SlideShare a Scribd company logo
1 of 12
Cost comparisons
between traditional build and 3D printing
Summary
3DBuildingPrint is not only the only faster, more efficient, less labor intensive, ecologically-friendly, 0% waste product
and with less chance of human error – It is also more cost effective
2
Left graph shows the costs for a model 4 bedded house (216 m2), split by the
major areas of expenditure expressed as a percentage of the total build cost
of £115,000.
The superstructure element of the work is by far the most in cash terms. The
major elements of this have been shown in the graph.
The superstructure costs total £37,800 or 33% of the total outlay.
It is predominantly in this area where the 3D printing solution can generate
savings.
3DBuildingPrint use a methodology whereby the "shell" of the house is constructed within a couple of days
This cuts down the on-site labour cost significantly as we are able to deliver the finished article in between 6-9 weeks
£17,186
£13,749
£26,352
£17,186
£37,809
£17,990
£-
£20,000
£40,000
£60,000
£80,000
£100,000
Traditional 3D Print
Super Structure
Finishes
Groundworks
Preliminaries
Electrics
Plumbing & Heating
Professional Fees
Room By Room
£114 574
£76 423
13 7
20
14
14
7
24
20
18
7
0
20
40
60
80
100
120
Traditional 3D Print
Super Structure
Finishes
Groundworks
Preliminaries
Electrics
Plumbing & Heating
Professional Fees
Room By Room
98
62
– £38 151
– 36 days
* -– All calculations will be provided on next pages
Costs reduced by 33%* Days reduced by 37%*
£10,312
£8,020
£4,583
£5,729
£4,583
£17,186
£26,352
Superstructure
£37 809
Room By Room
Professional Fees
Plumbing & Heating
Electrics
Preliminaries
Groundworks
Finishes
Super Structure
House specification for cost comparisons
3
Slab 12 000 8 000
Height, mm Length, mm
Front elevation 150 12 000 150
Right elevation 8 000
Rear elevation 12 000
Left elevation 8 000
Front elevation Side elevation
Single floor 12 000 8 000
Height, mm Length, mm
Front elevation 5 400 12 000
Right elevation 8 000
Rear elevation 12 000
5 400
Left elevation 8 000
Front elevation Side elevation
Footings 14 000 10 000
Height, mm Length, mm
Front elevation 300 14 000
300
Right elevation 10 000
Rear elevation 14 000
Left elevation 10 000
We will be considering an large house, which measures an area of 5.4m X 40m = 216 m2
Costs of main resources
Bricks parameters1
Height 0,065
Length 0,215
Width 0,1025
Price per 1 unit £ 0,44
Bricks in pack 1 000
Price for pack £ 440,00
Mortar Parameters2
Quantity of bricks for calculations 500
Volume per 500 bricks, m3 0,33
Volume in unit, m3 0,33
Price per 1 unit £ 28,00
Concrete Parameters3
Price per 1 m3 £ 85,00
Bricklayers parameters4
Price per day £ 180,00
Bricks per day 500
4
Standard house building
Assumptions
Building productivity
Method Units Productivity
Bricklayers bricks/day 500
1 - http://www.wickes.co.uk/Wickes-Engineering-Bricks-Red-65mm-Class-B/p/213642
2 - https://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwit2t_Y5P3KAhXH2hoKHRkJBpoQFggtMAA&url=http%3A%2F%2Fwww.kellys.uk.com%2Fcontent%2Fdownload.asp%3Fid%3D193&usg=AFQ
jCNFY7WKw3Tf3KcwfQzuLhtDdvdbT8g&sig2=3cQcCNcvvHlRfKWrBeql2A
3 - http://www.lets-do-diy.com/Projects-and-advice/Concrete-work/Average-ready-mix-concrete-cost.aspx
4 -
Costs Unit Price per unit/day Quantity for day
Bricklayers persons £ 180,00 2
3D Printer Operator persons £ 250,00 2
Labourer persons £ 120,00 1
Foreman persons £ 250,00 1
Materials for Super Structure for Traditional Building
Super Structure Height, m Length, m Width, m
Traditional building
Bricks required
Mortar
required, tubesBricks in a row Bricks req. for height
Bricks req.
for length
Total of
bricks
Total for external of house 15 708
First Slab 0,15 12,00 8,00
First floor 5,40 40,00 0,30 2 84 187 15 708
Front elevation 12,00
Right elevation 8,00
Rear elevation 12,00
Left elevation 8,00
Footings 0,30 14,00 10,00
Total for internal of house 7 896
First floor internal wall 5,40 20,00 0,10 1 84 94 7 896
Total for house 23 604 49,57
Waste 5% 24 784 52,05
Rounding Total 25 000 53,00
5
Standard house building
Calculations of resources and duration
A single or double story building measured from the top of the foundation over 3m will be legally required to be a double skin wall
(Pavement Expert 2015). This project will be building a house of the height of 5.4 meters and will therefore require double skin
masonry.
A double skinned wall for a 4 bedroom house will use approximately 23,500 bricks, this will amount to 24 packs plus an additional pack
Bricks are achieved by the use of concrete or mortar, whilst the area to cover is 216m2 this can done from a range of prices. Mortar is a
commonly used in construction as it can be a thicker bonding agent. We will need about 53 tubes of mortar 0,33m3 each
An average brick layer is priced at 180 per day. The average amount of bricks laid per person is 500 per day
The average amount of brick layers needed is 2 which average a daily brick laid count of 1,000
In accordance with the above productivity, superstructure will be built in 27 days
Building costs for Traditional Building
Costs Unit
Price per
unit
Quantity Traditional building
% of
costs
Super Structure £ 37 809 33%
Walls, Footings and Slab Costs £ 17 584 15%
Concrete for Footing and Slab m3 £ 85,00 60,00 £ 5 100 4%
Bricks pack of brick £ 440,00 25,00 £ 11 000 10%
Mortar tube £ 28,00 53,00 £ 1 484 1%
Labour £ 19 710 17%
Bricklayers persons £ 180,00 2*27 £ 9 720 8%
Labourer persons £ 120,00 1*27 £ 3 240 3%
Foreman persons £ 250,00 1*27 £ 6 750 6%
Other Resources 1 £ 515 0%
Professional Fees £ 8 020 7%
Groundworks £ 17 186 15%
Plumbing & Heating £ 4 583 4%
Electrics £ 5 729 5%
Finishes £ 26 352 23%
Room By Room £ 10 312 9%
Preliminaries £ 4 583 4%
Total House Cost £ 114 574 100%
6
As we can see below the costs for a model 4 bedded house (216 m2) will be about of £115,000
The superstructure element of the work is the most in cash terms, at costs of total £37,800 or 33% of the total outlay
£115,000 is lower limit for a such house, therefore our comparing will be close to real
Precise project calculations can be carried out in the near future, in the next stages
But basing on this calculation we can compare Traditional building and 3D Print technology
Standard house building
Total building costs for traditional building
Super
Structure
£37 809
Professional
Fees
£8 020
Groundworks
£17 186
Plumbing &
Heating
£4 583
Electrics
£5 729
Finishes
£26 352
Room By
Room
£10 312
Preliminaries
£4 583
7
3D Print house building
Calculations of resources and duration
Basing on previous assumptions and count that 3D Printer productivity is about 20 m3 per day we can calculate resources
