GRID CONNECTED PV ROOFTOP
PROGRAMME
CONCLAVE FOR CHANNEL PARTNERS
09.11.2016
Government of India
Ministry of New and Renewable Energy
MNRE
GRID CONNECTED ROOFTOP AND SMALL SOLAR
POWER PLANTS PROGRAMME
 Target till 2019-20 : 4200 MW.
 Budgetary allocation : Rs. 5000 Crore.
 Central Financial Assistance of 30% is provided for general
category and 70% for special category States, NE States and
Islands.
 No Central Financial Assistance is provided for establishments
under commercial and industrial sector.
 Incentives is provided for Government Sectors/PSUs.
 Phase-II of Programme has ben initiated
Achievement vis-a-vis
Target Allocation
Incentives for General
Category States/UTs
Incentives for Special
Category States/UTs
80% and above Rs.18,750/- per kW Rs.45,000/- per kW
Below 80% and upto 50% Rs.11,250/- per kW Rs.27,000/- per kW
Below 50% Rs.7,500/- per kW Rs.18,000/- per kW
PRESENT STATUS: POLICIES AND REGULATIONS
 17 States have come out with Solar Policy supporting
grid connected rooftop systems
 SERCs of 31 States/UTs have notified regulations for
net- metering/gross-metering
 States/UTs where regulations for net- metering/gross-
metering are yet to be notified:
 Arunachal Pradesh
 Telangana
 Manipur
 Mizoram
 Nagaland
FISCAL INCENTIVES FOR SOLAR ROOFTOP
SYSTEMS
 Accelerated depreciation
 80%(of Project Cost) for 1st year
 10% for 2nd year
 10% for 3rd year
 Concessional custom duty
 Excise duty exemptions
 Income tax holiday for 10 years for plants set up by
2020
 Under Priority Sector Lending, loans are available upto
Rs. 10 lakhs for individuals & upto Rs. 15 crore for
renewable energy projects
 Bank loans as a part of home loan/ home improvement
loan for solar rooftop systems
 Loans available for system aggregators from IREDA,
SBI and ADB at concessional interest rate
INSTALLATION OF ROOFTOP SOLAR ON
GOVERNMENT BUILDINGS
 Identification of rooftop & vacant areas in Govt / PSU
buildings
 Data of about 55 Ministries indicates RTS potential of
5900 MW
 8 meetings held in the Cabinet Secretariat with
Departments
 Commitment certificates obtained from Ministries
 Expert PSUs empanelled
 Project management consultancy charges (3%) : by
MNRE
 PSUs have created Solar Cells + site assessments
 Bidding process for RESCO & CAPEX being started
EMPANELED EXPERT PSU
 Solar Energy Corporation of
India
 Central Electronics Ltd
 India SME Technology
Services Limited
 PEC Limited
 Rajasthan Electronics &
Instruments Limited
 Bharat Heavy Electrical Ltd.
 Bharat Electronics Ltd.
 Punjab Communication
Limited
 REMCL
 C-DIT
 KELTRON
 RITES Limited
 Shreetron India Limited
 Gujarat Industries Power
Company Limited
 UP Industrial Co-operative
Limited
 NTPC Vidyut Vapar Nigam
Limited
400 kWp Plant : Chinnasawamy Stadium
Sr.no. States Target Total (MWp)
by Year 2022
Approval/Sanctio
n ( MWp)
Installation(Including
Installation by
SECI)(MWp)
1 Andhra Pradesh 2000 39.5 13.425
2 Bihar 1000 0.910
3 Chhattisgarh 700 11.2 23.406
4 Delhi 1100 92 35.934
5 Gujarat 3200 61.75 49.025
6 Haryana 1600 75 37.469
7 Himachal Pradesh 320 10 0.331
8 Jammu & Kashmir 450 7 1.000
9 Jharkhand 800 55 0.863
10 Karnataka 2300 10.935 38.188
11 Kerala 800 15 3.830
12 Madhya Pradesh 2200 115 4.473
13 Maharashtra 4700 100 51.215
14 Odisha 1000 4 1.581
15 Punjab 2000 25 44.543
16 Rajasthan 2300 31 19.076
17 Tamil Nadu 3500 312 83.617
18 Telangana 2000 74 18.852
19 Uttarakhand 350 51 8.097
20 Uttar Pradesh 4300 7 24.258
STATE WISE TARGET, SANCTIONS & ACHIEVEMENTS
STATE WISE TARGET, SANCTIONS & ACHIEVEMENTS
(CONTD…)
Sr.no. States Target Total (MWp)
by Year 2022
Approval/Sanctio
n ( MWp)
Installation(Including
Installation by
SECI)(MWp)
21 West Bengal 2100 7 12.017
