SlideShare a Scribd company logo
1 of 8
Download to read offline
India’s largest and
the first-of-its-kind project
in the rail sector
Engineering Procurement and Construction by
On the tracks of progress
A part of the Western Dedicated Freight Corridor has
been secured by a consortium of Sojitz Corp., Japan and
Larsen and Toubro Limited, India.
Sojitz Corporation, a general trading company conducts
its operations in about 50 countries through 505
consolidated subsidiaries and affiliated companies
all over the world. Sojitz’ business activities are wide-
ranging encompassing machinery, aerospace, energy
and mineral resources, chemicals and plastics, etc.
L&T, India’s largest engineering, technology,
construction and manufacturing organization has
established itself as a unique service provider delivering
turnkey solutions for all types of railway projects.
The Railway Strategic Business Group of L&T has
taken the lead in rail construction by introducing
pioneering techniques, resulting in execution of
projects with innovation, quality and speed.
The combination of the distinct strengths of these
two companies will help create one of the finest rail
infrastructures in the country. The EPC order involves
construction of 626 km of a double track corridor
from Rewari in Haryana to Iqbalgarh in Gujarat, via
Rajasthan, spanning three states. This is the country’s
largest project awarded so far in the rail sector and the
first-of-its-kind in India.
Logistic management is going through a sea-change with India’s largest and the first-of-its-kind project
in the rail sector to augment the rail infrastructure to increase share in rail freight market by offering
customers, a guaranteed, faster transit at economic tariff. Dedicated Freight Corridor Corporation of
India Limited (DFCCIL) - a Special Purpose Vehicle set-up under the administrative control of Ministry of
Railways is undertaking planning and development, mobilization of financial resources and construction,
maintenance and operation of Dedicated Freight Corridors connecting different states of the country.
In the first phase, DFCCIL will be constructing two corridors - the Western Dedicated Freight Corridor
(WDFC) and Eastern Dedicated Freight Corridor (EDFC) - spanning a total length of about 3322 route
km. The DFC project on the Western and Eastern routes is one of the most ambitious projects that Indian
Railways has ever taken up and once completed, would meet the transport requirements of the two busy
trunk routes for the next 15 to 20 years.
The WDFC (1483 km) will be from Jawaharlal Nehru Port (JNPT) in Mumbai to Tughlakabad and Dadri near
New Delhi and would cater largely to the container transport requirements between the existing and
emerging ports in Maharashtra and Gujarat and passes through the states of Haryana and Rajasthan.
Winning Collaboration
Sojitz - L&T Consortium (WDFC : Rewari - Iqbalgarh Section)
Sanctioned Projects
Future Projects
626 km from Rewari in Haryana to
Iqbalgarh in Gujarat
Western Dedicated
Freight Corridor
626 km of double line civil and track works
from Rewari in Haryana to
Iqbalgarh in Gujarat, via Rajasthan
Client
Dedicated
Freight Corridor
Corporation
of India Lim
ited
(DFCCIL)
SPV
set-up
under the
adm
inistrative control of
M
inistry of Railways
Contractor
Sojitz - L&T Consortium
Project Duration
208 W
eeks
SpecializedAgencies
Design-L&TRamboll
Trackwork-HarscoRail
USA
Project
Civil,Building,TrackWorks
for626kmDoubleRailway
linefromRewari-Iqbalgarh
Section(626km)
Major Scope of Work
As specified in tender document
The scope of work includes construction of 1388 track km (excluding turnouts) of railway line, 1342 bridges, and 20
stations along with supply of all associated equipment. This project will be executed using mechanized means of
track linking and employing the latest technology and advanced construction methodologies in railway construction.
Comprehensive solutions
from industry leaders
Track Length
1388 TKM
Bridges
1342 Nos.
Junction 
Crossing Stations
20 Nos.
Building Works
68,000 sq.m
Route Length
626 RKM
Design - The fountainhead of
innovation
Salient features of DFC Project
Feature Indian Railway DFCC
Height
Width
Axle Load
Train Length
Train Load
4.265 m 7.1 m
3200 mm 3660 mm
Axle Load
22.5 Ton
Axle Load
32.5 Ton
4,000 Ton 15,000 Ton
700 / 1500 m700 m
Dedicated Freight Corridors are proposed to adopt
world-class and state-of-the-art technology. Significant
improvements are being incorporated in the existing
carrying capacity by modifying basic design features. The
permanent way will be constructed with significantly
higher design features that will enable it to withstand
heavier loads at higher speeds.
Simultaneously, in order to optimise productive use
of the right of way, dimension of the rolling stock is
proposed to be enlarged. Both these improvements will
allow longer and heavier trains to ply on the Dedicated
Freight Corridors. The track will be designed for 25 t axle
load to run double stack containers dedicated for freight
and 32.5 t axle load for bridges and embankments.
