Introduction to the Construction
Industry [QSB30105]
Final Project: The Project Brief
Group Members: Lim Woo Leon 0322180
Michelle Wong Sook Yin 0322362
Justin Chong Yong Sheng 0322845
Tutor: Ms. Ann See Peng
Content Page
No. Content Page
1. Project Introduction
2. Site Plan
3. Site Location
4. Site Analysis
5. Site Observation
6. Authorities Procedure
7. ProposalA
8. ProposalB
9. ProposalC
Project Introduction
For the final project of Introduction to Construction Industry, students
are required to work in a group of 3 to 4 people and find a specific empty land
to initiate a small construction project. The size of the land should be between
50m x 50m (2500m2) to 50m x 70m (3500m2).
Individually, students are supposed to proposeaproject that serves
on any one or combination of two from these purposes:recreation area,
commercial area, industrial area, agricultural area, tourism area and residential
area.
In order to proposea project, students have to also state suggestion,
rationale, benefits, site analysis, impacts towards the community and client, site
plan, images of proposed idea. In this Project Report, there will be 3 proposals
for the site chosen.
Key Plan:
Kepong, Selangor
LocationPlan:
The Site
Site Analysis
Site analysis shows the direction of the wind direction, sunrise and sunset.
m
Location Observation
We have to find and search for a spotand develop it into a meaningful and
beneficial to the surrounding community. After an intense and carefully done
research, we have found a spacein Desa Parkcity, Kepong, with the area of 50m
x 70m.
This area is located right on top of a hill and has a scenic view. The open
land is located next to residential areas and also a church. This land is chosen as
our site.
These are some pictures and the observations we made at our site. The
observations made will affect the outcome of the site plan such as the placement
of the roads, windows etc.
There are identified areas which must be cleared and cleaned before
construction starts. Grass, trees and litter are some of the elements which were
identified to be cleared.
This is an overview of the undeveloped area which has to be cleared of the grass
and trees.
View of the nearby church from our chosen site. This area is packed with
people on weekends.
This is an area with overgrown vegetation which needs to be removed before
construction. There is also rubbish and waste in this area that needs to be
disposed properly.
This is the main entrance which is used to enter our proposed site. This entrance
connects to the main road.
This is the edge of our 50 x 70m site which overlooks the side view of the
nearby church.
This is an example of a waste area with overgrown grass and trees which needs
to be cleared before starting the construction.
This is an unknown fenced up area which needs approval from the local
authorities before performing any changes or construction to that area.
Topography
The whole area that we have chosenis located on top of a huge hill. The area is
a flat land with green grass growing everywhere and a few wild trees sprouting
randomly. Small rocks and pebbles are scattered around the whole area.
Humidity
Authorities Procedure
Step 1
Applicant Submits Application to SecretariatofOne Stop Centre
The One Stop Centre (OSC) Secretariat shall check and examine all documents
submitted based on the checklist prepared for application towards Planning
Permission, Building Plan Approval, Earthworks Plan and application for Road
and Drainage. If the application is incomplete, the OSC Secretariat will request
the applicant to submit the necessary or addition documents/plans.
The OSC Secretariat shall:
 Register the application
 Receive the receipt of processing fees
 Key in data for electronic submission, if applicable: and
 Issue letter receipt application to the applicant
Step 2
OSC SecretariatDistributes Application to RelevantDepartments
The OSC secretariat shall distribute the application with all accompanying
documents to the relevant departments for processing and for land development
applications, technical departments/agencies referred to area:
 State Town and Country Planning Department;
 Department of Valuation and Property (JPPH);
 Planning Department of Local Authority;
 Department of Agriculture (if necessary); and
 Other related technical departments/agencies
Step 3A
Processing Land Development Applications (Section 124A NLC) by the
Land Office
For simultaneous application for conversion and subdivision under Section
