Chapter Objectives
• Explain project planning, scheduling,
monitoring, and reporting
• Describe work breakdown structures, task
patterns, and critical path analysis
• Explain techniques for estimating task
completion times and costs
Chapter Objectives
• Describe various scheduling tools, including
Gantt charts and PERT/CPM charts
• Analyze task dependencies, durations, start
dates, and end dates
• Describe project management software and
how it can assist you in project planning,
estimating, scheduling, monitoring, and
reporting
Chapter Objectives
• Discuss the importance of project risk
management
• Understand why projects sometimes fail
Introduction
• You will learn about project planning,
estimating, scheduling, monitoring, reporting,
and the use of project management software
• You also will learn how to control and manage
project changes as they occur
Overview of Project Management
• Project Management
• A successful project must be completed on
time, within budget, and deliver a quality
product that satisfies users and meets
requirements
• Project manager or project leader
• Project coordinator
Overview of Project Management
• What Does a Project Manager Do?
– Project manager, project leader
– Project planning
– Project scheduling
– Project monitoring and controlling
– Project reporting
Overview of Project Management
• Project Activities and Planning Steps
Step 1: Create a Work Breakdown
Structure
• Work breakdown structure (WBS)
• What is a Gantt Chart?
– Task group
– Can present an overview of the project’s status,
but does not provide detailed information that is
necessary when managing a complex project
Step 1: Create a Work Breakdown
Structure
• What is a PERT/CPM Chart?
– The Program Evaluation Review Technique (PERT)
– Critical Path Method (CPM)
– The distinction between the two methods has
disappeared over time
Step 1: Create a Work Breakdown
Structure
• What is a PERT/CPM Chart ?
– PERT/CPM is called a bottom-up technique
– Project tasks
– Once you know the tasks, their duration, and the
order in which they must be performed, you can
calculate the time that it will take to complete the
project
Step 1: Create a Work Breakdown
Structure
• Which Type of Chart is Better?
– Although a Gantt chart offers a valuable snapshot
view of the project, PERT charts are more useful
for scheduling, monitoring, and controlling the
actual work
– PERT and Gantt charts are not mutually exclusive
techniques, and project managers often use both
methods
Step 1: Create a Work Breakdown
Structure
• Identifying Tasks in a Work Breakdown
Structure
– Task or activity
– Event or milestone
– Break the project down into smaller tasks,
creating a work breakdown structure
Step 1: Create a Work Breakdown
Structure
• Identifying Tasks in a
Work Breakdown
Structure
– Listing the tasks
– Can be challenging, because
the tasks might be embedded
in a document
– Create a table with columns
for task number, description,
duration, and predecessor
tasks
Step 1: Create a Work Breakdown
Structure
• Identifying Tasks in a Work Breakdown
Structure
– Estimating Task Duration
– Person-days
– Best-case estimate (B)
– Probable-case estimate (P)
Step 1: Create a Work Breakdown
Structure
• Identifying Tasks in a Work Breakdown
Structure
– Estimating Task Duration
– Worst-case estimate (W)
– Weight
(B+4P+W)
6
Step 1: Create a Work Breakdown
Structure
• Identifying Tasks in a Work Breakdown
Structure
– Factors Affecting Duration
– Project size and scope
– Human resources
– Experience with similar project
– constraints
Step 1: Create a Work Breakdown
Structure
• Displaying the Work Breakdown Structure
– If you are managing a complex project with many
tasks, you can use task groups, just as you would
in a Gantt chart, to simplify the list
Step 2: Identify Task Patterns
• Task pattern
• What are Task Patterns?
– Large or small, tasks depend on each other and
must be performed in a sequence, not unlike the
commands in a software program
– Task patterns can involve dependent tasks,
multiple successor tasks, and multiple
predecessor tasks
Step 2: Identify Task Patterns
• How do I Use Task Boxes to Create a Model?
Step 2: Identify Task Patterns
• What are the Main Types of Task Patterns?
– Dependent Tasks
– Multiple successor tasks
– Concurrent task
– Predecessor task
– Successor task
– Multiple Predecessor Tasks
Step 2: Identify Task Patterns
• How Do I Identify Task Patterns?
– You can identify task patterns by looking carefully
at the wording of the task statement
– Words like then, when, or and are action words
that signal a sequence of events
• How Do I Work With Complex Task Patterns?
– When various task patterns combine, you must
study the facts carefully in order to understand
the logical sequence
Step 2: Identify Task Patterns
• How Do I Work With Complex Task Patterns?
– Consider the following three fact statements and
the task patterns they represent
– Dependent tasks
– Dependent tasks and multiple successor tasks
– Dependent tasks, multiple successor tasks, and multiple