The Sojitz - LT consortium will offer its expertise and
extend its experience right from inception reports to
technical design, alignment design and track design
apart from validation of survey data, right of way and
final location survey.
With the geo-technical engineering expertise gained
over the years, the consortium will monitor and control
earthworks right from sub-soil, subgrade to ballast and
sleepers and offer strong and supreme quality of rail
infrastructure dedicated for freight.
Since the project involves significant major bridges,
various parameters have been taken into consideration
for design of special launching and erection techniques.
Construction Methodology
Smarter ideas, faster implementation
The DFC project will introduce numerous world-class
technologies right from planning, design, construction
to the operation of the line.
The laying of sleepers and tracks will be done using
state-of-the-art mechanised track laying equipment.
Specialised group of track machines will be deployed to
carry out ballast tamping, ballast regulating and track
stabilisation. Even the field joints will be brought to
bare minimum due to the deployment of high capacity,
robotic mobile flash butt welding machines.
Advantages of mechanized track linking
• Well-regulated supply of sleepers and rails directly
fed from the depot
• Higher output per hour can be achieved
• Dependency on labour is considerably reduced
• Supreme quality of execution
Winches for rail pulling Motorised sledges
Sleepers laying and positioning Pad insertion Rail insertion
Machine laying sleepers  rails
The Sojitz - LT Consortium envisions using the latest technology in rail construction. Key components sourced
through specialist international vendors / subcontractors include:
• Head Hardened Rails from Japan
• Complete Engineering Procurement and Construction by Sojitz - LT Consortium
• New Track Construction Machine from Harsco Rail, USA
• Locomotives from India
• Permanent way components from approved RDSO (Indian) Agencies
A comprehensive strategy for speedy construction has been evolved considering every facet of project management.
Key establishments envisaged for design, construction and commissioning include setting-up of design office in New
Delhi, Project office in Jaipur, Strategic section offices in Ajmer, Shri Madhopur and Marwar, Offices at 10 stations,
18 Labour camps at Base depots, Casting yard and Stations.
Project Management - Charting the way
to quality and speed
Project Infrastructure
Shri Amirgadh
Package D Package C Package B Package A
Keshavganj
Jawali Saradhana Shri Madhopur
DelhiJaipur
Shri Madhopur
Marwar Bangur Kishangarh Pachar Bhagega Ateli RewariIqbalgarh
626 km 436 km 107 km 0 km
Marwar Ajmer
Casting Yard .........................................
Depot Offices ........................................
Design Office Delhi ...............................
Project Director Office ..........................
Constr. Manager Offices ......................
• 8 Casting yards for bridge precast works
• 2 Sleeper plants for sleeper production
• 2 Rail welding depots
• 2 Rebar yards for rebar works
• 18 Batching plants for producing concrete
• 18 Sand sources to cater to sand requirement
• 11 Quarry sources to cater to concrete aggregate and
ballast requirement
Gantry
Rail positioning
Diagram showing crane moving on wagons
Multiple Benefits for the
Nation, Trade  Commerce and
to the people of India
• The Dedicated Freight Corridor (DFC) will contribute to India’s economic
development by freight transportation which is expected to undergo rapid
growth in the future.
• This project enables a segregated electrified line for freight, parallel to the
existing railway line. This indirectly allows the passenger trains to move faster
in the existing lines.
• This line will allow double-stack with a height of 7.1 m through wider tracks of
3.6 m that allow longer train lengths of 1500 m that can travel at a faster rate
of 100 kmph. For the industry this means, reduced unit cost of transportation
as DFC provides rail infrastructure to carry higher throughput per train.
• The route will also have lesser stations that fall only once every 30 - 40 km. The
entire corridor is expected to offer more axle load and an increased overall
freight train load by 3.5 times the current capacity. Again for the industry, this
means a guaranteed, faster transit at an economic tariff.
• Apart from improving the overall transport efficiency of the national network,
DFC will help accelerate the nation-wide economic development as well as
improve the environment. Transportation of goods through DFC will consume
less energy when compared to truck mode and the gas emission is completely
avoided along the DFC alignment.
• With the increase of trade and industrial development along the DFC, there
will be an increase in employment opportunities of the region.
• DFC will also improve and expand the market for agricultural produce, forestry
and fisheries of the regions as the speedy and improved transportation mode
will help shrink distances connecting the supply and demand points.

