INTRODUCTION
The Padma Bridge is a multipurpose road-rail bridge across the Padma river to be
constructed in Bangladesh. Padma Bridge is the most challenging construction
project in the history of Bangladesh. The two level steel truss bridge will carry
four-lane highway on the upper level & a single track railway on the lower level.
The bridge with 150.12m span 6.150km total length and 18.18m width it is going
to be the largest bridge in the Ganges-Brahmaputra-Meghna river basins of
country in terms of both span and the total length. Two points connected by total
41 spans.
DESCRIPTION
The project covers three districts-
Munshiganj(Mawa Point), Shariatpur &
Madaripur(janjira) point. The total area of
land to be acquired and required for its
components is 918 hectares. The requisition of
land for the construction yard will be for six
years on a rental basis. As per the new design,
an additional 144.04 has been identified for
acquisition, bringing the total land 1062.14
hectares. This additional land is required
because project site lost significant land due to
erosion, for transition structures & due to
change in railway alignment.
4
COMPONENT/COST OF THE PROJECT
5
 Main Bridge (BDT-12,133.39 ) crore
 River Training Works(RTW) (BDT-9,400) crore
 Janjira Approach Road & Selected Bridge End Facilities (BDT-1097.40) crore
 Mawa Approach Road & Selected Bridge End Facilities (BDT-193.40) crore
 Service Area-2 (BDT-208.71) crore
 Resettlement (BDT-645.95) crore
 Environment (Planted no of trees 1,69,957)
 Land Acquisition (BDT-1300) crore
 CSC(Main Bridge & RTW) (BDT-383.15) crore
 CSC(Approach Roads & Service Area-2) (BDT-133.49) crore
 Engineering Support & Safety Team(ESST) (BDT-72.14) crore
FINANCING
6
Padma bridge project cost is
estimated to be US$3.00 billion. The
Padma Multipurpose Bridge project
was designed to be funded by donors
such as the world Bank, Japan
International Cooperation Agency,
Asian Development Bank & Islamic
Development Bank. After a scandal of
alleged corruption by some people
associated with Bank withdrew it’s
commitment & other donors followed.
The project is now being funded from
own resources of Government of
Bangladesh. After decision of
Bangladesh Govt. that we will
construct the bridge by own fund.
ADVANTAGES OF PADMA BRIDGE
1) Increase the nation’s economy..
2) Develop railway connection.
3) Develop industrial sector.
4) Increase working sector.
5) Improve the country’s surface transport system.
6) Utilities can pass through Padma bridge like
gas, Electricity, optical fiber for
telecommunication.
Benefits of building road and rail
transportation across the river would come
from three main sources: decreased vehicle
operation costs, increased time saving and a
boost in GDP due to increased economic
activities. Main benefits of this project at
present we need more then 1 hour to cross
the river. After complete this Padma Bridge
we can cross it within 6 minutes.
PURPOSES OF PADMA MULTIPURPOSE PROJECT
7
8
 A bridge is not only a single bridge. It’s a new way to go a long way, a
door to reach some goals.
We hope it will help us to connect the people of those area to connect
with Dhaka and it will also connect us to a new phase of
communication.
CONCLUSION
THANK YOU
SOLAIMAN15-1639@DIU.EDU.BD.COM
HTTPS://WWW.LINKEDIN.COM/IN/SOLAIMAN-HOSSAIN-
TUHIN-9A403620B

More Related Content

What's hot

Lmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporationLmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporationPrakhar Tri
 
Allegation-on-Padma-Bridge_Kamalendu-Das
Allegation-on-Padma-Bridge_Kamalendu-DasAllegation-on-Padma-Bridge_Kamalendu-Das
Allegation-on-Padma-Bridge_Kamalendu-DasKamalendu Das
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metrosatish choudhari
 
jaipur metro rail presentation
jaipur metro rail presentationjaipur metro rail presentation
jaipur metro rail presentationtushar garg
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityPramod Kumar
 
LMRC summer training
LMRC summer trainingLMRC summer training
LMRC summer trainingPrachi Dixit
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081Anush verma
 
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...MILLA MENGA
 
Mthl( Mumbai Transe Harbour link)
Mthl( Mumbai Transe Harbour link)Mthl( Mumbai Transe Harbour link)
Mthl( Mumbai Transe Harbour link)Jayesh Kambli
 
Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3Parti Djibouti
 
Intruductions about metro jeddah
Intruductions about metro jeddahIntruductions about metro jeddah
Intruductions about metro jeddahKhalid Ibrahim
 