22 Arunachal Pradesh 50 0 0.000
23 Assam 250 14 1.179
24 Manipur 50 8.4 0.009
25 Meghalaya 50 0 0.011
26 Mizoram 50 0 0.100
27 Nagaland 50 0 0.504
28 Sikkim 50 0 0.010
29 Tripura 50 0 0.015
30 Chandigarh 100 30.5 11.161
31 Goa 150 2 0.052
32 Dadra and Nagar Haveli
300
0 0.595
33 Daman & Diu 0 0.000
34 Puducherry 100 0.02 0.000
35
Andaman & Nicobar
Islands 30 1
0.300
36 Laskhadweep 1 0.000
A Total 40000 1160.305 486.047
Solar Energy
Corporation of India* 899.6
-
B Ministry of Railways 502.5 3.700
C
PSUs/Govt.
Departments 482
11.370
Total 3044.405 501.117
STANDARDISATION OF RTS DOCUMENTS
 Model bidding documents were developed for both
CAPEX and RESCO modes
 Draft of following documents have been prepared
and vetted by Ministries of Law and Finance
o Memorandum of Understanding (MoU) for execution between
Organisation/ULB/Ministry/Departments and PSU’s
o Engineering, Procurement and Construction Agreement for
CAPEX /Ownership mode
o Power Purchase Agreement for RESCO /PPA mode RTS
 On the basis of the standardized documents, SECI’s
1000MW tender will be floated
CHANNEL PARTNER EMPANELMENT STATUS
Category of Channel Partner No. of empanelled
Agency
MNRE A Rating 147
MNRE B Rating 188
MNRE C Rating 147
MNRE D Rating/Channel Partner (New
Entrepreneur)
515
Total Empanelled Channel Partner 997
EXPECTED ROLE OF CHANNEL PARTNER
 Promote RTS in Residential, Institutional &
Industrial Sectors
 Develop sales & service network
 Develop innovative business models
 Provide user training for end user customers
 Prepare manuals & other advertising materials
 Help create environment for subsidy free eco-
system for RTS
150 KWP SOLAR ROOFTOP ON A CURVED ROOF IN A
METRO STATION IN FARIDABAD
PROPOSED ROOFTOP SOLAR INCENTIVE
SCHEME FOR DISCOMS
 To bring DisComs in the forefront for RTS implementation
 Providing them performance enabling financial support
 Providing support of Rs. 500 cr to DISCOMs for supporting
capacity of 1350 MWp by 2019-20.
 Maximum financial assistance provided: Rs. 37.5 lakh per
installed MW of RTS.
 To support the DisComs to
 develop RTS cell
 assess up gradation and modernization requirements of their
distribution network
 facilitate demand aggregation
 develop consumer awareness
 develop enabling forms/ processes,
 Enable meter/ equipment procurement
 capacity development etc.
PROPOSED RTS SCHEME FOR ULBS
 To focus on upcoming building so as to have RTS
installation.
 To enable RTS development from planning stage,
Ministry of Urban Development (MoUD) has
recently amended Model Building Bye-laws for
including RTS plants for major building projects
 ULBs to play pivotal role in accelerating the RTS by
means of implementation of building bye-laws,
building approvals, etc.
 MNRE proposes an incentive and award scheme
for ULBs through this scheme.
RECENT DEVELOPMENTS
 DG S&D Process Initiated
 Rate Contracts for Panels, Inverters,
etc
 Mobile App developed for Locating
Surya Mitras
 Mobile App has been developed by NIC
to give complete details required for
RTS installation.
 Geo-Tagging of Projects with ISRO
 SPIN portal is available on
solarrooftop.gov.in
 For empanelment applications
 To enter customer interest
 To enter Project Proposals
 To enter PCRs of executed projects
etc.
LIST OF TEST CENTRES FOR SOLAR
EQUIPMENTS
 Central Power Research Institute (CPRI)
 National Test House(NTH)
 Electronics Test and Development Centre(ETDC)
 The Energy and Resources Institute (TERI), New
Delhi
 UL India Pvt. Ltd.
 Scientific and Industrial Testing and Research
Centre (SiTarc)
 TUV Rheinland (India) Pvt. Ltd
 National Institute of Solar Energy (NISE)
 Electrical Research & Development Association
(ERDA)
Thank you