and costs for 3D printed house
Materials for Super Structure for Traditional Building and 3D Print
Super Structure Height, m Length, m Width, m
3D Print
Concrete required, m3
Total for external of house 121,20
First Slab 0,15 12,00 8,00 14,40
First floor 5,40 40,00 0,30 64,80
Front elevation 12,00
Right elevation 8,00
Rear elevation 12,00
Left elevation 8,00
Footings 0,30 14,00 10,00 42,00
Total for internal of house 10,80
First floor internal wall 5,40 20,00 0,10 10,80
Total for house 132,00
Waste 5% 138,60
Rounding Total 140,00
For double skinned wall for a 4 bedroom house we will use 300 mm concrete walls – so it will be about 140 m3 of material
Basing on 3D Printer productivity we can count duration of building (printing) process
It’s about 7 days instead of 27 for traditional building
Building costs for 3D Print
Costs Unit
Price per
unit
Quantity 3D Print
% of
costs
Super Structure £ 17 990 24%
Walls, Footings and Slab Costs £ 11 900 16%
Concrete for External and Internal walls m3 £ 85,00 80,00 £ 6 800 9%
Concrete for Footing and Slab m3 £ 85,00 60,00 £ 5 100 7%
Labour £ 6 090 8%
3D Printer Operator persons £ 250,00 2 £ 3 500 5%
Labourer persons £ 120,00 1 £ 840 1%
Foreman persons £ 250,00 1 £ 1 750 2%
Professional Fees £ 8 020 10%
Groundworks £ 13 749 18%
Plumbing & Heating £ 3 437 4%
Electrics £ 3 437 4%
Finishes £ 17 186 22%
Room By Room £ 10 312 13%
Preliminaries £ 2 291 3%
Total House Cost £ 76 423 100%
8
3D Print house building
Total building costs for 3D print building
As we can see below the costs for a model 4 bedded house (216 m2) will be about of £76,500
The superstructure element of the work is the still most in cash terms, but it costs already £18,000 or 24% of the total outlay
Super
Structure
£17 990
Professional
Fees
£8 020
Groundworks
£13 749
Plumbing &
Heating
£3 437
Electrics
£3 437
Finishes
£17 186
Room By
Room
£10 312
Preliminaries
£2 291
9
Comparisons – traditional build and 3D printing
Total building costs, durations and savings for 3D print building
Building costs for Traditional Building and 3D Print
Costs Unit
Price per
unit
Quantity
Traditional building 3D Print Saving
Cash % Days Cash % Days ₤ %
Super Structure £ 37 809 33% 18 £ 17 990 24% 7 £ 19 819 52% 11
Walls, Footings and Slab Costs £ 17 584 15% £ 11 900 16% £ 5 684 32%
Concrete for walls m3 £ 85,00 80,00 0% £ 6 800 9%
Concrete for Footing and Slab m3 £ 85,00 60,00 £ 5 100 4% £ 5 100 7%
Bricks pack of brick £ 440,00 25,00 £ 11 000 10% 0%
Mortar tube £ 28,00 53,00 £ 1 484 1% 0%
Labour £ 19 710 17% £ 6 090 8% £ 13 620 69%
Bricklayers persons £ 180,00 2 £ 9 720 8% £ - 0%
3D Printer Operator persons £ 250,00 2 £ - 0% £ 3 500 5%
Labourer persons £ 120,00 1 £ 3 240 3% £ 840 1%
Foreman persons £ 250,00 1 £ 6 750 6% £ 1 750 2%
Other Resuorсes 1 £ 515 0% £ - 0% £ 515 100% 0
Professional Fees £ 8 020 7% 1 £ 8 020 10% 1 £ - 0% 0
Groundworks £ 17 186 15% 14 £ 13 749 18% 7 £ 3 437 20% 7
Plumbing & Heating £ 4 583 4% 13 £ 3 437 4% 7 £ 1 146 25% 6
Electrics £ 5 729 5% 20 £ 3 437 4% 14 £ 2 291 40% 6
Finishes £ 26 352 23% 24 £ 17 186 22% 20 £ 9 166 35% 4
Room By Room £ 10 312 9% 1 £ 10 312 13% 1 £ - 0% 0
Preliminaries £ 4 583 4% 7 £ 2 291 3% 5 £ 2 291 50% 2
Total House Cost £ 114 574 100% 98 £ 76 423 100% 62 £ 38 151 33% 36
As we can see below savings for a model 4 bedded house (216 m2) will be about of £38,000
The superstructure element of the work saves about £20,000 or 50% of the total savings, it is mostly labour savings
10
Comparisons – traditional build and 3D printing
Total building costs, durations and savings for 3D print building
• Above are cost comparisons for traditional build and 3D printing, below – visualization of it
• In this simple modeling case we look at good efficiency of 3D printing technology:
– Less materials costs
– Less days for superstructure works
– Less days we need specialists on site, less labour costs
– Less chances for human errors
• Now we estimate costs on a typical 4 bedded traditional house can be reduced by £38k or 33% and this can be
further reduced as we develop this concept to design houses where the "printer" can perform the construction of
roofs and foundations
• This is a significant step in reducing both cost and time so allowing people to move into a property much earlier than
previously possible and improving any rental income stream if the house is being developed as a "buy to let"
This technology is here now and is definitely the future
£17,186
£13,749
£26,352
£17,186
£37,809
£17,990
£-
£20,000
£40,000
£60,000
£80,000
£100,000
Traditional 3D Print
Super Structure
Finishes
Groundworks
Preliminaries
Electrics
Plumbing & Heating
Professional Fees
Room By Room
£114 574
£76 423
13 7
20
14
14
7
24
20
18
7
0
20
40
60
80
100
120
Traditional 3D Print
Super Structure
Finishes
Groundworks
Preliminaries
Electrics
Plumbing & Heating
Professional Fees
Room By Room
98
62
– £38 151
– 36 days
Costs reduced by 31%* Days reduced by 37%*
• Site maintenance (toilets, health and safety on site, acoustic walls and machinery)
– Typically a middle house constructed using traditional methodology takes 34 weeks to build. This timeline is driven by a combination
of different circumstance. We aim to have our builds concluded in 10 weeks with a saving of £36,000 based on the weekly site
maintenance cost of 1,500.
• Wasted Trades
– Trades and skilled workman are often delayed because a previous part of the job has not been completed to allow that trade to
follow on
• Additional tools
– The costs of external scaffolding and building higher (any addition costs on top of the bricks and mortar would be) save about £2,250
• Potential financially savings because of speed of build
– Mortgage payments
– Rental payments
– Loan + interest payments
• Less components
– Saving of that less things to go wrong, less chance of going much builds generally to over budget
• Saving on wastage
– Less components can be stolen, gone missing or wasted because not needed in the build.
• The saving of nearly a third or quarter of time
– It is tangible even if the cost of materials are roughly the same
• Also if to be done overseas in third world countries
– The costs would be minimal as you would not have to consider building controls or planning requirements
11
Comparisons – traditional build and 3D printing
Wider vision and perspectives theses
Modeling shows us economy on savings resources like materials and labour wages, it shows time
economy and other savings in other part of building project
But our modeling don’t touch some other sides of new technology
Thank you for attention!
12

