Installation Requirements Comparison N/A Not Applicable
Concrete Wall Neptune System
Reduce Dig N/A
Compact Bottoms N/A
Blinding N/A
concrete Kicker (Toe) N/A
Water Bar (seal) N/A
concrete Retaining Wall N/A
Steel mesh N/A
Shuttering & concreting N/A
Back fill, removal of waste N/A
Installation Timescales for 10 m 2m High
CONCRETE INSTALLATION NEPTUNE INSTALLATION
Fencing off of whole area, leasing of There is no water used in any of
Fence, security and H & S advisers the manufacture of the System
In accordance with Safe Working therefore Neptune can be installed
Area regulations at an average In any weather conditions
Cost of £100 p.w. On any terrain, day or night.
Installation of a haul road.
Concrete cannot be poured if the Fencing off of whole area, leasing of
outside temperature is less than 20
F fence, security and H & S advisers
During low temperatures the pouring in accordance with Safe Working
Is delayed until such time at temperatures Area Regulations at an average £150
Have increased.
Installation of a coffer dam in accordance
With Safe Working Area Regulations
(riverside or seaside)
Average cost of £10K per 20m dam.
On excavation if a table of water is
Discovered this will require the use of
Pumps and the hire of a settlement N/A
Tank in case of contaminated water
Thus increasing costs at the point
Of excavation. Average cost of £600 a WEEK
Installation of 10 m of concrete at the Installation of 10 m takes 10 days
Appropriate temperature without delays requiring around 3 persons.
Will take up to 29 days to include curing
Time, followed by painting on of
Bitumen.
Once the concrete has Cured the
Site has to be back filled at a rate of
200 mm a layer of compaction using both N/A
Man and machinery. The Safe Working Area
Regulations have to be adhered to (every
Metre deep has to be battered back to 600 mm)
On completion the cleaning down of the N/A
Site to include removal of haul roads, removal of
Excess site waste.
Manpower Cost comparison per 10 m2
CONCRETE - 29 days NEPTUNE - 10 days
Site agent - £30 p.h. x 8 x 29 days £6,960 Site agent - £30 p.h. x 8 x 10 days £2400
Engineer - £30 p.h. x 20 hrs £2,400 Engineer - £30 p.h. x 20 hrs £480
Foreman/Joiner - £22 p.h. x 8 x 29 £5,104 Foreman/joiner - £22 p.h. x 8 x 10 £1760
Joiners x 2 £17 x 8 x 29 £7,888 N/A
Groundwork Team Groundwork Team
Machine drivers£150 x 2 x 23.2 £6,960 Machine drivers £150 x 2 x 10 days £3000
Days
Labourers£125 x 3 x22.5 Days £8,352 Labourers £125 x 3 x 10 days £3750
Haulage Haulage
Shuttering (1 man/1vehicle x 8 hrs) £640 N/A
Delivery £640 Delivery £640
Removal of shuttering £640 N/A
Removal of waste £2,400 N/A
Removal of temporary haul road £2,400 Installation/removal of Timber Matt £1,000
£6 Square metre per month
Total costs: £44,384 Cost: £ 13,030
Concrete £44,384
Neptune costs: £13,030
Total savings: £31,354 66.6%
NEPTUNE SYSTEM
Lifespan/effect on the Environment
Concrete Neptune
Concrete has a life span of 50 Life of 75 years with cladding
Years.
Produces greenhouse gases during Low carbon footprint
The course of manufacturing Attractive to the eye
And transit.
Continuously releases these gases All materials are recyclable
For a period of 10 years after
Installation.
Fuel costs in transporting and No back fill – no waste material
Mixing continuously.
Demolition Demolition
Concrete contaminates land tips. Neptune can be a temporary
Measure e.g. short term flood
Defence around towns/villages
Time span from demolition to
Back fill – 15 days. No back fill – no waste material
Time span to dismantle 4 days.
Increased fuel to transport broken concrete to land tips.