More Related Content

Similar to MNRE_Conclave-CP-presentation-solar.pptx

New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21Rajesh Prasad
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentivesChirag Jain
 
New grid connected solar photo voltaic power projects 500 mw capacity under...
New grid connected solar photo voltaic power projects 500   mw capacity under...New grid connected solar photo voltaic power projects 500   mw capacity under...
New grid connected solar photo voltaic power projects 500 mw capacity under...ank_
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsSanman Rajput
 
Transnational Trade of Electricity
Transnational Trade of ElectricityTransnational Trade of Electricity
Transnational Trade of ElectricityIPPAI
 
Natural group presentation tamil nadu solar energy policy devising cost effec...
Natural group presentation tamil nadu solar energy policy devising cost effec...Natural group presentation tamil nadu solar energy policy devising cost effec...
Natural group presentation tamil nadu solar energy policy devising cost effec...Ritesh Pothan
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...Harish Sharma
 
KREDL- Energy Efficiency Workshop - Bangalore
KREDL- Energy Efficiency Workshop -  BangaloreKREDL- Energy Efficiency Workshop -  Bangalore
KREDL- Energy Efficiency Workshop - BangaloreAdvit Foundaion
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Headway Solar
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...Harish Sharma
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVHarish Sharma
 
Budget 2014 15 Energy sector Edelman
Budget 2014 15 Energy sector EdelmanBudget 2014 15 Energy sector Edelman
Budget 2014 15 Energy sector EdelmanEdelmanIndiaPA
 
Summer training project on DVC power plant
Summer training project on DVC power plantSummer training project on DVC power plant
Summer training project on DVC power plantAnkita Shrestha
 
Opportunities & Challenges in Developing Wind Energy in India
Opportunities & Challenges in Developing Wind Energy in IndiaOpportunities & Challenges in Developing Wind Energy in India
Opportunities & Challenges in Developing Wind Energy in India Devesh Gautam
 
IRJET- Energy Statistics in India
IRJET- Energy Statistics in IndiaIRJET- Energy Statistics in India
IRJET- Energy Statistics in IndiaIRJET Journal
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...Harish Sharma
 

Similar to MNRE_Conclave-CP-presentation-solar.pptx (20)

New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21
 
Final faq booklet
Final faq bookletFinal faq booklet
Final faq booklet
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 
New grid connected solar photo voltaic power projects 500 mw capacity under...
New grid connected solar photo voltaic power projects 500   mw capacity under...New grid connected solar photo voltaic power projects 500   mw capacity under...
New grid connected solar photo voltaic power projects 500 mw capacity under...
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
Government Solar and Net Metering Policies
Government Solar and Net Metering PoliciesGovernment Solar and Net Metering Policies
Government Solar and Net Metering Policies
 
Transnational Trade of Electricity
Transnational Trade of ElectricityTransnational Trade of Electricity
Transnational Trade of Electricity
 
Natural group presentation tamil nadu solar energy policy devising cost effec...
Natural group presentation tamil nadu solar energy policy devising cost effec...Natural group presentation tamil nadu solar energy policy devising cost effec...
Natural group presentation tamil nadu solar energy policy devising cost effec...
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
 
KREDL- Energy Efficiency Workshop - Bangalore
KREDL- Energy Efficiency Workshop -  BangaloreKREDL- Energy Efficiency Workshop -  Bangalore
KREDL- Energy Efficiency Workshop - Bangalore
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
 
Budget 2014 15 Energy sector Edelman
Budget 2014 15 Energy sector EdelmanBudget 2014 15 Energy sector Edelman
Budget 2014 15 Energy sector Edelman
 
Summer training project on DVC power plant
Summer training project on DVC power plantSummer training project on DVC power plant
Summer training project on DVC power plant
 
Opportunities & Challenges in Developing Wind Energy in India
Opportunities & Challenges in Developing Wind Energy in IndiaOpportunities & Challenges in Developing Wind Energy in India
Opportunities & Challenges in Developing Wind Energy in India
 
Discussion paper 16.11.2015
Discussion paper 16.11.2015Discussion paper 16.11.2015
Discussion paper 16.11.2015
 
Union budget 2014 15
Union budget 2014 15Union budget 2014 15
Union budget 2014 15
 
IRJET- Energy Statistics in India
IRJET- Energy Statistics in IndiaIRJET- Energy Statistics in India
IRJET- Energy Statistics in India
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
 