More Related Content

What's hot

What's hot (20)

Bricks
BricksBricks
Bricks
 
3dbuildingprint vs traditional homes
3dbuildingprint vs traditional homes 3dbuildingprint vs traditional homes
3dbuildingprint vs traditional homes
 
Dimensioning
DimensioningDimensioning
Dimensioning
 
Eco- friendly building materials and construction techniques in India.
Eco- friendly building materials and construction techniques in India.Eco- friendly building materials and construction techniques in India.
Eco- friendly building materials and construction techniques in India.
 
Estimation
Estimation    Estimation
Estimation
 
Types of plaster
Types of plasterTypes of plaster
Types of plaster
 
LOW COST HOUSING
LOW COST HOUSINGLOW COST HOUSING
LOW COST HOUSING
 
construction tools
construction tools construction tools
construction tools
 
Green building ppt
Green building pptGreen building ppt
Green building ppt
 
Walls
WallsWalls
Walls
 
Masonry of Building
Masonry of Building Masonry of Building
Masonry of Building
 
autoclaved aerated concrete
autoclaved aerated concreteautoclaved aerated concrete
autoclaved aerated concrete
 
036 Innovative Construction Materials
036 Innovative Construction Materials036 Innovative Construction Materials
036 Innovative Construction Materials
 
Drawing Instruments and Accessories
Drawing Instruments and AccessoriesDrawing Instruments and Accessories
Drawing Instruments and Accessories
 
Building Bye Laws and Green Buildings
Building Bye Laws and Green BuildingsBuilding Bye Laws and Green Buildings
Building Bye Laws and Green Buildings
 
blockwork
 blockwork blockwork
blockwork
 
02 Ecological Design2
02 Ecological Design202 Ecological Design2
02 Ecological Design2
 
Low cost building materials and construction techniques
Low cost building materials and construction techniquesLow cost building materials and construction techniques
Low cost building materials and construction techniques
 