predecessor tasks
Step 3: Calculate the Critical Path
• What Is a Critical Path?
Step 3: Calculate the Critical Path
• How Do I Calculate the Critical Path?
– First, you should review the task patterns
– The next step is to determine start and finish
dates, which will determine the critical path for
the project
– Slack time
Project Monitoring and Control
• Monitoring and Control Techniques
– The project manager must keep track of tasks and
progress of team members, compare actual
progress with the project plan, verify the
completion of project milestones, and set
standards and ensure that they are followed
– Structured walkthrough
– Called design reviews, code reviews, or testing
reviews
Project Monitoring and Control
• Maintaining a Schedule
– Maintaining a project schedule can be a
challenging task
– The better the original plan, the easier it will be to
control the project
– If enough milestones and frequent checkpoints
exist, problems will be detected rapidly
– Project managers often spend most of their time
tracking the tasks along the critical path
Reporting
• Members of the project team regularly report
their progress
• Project Status Meetings
Reporting
• Project Status Reports
– A project manager must report regularly to his or
her immediate supervisor, upper management,
and users
– Should explain what you are doing to handle and
monitor the problem
– Most managers recognize that problems do occur
on most projects; it is better to alert management
sooner rather than later
Project Management Examples
• PERT/CPM Example
– You construct a PERT/CPM chart from this task list
in a two-step process
– Step 1: Create the work breakdown structure
– Step 2: Enter start and finish times
Project Management Examples
• Software-Driven
Example
– Open Workbench
– Open-source software
– When you use project
management software,
you follow the same
step-by-step process to
develop a WBS and
create various types of
charts
Project Management Examples
• Software-Driven
Example
– Work breakdown
structure
– Gantt chart
– Network diagram
– Project planning is a
dynamic task and
involves constant
change
Risk Management
• Every IT project involves
risks that systems
analysts and project
managers must address
• Risk management
• Steps in Risk
Management
– Develop risk
management plan
– Identify the risks
– Risk identification
Risk Management
• Steps in Risk Management (continued)
– Analyze the risks
– Qualitative risk analysis
– Quantitative risk analysis
– Create a risk response plan
– Monitor risks
Risk Management
• Risk Management Software
– Most project management software includes
powerful features
– The IT team can make a recommendation
regarding the risks
– Depending on the nature and magnitude of the
risk, the final decision might be made by
management
Managing for Success
• Business Issues
– The major objective of every system is to provide
a solution to a business problem or opportunity
– A system that falls short of business needs also
produces problems for users and reduces
employee morale and productivity
– Project creep
Managing for Success
• Budget Issues
– Cost overruns typically result from one or more of
the following:
– Unrealistic estimates
– Failure to develop an accurate forecast that considers all
costs over the life of the project
– Poor monitoring of progress and slow response to early
warning signs of problems
Managing for Success
• Budget Issues
– Cost overruns typically result from one or more of
the following:
– Schedule delays due to factors that were not foreseen
– Human resource issues, including turnover, inadequate
training, and motivation
Managing for Success
• Schedule Issues
– Problems with timetables and project milestones
can indicate a failure to recognize task
dependencies, confusion between effort and
progress, poor monitoring and control methods,
personality conflicts among team members, or
turnover of project personnel
The Bottom Line
• When problems occur,
the project manager’s
ability to handle the
situation becomes the
critical factor
The Bottom Line
• Sometimes, when a project experiences
delays or cost overruns, the system still can be
delivered on time and within budget if several
less critical requirements are trimmed
• Brooks’ Law
Chapter Summary
• Project management is the process of planning,
scheduling, monitoring and controlling, and
reporting upon the development of an information
system
• Project managers are responsible for project
planning, scheduling, monitoring, and reporting
• Planning, scheduling, monitoring and reporting all
take place within a larger project development
framework
Chapter Summary
• In project scheduling, the project manager develops
a specific time for each task, based on available
resources and whether or not the task is dependent
on other predecessor tasks
• Every successful information system must support
business requirements, stay within budget, and be
available on time
• Sound project management involves the same skills
as any other management
Chapter Summary
• Chapter 3 complete