More Related Content

What's hot

Dedicated freight corridor
Dedicated freight corridorDedicated freight corridor
Dedicated freight corridorHarshad Joshi
 
Rail budget highlights2011-12
Rail budget highlights2011-12Rail budget highlights2011-12
Rail budget highlights2011-12Nil Wahulkar
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metrosatish choudhari
 
UIC High Speed Rail Brochure
UIC High Speed Rail BrochureUIC High Speed Rail Brochure
UIC High Speed Rail BrochureUICcom
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveRajesh Prasad
 
Talgo Paper by Rajesh Prasad, IRSE in December 2012
Talgo Paper by Rajesh Prasad, IRSE in December 2012Talgo Paper by Rajesh Prasad, IRSE in December 2012
Talgo Paper by Rajesh Prasad, IRSE in December 2012Rajesh Prasad
 
Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata Rajesh Prasad
 
Highways and motorways of pakistan
Highways and motorways of pakistanHighways and motorways of pakistan
Highways and motorways of pakistaneisa khan
 
M9 presentation to president 1 6-12
M9 presentation to president 1 6-12M9 presentation to president 1 6-12
M9 presentation to president 1 6-12giap0083
 
Transportation and communication of pakistan
Transportation and communication of pakistanTransportation and communication of pakistan
Transportation and communication of pakistanAwais Munir
 
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...Rajesh Prasad
 
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011   Loay GhazalehME Roads & Railway Projects & Consortiums, Feb., 2011   Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay GhazalehLoay Ghazaleh MBA, BSc Civil Eng.
 
Pstt to bankers @ PC hotel (19-7-2012)
Pstt to bankers @ PC hotel (19-7-2012)Pstt to bankers @ PC hotel (19-7-2012)
Pstt to bankers @ PC hotel (19-7-2012)giap0083
 
Project management in NHAI
Project management in NHAIProject management in NHAI
Project management in NHAIAnshuman Jaiswal
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)Gurjit Kaur Kaler
 
DFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysDFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysAbeer Ray
 

What's hot (20)

Phulera presentation
Phulera presentationPhulera presentation
Phulera presentation
 
Dedicated freight corridor
Dedicated freight corridorDedicated freight corridor
Dedicated freight corridor
 
Rail budget highlights2011-12
Rail budget highlights2011-12Rail budget highlights2011-12
Rail budget highlights2011-12
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
 
UIC High Speed Rail Brochure
UIC High Speed Rail BrochureUIC High Speed Rail Brochure
UIC High Speed Rail Brochure
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
 
K Rail Silver line DPR - James Joseph Adhikarathil 9447464502
K Rail Silver line DPR  - James Joseph Adhikarathil 9447464502K Rail Silver line DPR  - James Joseph Adhikarathil 9447464502
K Rail Silver line DPR - James Joseph Adhikarathil 9447464502
 
Talgo Paper by Rajesh Prasad, IRSE in December 2012
Talgo Paper by Rajesh Prasad, IRSE in December 2012Talgo Paper by Rajesh Prasad, IRSE in December 2012
Talgo Paper by Rajesh Prasad, IRSE in December 2012
 
Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata
 
Highways and motorways of pakistan
Highways and motorways of pakistanHighways and motorways of pakistan
Highways and motorways of pakistan
 
M9 presentation to president 1 6-12
M9 presentation to president 1 6-12M9 presentation to president 1 6-12
M9 presentation to president 1 6-12
 
Transportation and communication of pakistan
Transportation and communication of pakistanTransportation and communication of pakistan
Transportation and communication of pakistan
 
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
 
Dhaka metro rail
Dhaka metro railDhaka metro rail
Dhaka metro rail
 
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011   Loay GhazalehME Roads & Railway Projects & Consortiums, Feb., 2011   Loay Ghazaleh
ME Roads & Railway Projects & Consortiums, Feb., 2011 Loay Ghazaleh
 
Railway
RailwayRailway
Railway
 
Pstt to bankers @ PC hotel (19-7-2012)
Pstt to bankers @ PC hotel (19-7-2012)Pstt to bankers @ PC hotel (19-7-2012)
Pstt to bankers @ PC hotel (19-7-2012)
 
