FOUNDRY PARK PPT_2023.02.24.ppt
1. Foundry Park
Ranihati-Amta Road, Howrah, West Bengal
developed by
Foundry Cluster Development Association
Department of MSME&T, Govt. of West Bengal
Nodal Organization:WBSIDCL
State Approved Industrial Park (SAIP)
State Approved Industrial Park (SAIP)
2. LOCATED IN :-
HAULIBAGAN
SAMANTI, JALABISWANATHPUR & SUVARAH
MOUZA), HOWRAH DISTRICT, WEST BENGAL
SITE POTENTIAL :-
THE SITE IS LOCATED IN THE HEART OF
FOUNDRY INDUSTRY IN EASTERN INDIA
THE APPROACH TO SITE IS FROM HOWRAH-
AMTA ROAD CONNECTED TO NH-6
Site Location
3. Registered under Section 8 of Companies Act on 29th March, 2005 with approval of WBIDC
and WBPCB.
Project being implemented with partial grant for infrastructural development from Govt.
of India under the Industrial Infrastructure Upgradation Scheme (IIUS), Department of
Promotion of Industry and Internal Trade (DPIIT), Ministry of Commerce & Industry, GoI.
State Govt has also contributed by way of setting up of STP and upgradation of local
sewarage and drainage system
Phase-I of around 600 acres with 150 foundries and allied units to be accommodated. Total
area of the project envisaged is 924 acres
About Foundry Park
4. Project Feature Information
Total Number of Units Planned Foundry Units:
100 nos. in total in 600 acres
Allied (Core making, pattern making, fettling, painting, fabrication
and machining shops, raw material banks etc.): 50 nos.
Total Envisaged Castings Output By end of 5th year of Commercial Operations: 5 lakh tonnes per
annum.
Total Envisaged Investment by
Foundry Units
Rs. 2500 crores
Employment Potential Direct Employment: 10,000 people (approx.)
Indirect Employment: 30,000 people
About Foundry Park
6. Sl No Major Items of Work Scope
1 ROAD WORK 11840 M
2 STORM WATER DRAIN WORK 18225 M
3 EXTERNAL WATER SUPPLY WORK 13000 M
4 WATER WORKS
UGR 3 nos
OHT 3 nos
PH 3 nos
TUBE WELLS 4 nos
5 SEWER NETWORK 12800 M
6 POWER DISTRIBUTION SYSTEM 33/11kv substation 2 nos
Major Scope of Work
7 Common Facility Buildings
I T I building
Testing laboratory & Tool room building
Information, Marketing, HRD & Management upgradation centre
Pump house & its UGR for CFB units
Sub-station building for CFB units
Boundary wall around CFB units
8. 1. 129 plots already allotted to stakeholders all from MSME
sector
2. 34 nos stakeholders have started factory construction
activities out of which 9 nos have started production after
obtaining all statutory clearances
3. Foundries and units manufacturing Light Engineering
Products are being set up
Plot Status
9. Source of Power :
220 KV sub-station set-up within the Park. FCDA provided
approximately 15 acres of Land to WBSETCL/WBSEDCL for
setting up the sub-station. The sub-station supplies
uninterrupted quality power to meet the entire requirement
Foundry Park.
There is provision of 3 Nos 33 KV substation out of which one is
operational and another one is under construction.
10. Status of approvals of Foundry Park under SAIP
‘Final Approval’ in favour of Foundry Park was accorded on 20.04.2022.
Now he has requested for for the release of ‘1st installment of Incentives’
of the said Industrial Park.
11. Checklist according to parameter for 1st Incentive payment
Sl
No
Criteria as per guideline Comments of PMU, WBSIDCL
1 Mutation, conversion & registration of
the land in SPV’s name
Mutation has already been done for total lands but conversion is
yet to be done. It also attracts the memo no. 796-GE(M)/3M-
68/11; dated 25.02.2021.
2 Formation of the SPV and obtaining
final approval of the AIP from the
SLEC
SPV already formed and obtained final approval of the AIP from
the SLEC on 20.04.2022.
This Park has been visited on 14th July, 2022 by the PMU Team of WBSIDCL in presence of Mr. Mukul
Maity, Site Engineer, Foundry Cluster Development Association along with his team and after
inspection & checking of the project it has been found that all basic and essential infrastructures
have been completed as per SAIP 2020 Guideline but, the SPV has developed the Park with the
assistance of Government funds.
Accordingly WBSIDCL has not recommended for release of ‘incentive’ in favour of Foundry
Park. SPV has also applied for reimbursement of stamp duty and registration fees and the
reimbursement of said fees has been recommended.
12. ….cont’d
Sl Criteria as per
guideline
Comments of PMU, WBSIDCL
3 Completion of
construction of Boundary
Wall, Land filling and
Internal Roads
Land filling Work is almost completed (95%).
The total length of Boundary Wall executed at site is 3400m (approx). So the
Construction of Boundary Wall is almost completed.
Internal Road Work has been completed and the total length of about 7760m. As
informed by FCDA, total thickness of the internal road is 580mm consisting of
230mm GSB, 250mm WMM, 60mm DBM & 40mm BC. Two (02) nos Culvert have been
constructed.
Drainage System is done comprises with RCC Wall and the total length of about
7760m. Many portions of drain are choked & damaged. Irrigation Deptt has
initiated the work of improvement of drainage congestion. Copy of all documents
relating to KMDA work is attached.
Regarding Electric Connection, FCDA informed WBSEDCL will set up a 220KVA
substations from which power will be drawn for the project by two 33KVA
substations. Twenty Four (24) nos Street Light have been installed along the road.
Setting up of 0.80MLD CETP is under going on at the end of KMDA.
13. ….cont’d
RECOMMENDATIONS BY WBSIDCL
Since the SPV has developed the Park with the assistance of Government funds, hence WBSIDCL
has not been recommended for release of ‘incentive’ in favour of Foundry Park as per section
8(F)* of SAIP 2020.
SPV has also applied for reimbursement of stamp duty and registration fees and the
reimbursement of said fees has been recommended by WBSIDCL as per guideline of SAIP 2020.
*As per section 8(F) of SAIP 2020 it is stated that the SPV availing of incentives under the Scheme shall be
eligible to avail incentives under any other scheme of the State Government / Government of India
except for the same item and excluding the cluster infrastructure development assistance as available in
MSME Policy of the State Government. Individual Units coming up in the AIP shall be eligible to avail
incentives under various schemes of the State Government/Central Government as per their eligibility.
19. Vivekananda Industrial Training Institute
Collaborated with Paschim Banga Society of Skill Development (PBSSD)
under the aegis of Ministry of Technical Education & Skill Development,
Govt. of West Bengal for:
Foundry courses including Melting, Moulding and Core making.
Theoretical Class Practical Training Class
Hostel facility for Students
20. Library & reading Room
Administrative Office
Conference Room with Projector
Infrastructure
Facilities in Training
Institute