More Related Content

What's hot

Software Project Management lecture 9
Software Project Management lecture 9Software Project Management lecture 9
Software Project Management lecture 9Syed Muhammad Hammad
 
Software Project Management lecture 10
Software Project Management lecture 10Software Project Management lecture 10
Software Project Management lecture 10Syed Muhammad Hammad
 
04. Project Management
04. Project Management04. Project Management
04. Project ManagementBhuWan Khadka
 
eUnit 2 software process model
eUnit 2  software process modeleUnit 2  software process model
eUnit 2 software process modelPreeti Mishra
 
Unit4 Proof of Correctness, Statistical Tools, Clean Room Process and Quality...
Unit4 Proof of Correctness, Statistical Tools, Clean Room Process and Quality...Unit4 Proof of Correctness, Statistical Tools, Clean Room Process and Quality...
Unit4 Proof of Correctness, Statistical Tools, Clean Room Process and Quality...Reetesh Gupta
 
Managing the information system project
Managing the information system projectManaging the information system project
Managing the information system projecta23ccb
 
Software Project Management lecture 12
Software Project Management lecture 12Software Project Management lecture 12
Software Project Management lecture 12Syed Muhammad Hammad
 
Project Time Management
Project Time Management Project Time Management
Project Time Management Ahmed Alageed
 
Project management zarkovic
Project management zarkovicProject management zarkovic
Project management zarkovicMR Z
 

What's hot (13)

system analysis and design Class 3
system analysis and design Class 3system analysis and design Class 3
system analysis and design Class 3
 
Software Project Management lecture 9
Software Project Management lecture 9Software Project Management lecture 9
Software Project Management lecture 9
 
Software Project Management lecture 10
Software Project Management lecture 10Software Project Management lecture 10
Software Project Management lecture 10
 
SAD Introduction
SAD IntroductionSAD Introduction
SAD Introduction
 
تحليل النظم
تحليل النظمتحليل النظم
تحليل النظم
 
04. Project Management
04. Project Management04. Project Management
04. Project Management
 
eUnit 2 software process model
eUnit 2  software process modeleUnit 2  software process model
eUnit 2 software process model
 
Unit4 Proof of Correctness, Statistical Tools, Clean Room Process and Quality...
Unit4 Proof of Correctness, Statistical Tools, Clean Room Process and Quality...Unit4 Proof of Correctness, Statistical Tools, Clean Room Process and Quality...
Unit4 Proof of Correctness, Statistical Tools, Clean Room Process and Quality...
 
Managing the information system project
Managing the information system projectManaging the information system project
Managing the information system project
 
Software Project Management lecture 12
Software Project Management lecture 12Software Project Management lecture 12
Software Project Management lecture 12
 
Requirements Engineering
Requirements EngineeringRequirements Engineering
Requirements Engineering
 
Project Time Management
Project Time Management Project Time Management
Project Time Management
 
Project management zarkovic
Project management zarkovicProject management zarkovic
Project management zarkovic
 

Viewers also liked

NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2Future Managers
 
Intro to environmental site assessments (esa)
Intro to environmental site assessments  (esa)Intro to environmental site assessments  (esa)
Intro to environmental site assessments (esa)Gordon Onley
 
Phase I Environmental Site Assessment Training Seminar
Phase I Environmental Site Assessment Training SeminarPhase I Environmental Site Assessment Training Seminar
Phase I Environmental Site Assessment Training SeminarBrandon Trate
 
Project Management and Control
Project Management and ControlProject Management and Control
Project Management and Controleresource erp
 
Phase I ESA Site Reconnaissance
Phase I ESA Site ReconnaissancePhase I ESA Site Reconnaissance
Phase I ESA Site Reconnaissancegdmayo
 