Recently uploaded

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 

Recently uploaded (20)

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 

MNRE_Conclave-CP-presentation-solar.pptx

  • 1. GRID CONNECTED PV ROOFTOP PROGRAMME CONCLAVE FOR CHANNEL PARTNERS 09.11.2016 Government of India Ministry of New and Renewable Energy MNRE
  • 2. GRID CONNECTED ROOFTOP AND SMALL SOLAR POWER PLANTS PROGRAMME  Target till 2019-20 : 4200 MW.  Budgetary allocation : Rs. 5000 Crore.  Central Financial Assistance of 30% is provided for general category and 70% for special category States, NE States and Islands.  No Central Financial Assistance is provided for establishments under commercial and industrial sector.  Incentives is provided for Government Sectors/PSUs.  Phase-II of Programme has ben initiated Achievement vis-a-vis Target Allocation Incentives for General Category States/UTs Incentives for Special Category States/UTs 80% and above Rs.18,750/- per kW Rs.45,000/- per kW Below 80% and upto 50% Rs.11,250/- per kW Rs.27,000/- per kW Below 50% Rs.7,500/- per kW Rs.18,000/- per kW
  • 3. PRESENT STATUS: POLICIES AND REGULATIONS  17 States have come out with Solar Policy supporting grid connected rooftop systems  SERCs of 31 States/UTs have notified regulations for net- metering/gross-metering  States/UTs where regulations for net- metering/gross- metering are yet to be notified:  Arunachal Pradesh  Telangana  Manipur  Mizoram  Nagaland
  • 4. FISCAL INCENTIVES FOR SOLAR ROOFTOP SYSTEMS  Accelerated depreciation  80%(of Project Cost) for 1st year  10% for 2nd year  10% for 3rd year  Concessional custom duty  Excise duty exemptions  Income tax holiday for 10 years for plants set up by 2020  Under Priority Sector Lending, loans are available upto Rs. 10 lakhs for individuals & upto Rs. 15 crore for renewable energy projects  Bank loans as a part of home loan/ home improvement loan for solar rooftop systems  Loans available for system aggregators from IREDA, SBI and ADB at concessional interest rate
  • 5. INSTALLATION OF ROOFTOP SOLAR ON GOVERNMENT BUILDINGS  Identification of rooftop & vacant areas in Govt / PSU buildings  Data of about 55 Ministries indicates RTS potential of 5900 MW  8 meetings held in the Cabinet Secretariat with Departments  Commitment certificates obtained from Ministries  Expert PSUs empanelled  Project management consultancy charges (3%) : by MNRE  PSUs have created Solar Cells + site assessments  Bidding process for RESCO & CAPEX being started
  • 6. EMPANELED EXPERT PSU  Solar Energy Corporation of India  Central Electronics Ltd  India SME Technology Services Limited  PEC Limited  Rajasthan Electronics & Instruments Limited  Bharat Heavy Electrical Ltd.  Bharat Electronics Ltd.  Punjab Communication Limited  REMCL  C-DIT  KELTRON  RITES Limited  Shreetron India Limited  Gujarat Industries Power Company Limited  UP Industrial Co-operative Limited  NTPC Vidyut Vapar Nigam Limited
  • 7. 400 kWp Plant : Chinnasawamy Stadium
  • 8. Sr.no. States Target Total (MWp) by Year 2022 Approval/Sanctio n ( MWp) Installation(Including Installation by SECI)(MWp) 1 Andhra Pradesh 2000 39.5 13.425 2 Bihar 1000 0.910 3 Chhattisgarh 700 11.2 23.406 4 Delhi 1100 92 35.934 5 Gujarat 3200 61.75 49.025 6 Haryana 1600 75 37.469 7 Himachal Pradesh 320 10 0.331 8 Jammu & Kashmir 450 7 1.000 9 Jharkhand 800 55 0.863 10 Karnataka 2300 10.935 38.188 11 Kerala 800 15 3.830 12 Madhya Pradesh 2200 115 4.473 13 Maharashtra 4700 100 51.215 14 Odisha 1000 4 1.581 15 Punjab 2000 25 44.543 16 Rajasthan 2300 31 19.076 17 Tamil Nadu 3500 312 83.617 18 Telangana 2000 74 18.852 19 Uttarakhand 350 51 8.097 20 Uttar Pradesh 4300 7 24.258 STATE WISE TARGET, SANCTIONS & ACHIEVEMENTS