Green building ppt
Green building pptGreen building ppt
Green building ppt
 
Reinforced Concrete
Reinforced ConcreteReinforced Concrete
Reinforced Concrete
 

Viewers also liked

Bt quartet 1500 User Guide from Telephones Online www.telephonesonline.co.uk
Bt quartet 1500 User Guide from Telephones Online  www.telephonesonline.co.ukBt quartet 1500 User Guide from Telephones Online  www.telephonesonline.co.uk
Bt quartet 1500 User Guide from Telephones Online www.telephonesonline.co.ukTelephones Online
 
Traditional herbs and folic medicine in the uae
Traditional herbs and folic medicine in the uaeTraditional herbs and folic medicine in the uae
Traditional herbs and folic medicine in the uaeEva Jay
 
Solar decathlon europe 2012 welcome meeting edwin rodriguez ubiñas
Solar decathlon europe 2012 welcome meeting edwin rodriguez ubiñasSolar decathlon europe 2012 welcome meeting edwin rodriguez ubiñas
Solar decathlon europe 2012 welcome meeting edwin rodriguez ubiñasAlma Elena
 
Architecture in Hot and humid climate
Architecture in Hot and humid climateArchitecture in Hot and humid climate
Architecture in Hot and humid climateMaitreyi Yellapragada
 
Architecture for hot and humid climate
Architecture for hot and humid climateArchitecture for hot and humid climate
Architecture for hot and humid climateAsmita Rawool
 
Hot and dry climate architecture
Hot and dry climate architectureHot and dry climate architecture
Hot and dry climate architectureRonak Dhupia
 

Viewers also liked (9)

Bt quartet 1500 User Guide from Telephones Online www.telephonesonline.co.uk
Bt quartet 1500 User Guide from Telephones Online  www.telephonesonline.co.ukBt quartet 1500 User Guide from Telephones Online  www.telephonesonline.co.uk
Bt quartet 1500 User Guide from Telephones Online www.telephonesonline.co.uk
 
Traditional herbs and folic medicine in the uae
Traditional herbs and folic medicine in the uaeTraditional herbs and folic medicine in the uae
Traditional herbs and folic medicine in the uae
 
Solar decathlon europe 2012 welcome meeting edwin rodriguez ubiñas
Solar decathlon europe 2012 welcome meeting edwin rodriguez ubiñasSolar decathlon europe 2012 welcome meeting edwin rodriguez ubiñas
Solar decathlon europe 2012 welcome meeting edwin rodriguez ubiñas
 
Bamboo
BambooBamboo
Bamboo
 
Hot and dry climate
Hot and dry climateHot and dry climate
Hot and dry climate
 
Architecture in Hot and humid climate
Architecture in Hot and humid climateArchitecture in Hot and humid climate
Architecture in Hot and humid climate
 
Hot & dry climate
Hot & dry climateHot & dry climate
Hot & dry climate
 
Architecture for hot and humid climate
Architecture for hot and humid climateArchitecture for hot and humid climate
Architecture for hot and humid climate
 
Hot and dry climate architecture
Hot and dry climate architectureHot and dry climate architecture
Hot and dry climate architecture
 

Similar to Cost Comparisons 3dbuildingprint vs traditional house methods

Cost comparison 10m 2m high wall 2
Cost comparison 10m 2m high wall  2Cost comparison 10m 2m high wall  2
Cost comparison 10m 2m high wall 2Micheal Mullvihill
 
Energy Assignments
Energy AssignmentsEnergy Assignments
Energy AssignmentsEamon Healy
 
SMM7 Cost Summary Report
SMM7 Cost Summary ReportSMM7 Cost Summary Report
SMM7 Cost Summary ReportNatalie Reid
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 
Energy efficient construction and trainig practices - 1 Basics
Energy efficient construction and trainig practices -  1 BasicsEnergy efficient construction and trainig practices -  1 Basics
Energy efficient construction and trainig practices - 1 BasicsMotiva
 
Block estimate.ppt (1)
Block estimate.ppt (1)Block estimate.ppt (1)
Block estimate.ppt (1)kumud singh
 
Icng eco housing (1)
Icng eco housing (1)Icng eco housing (1)
Icng eco housing (1)Sarah Waddle
 
Tutorial brickwork
Tutorial brickworkTutorial brickwork
Tutorial brickworkTimun Loh
 
Schedule of Works Bill
Schedule of Works BillSchedule of Works Bill
Schedule of Works BillNatalie Reid
 
Tim Fenn RIMA International Conference invited presentation 2014
Tim Fenn RIMA International Conference invited presentation 2014Tim Fenn RIMA International Conference invited presentation 2014
Tim Fenn RIMA International Conference invited presentation 2014Tim Fenn
 
Final presentation with excel 2
Final presentation with excel 2Final presentation with excel 2
Final presentation with excel 2Aura Investments
 
Blake Lapthorn green breakfast with Gregory Dix, Associate Director of Savills
Blake Lapthorn green breakfast with Gregory Dix, Associate Director of SavillsBlake Lapthorn green breakfast with Gregory Dix, Associate Director of Savills
Blake Lapthorn green breakfast with Gregory Dix, Associate Director of SavillsBlake Morgan
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner SampleHai Nguyen
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner SampleHai Nguyen
 
Architect Sample
Architect SampleArchitect Sample
Architect SampleHai Nguyen
 
“Decarbonising cities” – Prof Lucelia Rodrigues, University of Nottingham
“Decarbonising cities” – Prof Lucelia Rodrigues, University of Nottingham“Decarbonising cities” – Prof Lucelia Rodrigues, University of Nottingham
“Decarbonising cities” – Prof Lucelia Rodrigues, University of NottinghamKyungeun Sung
 