New technologies in environmental cleaning
New technologies in environmental cleaningNew technologies in environmental cleaning
New technologies in environmental cleaningMoustapha Ramadan
 
Work breakdown structure by muhammad talha
Work breakdown structure by muhammad talhaWork breakdown structure by muhammad talha
Work breakdown structure by muhammad talhaMuhammad Talha
 
Project Management Body of Knowledge (Introduction)
Project Management Body of Knowledge (Introduction)Project Management Body of Knowledge (Introduction)
Project Management Body of Knowledge (Introduction)Jeffrey Cheah
 
Safe Drinking Water Act How Safe is My Drinking Water
Safe Drinking Water Act How Safe is My Drinking WaterSafe Drinking Water Act How Safe is My Drinking Water
Safe Drinking Water Act How Safe is My Drinking WaterMichael Klein
 
Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)stakeholdermap
 
Environmental pollution
Environmental pollutionEnvironmental pollution
Environmental pollutionAsif Ashraf
 
Project management planning
Project management planningProject management planning
Project management planningAlvin Niere
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?Kenny Hirschmann
 
Planning And Project Management
Planning And Project ManagementPlanning And Project Management
Planning And Project ManagementST. JAMES COLLEGE
 
15) groundwater contamination, prevention and remedial techniques as on 27-05...
15) groundwater contamination, prevention and remedial techniques as on 27-05...15) groundwater contamination, prevention and remedial techniques as on 27-05...
15) groundwater contamination, prevention and remedial techniques as on 27-05...Najam Ul Syed Hassan
 

Viewers also liked (20)

NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2
 
Intro to environmental site assessments (esa)
Intro to environmental site assessments  (esa)Intro to environmental site assessments  (esa)
Intro to environmental site assessments (esa)
 
P&msp2010 04 wbs-and-estimation
P&msp2010 04 wbs-and-estimationP&msp2010 04 wbs-and-estimation
P&msp2010 04 wbs-and-estimation
 
Phase I Environmental Site Assessment Training Seminar
Phase I Environmental Site Assessment Training SeminarPhase I Environmental Site Assessment Training Seminar
Phase I Environmental Site Assessment Training Seminar
 
Project Management and Control
Project Management and ControlProject Management and Control
Project Management and Control
 
Phase I ESA Site Reconnaissance
Phase I ESA Site ReconnaissancePhase I ESA Site Reconnaissance
Phase I ESA Site Reconnaissance
 
New technologies in environmental cleaning
New technologies in environmental cleaningNew technologies in environmental cleaning
New technologies in environmental cleaning
 
Work breakdown structure by muhammad talha
Work breakdown structure by muhammad talhaWork breakdown structure by muhammad talha
Work breakdown structure by muhammad talha
 
PERT CPM Intro
PERT CPM IntroPERT CPM Intro
PERT CPM Intro
 
Project Management Body of Knowledge (Introduction)
Project Management Body of Knowledge (Introduction)Project Management Body of Knowledge (Introduction)
Project Management Body of Knowledge (Introduction)
 
Quality control methods
Quality control methodsQuality control methods
Quality control methods
 
Safe Drinking Water Act How Safe is My Drinking Water
Safe Drinking Water Act How Safe is My Drinking WaterSafe Drinking Water Act How Safe is My Drinking Water
Safe Drinking Water Act How Safe is My Drinking Water
 
Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
Environmental pollution
Environmental pollutionEnvironmental pollution
Environmental pollution
 
Project management planning
Project management planningProject management planning
Project management planning
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?
 
Planning And Project Management
Planning And Project ManagementPlanning And Project Management
Planning And Project Management
 
15) groundwater contamination, prevention and remedial techniques as on 27-05...
15) groundwater contamination, prevention and remedial techniques as on 27-05...15) groundwater contamination, prevention and remedial techniques as on 27-05...
15) groundwater contamination, prevention and remedial techniques as on 27-05...
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 

Similar to Sadchap03

Chapter 3 Managing Systems Projects .pptx
Chapter 3 Managing Systems Projects .pptxChapter 3 Managing Systems Projects .pptx
Chapter 3 Managing Systems Projects .pptxAxmedMaxamuudYoonis
 
chapter03-120827115353-phpapp02.pdf
chapter03-120827115353-phpapp02.pdfchapter03-120827115353-phpapp02.pdf
chapter03-120827115353-phpapp02.pdfAxmedMaxamuud6
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)ShudipPal
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterpreetidamakale
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..pptPedadaSaikumar
 