124A NLC, the process and procedureshall be as follows:
i. Receive application from OSC Secretariat;
ii. Receive payment or prove of payment;
iii. Examine Form 7D, pre-computation plan*, letter of consent from other
land owner/s, and power of attorney (if required);
iv. Examine status of land (caveat, land restrictions, expressed conditions,
and others);
v. Register application in the ownership document;
vi. Prepare land report;
vii. Make preliminary charting; and
viii. Land Administrator prepares comments to the Director of Town Planning
of the Local Authority, and make copies to OSC Secretariat by fax, post,
email or by hand.
For Malay Reserve Land, prescribed form in the State Land Rules has to be
used.
Step 3B
Processing of Planning Permission Application by the Department of Town
Planning Local Authority
For application of Planning Permission, the process and procedure shall be as
follows:
 Receive application letter from the One Stop Centre Secretariat and open
file;
 Check application fee;
 Check documents as in the detail checklist
 Refer to Development Plans and Planning Guidelines;
 Check content of Development Proposal Report prepared according to the
Development Proposal Report prepared according to the Development
ProposalReport Manual JPBD, Peninsular Malaysia
 Send notice to neigbouring lot owners / hearing of objections (for areas
without a local plan) as in Schedule VIII Development Control (General)
Rules 1986;
 Refer to the State Planning Committee and the National Physical
Planning Council (if required) and the period taken will depend on the
meeting date of the SPC/MPFN;
 Receive comments from technical departments/agencies and coordinate
the conditions and comments;
 Prepare written directions to the applicant and ensures all requirements
are complied with, within 7 days (or extended period granted); and
 Prepare recommendation paper to the One Stop Centre Secretariat
Step 3C
Processing of Building Plan Application by the Department of Town
Planning Local Authority
For the building plan approval, the officer in the Building Department shall
undertake the following process and procedure:
 Receive application letter with complete documents from the One Stop
Centre Secretariat and open file;
 Check fee payment;
 Check Form A (Schedule II Uniform Building By Laws 1984);
 Check the building plan based on detailed checklist
 Receive comments from technical departments/agencies and coordinate
comments with the agreed layout plan;
 Prepare written directions to the applicant and ensures applicant comply
with conditions;
 Prepare recommendation paper to the One Stop Centre Secretariat
The Director of Building Department shall table the recommendation paper in
the OSC Committee Meeting.
Step 3D
Processing the Earthworks Plan and the Road Drainage Plan Application
by the Department of Engineering LocalAuthority
For earthworks plan and road and drainage plan approval, the Engineering
Department shall undertake the following procedures:
 Receive application letter with complete documents from the One Stop
Centre Secretariat and open file;
 Check fee payment;
 Check document as in the detail checklist
i. Earthwork Plan
ii. Road & Drainage Plan
 Receive and coordinate comments from technical departments/agencies
and coordinates comments with the agreed layout plans;
 Prepare written directions to applicant and ensure applicant had amended
the plans within the stipulated timeframe; and
 Prepare recommendation paper to the One Stop Centre Secretariat
The Director of Engineering Department shall table the recommendation paper
in the OSC Committee Meeting.
Step 3E
Comments By TechnicalDepartment/Agencies
 The relevant departments/agencies receive complete documents from the
One Stop Centre Secretariat;
 Check the application;
 Prepare and submit comments to the relevant processing departments
according to application;
 Submit c.c of comments to the One Stop Centre Secretariat
Step 4
Complied and Coordinates RecommendationPapers
The One Stop Centre Secretariat shall:
 compile and coordinate all recommendation papers;
 issue letter of calling for meeting attached with meeting agenda to all
members of the OSC Committee; and
 distribute recommendation papers.
Should a technical department/agency not able to provide comments within the
stipulated time without a valid reason, the One Stop Centre Committee shall
proceed to consider the application and make decision.