Sample Shell Scheme Enhancement Proposal Document
Sample Shell Scheme Enhancement Proposal DocumentSample Shell Scheme Enhancement Proposal Document
Sample Shell Scheme Enhancement Proposal Documentwilsonguy
 
Sample Shell Scheme Enhancement Proposal Document
Sample Shell Scheme Enhancement Proposal DocumentSample Shell Scheme Enhancement Proposal Document
Sample Shell Scheme Enhancement Proposal Documentwilsonguy
 
Final slideshow presentation (1)
Final slideshow presentation (1)Final slideshow presentation (1)
Final slideshow presentation (1)Aura Investments
 

Similar to Cost Comparisons 3dbuildingprint vs traditional house methods (20)

Cost comparison 10m 2m high wall 2
Cost comparison 10m 2m high wall  2Cost comparison 10m 2m high wall  2
Cost comparison 10m 2m high wall 2
 
Energy Assignments
Energy AssignmentsEnergy Assignments
Energy Assignments
 
SMM7 Cost Summary Report
SMM7 Cost Summary ReportSMM7 Cost Summary Report
SMM7 Cost Summary Report
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Energy efficient construction and trainig practices - 1 Basics
Energy efficient construction and trainig practices -  1 BasicsEnergy efficient construction and trainig practices -  1 Basics
Energy efficient construction and trainig practices - 1 Basics
 
Block estimate.ppt (1)
Block estimate.ppt (1)Block estimate.ppt (1)
Block estimate.ppt (1)
 
Icng eco housing (1)
Icng eco housing (1)Icng eco housing (1)
Icng eco housing (1)
 
Tutorial brickwork
Tutorial brickworkTutorial brickwork
Tutorial brickwork
 
Schedule of Works Bill
Schedule of Works BillSchedule of Works Bill
Schedule of Works Bill
 
Tim Fenn RIMA International Conference invited presentation 2014
Tim Fenn RIMA International Conference invited presentation 2014Tim Fenn RIMA International Conference invited presentation 2014
Tim Fenn RIMA International Conference invited presentation 2014
 
Final presentation with excel 2
Final presentation with excel 2Final presentation with excel 2
Final presentation with excel 2
 
Blake Lapthorn green breakfast with Gregory Dix, Associate Director of Savills
Blake Lapthorn green breakfast with Gregory Dix, Associate Director of SavillsBlake Lapthorn green breakfast with Gregory Dix, Associate Director of Savills
Blake Lapthorn green breakfast with Gregory Dix, Associate Director of Savills
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner Sample
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner Sample
 
De assignment
De assignmentDe assignment
De assignment
 
Architect Sample
Architect SampleArchitect Sample
Architect Sample
 
“Decarbonising cities” – Prof Lucelia Rodrigues, University of Nottingham
“Decarbonising cities” – Prof Lucelia Rodrigues, University of Nottingham“Decarbonising cities” – Prof Lucelia Rodrigues, University of Nottingham
“Decarbonising cities” – Prof Lucelia Rodrigues, University of Nottingham
 
Sample Shell Scheme Enhancement Proposal Document
Sample Shell Scheme Enhancement Proposal DocumentSample Shell Scheme Enhancement Proposal Document
Sample Shell Scheme Enhancement Proposal Document
 
Sample Shell Scheme Enhancement Proposal Document
Sample Shell Scheme Enhancement Proposal DocumentSample Shell Scheme Enhancement Proposal Document
Sample Shell Scheme Enhancement Proposal Document
 
Final slideshow presentation (1)
Final slideshow presentation (1)Final slideshow presentation (1)
Final slideshow presentation (1)
 

Recently uploaded

FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfMarinCaroMartnezBerg
 
Call Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...amitlee9823
 
Call Girls In Bellandur ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bellandur ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bellandur ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bellandur ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAl Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAroojKhan71
 
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...amitlee9823
 
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...amitlee9823
 
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...Valters Lauzums
 
ALSO dropshipping via API with DroFx.pptx
ALSO dropshipping via API with DroFx.pptxALSO dropshipping via API with DroFx.pptx
ALSO dropshipping via API with DroFx.pptxolyaivanovalion
 
Accredited-Transport-Cooperatives-Jan-2021-Web.pdf
Accredited-Transport-Cooperatives-Jan-2021-Web.pdfAccredited-Transport-Cooperatives-Jan-2021-Web.pdf
Accredited-Transport-Cooperatives-Jan-2021-Web.pdfadriantubila
 
Mature dropshipping via API with DroFx.pptx
Mature dropshipping via API with DroFx.pptxMature dropshipping via API with DroFx.pptx
Mature dropshipping via API with DroFx.pptxolyaivanovalion
 
CebaBaby dropshipping via API with DroFX.pptx
CebaBaby dropshipping via API with DroFX.pptxCebaBaby dropshipping via API with DroFX.pptx
CebaBaby dropshipping via API with DroFX.pptxolyaivanovalion
 
Capstone Project on IBM Data Analytics Program
Capstone Project on IBM Data Analytics ProgramCapstone Project on IBM Data Analytics Program
Capstone Project on IBM Data Analytics ProgramMoniSankarHazra
 
BigBuy dropshipping via API with DroFx.pptx
BigBuy dropshipping via API with DroFx.pptxBigBuy dropshipping via API with DroFx.pptx
BigBuy dropshipping via API with DroFx.pptxolyaivanovalion
 
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...Delhi Call girls
 
Edukaciniai dropshipping via API with DroFx
Edukaciniai dropshipping via API with DroFxEdukaciniai dropshipping via API with DroFx
Edukaciniai dropshipping via API with DroFxolyaivanovalion
 
Discover Why Less is More in B2B Research
Discover Why Less is More in B2B ResearchDiscover Why Less is More in B2B Research
Discover Why Less is More in B2B Researchmichael115558
 

Recently uploaded (20)

FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdf
 
Call Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Begur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Jalahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
 
Call Girls In Bellandur ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bellandur ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bellandur ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bellandur ☎ 7737669865 🥵 Book Your One night Stand
 
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAl Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
 
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Thane West Call On 9920725232 With Body to body massage...
 