Mba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aMba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aRai University
 
Time management pressent
Time management pressentTime management pressent
Time management pressentiklil fairuz
 
AASP_SUMMIT2015_Project_Mgt.pptx
AASP_SUMMIT2015_Project_Mgt.pptxAASP_SUMMIT2015_Project_Mgt.pptx
AASP_SUMMIT2015_Project_Mgt.pptxaravind Guru
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project ManagementRasan Samarasinghe
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Managementrielaantonio
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.pptDeepgaichor1
 
Lec. No. 4 (1).ppsx
Lec. No. 4 (1).ppsxLec. No. 4 (1).ppsx
Lec. No. 4 (1).ppsxHabibaHamed2
 
Topic 11 - Project Schedule Management.pdf
Topic 11 - Project Schedule Management.pdfTopic 11 - Project Schedule Management.pdf
Topic 11 - Project Schedule Management.pdfHuyNguyen657394
 
Project Management Professional (PMI) Study Guide
Project Management Professional (PMI) Study GuideProject Management Professional (PMI) Study Guide
Project Management Professional (PMI) Study Guidemsrakesh
 
Software project management tools
Software project management toolsSoftware project management tools
Software project management toolsDarshak Mehta
 
Project management professional
Project management professionalProject management professional
Project management professionalRaynaITSTEP
 
9 project planning
9 project planning9 project planning
9 project planningrandhirlpu
 

Similar to Sadchap03 (20)

Chapter 3 Managing Systems Projects .pptx
Chapter 3 Managing Systems Projects .pptxChapter 3 Managing Systems Projects .pptx
Chapter 3 Managing Systems Projects .pptx
 
chapter03-120827115353-phpapp02.pdf
chapter03-120827115353-phpapp02.pdfchapter03-120827115353-phpapp02.pdf
chapter03-120827115353-phpapp02.pdf
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapter
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
Mba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aMba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management a
 
MIS Project management
MIS Project managementMIS Project management
MIS Project management
 
Time management pressent
Time management pressentTime management pressent
Time management pressent
 
Gantt Charts.ppt
Gantt Charts.pptGantt Charts.ppt
Gantt Charts.ppt
 
Project Management
Project ManagementProject Management
Project Management
 
AASP_SUMMIT2015_Project_Mgt.pptx
AASP_SUMMIT2015_Project_Mgt.pptxAASP_SUMMIT2015_Project_Mgt.pptx
AASP_SUMMIT2015_Project_Mgt.pptx
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Management
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt
 
Lec. No. 4 (1).ppsx
Lec. No. 4 (1).ppsxLec. No. 4 (1).ppsx
Lec. No. 4 (1).ppsx
 
Topic 11 - Project Schedule Management.pdf
Topic 11 - Project Schedule Management.pdfTopic 11 - Project Schedule Management.pdf
Topic 11 - Project Schedule Management.pdf
 
Project Management Professional (PMI) Study Guide
Project Management Professional (PMI) Study GuideProject Management Professional (PMI) Study Guide
Project Management Professional (PMI) Study Guide
 
Software project management tools
Software project management toolsSoftware project management tools
Software project management tools
 
Project management professional
Project management professionalProject management professional
Project management professional
 
9 project planning
9 project planning9 project planning
9 project planning
 

More from let's go to study (20)

Rs instructor ppt_chapter11_final
Rs instructor ppt_chapter11_finalRs instructor ppt_chapter11_final
Rs instructor ppt_chapter11_final
 
Ch10
Ch10Ch10
Ch10
 
Before beginning
Before beginningBefore beginning
Before beginning
 
Chapter 8 (security)
Chapter 8 (security)Chapter 8 (security)
Chapter 8 (security)
 
Chapter 7 (ado.net)
Chapter 7 (ado.net)Chapter 7 (ado.net)
Chapter 7 (ado.net)
 
Chapter 6 (data binding)
Chapter 6 (data binding)Chapter 6 (data binding)
Chapter 6 (data binding)
 