  • 9. STATE WISE TARGET, SANCTIONS & ACHIEVEMENTS (CONTD…) Sr.no. States Target Total (MWp) by Year 2022 Approval/Sanctio n ( MWp) Installation(Including Installation by SECI)(MWp) 21 West Bengal 2100 7 12.017 22 Arunachal Pradesh 50 0 0.000 23 Assam 250 14 1.179 24 Manipur 50 8.4 0.009 25 Meghalaya 50 0 0.011 26 Mizoram 50 0 0.100 27 Nagaland 50 0 0.504 28 Sikkim 50 0 0.010 29 Tripura 50 0 0.015 30 Chandigarh 100 30.5 11.161 31 Goa 150 2 0.052 32 Dadra and Nagar Haveli 300 0 0.595 33 Daman & Diu 0 0.000 34 Puducherry 100 0.02 0.000 35 Andaman & Nicobar Islands 30 1 0.300 36 Laskhadweep 1 0.000 A Total 40000 1160.305 486.047 Solar Energy Corporation of India* 899.6 - B Ministry of Railways 502.5 3.700 C PSUs/Govt. Departments 482 11.370 Total 3044.405 501.117
  • 10. STANDARDISATION OF RTS DOCUMENTS  Model bidding documents were developed for both CAPEX and RESCO modes  Draft of following documents have been prepared and vetted by Ministries of Law and Finance o Memorandum of Understanding (MoU) for execution between Organisation/ULB/Ministry/Departments and PSU’s o Engineering, Procurement and Construction Agreement for CAPEX /Ownership mode o Power Purchase Agreement for RESCO /PPA mode RTS  On the basis of the standardized documents, SECI’s 1000MW tender will be floated
  • 11. CHANNEL PARTNER EMPANELMENT STATUS Category of Channel Partner No. of empanelled Agency MNRE A Rating 147 MNRE B Rating 188 MNRE C Rating 147 MNRE D Rating/Channel Partner (New Entrepreneur) 515 Total Empanelled Channel Partner 997
  • 12. EXPECTED ROLE OF CHANNEL PARTNER  Promote RTS in Residential, Institutional & Industrial Sectors  Develop sales & service network  Develop innovative business models  Provide user training for end user customers  Prepare manuals & other advertising materials  Help create environment for subsidy free eco- system for RTS
  • 13. 150 KWP SOLAR ROOFTOP ON A CURVED ROOF IN A METRO STATION IN FARIDABAD
  • 14. PROPOSED ROOFTOP SOLAR INCENTIVE SCHEME FOR DISCOMS  To bring DisComs in the forefront for RTS implementation  Providing them performance enabling financial support  Providing support of Rs. 500 cr to DISCOMs for supporting capacity of 1350 MWp by 2019-20.  Maximum financial assistance provided: Rs. 37.5 lakh per installed MW of RTS.  To support the DisComs to  develop RTS cell  assess up gradation and modernization requirements of their distribution network  facilitate demand aggregation  develop consumer awareness  develop enabling forms/ processes,  Enable meter/ equipment procurement  capacity development etc.
  • 15. PROPOSED RTS SCHEME FOR ULBS  To focus on upcoming building so as to have RTS installation.  To enable RTS development from planning stage, Ministry of Urban Development (MoUD) has recently amended Model Building Bye-laws for including RTS plants for major building projects  ULBs to play pivotal role in accelerating the RTS by means of implementation of building bye-laws, building approvals, etc.  MNRE proposes an incentive and award scheme for ULBs through this scheme.
  • 16. RECENT DEVELOPMENTS  DG S&D Process Initiated  Rate Contracts for Panels, Inverters, etc  Mobile App developed for Locating Surya Mitras  Mobile App has been developed by NIC to give complete details required for RTS installation.  Geo-Tagging of Projects with ISRO  SPIN portal is available on solarrooftop.gov.in  For empanelment applications  To enter customer interest  To enter Project Proposals  To enter PCRs of executed projects etc.
  • 17. LIST OF TEST CENTRES FOR SOLAR EQUIPMENTS  Central Power Research Institute (CPRI)  National Test House(NTH)  Electronics Test and Development Centre(ETDC)  The Energy and Resources Institute (TERI), New Delhi  UL India Pvt. Ltd.  Scientific and Industrial Testing and Research Centre (SiTarc)  TUV Rheinland (India) Pvt. Ltd  National Institute of Solar Energy (NISE)  Electrical Research & Development Association (ERDA)