Introduction of Dhaka Metro Rail:
 The Dhaka Metro is an approved metro rail system under construction in Dhaka, the capital and largest city
of Bangladesh. Together with a separate BRT (Bus Rapid Transit) system it has been long called for to solve
the extreme amount of traffic jams and congestion that occur throughout the entire city on a daily basis,
among the heaviest in the world. It is a part of the 20-year long Strategic Transport Plan (STP) chalked out by
the Government's Transport Coordination Authority (DTCA).
 Currently the metro rail system consists of one line referred to as the MRT (Mass Rapid Transit) Line-6, with
other metro rail lines being added in the future. This Wikipedia article focuses mainly on Dhaka MRT Line-6.
 The Dhaka Metro Rail Line-6 consists of 16 elevated stations each of 180m long and 20.1 km of electricity
powered light rail tracks. MRT Line-6. All of Line-6, save for the depot, as well as some of its accompanying
BRT, will be elevated above current roads primarily above road medians to allow traffic flow underneath, with
stations also elevated.[
 Construction began on 26 June 2016 with an inauguration ceremony presided over by Prime Minister Sheikh
Hasina. The civil work is being done by the Italian-Thai Development Public Company Limited and Sinohydro
Corporation Limited JV and a Tokyo based construction company is developing the depot’s land.
Overview:
 The deal for construction of the 20.1 kilometers (12.5 mi) Line 6, costing $2.8 billion, was signed by
the Government of Bangladesh with the Japan International Cooperation Agency on 20 February 2013.This first
route, originally projected to start from Uttara, a northern suburb of Dhaka, to Sayedabad, in the south of the
capital, was eventually extended north to Uttara and truncated south to Motijheel.
 Each train will hold up to 1800 passengers. With 56 trains to be in service by 2019, Dhaka Metro is projected to
serve more than 60,000 passengers per hour by 2021, with wait times of approximately 4 minutes. The entire
route will be able to be travelled in less than 40 minutes at an average speed of 100 km/h (62 mph), expected to
drastically reduce the number of private cars on Dhaka's streets as well as their potentially 7-hour-long
standstills.
 During an interview with a local news paper, Md Mofazzel Hossain, Project Director of Dhaka Mass Rapid Transit
Development Project said "The metro rail would be noise-free, with noise barriers and vibration-free lines, and
the cars would be made of stainless steel and aluminium alloy". The system plans to use magnetic contactless
Integrated Circuit Ticketing commonly also known as smart cards. Platform screening door (PSD) barriers used
in the platform level will increase safety and increase efficiency.
 When the service is in full operation, trains of six air-conditioned spacious cars will arrive every four minutes
going each way at each of the 16 stations.
 The project is being managed by the Communications Ministry's Dhaka Transport Co-ordination Authority, and a
consortium of foreign as well as Bangladeshi firms known as NKDM Association is acting as General Consultant
(GC). NKDM Association consists of: Nippon Koei Japan, Nippon Koei India, Delhi Metro Rail Corp (India), Mott
MacDonald UK, Mott MacDonald India and Development Design Consultants (local consultant-Bangladesh).
Conception and Origin:
 In a view to implement Dhaka City's 20-year long Strategic Transport (STP), Bangladesh Government
invited Japan International Cooperation Agency (JICA) to conduct a primary survey and feasibility study
on the transport system of Dhaka back in 2009–2010. In 2012 the Government’s Executive Committee of
National Economic Council (ECNEC) approved the project. A loan agreement between Bangladesh
Government and JICA was signed in January 2013. The same year, Dhaka Mass Transit Company Ltd.
(DMTC), the implementing agency of MRT Line-6 project was formed. The General Consultant (GC)
namely the NKDM Association (See above) commenced work from February 2014.
 In June 2013, Dhaka Mass Transit Company Limited (DMTC) was established by the Government to
implement the Metro Rail Lines across the City. The project will be constructed under the supervision of
(DMTCL) under the jurisdiction of Road Transport and Highway Division, Ministry of Road Transport and
Bridges, Government of Bangladesh. Once complete, metro rail services would be operated by DMTCL.
Project Components, Dates and Progress:
 During an interview with daily sun, Md Mofazzel Hossain, Project Director of Dhaka Mass Rapid Transit
Development Project said that the project will be implemented under eight construction packages (CP). The
development components or construction packages include – CP-01 (Depot Land Development), CP-02 (Depot
Civil & Buildings), CP-03, CP-04 (Viaduct & Stations, Uttara-Agargaon), CP-05, CP-06 (Viaduct & Stations,
Agargaon-Motijheel), CP-07 (Electro-Mechanical Systems) and CP-08 (Rolling Stock & Depot Equipment).
 Utility relocation from Mirpur-10 to Agargaon was planned to start August 2016, Other surveys have already
been completed during the period of 2014 – October 2016 as mentioned by the project director Topographic
Survey, Traffic Survey, Geotechnical Survey, Right of Way (ROW) Survey, Historical Importance/ Archeological
(HIA) Survey, Environmental Baseline (EBL) Survey, Soil Electric Resistivity (SER) Survey and Utility
Verification Survey.
 As of May 2015, soil testing for the line was completed, with construction for the first section having begun on
26 June 2016, and construction for the second section planned to begin in July 2017, for planned public
operation by the end of 2019 and sometime in 2020, respectively.
 A Japanese firm Tokyo Construction Ltd, is carrying out the depot land development work (CP-01). Tokyu
Construction Ltd will develop the depot on a 23.84-hectare of land during the construction period at the cost of
around ৳5.67 billion (US$73 million). He said the Pre-Qualification (PQ) of CP-02 has already done and 15
firms are qualified for this. Tender for CP-02 is already floated and the last date of the submission is 6
September this year. While asked about CP-03 and CP-04, he said PQ process has been done on 20 April this
year. Tender has been invited and the last date of submission is 8 August 2016. But the date may be extended,
he mentioned.
Tentative alignments have been decided upon for the three initial metro lines. Only Line 6, as of
27 June 2016, has a definite station layout.
Uttara North Agargaon
Uttara Center Bijoy Sarani
Uttara South Farmgate
Pallabi Karwan Bazar
Mirpur-11 Shahbag
Mirpur-10 Dhaka University
Kazipara Bangladesh Secretariat
Shewrapara Motijheel
Route Alignment List:
Route Alignment Map:
Benefits of Metro Rail:
 Fuel Cost saving
 Number of Vehicles off the road
 Vehicle cost saving
 Reduction in emission of greenhouse gases
 Emission cost saving
 Number of Road accidents avoided
Under Construction of Dhaka Metro Rail:
Long Span of Shewrapara Metro Rail Station :
Proposed 3D View Of Kazipara Metro Rail Station :
Proposed Train of Dhaka Metro Rail
The End