Study of Samruddhi Mahamarg For Package 1
Study of Samruddhi Mahamarg For Package 1Study of Samruddhi Mahamarg For Package 1
Study of Samruddhi Mahamarg For Package 1ShantanuYelane
 

What's hot (20)

Lmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporationLmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporation
 
Kenya rail sector
 Kenya rail sector Kenya rail sector
Kenya rail sector
 
Allegation-on-Padma-Bridge_Kamalendu-Das
Allegation-on-Padma-Bridge_Kamalendu-DasAllegation-on-Padma-Bridge_Kamalendu-Das
Allegation-on-Padma-Bridge_Kamalendu-Das
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
 
jaipur metro rail presentation
jaipur metro rail presentationjaipur metro rail presentation
jaipur metro rail presentation
 
JMRC PRESENTATION
JMRC PRESENTATIONJMRC PRESENTATION
JMRC PRESENTATION
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
 
LMRC summer training
LMRC summer trainingLMRC summer training
LMRC summer training
 
Dhaka metro rail project
Dhaka metro rail projectDhaka metro rail project
Dhaka metro rail project
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
 
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...
 
Mthl( Mumbai Transe Harbour link)
Mthl( Mumbai Transe Harbour link)Mthl( Mumbai Transe Harbour link)
Mthl( Mumbai Transe Harbour link)
 
Metro ppt - copy
Metro ppt - copyMetro ppt - copy
Metro ppt - copy
 
Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3
 
Sea link (2)
Sea link (2)Sea link (2)
Sea link (2)
 
Nigeria rail industry
Nigeria rail industryNigeria rail industry
Nigeria rail industry
 
Hyderabad Metro Rail Project
Hyderabad Metro Rail ProjectHyderabad Metro Rail Project
Hyderabad Metro Rail Project
 
Intruductions about metro jeddah
Intruductions about metro jeddahIntruductions about metro jeddah
Intruductions about metro jeddah
 
Study of Samruddhi Mahamarg For Package 1
Study of Samruddhi Mahamarg For Package 1Study of Samruddhi Mahamarg For Package 1
Study of Samruddhi Mahamarg For Package 1
 
BMRCL In-Plant Training Report
BMRCL In-Plant Training ReportBMRCL In-Plant Training Report
BMRCL In-Plant Training Report
 

Similar to Simulation & Modeling presentation

Padma bridge
Padma bridgePadma bridge
Padma bridgemsnsela
 
gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800PRIYANSHU KUMAR
 
Bangladesh studies presentation slide
Bangladesh studies presentation slideBangladesh studies presentation slide
Bangladesh studies presentation slideMD Jannatul Giyem
 
Construction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsConstruction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsShivamSharma979
 
Case Study on Mumbai Trans Harbor link
Case Study on Mumbai Trans Harbor linkCase Study on Mumbai Trans Harbor link
Case Study on Mumbai Trans Harbor linkAbhijeetTambade3
 
Padma Brige Project 2017
Padma Brige Project 2017Padma Brige Project 2017
Padma Brige Project 2017RJ Sajeeb
 
Bandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,IndiaBandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,Indiaoyepuneeta
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiShobhit Acharya
 
NMMC Metro Rail Project
NMMC Metro Rail ProjectNMMC Metro Rail Project
NMMC Metro Rail ProjectParth Patil
 
Transport infrastructure in india
Transport infrastructure in indiaTransport infrastructure in india
Transport infrastructure in indiaHarsh Chudasama
 
Presentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptxPresentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptxSabujMahmud2
 
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptxPresentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptxraju2rahman
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge ConstructionSukhdeep Jat
 
IRJET- Financial Feasibility Study of the Indian Bullet Train
IRJET-  	  Financial Feasibility Study of the Indian Bullet TrainIRJET-  	  Financial Feasibility Study of the Indian Bullet Train
IRJET- Financial Feasibility Study of the Indian Bullet TrainIRJET Journal
 

Similar to Simulation & Modeling presentation (20)

Padma bridge
Padma bridgePadma bridge
Padma bridge
 
gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800
 
Bangladesh studies presentation slide
Bangladesh studies presentation slideBangladesh studies presentation slide
Bangladesh studies presentation slide
 
Construction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsConstruction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossings
 
Bandra Worli Sea Link
Bandra Worli Sea LinkBandra Worli Sea Link
Bandra Worli Sea Link
 
Case Study on Mumbai Trans Harbor link
Case Study on Mumbai Trans Harbor linkCase Study on Mumbai Trans Harbor link
Case Study on Mumbai Trans Harbor link
 