For applications that had submitted the pre-computation plan at the early stage,
any differences noted between the pre-computation plan and the layout plan, the
OSC Secretariat will have to inform the applicant to make the necessary
amendments.
Step 5
One Stop Centre Committee Meeting
The OSC Committee Meeting shall undertake to consider and make decisions
on the applications for planning permission, building plans, earthwork plans,
road and drainage plans.
The committee shall make recommendations for:
 pre-computation plan;
 application for simultaneous subdivision and conversion under section
124A NLC in accordance with subparagraph 136 (1)(c)(i) NLC or
application for surrender and re-alienation section 204D NLC in
accordancewith paragraph 204D(1)(d) NLC.
The decision of the planning permission in the OSC Committee Meeting shall
be issued through;
 Form C1, Schedule I Development Control (General) Rules, 1986 -
Award Planning Permission to Applicant; and
 Form B, Schedule IV Development Control (General) Rules, 1986 -
Notice to Personwho Object the Planning Permission; or
 Form C2, Schedule I Development Control (General) Rules, 1986 -
Reject to grant planning permission
These documents shall be signed by YDP or empowerment to the Director of
Planning Department Local Authority.
Step 6
Preparationof Notificationof Planning Approval to Land Administrator
The OSC Secretariat shall prepare the necessary documents to be submitted to
the Land Administrator:
 Approved documents (layout and pre-computation plans that had been
signed);
 Form C1, Schedule I Development Control (General Rules), 1986 -
planning permission approval;
 letter of confirmation of approval
Step 7
Prepare RecommendationPaperto the State Executive Council (EXCO)
The Land Administrator shall prepare a recommendation paper to the State
Director of Lands and Mines to be tabled at the meeting of the State Exectuive
Council for decision.
The State Director for Lands and Mines shall inform the State's decision to the
Land Administrator and make copyof the decision to the One Stop Centre
Secretariat.
Step 8
The Land Administrator informs the Applicant of the Decisin on the Land
DevelopmentApplication
Under section 124A, the Land Administrator shall inform the applicant of the
following:-
1. the subdivision that has been approved;
2. for every subdivision, the category, conditions and expressed conditions
(if applicable) as directed by the State Authority;
3. additional premium rate and quit rent for every subdivision as well as
other payments that need to be made;
4. the period for the payment of additional premium, quit rent and others;
and
5. other conditions of approval as imposed by the State Authority.
As the same time, the Land Administrator need to present the notice in Form 7G
requesting the applicant to make the necessary payments within the stipulated
time as follows:-
1. Surveying fees if the survey is to be done by the Department of Land
Survey; and
2. Payment for the preparation and registration of the Qualified Title for
every lot in the subdivision.
For section 204D, the Land Administrator shall inform the applicant of the
following:-
 The terms of the approval for each unit that shall be re-alienated;
 The additional premium and tax rates for each unit that shall be re-
alienated;
 Period of payment of the additional premium, tax and other payments that
is charged; and
 The amount of premium in Form 5A in relation with each unit. The
survey charges shall not be included in Form 5A if the survey is to be
undertaken by a licensed surveyor and the Land Administrator has been
given the assurance by the Board of Surveyors.
Step 9
Prepare DecisionPaperfor Acknowledgementto the Full Council
The OSC secretariat shall prepare decision paper of the One Stop Centre
Committee to be acknowledged at the Full Council Meeting of the Local
Authority.
Step 10
Inform the Approval to the Applicant
The One Stop Centre secretariat shall:
 collect the approved documents signed by the YDP or through
empowerment to the Director of Planning, Director of Building and
Director of Engineering.
 inform the applicant the on the decision of the application enclosing the
approved layout plan, building plan and other related plans.
The total time frame for the processing of simultaneous application is suggested
as 92 days (3 months and 2 days).
If the application falls within an area with the gazetted local plan, the normal
time to process shall be 67 days (2 months and 7 days).