More Related Content

Similar to Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx

Bullet train in India
Bullet train in IndiaBullet train in India
Bullet train in IndiaSamyak Jain
 
Bridge development in chhattisgarh
Bridge development in chhattisgarhBridge development in chhattisgarh
Bridge development in chhattisgarhrajpalnegi
 
Bridge development in chhattisgarh
Bridge development in chhattisgarhBridge development in chhattisgarh
Bridge development in chhattisgarhrajpalnegi
 
Lmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporationLmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporationPrakhar Tri
 
LMRC summer training
LMRC summer trainingLMRC summer training
LMRC summer trainingPrachi Dixit
 
Padma Brige Project 2017
Padma Brige Project 2017Padma Brige Project 2017
Padma Brige Project 2017RJ Sajeeb
 
Road Developments in India.pptx
Road Developments in India.pptxRoad Developments in India.pptx
Road Developments in India.pptxPriyanka Dange
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India pptNikita James
 
India’s largest highway project -The Golden Quadrilateral project
India’s largest highway project -The Golden Quadrilateral projectIndia’s largest highway project -The Golden Quadrilateral project
India’s largest highway project -The Golden Quadrilateral projectSuresh Mandal
 
Development projects of neepal
Development projects of neepalDevelopment projects of neepal
Development projects of neepaljivanadhikari
 
India (6).pdf
India (6).pdfIndia (6).pdf
India (6).pdfnayanaNMH
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiShobhit Acharya
 

Similar to Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx (20)

Bullet train in India
Bullet train in IndiaBullet train in India
Bullet train in India
 
Bridge development in chhattisgarh
Bridge development in chhattisgarhBridge development in chhattisgarh
Bridge development in chhattisgarh
 