Chapter 5 (master page)
Chapter 5 (master page)Chapter 5 (master page)
Chapter 5 (master page)
 
Chapter 4 (navigater)
Chapter 4 (navigater)Chapter 4 (navigater)
Chapter 4 (navigater)
 
Chapter 3 (validation control)
Chapter 3 (validation control)Chapter 3 (validation control)
Chapter 3 (validation control)
 
Chapter 2 (web servercontrol)
Chapter 2 (web servercontrol)Chapter 2 (web servercontrol)
Chapter 2 (web servercontrol)
 
Chapter 1 (asp.net over view)
Chapter 1 (asp.net over view)Chapter 1 (asp.net over view)
Chapter 1 (asp.net over view)
 
Before beginning
Before beginningBefore beginning
Before beginning
 
Sadchap02
Sadchap02Sadchap02
Sadchap02
 
Sadchap01
Sadchap01Sadchap01
Sadchap01
 
database design process
database design processdatabase design process
database design process
 
009 sql server management studio
009 sql server management studio009 sql server management studio
009 sql server management studio
 
007 sql server-installation
007 sql server-installation007 sql server-installation
007 sql server-installation
 
Chapter 2-html-tage
Chapter 2-html-tageChapter 2-html-tage
Chapter 2-html-tage
 
Chapter 0 before you start
Chapter 0   before you startChapter 0   before you start
Chapter 0 before you start
 
Java 2 chapter 10 - basic oop in java
Java 2   chapter 10 - basic oop in javaJava 2   chapter 10 - basic oop in java
Java 2 chapter 10 - basic oop in java
 

Recently uploaded

Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Colleen Farrelly
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfBoston Institute of Analytics
 
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...limedy534
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改yuu sss
 
9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home ServiceSapana Sha
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfgstagge
 
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝DelhiRS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhijennyeacort
 
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一F sss
 
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理e4aez8ss
 
How we prevented account sharing with MFA
How we prevented account sharing with MFAHow we prevented account sharing with MFA
How we prevented account sharing with MFAAndrei Kaleshka
 
ASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel CanterASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel Cantervoginip
 
Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfLars Albertsson
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptxthyngster
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdfHuman37
 
办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degree
办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degree办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degree
办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degreeyuu sss
 
Top 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In QueensTop 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In Queensdataanalyticsqueen03
 

Recently uploaded (20)

Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024
 
Call Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort ServiceCall Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort Service
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
 
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
 
9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdf
 
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
 
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝DelhiRS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
 
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
 
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
科罗拉多大学波尔得分校毕业证学位证成绩单-可办理
 
How we prevented account sharing with MFA
How we prevented account sharing with MFAHow we prevented account sharing with MFA
How we prevented account sharing with MFA
 
ASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel CanterASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel Canter
 
Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdf
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf
 
办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degree
办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degree办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degree
办美国阿肯色大学小石城分校毕业证成绩单pdf电子版制作修改#真实留信入库#永久存档#真实可查#diploma#degree
 
Top 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In QueensTop 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In Queens
 