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
 
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
 
ALSO dropshipping via API with DroFx.pptx
ALSO dropshipping via API with DroFx.pptxALSO dropshipping via API with DroFx.pptx
ALSO dropshipping via API with DroFx.pptx
 
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
 
Accredited-Transport-Cooperatives-Jan-2021-Web.pdf
Accredited-Transport-Cooperatives-Jan-2021-Web.pdfAccredited-Transport-Cooperatives-Jan-2021-Web.pdf
Accredited-Transport-Cooperatives-Jan-2021-Web.pdf
 
Mature dropshipping via API with DroFx.pptx
Mature dropshipping via API with DroFx.pptxMature dropshipping via API with DroFx.pptx
Mature dropshipping via API with DroFx.pptx
 
Sampling (random) method and Non random.ppt
Sampling (random) method and Non random.pptSampling (random) method and Non random.ppt
Sampling (random) method and Non random.ppt
 
CebaBaby dropshipping via API with DroFX.pptx
CebaBaby dropshipping via API with DroFX.pptxCebaBaby dropshipping via API with DroFX.pptx
CebaBaby dropshipping via API with DroFX.pptx
 
Capstone Project on IBM Data Analytics Program
Capstone Project on IBM Data Analytics ProgramCapstone Project on IBM Data Analytics Program
Capstone Project on IBM Data Analytics Program
 
BigBuy dropshipping via API with DroFx.pptx
BigBuy dropshipping via API with DroFx.pptxBigBuy dropshipping via API with DroFx.pptx
BigBuy dropshipping via API with DroFx.pptx
 
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...
 
Edukaciniai dropshipping via API with DroFx
Edukaciniai dropshipping via API with DroFxEdukaciniai dropshipping via API with DroFx
Edukaciniai dropshipping via API with DroFx
 
Discover Why Less is More in B2B Research
Discover Why Less is More in B2B ResearchDiscover Why Less is More in B2B Research
Discover Why Less is More in B2B Research
 