More Related Content

Similar to Cost comparison 10m 2m high wall 2

Icng eco housing (1)
Icng eco housing (1)Icng eco housing (1)
Icng eco housing (1)
Sarah Waddle
 
Encon Best - sales right, proposal version 1
Encon Best - sales right, proposal version 1Encon Best - sales right, proposal version 1
Encon Best - sales right, proposal version 1
Glenn Davis
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
Natalie Reid
 
Ecobuild stand 2007mh1
Ecobuild stand 2007mh1Ecobuild stand 2007mh1
Ecobuild stand 2007mh1
limetech
 

Similar to Cost comparison 10m 2m high wall 2 (20)

Manufacturing of fly-ash brick
Manufacturing of fly-ash brickManufacturing of fly-ash brick
Manufacturing of fly-ash brick
 
study of self-compacting concrete for economical construction
study of self-compacting concrete for economical constructionstudy of self-compacting concrete for economical construction
study of self-compacting concrete for economical construction
 
IRJET- Replacement of Sand in Mortar
IRJET- Replacement of Sand in MortarIRJET- Replacement of Sand in Mortar
IRJET- Replacement of Sand in Mortar
 
3. roland streng
3. roland streng3. roland streng
3. roland streng
 
Icng eco housing (1)
Icng eco housing (1)Icng eco housing (1)
Icng eco housing (1)
 
Encon Best - sales right, proposal version 1
Encon Best - sales right, proposal version 1Encon Best - sales right, proposal version 1
Encon Best - sales right, proposal version 1
 
Energy efficient construction and trainig practices - 1 Basics
Energy efficient construction and trainig practices -  1 BasicsEnergy efficient construction and trainig practices -  1 Basics
Energy efficient construction and trainig practices - 1 Basics
 
Environment friendly building_material_technologies_for_low_cost_housing
Environment friendly building_material_technologies_for_low_cost_housingEnvironment friendly building_material_technologies_for_low_cost_housing
Environment friendly building_material_technologies_for_low_cost_housing
 
Cbecl clay brick project with tunnel kiln-200000 pcs per day
Cbecl clay brick project with tunnel kiln-200000 pcs per dayCbecl clay brick project with tunnel kiln-200000 pcs per day
Cbecl clay brick project with tunnel kiln-200000 pcs per day
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Auto Bricks - Tunnel Kiln and Hoffman Kiln Project Cost
Auto Bricks - Tunnel Kiln and Hoffman Kiln Project CostAuto Bricks - Tunnel Kiln and Hoffman Kiln Project Cost
Auto Bricks - Tunnel Kiln and Hoffman Kiln Project Cost
 
SUSTAINABLE DEVELOPMENT WITH CONCRETE
SUSTAINABLE DEVELOPMENT WITH CONCRETESUSTAINABLE DEVELOPMENT WITH CONCRETE
SUSTAINABLE DEVELOPMENT WITH CONCRETE
 
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonald
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonaldCosts for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonald
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonald
 
partial replacement of aggregates by recycled concrete
 partial replacement of aggregates by recycled concrete partial replacement of aggregates by recycled concrete
partial replacement of aggregates by recycled concrete
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabs
 
IRJET - Fly Ash Interlocking Brick by using Geopolymer Concrete
IRJET - Fly Ash Interlocking Brick by using Geopolymer ConcreteIRJET - Fly Ash Interlocking Brick by using Geopolymer Concrete
IRJET - Fly Ash Interlocking Brick by using Geopolymer Concrete
 
Building materials, Basic civil engineering ,unit-1
Building materials, Basic civil engineering ,unit-1Building materials, Basic civil engineering ,unit-1
Building materials, Basic civil engineering ,unit-1
 
Ecobuild stand 2007mh1
Ecobuild stand 2007mh1Ecobuild stand 2007mh1
Ecobuild stand 2007mh1
 
Visite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windVisite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore wind
 
D1 (B2) Jan Suchorzewski - Combined carbonation-frost resistance of sustainab...
D1 (B2) Jan Suchorzewski - Combined carbonation-frost resistance of sustainab...D1 (B2) Jan Suchorzewski - Combined carbonation-frost resistance of sustainab...
D1 (B2) Jan Suchorzewski - Combined carbonation-frost resistance of sustainab...
 