Project management in NHAI
Project management in NHAIProject management in NHAI
Project management in NHAI
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)
 
DFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysDFC Decongesting Indian Railways
DFC Decongesting Indian Railways
 

Similar to DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi

summer training report in L&T construction
summer training report in L&T construction summer training report in L&T construction
summer training report in L&T construction Manish Barwal
 
Expression of Interest for Formation of Joint Venture Company
Expression of Interest for Formation of Joint Venture CompanyExpression of Interest for Formation of Joint Venture Company
Expression of Interest for Formation of Joint Venture Companyfinancedude
 
Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesaUtsav Tripathy
 
Railway infrastructure construction and upgrading in india and the middle eas...
Railway infrastructure construction and upgrading in india and the middle eas...Railway infrastructure construction and upgrading in india and the middle eas...
Railway infrastructure construction and upgrading in india and the middle eas...Business Finland
 
IRJET- Financial Feasibility Study of the Indian Bullet Train
IRJET-  	  Financial Feasibility Study of the Indian Bullet TrainIRJET-  	  Financial Feasibility Study of the Indian Bullet Train
IRJET- Financial Feasibility Study of the Indian Bullet TrainIRJET Journal
 
1.railway engnieering
1.railway engnieering1.railway engnieering
1.railway engnieeringMani Vel
 
Smart Railway infrastructure and High speed trains
Smart Railway infrastructure and High speed trains Smart Railway infrastructure and High speed trains
Smart Railway infrastructure and High speed trains VishalSharma109227
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailIRJET Journal
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiPrabjeet Singh
 
Ten remarkable infrastructure developments in india
Ten remarkable infrastructure developments in indiaTen remarkable infrastructure developments in india
Ten remarkable infrastructure developments in indiaSandeep Patel
 
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptxRAKESHPANDEY754083
 
High-Speed Rail in India - A Game-Changer for Transportation
High-Speed Rail in India - A Game-Changer for TransportationHigh-Speed Rail in India - A Game-Changer for Transportation
High-Speed Rail in India - A Game-Changer for TransportationIndia Brand Equity Foundation
 
Transport infrastructure in india
Transport infrastructure in indiaTransport infrastructure in india
Transport infrastructure in indiaHarsh Chudasama
 

Similar to DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi (20)

summer training report in L&T construction
summer training report in L&T construction summer training report in L&T construction
summer training report in L&T construction
 
Expression of Interest for Formation of Joint Venture Company
Expression of Interest for Formation of Joint Venture CompanyExpression of Interest for Formation of Joint Venture Company
Expression of Interest for Formation of Joint Venture Company
 
Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesa
 
CAREER LAND MARKS
CAREER LAND MARKSCAREER LAND MARKS
CAREER LAND MARKS
 
Kalindee Rail Nirman Engineers
Kalindee Rail Nirman EngineersKalindee Rail Nirman Engineers
Kalindee Rail Nirman Engineers
 
Railways
RailwaysRailways
Railways
 
Railway infrastructure construction and upgrading in india and the middle eas...
Railway infrastructure construction and upgrading in india and the middle eas...Railway infrastructure construction and upgrading in india and the middle eas...
Railway infrastructure construction and upgrading in india and the middle eas...
 
IRJET- Financial Feasibility Study of the Indian Bullet Train
IRJET-  	  Financial Feasibility Study of the Indian Bullet TrainIRJET-  	  Financial Feasibility Study of the Indian Bullet Train
IRJET- Financial Feasibility Study of the Indian Bullet Train
 
Group 3 (1).doc
Group 3 (1).docGroup 3 (1).doc
Group 3 (1).doc
 
1.railway engnieering
1.railway engnieering1.railway engnieering
1.railway engnieering
 
Dlw locomotive workshop
Dlw locomotive workshopDlw locomotive workshop
Dlw locomotive workshop
 
Smart Railway infrastructure and High speed trains
Smart Railway infrastructure and High speed trains Smart Railway infrastructure and High speed trains
Smart Railway infrastructure and High speed trains
 
Indian railways
Indian railwaysIndian railways
Indian railways
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 
Ten remarkable infrastructure developments in india
Ten remarkable infrastructure developments in indiaTen remarkable infrastructure developments in india
Ten remarkable infrastructure developments in india
 
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
 
36551105 delhi-metro
36551105 delhi-metro36551105 delhi-metro
36551105 delhi-metro
 
High-Speed Rail in India - A Game-Changer for Transportation
High-Speed Rail in India - A Game-Changer for TransportationHigh-Speed Rail in India - A Game-Changer for Transportation
High-Speed Rail in India - A Game-Changer for Transportation
 