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
 

Sadchap03

  • 1. Systems Analysis and Design 9th Edition Chapter 3 Managing Systems Projects
  • 2. Chapter Objectives • Explain project planning, scheduling, monitoring, and reporting • Describe work breakdown structures, task patterns, and critical path analysis • Explain techniques for estimating task completion times and costs
  • 3. Chapter Objectives • Describe various scheduling tools, including Gantt charts and PERT/CPM charts • Analyze task dependencies, durations, start dates, and end dates • Describe project management software and how it can assist you in project planning, estimating, scheduling, monitoring, and reporting
  • 4. Chapter Objectives • Discuss the importance of project risk management • Understand why projects sometimes fail
  • 5. Introduction • You will learn about project planning, estimating, scheduling, monitoring, reporting, and the use of project management software • You also will learn how to control and manage project changes as they occur
  • 6. Overview of Project Management • Project Management • A successful project must be completed on time, within budget, and deliver a quality product that satisfies users and meets requirements • Project manager or project leader • Project coordinator
  • 7. Overview of Project Management • What Does a Project Manager Do? – Project manager, project leader – Project planning – Project scheduling – Project monitoring and controlling – Project reporting
  • 8. Overview of Project Management • Project Activities and Planning Steps
  • 9. Step 1: Create a Work Breakdown Structure • Work breakdown structure (WBS) • What is a Gantt Chart? – Task group – Can present an overview of the project’s status, but does not provide detailed information that is necessary when managing a complex project
  • 10. Step 1: Create a Work Breakdown Structure • What is a PERT/CPM Chart? – The Program Evaluation Review Technique (PERT) – Critical Path Method (CPM) – The distinction between the two methods has disappeared over time
  • 11. Step 1: Create a Work Breakdown Structure • What is a PERT/CPM Chart ? – PERT/CPM is called a bottom-up technique – Project tasks – Once you know the tasks, their duration, and the order in which they must be performed, you can calculate the time that it will take to complete the project
  • 12. Step 1: Create a Work Breakdown Structure • Which Type of Chart is Better? – Although a Gantt chart offers a valuable snapshot view of the project, PERT charts are more useful for scheduling, monitoring, and controlling the actual work – PERT and Gantt charts are not mutually exclusive techniques, and project managers often use both methods
  • 13. Step 1: Create a Work Breakdown Structure • Identifying Tasks in a Work Breakdown Structure – Task or activity – Event or milestone – Break the project down into smaller tasks, creating a work breakdown structure
  • 14. Step 1: Create a Work Breakdown Structure • Identifying Tasks in a Work Breakdown Structure – Listing the tasks – Can be challenging, because the tasks might be embedded in a document – Create a table with columns for task number, description, duration, and predecessor tasks
  • 15. Step 1: Create a Work Breakdown Structure • Identifying Tasks in a Work Breakdown Structure – Estimating Task Duration – Person-days – Best-case estimate (B) – Probable-case estimate (P)
  • 16. Step 1: Create a Work Breakdown Structure • Identifying Tasks in a Work Breakdown Structure – Estimating Task Duration – Worst-case estimate (W) – Weight (B+4P+W) 6
  • 17. Step 1: Create a Work Breakdown Structure • Identifying Tasks in a Work Breakdown Structure – Factors Affecting Duration – Project size and scope – Human resources – Experience with similar project – constraints
  • 18. Step 1: Create a Work Breakdown Structure • Displaying the Work Breakdown Structure – If you are managing a complex project with many tasks, you can use task groups, just as you would in a Gantt chart, to simplify the list
  • 19. Step 2: Identify Task Patterns • Task pattern • What are Task Patterns? – Large or small, tasks depend on each other and must be performed in a sequence, not unlike the commands in a software program – Task patterns can involve dependent tasks, multiple successor tasks, and multiple predecessor tasks
  • 20. Step 2: Identify Task Patterns • How do I Use Task Boxes to Create a Model?
  • 21. Step 2: Identify Task Patterns • What are the Main Types of Task Patterns? – Dependent Tasks – Multiple successor tasks – Concurrent task – Predecessor task – Successor task – Multiple Predecessor Tasks
  • 22. Step 2: Identify Task Patterns • How Do I Identify Task Patterns? – You can identify task patterns by looking carefully at the wording of the task statement – Words like then, when, or and are action words that signal a sequence of events • How Do I Work With Complex Task Patterns? – When various task patterns combine, you must study the facts carefully in order to understand the logical sequence
  • 23. Step 2: Identify Task Patterns • How Do I Work With Complex Task Patterns? – Consider the following three fact statements and the task patterns they represent – Dependent tasks – Dependent tasks and multiple successor tasks – Dependent tasks, multiple successor tasks, and multiple predecessor tasks
  • 24. Step 3: Calculate the Critical Path • What Is a Critical Path?
  • 25. Step 3: Calculate the Critical Path • How Do I Calculate the Critical Path? – First, you should review the task patterns – The next step is to determine start and finish dates, which will determine the critical path for the project – Slack time