Recently uploaded

Securing the Future | Public Good App House
Securing the Future | Public Good App HouseSecuring the Future | Public Good App House
Securing the Future | Public Good App House
TechSoup
 
Dawson City Rolling Ads for May 15 2024 Yukon
Dawson City Rolling Ads for May 15 2024 YukonDawson City Rolling Ads for May 15 2024 Yukon
Dawson City Rolling Ads for May 15 2024 Yukon
pmenzies
 

Recently uploaded (20)

Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...
Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...
Introduction to The Guidelines for the Long-term Sustainability of Outer Spac...
 
Electric vehicle infrastructure in rural areas
Electric vehicle infrastructure in rural areasElectric vehicle infrastructure in rural areas
Electric vehicle infrastructure in rural areas
 
Securing the Future | Public Good App House
Securing the Future | Public Good App HouseSecuring the Future | Public Good App House
Securing the Future | Public Good App House
 
Topical Guide for RID 3830 Public Image Training Series.ppsx
Topical Guide for RID 3830 Public Image Training Series.ppsxTopical Guide for RID 3830 Public Image Training Series.ppsx
Topical Guide for RID 3830 Public Image Training Series.ppsx
 
The impact and warm of wildlife crime - 2024 World Wildlife Crime Report.
The impact and warm of wildlife crime - 2024 World Wildlife Crime Report.The impact and warm of wildlife crime - 2024 World Wildlife Crime Report.
The impact and warm of wildlife crime - 2024 World Wildlife Crime Report.
 
WhenWomenTakeControl.pdf Yale Historical Review
WhenWomenTakeControl.pdf Yale Historical ReviewWhenWomenTakeControl.pdf Yale Historical Review
WhenWomenTakeControl.pdf Yale Historical Review
 
2024: The FAR - Federal Acquisition Regulations, Part 34
2024: The FAR - Federal Acquisition Regulations, Part 342024: The FAR - Federal Acquisition Regulations, Part 34
2024: The FAR - Federal Acquisition Regulations, Part 34
 
EDI Executive Education MasterClass- 15thMay 2024 (updated).pdf
EDI Executive Education MasterClass- 15thMay 2024 (updated).pdfEDI Executive Education MasterClass- 15thMay 2024 (updated).pdf
EDI Executive Education MasterClass- 15thMay 2024 (updated).pdf
 
Everything you need to know about your Parish or Town council website & .gov....
Everything you need to know about your Parish or Town council website & .gov....Everything you need to know about your Parish or Town council website & .gov....
Everything you need to know about your Parish or Town council website & .gov....
 
Plant health, safe trade and digital technology.
Plant health, safe trade and digital technology.Plant health, safe trade and digital technology.
Plant health, safe trade and digital technology.
 
Electric Vehicle infrastructure planning in Rural Planning Organizations
Electric Vehicle infrastructure planning in Rural Planning OrganizationsElectric Vehicle infrastructure planning in Rural Planning Organizations
Electric Vehicle infrastructure planning in Rural Planning Organizations
 
Dawson City Rolling Ads for May 15 2024 Yukon
Dawson City Rolling Ads for May 15 2024 YukonDawson City Rolling Ads for May 15 2024 Yukon
Dawson City Rolling Ads for May 15 2024 Yukon
 
Item # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. ReportItem # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. Report
 
Rocky Mount Greenville Willson Regional Transit Plan
Rocky Mount Greenville Willson Regional Transit PlanRocky Mount Greenville Willson Regional Transit Plan
Rocky Mount Greenville Willson Regional Transit Plan
 
The Outlook for the Budget and the Economy
The Outlook for the Budget and the EconomyThe Outlook for the Budget and the Economy
The Outlook for the Budget and the Economy
 
PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438
 
World Migratory Bird Day 2024 "Protect insects, Protect Birds"
World Migratory Bird Day  2024 "Protect insects, Protect Birds"World Migratory Bird Day  2024 "Protect insects, Protect Birds"
World Migratory Bird Day 2024 "Protect insects, Protect Birds"
 
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...The 2024 World Wildlife Crime Report tracks all these issues, trends and more...
The 2024 World Wildlife Crime Report tracks all these issues, trends and more...
 