Padma Brige Project 2017
Padma Brige Project 2017Padma Brige Project 2017
Padma Brige Project 2017
 
Bandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,IndiaBandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,India
 
wdfcil
wdfcilwdfcil
wdfcil
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
 
NMMC Metro Rail Project
NMMC Metro Rail ProjectNMMC Metro Rail Project
NMMC Metro Rail Project
 
Transport infrastructure in india
Transport infrastructure in indiaTransport infrastructure in india
Transport infrastructure in india
 
Usbrlp at a glance
Usbrlp at a glanceUsbrlp at a glance
Usbrlp at a glance
 
Presentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptxPresentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptx
 
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptxPresentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge Construction
 
IRJET- Financial Feasibility Study of the Indian Bullet Train
IRJET-  	  Financial Feasibility Study of the Indian Bullet TrainIRJET-  	  Financial Feasibility Study of the Indian Bullet Train
IRJET- Financial Feasibility Study of the Indian Bullet Train
 
Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015
 
Dfc
DfcDfc
Dfc
 
Phulera presentation
Phulera presentationPhulera presentation
Phulera presentation
 

Recently uploaded

Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 

Recently uploaded (20)

Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 

Simulation & Modeling presentation

  • 1. SOLAIMAN HOSSAIN TUHIN ID : 173-15-1639 DEPARTMENT OF CSE IN (DIU)
  • 3. 3 INTRODUCTION The Padma Bridge is a multipurpose road-rail bridge across the Padma river to be constructed in Bangladesh. Padma Bridge is the most challenging construction project in the history of Bangladesh. The two level steel truss bridge will carry four-lane highway on the upper level & a single track railway on the lower level. The bridge with 150.12m span 6.150km total length and 18.18m width it is going to be the largest bridge in the Ganges-Brahmaputra-Meghna river basins of country in terms of both span and the total length. Two points connected by total 41 spans.
  • 4. DESCRIPTION The project covers three districts- Munshiganj(Mawa Point), Shariatpur & Madaripur(janjira) point. The total area of land to be acquired and required for its components is 918 hectares. The requisition of land for the construction yard will be for six years on a rental basis. As per the new design, an additional 144.04 has been identified for acquisition, bringing the total land 1062.14 hectares. This additional land is required because project site lost significant land due to erosion, for transition structures & due to change in railway alignment. 4
  • 5. COMPONENT/COST OF THE PROJECT 5  Main Bridge (BDT-12,133.39 ) crore  River Training Works(RTW) (BDT-9,400) crore  Janjira Approach Road & Selected Bridge End Facilities (BDT-1097.40) crore  Mawa Approach Road & Selected Bridge End Facilities (BDT-193.40) crore  Service Area-2 (BDT-208.71) crore  Resettlement (BDT-645.95) crore  Environment (Planted no of trees 1,69,957)  Land Acquisition (BDT-1300) crore  CSC(Main Bridge & RTW) (BDT-383.15) crore  CSC(Approach Roads & Service Area-2) (BDT-133.49) crore  Engineering Support & Safety Team(ESST) (BDT-72.14) crore
  • 6. FINANCING 6 Padma bridge project cost is estimated to be US$3.00 billion. The Padma Multipurpose Bridge project was designed to be funded by donors such as the world Bank, Japan International Cooperation Agency, Asian Development Bank & Islamic Development Bank. After a scandal of alleged corruption by some people associated with Bank withdrew it’s commitment & other donors followed. The project is now being funded from own resources of Government of Bangladesh. After decision of Bangladesh Govt. that we will construct the bridge by own fund.
  • 7. ADVANTAGES OF PADMA BRIDGE 1) Increase the nation’s economy.. 2) Develop railway connection. 3) Develop industrial sector. 4) Increase working sector. 5) Improve the country’s surface transport system. 6) Utilities can pass through Padma bridge like gas, Electricity, optical fiber for telecommunication. Benefits of building road and rail transportation across the river would come from three main sources: decreased vehicle operation costs, increased time saving and a boost in GDP due to increased economic activities. Main benefits of this project at present we need more then 1 hour to cross the river. After complete this Padma Bridge we can cross it within 6 minutes. PURPOSES OF PADMA MULTIPURPOSE PROJECT 7
  • 8. 8  A bridge is not only a single bridge. It’s a new way to go a long way, a door to reach some goals. We hope it will help us to connect the people of those area to connect with Dhaka and it will also connect us to a new phase of communication. CONCLUSION