Cost Comparisons 3dbuildingprint vs traditional house methods

  • 1. Cost comparisons between traditional build and 3D printing
  • 2. Summary 3DBuildingPrint is not only the only faster, more efficient, less labor intensive, ecologically-friendly, 0% waste product and with less chance of human error – It is also more cost effective 2 Left graph shows the costs for a model 4 bedded house (216 m2), split by the major areas of expenditure expressed as a percentage of the total build cost of £115,000. The superstructure element of the work is by far the most in cash terms. The major elements of this have been shown in the graph. The superstructure costs total £37,800 or 33% of the total outlay. It is predominantly in this area where the 3D printing solution can generate savings. 3DBuildingPrint use a methodology whereby the "shell" of the house is constructed within a couple of days This cuts down the on-site labour cost significantly as we are able to deliver the finished article in between 6-9 weeks £17,186 £13,749 £26,352 £17,186 £37,809 £17,990 £- £20,000 £40,000 £60,000 £80,000 £100,000 Traditional 3D Print Super Structure Finishes Groundworks Preliminaries Electrics Plumbing & Heating Professional Fees Room By Room £114 574 £76 423 13 7 20 14 14 7 24 20 18 7 0 20 40 60 80 100 120 Traditional 3D Print Super Structure Finishes Groundworks Preliminaries Electrics Plumbing & Heating Professional Fees Room By Room 98 62 – £38 151 – 36 days * -– All calculations will be provided on next pages Costs reduced by 33%* Days reduced by 37%* £10,312 £8,020 £4,583 £5,729 £4,583 £17,186 £26,352 Superstructure £37 809 Room By Room Professional Fees Plumbing & Heating Electrics Preliminaries Groundworks Finishes Super Structure
  • 3. House specification for cost comparisons 3 Slab 12 000 8 000 Height, mm Length, mm Front elevation 150 12 000 150 Right elevation 8 000 Rear elevation 12 000 Left elevation 8 000 Front elevation Side elevation Single floor 12 000 8 000 Height, mm Length, mm Front elevation 5 400 12 000 Right elevation 8 000 Rear elevation 12 000 5 400 Left elevation 8 000 Front elevation Side elevation Footings 14 000 10 000 Height, mm Length, mm Front elevation 300 14 000 300 Right elevation 10 000 Rear elevation 14 000 Left elevation 10 000 We will be considering an large house, which measures an area of 5.4m X 40m = 216 m2
  • 4. Costs of main resources Bricks parameters1 Height 0,065 Length 0,215 Width 0,1025 Price per 1 unit £ 0,44 Bricks in pack 1 000 Price for pack £ 440,00 Mortar Parameters2 Quantity of bricks for calculations 500 Volume per 500 bricks, m3 0,33 Volume in unit, m3 0,33 Price per 1 unit £ 28,00 Concrete Parameters3 Price per 1 m3 £ 85,00 Bricklayers parameters4 Price per day £ 180,00 Bricks per day 500 4 Standard house building Assumptions Building productivity Method Units Productivity Bricklayers bricks/day 500 1 - http://www.wickes.co.uk/Wickes-Engineering-Bricks-Red-65mm-Class-B/p/213642 2 - https://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwit2t_Y5P3KAhXH2hoKHRkJBpoQFggtMAA&url=http%3A%2F%2Fwww.kellys.uk.com%2Fcontent%2Fdownload.asp%3Fid%3D193&usg=AFQ jCNFY7WKw3Tf3KcwfQzuLhtDdvdbT8g&sig2=3cQcCNcvvHlRfKWrBeql2A 3 - http://www.lets-do-diy.com/Projects-and-advice/Concrete-work/Average-ready-mix-concrete-cost.aspx 4 - Costs Unit Price per unit/day Quantity for day Bricklayers persons £ 180,00 2 3D Printer Operator persons £ 250,00 2 Labourer persons £ 120,00 1 Foreman persons £ 250,00 1
  • 5. Materials for Super Structure for Traditional Building Super Structure Height, m Length, m Width, m Traditional building Bricks required Mortar required, tubesBricks in a row Bricks req. for height Bricks req. for length Total of bricks Total for external of house 15 708 First Slab 0,15 12,00 8,00 First floor 5,40 40,00 0,30 2 84 187 15 708 Front elevation 12,00 Right elevation 8,00 Rear elevation 12,00 Left elevation 8,00 Footings 0,30 14,00 10,00 Total for internal of house 7 896 First floor internal wall 5,40 20,00 0,10 1 84 94 7 896 Total for house 23 604 49,57 Waste 5% 24 784 52,05 Rounding Total 25 000 53,00 5 Standard house building Calculations of resources and duration A single or double story building measured from the top of the foundation over 3m will be legally required to be a double skin wall (Pavement Expert 2015). This project will be building a house of the height of 5.4 meters and will therefore require double skin masonry. A double skinned wall for a 4 bedroom house will use approximately 23,500 bricks, this will amount to 24 packs plus an additional pack Bricks are achieved by the use of concrete or mortar, whilst the area to cover is 216m2 this can done from a range of prices. Mortar is a commonly used in construction as it can be a thicker bonding agent. We will need about 53 tubes of mortar 0,33m3 each An average brick layer is priced at 180 per day. The average amount of bricks laid per person is 500 per day The average amount of brick layers needed is 2 which average a daily brick laid count of 1,000 In accordance with the above productivity, superstructure will be built in 27 days
  • 6. Building costs for Traditional Building Costs Unit Price per unit Quantity Traditional building % of costs Super Structure £ 37 809 33% Walls, Footings and Slab Costs £ 17 584 15% Concrete for Footing and Slab m3 £ 85,00 60,00 £ 5 100 4% Bricks pack of brick £ 440,00 25,00 £ 11 000 10% Mortar tube £ 28,00 53,00 £ 1 484 1% Labour £ 19 710 17% Bricklayers persons £ 180,00 2*27 £ 9 720 8% Labourer persons £ 120,00 1*27 £ 3 240 3% Foreman persons £ 250,00 1*27 £ 6 750 6% Other Resources 1 £ 515 0% Professional Fees £ 8 020 7% Groundworks £ 17 186 15% Plumbing & Heating £ 4 583 4% Electrics £ 5 729 5% Finishes £ 26 352 23% Room By Room £ 10 312 9% Preliminaries £ 4 583 4% Total House Cost £ 114 574 100% 6 As we can see below the costs for a model 4 bedded house (216 m2) will be about of £115,000 The superstructure element of the work is the most in cash terms, at costs of total £37,800 or 33% of the total outlay £115,000 is lower limit for a such house, therefore our comparing will be close to real Precise project calculations can be carried out in the near future, in the next stages But basing on this calculation we can compare Traditional building and 3D Print technology Standard house building Total building costs for traditional building Super Structure £37 809 Professional Fees £8 020 Groundworks £17 186 Plumbing & Heating £4 583 Electrics £5 729 Finishes £26 352 Room By Room £10 312 Preliminaries £4 583