More Related Content

What's hot

Malaysian Property Development
Malaysian Property DevelopmentMalaysian Property Development
Malaysian Property DevelopmentDebbie Loh
 
Land Development Process - Orange County, Florida
Land Development Process - Orange County, FloridaLand Development Process - Orange County, Florida
Land Development Process - Orange County, FloridaScott Skraban, MPA, CH-ERIM
 
Chapter 11_DMF-Status Report
Chapter 11_DMF-Status ReportChapter 11_DMF-Status Report
Chapter 11_DMF-Status ReportVivek Agnihotri
 
Building plan approval for b khata ,bda,bbmp in Bangalore
Building plan approval for b khata ,bda,bbmp in BangaloreBuilding plan approval for b khata ,bda,bbmp in Bangalore
Building plan approval for b khata ,bda,bbmp in Bangalorecitadilconstruction
 
Item 8.5 2014 lua update
Item 8.5   2014 lua updateItem 8.5   2014 lua update
Item 8.5 2014 lua updateepdevelopment
 

What's hot (8)

Malaysian Property Development
Malaysian Property DevelopmentMalaysian Property Development
Malaysian Property Development
 
Land Development Process - Orange County, Florida
Land Development Process - Orange County, FloridaLand Development Process - Orange County, Florida
Land Development Process - Orange County, Florida
 
Chapter 11_DMF-Status Report
Chapter 11_DMF-Status ReportChapter 11_DMF-Status Report
Chapter 11_DMF-Status Report
 
Building plan approval for b khata ,bda,bbmp in Bangalore
Building plan approval for b khata ,bda,bbmp in BangaloreBuilding plan approval for b khata ,bda,bbmp in Bangalore
Building plan approval for b khata ,bda,bbmp in Bangalore
 
150615 Wainfleet SPC Guidelines
150615 Wainfleet SPC Guidelines150615 Wainfleet SPC Guidelines
150615 Wainfleet SPC Guidelines
 
Decision Notice
Decision NoticeDecision Notice
Decision Notice
 
Mineral resource overlay increase 2006-ordinance-06-816
Mineral resource overlay increase 2006-ordinance-06-816Mineral resource overlay increase 2006-ordinance-06-816
Mineral resource overlay increase 2006-ordinance-06-816
 
Item 8.5 2014 lua update
Item 8.5   2014 lua updateItem 8.5   2014 lua update
Item 8.5 2014 lua update
 

Similar to Group proposal

Approval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned DevelopmentsApproval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned DevelopmentsBrunswick County
 
Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2B. BHASKAR
 
Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airportsAbhishek Kumar Sinha
 
03 flow chart - redevelopment of the building
03   flow chart -  redevelopment of the building03   flow chart -  redevelopment of the building
03 flow chart - redevelopment of the buildingspandane
 
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14Competition Advisory Services (India) LLP
 
Ici final project report
Ici final project reportIci final project report
Ici final project reportJıa Yıı
 
Ici final project report
Ici final project reportIci final project report
Ici final project reportjygwen
 
building plan and designing and ppt.ppt
building plan and designing and  ppt.pptbuilding plan and designing and  ppt.ppt
building plan and designing and ppt.pptSureshKumarMP3
 
Ohio Historic Preservation Office - Technical Preservation Services Departmen...
Ohio Historic Preservation Office - Technical Preservation Services Departmen...Ohio Historic Preservation Office - Technical Preservation Services Departmen...
Ohio Historic Preservation Office - Technical Preservation Services Departmen...Heritage Ohio
 
Historic Tax Credits Preparation & Application
Historic Tax Credits Preparation & ApplicationHistoric Tax Credits Preparation & Application
Historic Tax Credits Preparation & ApplicationHeritage Ohio
 
The Planning Series 10 - Environmental Impact Assessment
The Planning Series 10 - Environmental Impact AssessmentThe Planning Series 10 - Environmental Impact Assessment
The Planning Series 10 - Environmental Impact AssessmentDr Georgette Kluiters
 
Major Subdivision Review Process
Major Subdivision  Review ProcessMajor Subdivision  Review Process
Major Subdivision Review Processgscplanning
 
Project management (1)
Project management (1)Project management (1)
Project management (1)aarenneoone
 
Coastal Canal Grant Program BOCC Policy
Coastal Canal Grant Program BOCC PolicyCoastal Canal Grant Program BOCC Policy
Coastal Canal Grant Program BOCC Policymarygracekamis
 
Plan preparation techniques
Plan preparation techniquesPlan preparation techniques
Plan preparation techniquesCoEP
 