Transport infrastructure in india
Transport infrastructure in indiaTransport infrastructure in india
Transport infrastructure in india
 

DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi

  • 1. India’s largest and the first-of-its-kind project in the rail sector Engineering Procurement and Construction by
  • 2. On the tracks of progress A part of the Western Dedicated Freight Corridor has been secured by a consortium of Sojitz Corp., Japan and Larsen and Toubro Limited, India. Sojitz Corporation, a general trading company conducts its operations in about 50 countries through 505 consolidated subsidiaries and affiliated companies all over the world. Sojitz’ business activities are wide- ranging encompassing machinery, aerospace, energy and mineral resources, chemicals and plastics, etc. L&T, India’s largest engineering, technology, construction and manufacturing organization has established itself as a unique service provider delivering turnkey solutions for all types of railway projects. The Railway Strategic Business Group of L&T has taken the lead in rail construction by introducing pioneering techniques, resulting in execution of projects with innovation, quality and speed. The combination of the distinct strengths of these two companies will help create one of the finest rail infrastructures in the country. The EPC order involves construction of 626 km of a double track corridor from Rewari in Haryana to Iqbalgarh in Gujarat, via Rajasthan, spanning three states. This is the country’s largest project awarded so far in the rail sector and the first-of-its-kind in India. Logistic management is going through a sea-change with India’s largest and the first-of-its-kind project in the rail sector to augment the rail infrastructure to increase share in rail freight market by offering customers, a guaranteed, faster transit at economic tariff. Dedicated Freight Corridor Corporation of India Limited (DFCCIL) - a Special Purpose Vehicle set-up under the administrative control of Ministry of Railways is undertaking planning and development, mobilization of financial resources and construction, maintenance and operation of Dedicated Freight Corridors connecting different states of the country. In the first phase, DFCCIL will be constructing two corridors - the Western Dedicated Freight Corridor (WDFC) and Eastern Dedicated Freight Corridor (EDFC) - spanning a total length of about 3322 route km. The DFC project on the Western and Eastern routes is one of the most ambitious projects that Indian Railways has ever taken up and once completed, would meet the transport requirements of the two busy trunk routes for the next 15 to 20 years. The WDFC (1483 km) will be from Jawaharlal Nehru Port (JNPT) in Mumbai to Tughlakabad and Dadri near New Delhi and would cater largely to the container transport requirements between the existing and emerging ports in Maharashtra and Gujarat and passes through the states of Haryana and Rajasthan. Winning Collaboration Sojitz - L&T Consortium (WDFC : Rewari - Iqbalgarh Section)
  • 3. Sanctioned Projects Future Projects 626 km from Rewari in Haryana to Iqbalgarh in Gujarat Western Dedicated Freight Corridor 626 km of double line civil and track works from Rewari in Haryana to Iqbalgarh in Gujarat, via Rajasthan
  • 4. Client Dedicated Freight Corridor Corporation of India Lim ited (DFCCIL) SPV set-up under the adm inistrative control of M inistry of Railways Contractor Sojitz - L&T Consortium Project Duration 208 W eeks SpecializedAgencies Design-L&TRamboll Trackwork-HarscoRail USA Project Civil,Building,TrackWorks for626kmDoubleRailway linefromRewari-Iqbalgarh Section(626km) Major Scope of Work As specified in tender document The scope of work includes construction of 1388 track km (excluding turnouts) of railway line, 1342 bridges, and 20 stations along with supply of all associated equipment. This project will be executed using mechanized means of track linking and employing the latest technology and advanced construction methodologies in railway construction. Comprehensive solutions from industry leaders Track Length 1388 TKM Bridges 1342 Nos. Junction Crossing Stations 20 Nos. Building Works 68,000 sq.m Route Length 626 RKM
  • 5. Design - The fountainhead of innovation Salient features of DFC Project Feature Indian Railway DFCC Height Width Axle Load Train Length Train Load 4.265 m 7.1 m 3200 mm 3660 mm Axle Load 22.5 Ton Axle Load 32.5 Ton 4,000 Ton 15,000 Ton 700 / 1500 m700 m Dedicated Freight Corridors are proposed to adopt world-class and state-of-the-art technology. Significant improvements are being incorporated in the existing carrying capacity by modifying basic design features. The permanent way will be constructed with significantly higher design features that will enable it to withstand heavier loads at higher speeds. Simultaneously, in order to optimise productive use of the right of way, dimension of the rolling stock is proposed to be enlarged. Both these improvements will allow longer and heavier trains to ply on the Dedicated Freight Corridors. The track will be designed for 25 t axle load to run double stack containers dedicated for freight and 32.5 t axle load for bridges and embankments. The Sojitz - LT consortium will offer its expertise and extend its experience right from inception reports to technical design, alignment design and track design apart from validation of survey data, right of way and final location survey. With the geo-technical engineering expertise gained over the years, the consortium will monitor and control earthworks right from sub-soil, subgrade to ballast and sleepers and offer strong and supreme quality of rail infrastructure dedicated for freight. Since the project involves significant major bridges, various parameters have been taken into consideration for design of special launching and erection techniques.