  • 26. Project Monitoring and Control • Monitoring and Control Techniques – The project manager must keep track of tasks and progress of team members, compare actual progress with the project plan, verify the completion of project milestones, and set standards and ensure that they are followed – Structured walkthrough – Called design reviews, code reviews, or testing reviews
  • 27. Project Monitoring and Control • Maintaining a Schedule – Maintaining a project schedule can be a challenging task – The better the original plan, the easier it will be to control the project – If enough milestones and frequent checkpoints exist, problems will be detected rapidly – Project managers often spend most of their time tracking the tasks along the critical path
  • 28. Reporting • Members of the project team regularly report their progress • Project Status Meetings
  • 29. Reporting • Project Status Reports – A project manager must report regularly to his or her immediate supervisor, upper management, and users – Should explain what you are doing to handle and monitor the problem – Most managers recognize that problems do occur on most projects; it is better to alert management sooner rather than later
  • 30. Project Management Examples • PERT/CPM Example – You construct a PERT/CPM chart from this task list in a two-step process – Step 1: Create the work breakdown structure – Step 2: Enter start and finish times
  • 31. Project Management Examples • Software-Driven Example – Open Workbench – Open-source software – When you use project management software, you follow the same step-by-step process to develop a WBS and create various types of charts
  • 32. Project Management Examples • Software-Driven Example – Work breakdown structure – Gantt chart – Network diagram – Project planning is a dynamic task and involves constant change
  • 33. Risk Management • Every IT project involves risks that systems analysts and project managers must address • Risk management • Steps in Risk Management – Develop risk management plan – Identify the risks – Risk identification
  • 34. Risk Management • Steps in Risk Management (continued) – Analyze the risks – Qualitative risk analysis – Quantitative risk analysis – Create a risk response plan – Monitor risks
  • 35. Risk Management • Risk Management Software – Most project management software includes powerful features – The IT team can make a recommendation regarding the risks – Depending on the nature and magnitude of the risk, the final decision might be made by management
  • 36. Managing for Success • Business Issues – The major objective of every system is to provide a solution to a business problem or opportunity – A system that falls short of business needs also produces problems for users and reduces employee morale and productivity – Project creep
  • 37. Managing for Success • Budget Issues – Cost overruns typically result from one or more of the following: – Unrealistic estimates – Failure to develop an accurate forecast that considers all costs over the life of the project – Poor monitoring of progress and slow response to early warning signs of problems
  • 38. Managing for Success • Budget Issues – Cost overruns typically result from one or more of the following: – Schedule delays due to factors that were not foreseen – Human resource issues, including turnover, inadequate training, and motivation
  • 39. Managing for Success • Schedule Issues – Problems with timetables and project milestones can indicate a failure to recognize task dependencies, confusion between effort and progress, poor monitoring and control methods, personality conflicts among team members, or turnover of project personnel
  • 40. The Bottom Line • When problems occur, the project manager’s ability to handle the situation becomes the critical factor
  • 41. The Bottom Line • Sometimes, when a project experiences delays or cost overruns, the system still can be delivered on time and within budget if several less critical requirements are trimmed • Brooks’ Law
  • 42. Chapter Summary • Project management is the process of planning, scheduling, monitoring and controlling, and reporting upon the development of an information system • Project managers are responsible for project planning, scheduling, monitoring, and reporting • Planning, scheduling, monitoring and reporting all take place within a larger project development framework
  • 43. Chapter Summary • In project scheduling, the project manager develops a specific time for each task, based on available resources and whether or not the task is dependent on other predecessor tasks • Every successful information system must support business requirements, stay within budget, and be available on time • Sound project management involves the same skills as any other management

Editor's Notes

  1. <number>
  2. <number>
  3. <number>
  4. <number>
  5. <number>
  6. <number>
  7. <number>
  8. <number>
  9. <number>
  10. <number>
  11. <number>
  12. <number>
  13. <number>
  14. <number>
  15. <number>
  16. <number>
  17. <number>
  18. <number>
  19. <number>
  20. <number>
  21. <number>
  22. <number>
  23. <number>
  24. <number>
  25. <number>
  26. <number>
  27. <number>
  28. <number>
  29. <number>
  30. <number>
  31. <number>
  32. <number>
  33. <number>
  34. <number>
  35. <number>
  36. <number>
  37. <number>
  38. <number>
  39. <number>
  40. <number>
  41. <number>
  42. <number>
  43. <number>
  44. <number>