GSP TDOT Utility Presentation
GSP TDOT Utility PresentationGSP TDOT Utility Presentation
GSP TDOT Utility PresentationRichard Yeager
 
Eia procedural-guideline
Eia procedural-guidelineEia procedural-guideline
Eia procedural-guidelineHussaini Omale
 
Document 1
Document 1Document 1
Document 1Erik Ong
 
Ohio Historic Preservation Office
Ohio Historic Preservation OfficeOhio Historic Preservation Office
Ohio Historic Preservation OfficeHeritage Ohio
 

Similar to Group proposal (20)

Approval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned DevelopmentsApproval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned Developments
 
Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2
 
Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airports
 
03 flow chart - redevelopment of the building
03   flow chart -  redevelopment of the building03   flow chart -  redevelopment of the building
03 flow chart - redevelopment of the building
 
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14Streamlining Approval Procedure for Real Estate Projects (SAPREP) -  19 sept '14
Streamlining Approval Procedure for Real Estate Projects (SAPREP) - 19 sept '14
 
Ici final project report
Ici final project reportIci final project report
Ici final project report
 
Ici final project report
Ici final project reportIci final project report
Ici final project report
 
building plan and designing and ppt.ppt
building plan and designing and  ppt.pptbuilding plan and designing and  ppt.ppt
building plan and designing and ppt.ppt
 
Ohio Historic Preservation Office - Technical Preservation Services Departmen...
Ohio Historic Preservation Office - Technical Preservation Services Departmen...Ohio Historic Preservation Office - Technical Preservation Services Departmen...
Ohio Historic Preservation Office - Technical Preservation Services Departmen...
 
Historic Tax Credits Preparation & Application
Historic Tax Credits Preparation & ApplicationHistoric Tax Credits Preparation & Application
Historic Tax Credits Preparation & Application
 
The Planning Series 10 - Environmental Impact Assessment
The Planning Series 10 - Environmental Impact AssessmentThe Planning Series 10 - Environmental Impact Assessment
The Planning Series 10 - Environmental Impact Assessment
 
Major Subdivision Review Process
Major Subdivision  Review ProcessMajor Subdivision  Review Process
Major Subdivision Review Process
 
Project management (1)
Project management (1)Project management (1)
Project management (1)
 
Coastal Canal Grant Program BOCC Policy
Coastal Canal Grant Program BOCC PolicyCoastal Canal Grant Program BOCC Policy
Coastal Canal Grant Program BOCC Policy
 
Dtcp demo2
Dtcp demo2Dtcp demo2
Dtcp demo2
 
Plan preparation techniques
Plan preparation techniquesPlan preparation techniques
Plan preparation techniques
 
GSP TDOT Utility Presentation
GSP TDOT Utility PresentationGSP TDOT Utility Presentation
GSP TDOT Utility Presentation
 
Eia procedural-guideline
Eia procedural-guidelineEia procedural-guideline
Eia procedural-guideline
 
Document 1
Document 1Document 1
Document 1
 
Ohio Historic Preservation Office
Ohio Historic Preservation OfficeOhio Historic Preservation Office
Ohio Historic Preservation Office
 

More from ChelleChelleeeee

Design design process journal brief
Design design process journal briefDesign design process journal brief
Design design process journal briefChelleChelleeeee
 
Design project two brief rev b
Design project two   brief rev bDesign project two   brief rev b
Design project two brief rev bChelleChelleeeee
 
Design project two brief rev b
Design project two   brief rev bDesign project two   brief rev b
Design project two brief rev bChelleChelleeeee
 
Presentation slides-insert-group-name
Presentation slides-insert-group-namePresentation slides-insert-group-name
Presentation slides-insert-group-nameChelleChelleeeee
 
Bus30104 intro to biz final project aug 2015
Bus30104 intro to biz final project   aug 2015Bus30104 intro to biz final project   aug 2015
Bus30104 intro to biz final project aug 2015ChelleChelleeeee
 
Bus30104 intro to biz assignment business plan aug 2015
Bus30104 intro to biz assignment   business plan aug 2015Bus30104 intro to biz assignment   business plan aug 2015
Bus30104 intro to biz assignment business plan aug 2015ChelleChelleeeee
 