  • 6. Construction Methodology Smarter ideas, faster implementation The DFC project will introduce numerous world-class technologies right from planning, design, construction to the operation of the line. The laying of sleepers and tracks will be done using state-of-the-art mechanised track laying equipment. Specialised group of track machines will be deployed to carry out ballast tamping, ballast regulating and track stabilisation. Even the field joints will be brought to bare minimum due to the deployment of high capacity, robotic mobile flash butt welding machines. Advantages of mechanized track linking • Well-regulated supply of sleepers and rails directly fed from the depot • Higher output per hour can be achieved • Dependency on labour is considerably reduced • Supreme quality of execution Winches for rail pulling Motorised sledges Sleepers laying and positioning Pad insertion Rail insertion Machine laying sleepers rails The Sojitz - LT Consortium envisions using the latest technology in rail construction. Key components sourced through specialist international vendors / subcontractors include: • Head Hardened Rails from Japan • Complete Engineering Procurement and Construction by Sojitz - LT Consortium • New Track Construction Machine from Harsco Rail, USA • Locomotives from India • Permanent way components from approved RDSO (Indian) Agencies A comprehensive strategy for speedy construction has been evolved considering every facet of project management. Key establishments envisaged for design, construction and commissioning include setting-up of design office in New Delhi, Project office in Jaipur, Strategic section offices in Ajmer, Shri Madhopur and Marwar, Offices at 10 stations, 18 Labour camps at Base depots, Casting yard and Stations. Project Management - Charting the way to quality and speed
  • 7. Project Infrastructure Shri Amirgadh Package D Package C Package B Package A Keshavganj Jawali Saradhana Shri Madhopur DelhiJaipur Shri Madhopur Marwar Bangur Kishangarh Pachar Bhagega Ateli RewariIqbalgarh 626 km 436 km 107 km 0 km Marwar Ajmer Casting Yard ......................................... Depot Offices ........................................ Design Office Delhi ............................... Project Director Office .......................... Constr. Manager Offices ...................... • 8 Casting yards for bridge precast works • 2 Sleeper plants for sleeper production • 2 Rail welding depots • 2 Rebar yards for rebar works • 18 Batching plants for producing concrete • 18 Sand sources to cater to sand requirement • 11 Quarry sources to cater to concrete aggregate and ballast requirement Gantry Rail positioning Diagram showing crane moving on wagons
  • 8. Multiple Benefits for the Nation, Trade Commerce and to the people of India • The Dedicated Freight Corridor (DFC) will contribute to India’s economic development by freight transportation which is expected to undergo rapid growth in the future. • This project enables a segregated electrified line for freight, parallel to the existing railway line. This indirectly allows the passenger trains to move faster in the existing lines. • This line will allow double-stack with a height of 7.1 m through wider tracks of 3.6 m that allow longer train lengths of 1500 m that can travel at a faster rate of 100 kmph. For the industry this means, reduced unit cost of transportation as DFC provides rail infrastructure to carry higher throughput per train. • The route will also have lesser stations that fall only once every 30 - 40 km. The entire corridor is expected to offer more axle load and an increased overall freight train load by 3.5 times the current capacity. Again for the industry, this means a guaranteed, faster transit at an economic tariff. • Apart from improving the overall transport efficiency of the national network, DFC will help accelerate the nation-wide economic development as well as improve the environment. Transportation of goods through DFC will consume less energy when compared to truck mode and the gas emission is completely avoided along the DFC alignment. • With the increase of trade and industrial development along the DFC, there will be an increase in employment opportunities of the region. • DFC will also improve and expand the market for agricultural produce, forestry and fisheries of the regions as the speedy and improved transportation mode will help shrink distances connecting the supply and demand points.