Bridge development in chhattisgarh
Bridge development in chhattisgarhBridge development in chhattisgarh
Bridge development in chhattisgarh
 
Lmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporationLmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporation
 
LMRC summer training
LMRC summer trainingLMRC summer training
LMRC summer training
 
Presentation1
Presentation1Presentation1
Presentation1
 
Padma Brige Project 2017
Padma Brige Project 2017Padma Brige Project 2017
Padma Brige Project 2017
 
Cir 35 2014
Cir  35 2014Cir  35 2014
Cir 35 2014
 
Cir 35 2014
Cir  35 2014Cir  35 2014
Cir 35 2014
 
Road Developments in India.pptx
Road Developments in India.pptxRoad Developments in India.pptx
Road Developments in India.pptx
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
BMRCL In-Plant Training Report
BMRCL In-Plant Training ReportBMRCL In-Plant Training Report
BMRCL In-Plant Training Report
 
India’s largest highway project -The Golden Quadrilateral project
India’s largest highway project -The Golden Quadrilateral projectIndia’s largest highway project -The Golden Quadrilateral project
India’s largest highway project -The Golden Quadrilateral project
 
Nl infrastructure oct 24 - oct 30, 2015
Nl infrastructure oct 24 - oct 30, 2015Nl infrastructure oct 24 - oct 30, 2015
Nl infrastructure oct 24 - oct 30, 2015
 
Development projects of neepal
Development projects of neepalDevelopment projects of neepal
Development projects of neepal
 
India (6).pdf
India (6).pdfIndia (6).pdf
India (6).pdf
 
Sea link (2)
Sea link (2)Sea link (2)
Sea link (2)
 
wdfcil
wdfcilwdfcil
wdfcil
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
 
Road _highways
Road  _highwaysRoad  _highways
Road _highways
 

Recently uploaded

Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Delhi Call girls
 
(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...
(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...
(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...Hot Call Girls In Sector 58 (Noida)
 
Innovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC TechnologyInnovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC Technologyquickpartslimitlessm
 
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kasba 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Roomdivyansh0kumar0
 
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHot Call Girls In Sector 58 (Noida)
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubaikojalkojal131
 
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfJohn Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfExcavator
 
加拿大温尼伯大学毕业证(UBC毕业证书)成绩单原版一比一
加拿大温尼伯大学毕业证(UBC毕业证书)成绩单原版一比一加拿大温尼伯大学毕业证(UBC毕业证书)成绩单原版一比一
加拿大温尼伯大学毕业证(UBC毕业证书)成绩单原版一比一nsrmw5ykn
 
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...Garima Khatri
 
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...
Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...
Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...Niya Khan
 
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一mjyguplun
 
VIP Russian Call Girls in Jamshedpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Jamshedpur Deepika 8250192130 Independent Escort Se...VIP Russian Call Girls in Jamshedpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Jamshedpur Deepika 8250192130 Independent Escort Se...Suhani Kapoor
 
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...Hot Call Girls In Sector 58 (Noida)
 
定制(Cantab毕业证书)剑桥大学毕业证成绩单原版一比一
定制(Cantab毕业证书)剑桥大学毕业证成绩单原版一比一定制(Cantab毕业证书)剑桥大学毕业证成绩单原版一比一
定制(Cantab毕业证书)剑桥大学毕业证成绩单原版一比一mjyguplun
 
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfSales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfAggregage
 
Introduction of Basic of Paint Technology
Introduction of Basic of Paint TechnologyIntroduction of Basic of Paint Technology
Introduction of Basic of Paint TechnologyRaghavendraMishra19
 

Recently uploaded (20)

Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
 
(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...
(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...
(COD) ̄Young Call Girls In Dwarka , New Delhi꧁❤ 7042364481❤꧂ Escorts Service i...
 
Innovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC TechnologyInnovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC Technology
 
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kasba 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
 
Call Girls In Kirti Nagar 7042364481 Escort Service 24x7 Delhi
Call Girls In Kirti Nagar 7042364481 Escort Service 24x7 DelhiCall Girls In Kirti Nagar 7042364481 Escort Service 24x7 Delhi
Call Girls In Kirti Nagar 7042364481 Escort Service 24x7 Delhi
 
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
 
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfJohn Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
 
加拿大温尼伯大学毕业证(UBC毕业证书)成绩单原版一比一
加拿大温尼伯大学毕业证(UBC毕业证书)成绩单原版一比一加拿大温尼伯大学毕业证(UBC毕业证书)成绩单原版一比一
加拿大温尼伯大学毕业证(UBC毕业证书)成绩单原版一比一
 
Call Girls In Kirti Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Kirti Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Kirti Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Kirti Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
 
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...
Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...
Alia +91-9537192988-Experience the Unmatchable Pleasure with Model Ahmedabad ...
 
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
 
VIP Russian Call Girls in Jamshedpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Jamshedpur Deepika 8250192130 Independent Escort Se...VIP Russian Call Girls in Jamshedpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Jamshedpur Deepika 8250192130 Independent Escort Se...
 
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
 
定制(Cantab毕业证书)剑桥大学毕业证成绩单原版一比一
定制(Cantab毕业证书)剑桥大学毕业证成绩单原版一比一定制(Cantab毕业证书)剑桥大学毕业证成绩单原版一比一
定制(Cantab毕业证书)剑桥大学毕业证成绩单原版一比一
 
Call Girls in Shri Niwas Puri Delhi 💯Call Us 🔝9953056974🔝
Call Girls in  Shri Niwas Puri  Delhi 💯Call Us 🔝9953056974🔝Call Girls in  Shri Niwas Puri  Delhi 💯Call Us 🔝9953056974🔝
Call Girls in Shri Niwas Puri Delhi 💯Call Us 🔝9953056974🔝
 
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfSales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
 
Introduction of Basic of Paint Technology
Introduction of Basic of Paint TechnologyIntroduction of Basic of Paint Technology
Introduction of Basic of Paint Technology
 

Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx

  • 2. Introduction of Dhaka Metro Rail:  The Dhaka Metro is an approved metro rail system under construction in Dhaka, the capital and largest city of Bangladesh. Together with a separate BRT (Bus Rapid Transit) system it has been long called for to solve the extreme amount of traffic jams and congestion that occur throughout the entire city on a daily basis, among the heaviest in the world. It is a part of the 20-year long Strategic Transport Plan (STP) chalked out by the Government's Transport Coordination Authority (DTCA).  Currently the metro rail system consists of one line referred to as the MRT (Mass Rapid Transit) Line-6, with other metro rail lines being added in the future. This Wikipedia article focuses mainly on Dhaka MRT Line-6.  The Dhaka Metro Rail Line-6 consists of 16 elevated stations each of 180m long and 20.1 km of electricity powered light rail tracks. MRT Line-6. All of Line-6, save for the depot, as well as some of its accompanying BRT, will be elevated above current roads primarily above road medians to allow traffic flow underneath, with stations also elevated.[  Construction began on 26 June 2016 with an inauguration ceremony presided over by Prime Minister Sheikh Hasina. The civil work is being done by the Italian-Thai Development Public Company Limited and Sinohydro Corporation Limited JV and a Tokyo based construction company is developing the depot’s land.
  • 3. Overview:  The deal for construction of the 20.1 kilometers (12.5 mi) Line 6, costing $2.8 billion, was signed by the Government of Bangladesh with the Japan International Cooperation Agency on 20 February 2013.This first route, originally projected to start from Uttara, a northern suburb of Dhaka, to Sayedabad, in the south of the capital, was eventually extended north to Uttara and truncated south to Motijheel.  Each train will hold up to 1800 passengers. With 56 trains to be in service by 2019, Dhaka Metro is projected to serve more than 60,000 passengers per hour by 2021, with wait times of approximately 4 minutes. The entire route will be able to be travelled in less than 40 minutes at an average speed of 100 km/h (62 mph), expected to drastically reduce the number of private cars on Dhaka's streets as well as their potentially 7-hour-long standstills.  During an interview with a local news paper, Md Mofazzel Hossain, Project Director of Dhaka Mass Rapid Transit Development Project said "The metro rail would be noise-free, with noise barriers and vibration-free lines, and the cars would be made of stainless steel and aluminium alloy". The system plans to use magnetic contactless Integrated Circuit Ticketing commonly also known as smart cards. Platform screening door (PSD) barriers used in the platform level will increase safety and increase efficiency.  When the service is in full operation, trains of six air-conditioned spacious cars will arrive every four minutes going each way at each of the 16 stations.  The project is being managed by the Communications Ministry's Dhaka Transport Co-ordination Authority, and a consortium of foreign as well as Bangladeshi firms known as NKDM Association is acting as General Consultant (GC). NKDM Association consists of: Nippon Koei Japan, Nippon Koei India, Delhi Metro Rail Corp (India), Mott MacDonald UK, Mott MacDonald India and Development Design Consultants (local consultant-Bangladesh).
  • 4. Conception and Origin:  In a view to implement Dhaka City's 20-year long Strategic Transport (STP), Bangladesh Government invited Japan International Cooperation Agency (JICA) to conduct a primary survey and feasibility study on the transport system of Dhaka back in 2009–2010. In 2012 the Government’s Executive Committee of National Economic Council (ECNEC) approved the project. A loan agreement between Bangladesh Government and JICA was signed in January 2013. The same year, Dhaka Mass Transit Company Ltd. (DMTC), the implementing agency of MRT Line-6 project was formed. The General Consultant (GC) namely the NKDM Association (See above) commenced work from February 2014.  In June 2013, Dhaka Mass Transit Company Limited (DMTC) was established by the Government to implement the Metro Rail Lines across the City. The project will be constructed under the supervision of (DMTCL) under the jurisdiction of Road Transport and Highway Division, Ministry of Road Transport and Bridges, Government of Bangladesh. Once complete, metro rail services would be operated by DMTCL.
  • 5. Project Components, Dates and Progress:  During an interview with daily sun, Md Mofazzel Hossain, Project Director of Dhaka Mass Rapid Transit Development Project said that the project will be implemented under eight construction packages (CP). The development components or construction packages include – CP-01 (Depot Land Development), CP-02 (Depot Civil & Buildings), CP-03, CP-04 (Viaduct & Stations, Uttara-Agargaon), CP-05, CP-06 (Viaduct & Stations, Agargaon-Motijheel), CP-07 (Electro-Mechanical Systems) and CP-08 (Rolling Stock & Depot Equipment).  Utility relocation from Mirpur-10 to Agargaon was planned to start August 2016, Other surveys have already been completed during the period of 2014 – October 2016 as mentioned by the project director Topographic Survey, Traffic Survey, Geotechnical Survey, Right of Way (ROW) Survey, Historical Importance/ Archeological (HIA) Survey, Environmental Baseline (EBL) Survey, Soil Electric Resistivity (SER) Survey and Utility Verification Survey.  As of May 2015, soil testing for the line was completed, with construction for the first section having begun on 26 June 2016, and construction for the second section planned to begin in July 2017, for planned public operation by the end of 2019 and sometime in 2020, respectively.  A Japanese firm Tokyo Construction Ltd, is carrying out the depot land development work (CP-01). Tokyu Construction Ltd will develop the depot on a 23.84-hectare of land during the construction period at the cost of around ৳5.67 billion (US$73 million). He said the Pre-Qualification (PQ) of CP-02 has already done and 15 firms are qualified for this. Tender for CP-02 is already floated and the last date of the submission is 6 September this year. While asked about CP-03 and CP-04, he said PQ process has been done on 20 April this year. Tender has been invited and the last date of submission is 8 August 2016. But the date may be extended, he mentioned.
  • 6. Tentative alignments have been decided upon for the three initial metro lines. Only Line 6, as of 27 June 2016, has a definite station layout. Uttara North Agargaon Uttara Center Bijoy Sarani Uttara South Farmgate Pallabi Karwan Bazar Mirpur-11 Shahbag Mirpur-10 Dhaka University Kazipara Bangladesh Secretariat Shewrapara Motijheel Route Alignment List:
  • 8. Benefits of Metro Rail:  Fuel Cost saving  Number of Vehicles off the road  Vehicle cost saving  Reduction in emission of greenhouse gases  Emission cost saving  Number of Road accidents avoided
  • 9. Under Construction of Dhaka Metro Rail:
  • 10. Long Span of Shewrapara Metro Rail Station :
  • 11. Proposed 3D View Of Kazipara Metro Rail Station :
  • 12. Proposed Train of Dhaka Metro Rail