Bus30104 new course outline august 2015 semester
Bus30104  new course outline   august 2015 semesterBus30104  new course outline   august 2015 semester
Bus30104 new course outline august 2015 semesterChelleChelleeeee
 
Social psychology presentation slides
Social psychology presentation slidesSocial psychology presentation slides
Social psychology presentation slidesChelleChelleeeee
 
3 self-fuifilling prophecy
3  self-fuifilling prophecy3  self-fuifilling prophecy
3 self-fuifilling prophecyChelleChelleeeee
 
2 charles horton cooley and the looking
2  charles horton cooley and the looking2  charles horton cooley and the looking
2 charles horton cooley and the lookingChelleChelleeeee
 

More from ChelleChelleeeee (20)

Final final
Final finalFinal final
Final final
 
Design design process journal brief
Design design process journal briefDesign design process journal brief
Design design process journal brief
 
Design project two brief rev b
Design project two   brief rev bDesign project two   brief rev b
Design project two brief rev b
 
Design project two brief rev b
Design project two   brief rev bDesign project two   brief rev b
Design project two brief rev b
 
Presentation slides-insert-group-name
Presentation slides-insert-group-namePresentation slides-insert-group-name
Presentation slides-insert-group-name
 
Business report complete
Business report completeBusiness report complete
Business report complete
 
Bus30104 intro to biz final project aug 2015
Bus30104 intro to biz final project   aug 2015Bus30104 intro to biz final project   aug 2015
Bus30104 intro to biz final project aug 2015
 
Bus30104 intro to biz assignment business plan aug 2015
Bus30104 intro to biz assignment   business plan aug 2015Bus30104 intro to biz assignment   business plan aug 2015
Bus30104 intro to biz assignment business plan aug 2015
 
Bus30104 new course outline august 2015 semester
Bus30104  new course outline   august 2015 semesterBus30104  new course outline   august 2015 semester
Bus30104 new course outline august 2015 semester
 
Fnbe research-project
Fnbe research-projectFnbe research-project
Fnbe research-project
 
Social psychology presentation slides
Social psychology presentation slidesSocial psychology presentation slides
Social psychology presentation slides
 
Video report
Video reportVideo report
Video report
 
Psychology presentation
Psychology presentationPsychology presentation
Psychology presentation
 
Fnbe journal-assignment
Fnbe journal-assignmentFnbe journal-assignment
Fnbe journal-assignment
 
Fnbe course-outline
Fnbe course-outlineFnbe course-outline
Fnbe course-outline
 
5 obsertational learning
5  obsertational learning5  obsertational learning
5 obsertational learning
 
4 confirmation bias
4  confirmation bias4  confirmation bias
4 confirmation bias
 
3 self-fuifilling prophecy
3  self-fuifilling prophecy3  self-fuifilling prophecy
3 self-fuifilling prophecy
 
2 charles horton cooley and the looking
2  charles horton cooley and the looking2  charles horton cooley and the looking
2 charles horton cooley and the looking
 
1 social facilitation
1  social facilitation1  social facilitation
1 social facilitation
 

Recently uploaded

HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptxJoelynRubio1
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfPondicherry University
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Basic Intentional Injuries Health Education
Basic Intentional Injuries Health EducationBasic Intentional Injuries Health Education
Basic Intentional Injuries Health EducationNeilDeclaro1
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptNishitharanjan Rout
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17Celine George
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 

Recently uploaded (20)

HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Basic Intentional Injuries Health Education
Basic Intentional Injuries Health EducationBasic Intentional Injuries Health Education
Basic Intentional Injuries Health Education
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17
 
Call Girls in Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in  Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in  Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 