  • 7. 7 3D Print house building Calculations of resources and duration Basing on previous assumptions and count that 3D Printer productivity is about 20 m3 per day we can calculate resources and costs for 3D printed house Materials for Super Structure for Traditional Building and 3D Print Super Structure Height, m Length, m Width, m 3D Print Concrete required, m3 Total for external of house 121,20 First Slab 0,15 12,00 8,00 14,40 First floor 5,40 40,00 0,30 64,80 Front elevation 12,00 Right elevation 8,00 Rear elevation 12,00 Left elevation 8,00 Footings 0,30 14,00 10,00 42,00 Total for internal of house 10,80 First floor internal wall 5,40 20,00 0,10 10,80 Total for house 132,00 Waste 5% 138,60 Rounding Total 140,00 For double skinned wall for a 4 bedroom house we will use 300 mm concrete walls – so it will be about 140 m3 of material Basing on 3D Printer productivity we can count duration of building (printing) process It’s about 7 days instead of 27 for traditional building
  • 8. Building costs for 3D Print Costs Unit Price per unit Quantity 3D Print % of costs Super Structure £ 17 990 24% Walls, Footings and Slab Costs £ 11 900 16% Concrete for External and Internal walls m3 £ 85,00 80,00 £ 6 800 9% Concrete for Footing and Slab m3 £ 85,00 60,00 £ 5 100 7% Labour £ 6 090 8% 3D Printer Operator persons £ 250,00 2 £ 3 500 5% Labourer persons £ 120,00 1 £ 840 1% Foreman persons £ 250,00 1 £ 1 750 2% Professional Fees £ 8 020 10% Groundworks £ 13 749 18% Plumbing & Heating £ 3 437 4% Electrics £ 3 437 4% Finishes £ 17 186 22% Room By Room £ 10 312 13% Preliminaries £ 2 291 3% Total House Cost £ 76 423 100% 8 3D Print house building Total building costs for 3D print building As we can see below the costs for a model 4 bedded house (216 m2) will be about of £76,500 The superstructure element of the work is the still most in cash terms, but it costs already £18,000 or 24% of the total outlay Super Structure £17 990 Professional Fees £8 020 Groundworks £13 749 Plumbing & Heating £3 437 Electrics £3 437 Finishes £17 186 Room By Room £10 312 Preliminaries £2 291
  • 9. 9 Comparisons – traditional build and 3D printing Total building costs, durations and savings for 3D print building Building costs for Traditional Building and 3D Print Costs Unit Price per unit Quantity Traditional building 3D Print Saving Cash % Days Cash % Days ₤ % Super Structure £ 37 809 33% 18 £ 17 990 24% 7 £ 19 819 52% 11 Walls, Footings and Slab Costs £ 17 584 15% £ 11 900 16% £ 5 684 32% Concrete for walls m3 £ 85,00 80,00 0% £ 6 800 9% Concrete for Footing and Slab m3 £ 85,00 60,00 £ 5 100 4% £ 5 100 7% Bricks pack of brick £ 440,00 25,00 £ 11 000 10% 0% Mortar tube £ 28,00 53,00 £ 1 484 1% 0% Labour £ 19 710 17% £ 6 090 8% £ 13 620 69% Bricklayers persons £ 180,00 2 £ 9 720 8% £ - 0% 3D Printer Operator persons £ 250,00 2 £ - 0% £ 3 500 5% Labourer persons £ 120,00 1 £ 3 240 3% £ 840 1% Foreman persons £ 250,00 1 £ 6 750 6% £ 1 750 2% Other Resuorсes 1 £ 515 0% £ - 0% £ 515 100% 0 Professional Fees £ 8 020 7% 1 £ 8 020 10% 1 £ - 0% 0 Groundworks £ 17 186 15% 14 £ 13 749 18% 7 £ 3 437 20% 7 Plumbing & Heating £ 4 583 4% 13 £ 3 437 4% 7 £ 1 146 25% 6 Electrics £ 5 729 5% 20 £ 3 437 4% 14 £ 2 291 40% 6 Finishes £ 26 352 23% 24 £ 17 186 22% 20 £ 9 166 35% 4 Room By Room £ 10 312 9% 1 £ 10 312 13% 1 £ - 0% 0 Preliminaries £ 4 583 4% 7 £ 2 291 3% 5 £ 2 291 50% 2 Total House Cost £ 114 574 100% 98 £ 76 423 100% 62 £ 38 151 33% 36 As we can see below savings for a model 4 bedded house (216 m2) will be about of £38,000 The superstructure element of the work saves about £20,000 or 50% of the total savings, it is mostly labour savings
  • 10. 10 Comparisons – traditional build and 3D printing Total building costs, durations and savings for 3D print building • Above are cost comparisons for traditional build and 3D printing, below – visualization of it • In this simple modeling case we look at good efficiency of 3D printing technology: – Less materials costs – Less days for superstructure works – Less days we need specialists on site, less labour costs – Less chances for human errors • Now we estimate costs on a typical 4 bedded traditional house can be reduced by £38k or 33% and this can be further reduced as we develop this concept to design houses where the "printer" can perform the construction of roofs and foundations • This is a significant step in reducing both cost and time so allowing people to move into a property much earlier than previously possible and improving any rental income stream if the house is being developed as a "buy to let" This technology is here now and is definitely the future £17,186 £13,749 £26,352 £17,186 £37,809 £17,990 £- £20,000 £40,000 £60,000 £80,000 £100,000 Traditional 3D Print Super Structure Finishes Groundworks Preliminaries Electrics Plumbing & Heating Professional Fees Room By Room £114 574 £76 423 13 7 20 14 14 7 24 20 18 7 0 20 40 60 80 100 120 Traditional 3D Print Super Structure Finishes Groundworks Preliminaries Electrics Plumbing & Heating Professional Fees Room By Room 98 62 – £38 151 – 36 days Costs reduced by 31%* Days reduced by 37%*
  • 11. • Site maintenance (toilets, health and safety on site, acoustic walls and machinery) – Typically a middle house constructed using traditional methodology takes 34 weeks to build. This timeline is driven by a combination of different circumstance. We aim to have our builds concluded in 10 weeks with a saving of £36,000 based on the weekly site maintenance cost of 1,500. • Wasted Trades – Trades and skilled workman are often delayed because a previous part of the job has not been completed to allow that trade to follow on • Additional tools – The costs of external scaffolding and building higher (any addition costs on top of the bricks and mortar would be) save about £2,250 • Potential financially savings because of speed of build – Mortgage payments – Rental payments – Loan + interest payments • Less components – Saving of that less things to go wrong, less chance of going much builds generally to over budget • Saving on wastage – Less components can be stolen, gone missing or wasted because not needed in the build. • The saving of nearly a third or quarter of time – It is tangible even if the cost of materials are roughly the same • Also if to be done overseas in third world countries – The costs would be minimal as you would not have to consider building controls or planning requirements 11 Comparisons – traditional build and 3D printing Wider vision and perspectives theses Modeling shows us economy on savings resources like materials and labour wages, it shows time economy and other savings in other part of building project But our modeling don’t touch some other sides of new technology
  • 12. Thank you for attention! 12