Nitrogen filled high expansion foam in open Containers
Nitrogen filled high expansion foam in open ContainersNitrogen filled high expansion foam in open Containers
Nitrogen filled high expansion foam in open Containers
 
World Migratory Bird day 2024; May 11 and October 12
World Migratory Bird day 2024; May 11 and October 12World Migratory Bird day 2024; May 11 and October 12
World Migratory Bird day 2024; May 11 and October 12
 

Cost comparison 10m 2m high wall 2

  • 1. Installation Requirements Comparison N/A Not Applicable Concrete Wall Neptune System Reduce Dig N/A Compact Bottoms N/A Blinding N/A concrete Kicker (Toe) N/A Water Bar (seal) N/A
  • 2. concrete Retaining Wall N/A Steel mesh N/A Shuttering & concreting N/A Back fill, removal of waste N/A
  • 3. Installation Timescales for 10 m 2m High CONCRETE INSTALLATION NEPTUNE INSTALLATION Fencing off of whole area, leasing of There is no water used in any of Fence, security and H & S advisers the manufacture of the System In accordance with Safe Working therefore Neptune can be installed Area regulations at an average In any weather conditions Cost of £100 p.w. On any terrain, day or night. Installation of a haul road. Concrete cannot be poured if the Fencing off of whole area, leasing of outside temperature is less than 20 F fence, security and H & S advisers During low temperatures the pouring in accordance with Safe Working Is delayed until such time at temperatures Area Regulations at an average £150 Have increased. Installation of a coffer dam in accordance With Safe Working Area Regulations (riverside or seaside) Average cost of £10K per 20m dam.
  • 4. On excavation if a table of water is Discovered this will require the use of Pumps and the hire of a settlement N/A Tank in case of contaminated water Thus increasing costs at the point Of excavation. Average cost of £600 a WEEK Installation of 10 m of concrete at the Installation of 10 m takes 10 days Appropriate temperature without delays requiring around 3 persons. Will take up to 29 days to include curing Time, followed by painting on of Bitumen. Once the concrete has Cured the Site has to be back filled at a rate of 200 mm a layer of compaction using both N/A Man and machinery. The Safe Working Area Regulations have to be adhered to (every Metre deep has to be battered back to 600 mm) On completion the cleaning down of the N/A Site to include removal of haul roads, removal of Excess site waste.
  • 5. Manpower Cost comparison per 10 m2 CONCRETE - 29 days NEPTUNE - 10 days Site agent - £30 p.h. x 8 x 29 days £6,960 Site agent - £30 p.h. x 8 x 10 days £2400 Engineer - £30 p.h. x 20 hrs £2,400 Engineer - £30 p.h. x 20 hrs £480 Foreman/Joiner - £22 p.h. x 8 x 29 £5,104 Foreman/joiner - £22 p.h. x 8 x 10 £1760 Joiners x 2 £17 x 8 x 29 £7,888 N/A Groundwork Team Groundwork Team Machine drivers£150 x 2 x 23.2 £6,960 Machine drivers £150 x 2 x 10 days £3000 Days Labourers£125 x 3 x22.5 Days £8,352 Labourers £125 x 3 x 10 days £3750
  • 6. Haulage Haulage Shuttering (1 man/1vehicle x 8 hrs) £640 N/A Delivery £640 Delivery £640 Removal of shuttering £640 N/A Removal of waste £2,400 N/A Removal of temporary haul road £2,400 Installation/removal of Timber Matt £1,000 £6 Square metre per month Total costs: £44,384 Cost: £ 13,030 Concrete £44,384 Neptune costs: £13,030 Total savings: £31,354 66.6%
  • 7. NEPTUNE SYSTEM Lifespan/effect on the Environment Concrete Neptune Concrete has a life span of 50 Life of 75 years with cladding Years. Produces greenhouse gases during Low carbon footprint The course of manufacturing Attractive to the eye And transit. Continuously releases these gases All materials are recyclable For a period of 10 years after Installation. Fuel costs in transporting and No back fill – no waste material Mixing continuously. Demolition Demolition Concrete contaminates land tips. Neptune can be a temporary Measure e.g. short term flood Defence around towns/villages Time span from demolition to
  • 8. Back fill – 15 days. No back fill – no waste material Time span to dismantle 4 days. Increased fuel to transport broken concrete to land tips.