Group proposal

  • 1. Introduction to the Construction Industry [QSB30105] Final Project: The Project Brief Group Members: Lim Woo Leon 0322180 Michelle Wong Sook Yin 0322362 Justin Chong Yong Sheng 0322845 Tutor: Ms. Ann See Peng
  • 2. Content Page No. Content Page 1. Project Introduction 2. Site Plan 3. Site Location 4. Site Analysis 5. Site Observation 6. Authorities Procedure 7. ProposalA 8. ProposalB 9. ProposalC
  • 3. Project Introduction For the final project of Introduction to Construction Industry, students are required to work in a group of 3 to 4 people and find a specific empty land to initiate a small construction project. The size of the land should be between 50m x 50m (2500m2) to 50m x 70m (3500m2). Individually, students are supposed to proposeaproject that serves on any one or combination of two from these purposes:recreation area, commercial area, industrial area, agricultural area, tourism area and residential area. In order to proposea project, students have to also state suggestion, rationale, benefits, site analysis, impacts towards the community and client, site plan, images of proposed idea. In this Project Report, there will be 3 proposals for the site chosen.
  • 5. Site Analysis Site analysis shows the direction of the wind direction, sunrise and sunset. m
  • 6. Location Observation We have to find and search for a spotand develop it into a meaningful and beneficial to the surrounding community. After an intense and carefully done research, we have found a spacein Desa Parkcity, Kepong, with the area of 50m x 70m. This area is located right on top of a hill and has a scenic view. The open land is located next to residential areas and also a church. This land is chosen as our site. These are some pictures and the observations we made at our site. The observations made will affect the outcome of the site plan such as the placement of the roads, windows etc. There are identified areas which must be cleared and cleaned before construction starts. Grass, trees and litter are some of the elements which were identified to be cleared. This is an overview of the undeveloped area which has to be cleared of the grass and trees.
  • 7. View of the nearby church from our chosen site. This area is packed with people on weekends. This is an area with overgrown vegetation which needs to be removed before construction. There is also rubbish and waste in this area that needs to be disposed properly.
  • 8. This is the main entrance which is used to enter our proposed site. This entrance connects to the main road. This is the edge of our 50 x 70m site which overlooks the side view of the nearby church.
  • 9. This is an example of a waste area with overgrown grass and trees which needs to be cleared before starting the construction. This is an unknown fenced up area which needs approval from the local authorities before performing any changes or construction to that area.
  • 10. Topography The whole area that we have chosenis located on top of a huge hill. The area is a flat land with green grass growing everywhere and a few wild trees sprouting randomly. Small rocks and pebbles are scattered around the whole area. Humidity
  • 11. Authorities Procedure Step 1 Applicant Submits Application to SecretariatofOne Stop Centre The One Stop Centre (OSC) Secretariat shall check and examine all documents submitted based on the checklist prepared for application towards Planning Permission, Building Plan Approval, Earthworks Plan and application for Road and Drainage. If the application is incomplete, the OSC Secretariat will request the applicant to submit the necessary or addition documents/plans. The OSC Secretariat shall:  Register the application  Receive the receipt of processing fees  Key in data for electronic submission, if applicable: and  Issue letter receipt application to the applicant Step 2 OSC SecretariatDistributes Application to RelevantDepartments The OSC secretariat shall distribute the application with all accompanying documents to the relevant departments for processing and for land development applications, technical departments/agencies referred to area:  State Town and Country Planning Department;  Department of Valuation and Property (JPPH);  Planning Department of Local Authority;  Department of Agriculture (if necessary); and  Other related technical departments/agencies
  • 12. Step 3A Processing Land Development Applications (Section 124A NLC) by the Land Office For simultaneous application for conversion and subdivision under Section 124A NLC, the process and procedureshall be as follows: i. Receive application from OSC Secretariat; ii. Receive payment or prove of payment; iii. Examine Form 7D, pre-computation plan*, letter of consent from other land owner/s, and power of attorney (if required); iv. Examine status of land (caveat, land restrictions, expressed conditions, and others); v. Register application in the ownership document; vi. Prepare land report; vii. Make preliminary charting; and viii. Land Administrator prepares comments to the Director of Town Planning of the Local Authority, and make copies to OSC Secretariat by fax, post, email or by hand. For Malay Reserve Land, prescribed form in the State Land Rules has to be used. Step 3B Processing of Planning Permission Application by the Department of Town Planning Local Authority For application of Planning Permission, the process and procedure shall be as follows:  Receive application letter from the One Stop Centre Secretariat and open file;  Check application fee;  Check documents as in the detail checklist
