeking a position to utilize my skills and abilities in a challenging environment that offers professional growth while being resourceful, innovative and flexible. Academic Profile Bachelors Degree in Electrical & Electronics Engineering  Institute: Ghousia college of Engineering, Karanataka  University : Visvesvaraya Technological University, Belgaum. Total Work Experience – 6.5 Year Professional Experience (Total Experience: 6.5 years) 1) 25th November 2014 to Till date Job Role: Electrical Project Engineer ABWA CONTRACTING CO. LTD. Project Title:1. Residence ofH.R.H Prince Bandar Bin Sultan Bin Abdulaziz. Project Title:2. Fast Riyadh Metro Alliance MEP Offices. Job Responsibility  Responsible for the overall implementation of quantity price estimation,shop drawing,quality assurance and control related to electrical works.  Developed project documentation including equipment layout and specification cost estimates and schematic diagrams.  Implemented lower cost machinery with additional features.  Handle the tasks of preparing detailed scope of work and interpreting engineering drawings for assigned projects.  Taking full responsibility for all electrical works and handing over the project to the complete satisfaction of the clients.  Managed the coordination of all electro-mechanical works.  Installation of Electrical M.V panels,L.V panels, 2000 KVA,1500 KVA Transformer,13.8KVA,625kVA Genset,chillers, pumps, fire system ,booster pumps, cables, switches, Building Automation, UPS systems etc .  Prepare all construction electrical cable tray layouts like earthing layouts, area classification layouts, cable schedule and electrical connection diagram.  Coordinating with Vendors and Contractors for the timely Completion of the Projects.  Managing the Projects and try to reduce the Expenditure.  Quality checking of all the activities.  Resolving the electrical issues raised by client,vendor or construction team or by other department.  Explaning the electrical scope to construction team and guiding them wherever it is required.
  • 2. 1)5th August 2013 to 31 October 2014 Job Role: Electrical Site Engineer PRATIKSHA ELECTRICALS PVT LTD. Project Title:1. Mango Suits Hotel, Airoli MUMBAI Project Title:2. Ashok Nirvan project,Lonavala,district pune. Job Responsibility  Analyzing the drawing and allocating the space & raw material required for the job  Instructing the supervisors and electricians to carry out the job according to the drawing.  Preparation of daily progress report (DPR).  Installation and assembling of Electrical panels, cables, switches, Building Automation, UPS systems etc .  Prepare all construction electrical cable tray layouts like earthing layouts, area classification layouts, cable schedule and electrical connection diagram.  Prepare particular data sheet for electrical tools and equipments.  Prepare specific electrical system for construction.  Responsible for overall execution of work/job at site.  Coordinating with other fellow contractors for clearance to work.  Managing the Projects and try to reduce the Expenditure.  Quality checking of all the activities.  Responsible for maintaining complete information of lighting database system.  Resolving the electrical issues raised by client,vendor or construction team or by other department.  Explaning the electrical scope to construction team and guiding them wherever it is required. 2) January 2012 to June 2013 Job Role:Electrical Site Engineer Company Name: Rohini Industrial Electricals Pvt. Ltd. Project Site-M/s. Indorama Synthetic Pvt. Ltd,Buttibori, Nagpur, Maharashtra Job Responsibility Overall Voltage drop calculations and drawing Submittal for consultants for approval. Load Sharing, Breakers Selections, Lighting Arresters Calculations for Approvals from Clients and Consultants. Erection, Testing and Commissioning of 22 KV HV Breakers, LV Breakers. Erection, Installation, Testing and Commissioning of transformer 2.5 MVA. Erection and Installation of UPS 800kva system. Erection, Installation, Testing and Commissioning of PCC panel. Erection , Installation, Testing of HVAC Panel. Erection, Installation, testing and Commissioning of MCC panel. Erection, Installation, Testing and Commissioning of DOL Starter Motor for AHU. Erection, Installation, testing and Commissioning of Power Distribution Board(PDB). Erection, Installation, testing and Commissioning of Power Distribution unit(PDU). Supervise the installations of electrical systems on a daily/regular basis to ensure quality Control and compliance with contract documents and approved material and shop drawings.
  • 3. Co ordination for overall site activities to satisfy the client and customer Review of the Project Specification for Preparation of Material Submittals, Drawings and Engineering Data of all Specialist Systems in order to procure the required system materials to cope up with the Project Program. Supervise the installations of electrical systems on a daily/regular basis to ensure quality control and compliance with contract documents and approved material and shop drawings. Preparation of Daily, Weekly and Monthly Progress reports,Mobilization of Material, Man Power & Site setup. Concealed wiring works in Control Building, Control Building Lighting Works Outdoor Lighting works. Attending Site review & Project progress Meetings Managing the Projects and try to reduce the Expenditure  Quality checking of all the activities. 3) July2010 to Dec2011 Job Role: Asst Engineer Company Name: Chamundeswari Electrical Contractors Client: karanataka power transmission corporation, kanakapura Project Title :- 220/66 kvsubstation, karanataka power transmission corporation, kanakapura Ramanagarm. Job Responsibility  Managing overall activities pertaining to erection, testing, commissioning and maintenance of a wide range of Electrical equipments like Transformers, Generators, Motors, PLC Systems and process control & Instrumentation equipments.  Periodical maintenance of transformers,circuit breakers and various switch gears.  Daily checking of the lighting and other electrical panel.  Responsibilities of providing technical expertise to support substation operations.  Identify and update plant electrical related operational and equipment issues to the senior electrical engineer.  Responsible for the maintenance of switch gears, breakers,electrical equipment, DC distribution systems.  Handle the responsibilities of maintenance 220/66 kv substation.  Executing cost saving and energy. Career Level Career Level - Medium Level Notice Period to work- Within 2 month Computer Skills MS Office 2003, 2007, Ms Word, Excel ,PPT ,DELUX for lux calculation Electrical AutoCAD (2D), Pspice ,Basic of C
  • 4. Strengths:  Staff management skills and cheerful persistence in all technical pursuits.  Methodical application of scientific fundamentals to effect solutions to various engineering problems.  Hard working, quick achievement of concepts and ability to work under pressure.  Particular ability to seek out and correct technical, presentational, and cross-referencing flaws in construction bid packages.  Superior documentation, publishing, and training skills. I hereby declare that the above mentioned details are true to the best of my knowledge. Name: Md Danish Ahsan Date Signature