  • 13.  Refer to Development Plans and Planning Guidelines;  Check content of Development Proposal Report prepared according to the Development Proposal Report prepared according to the Development ProposalReport Manual JPBD, Peninsular Malaysia  Send notice to neigbouring lot owners / hearing of objections (for areas without a local plan) as in Schedule VIII Development Control (General) Rules 1986;  Refer to the State Planning Committee and the National Physical Planning Council (if required) and the period taken will depend on the meeting date of the SPC/MPFN;  Receive comments from technical departments/agencies and coordinate the conditions and comments;  Prepare written directions to the applicant and ensures all requirements are complied with, within 7 days (or extended period granted); and  Prepare recommendation paper to the One Stop Centre Secretariat Step 3C Processing of Building Plan Application by the Department of Town Planning Local Authority For the building plan approval, the officer in the Building Department shall undertake the following process and procedure:  Receive application letter with complete documents from the One Stop Centre Secretariat and open file;  Check fee payment;  Check Form A (Schedule II Uniform Building By Laws 1984);  Check the building plan based on detailed checklist  Receive comments from technical departments/agencies and coordinate comments with the agreed layout plan;  Prepare written directions to the applicant and ensures applicant comply with conditions;  Prepare recommendation paper to the One Stop Centre Secretariat The Director of Building Department shall table the recommendation paper in the OSC Committee Meeting.
  • 14. Step 3D Processing the Earthworks Plan and the Road Drainage Plan Application by the Department of Engineering LocalAuthority For earthworks plan and road and drainage plan approval, the Engineering Department shall undertake the following procedures:  Receive application letter with complete documents from the One Stop Centre Secretariat and open file;  Check fee payment;  Check document as in the detail checklist i. Earthwork Plan ii. Road & Drainage Plan  Receive and coordinate comments from technical departments/agencies and coordinates comments with the agreed layout plans;  Prepare written directions to applicant and ensure applicant had amended the plans within the stipulated timeframe; and  Prepare recommendation paper to the One Stop Centre Secretariat The Director of Engineering Department shall table the recommendation paper in the OSC Committee Meeting. Step 3E Comments By TechnicalDepartment/Agencies  The relevant departments/agencies receive complete documents from the One Stop Centre Secretariat;  Check the application;  Prepare and submit comments to the relevant processing departments according to application;  Submit c.c of comments to the One Stop Centre Secretariat
  • 15. Step 4 Complied and Coordinates RecommendationPapers The One Stop Centre Secretariat shall:  compile and coordinate all recommendation papers;  issue letter of calling for meeting attached with meeting agenda to all members of the OSC Committee; and  distribute recommendation papers. Should a technical department/agency not able to provide comments within the stipulated time without a valid reason, the One Stop Centre Committee shall proceed to consider the application and make decision. For applications that had submitted the pre-computation plan at the early stage, any differences noted between the pre-computation plan and the layout plan, the OSC Secretariat will have to inform the applicant to make the necessary amendments. Step 5 One Stop Centre Committee Meeting The OSC Committee Meeting shall undertake to consider and make decisions on the applications for planning permission, building plans, earthwork plans, road and drainage plans. The committee shall make recommendations for:  pre-computation plan;  application for simultaneous subdivision and conversion under section 124A NLC in accordance with subparagraph 136 (1)(c)(i) NLC or application for surrender and re-alienation section 204D NLC in accordancewith paragraph 204D(1)(d) NLC. The decision of the planning permission in the OSC Committee Meeting shall be issued through;
  • 16.  Form C1, Schedule I Development Control (General) Rules, 1986 - Award Planning Permission to Applicant; and  Form B, Schedule IV Development Control (General) Rules, 1986 - Notice to Personwho Object the Planning Permission; or  Form C2, Schedule I Development Control (General) Rules, 1986 - Reject to grant planning permission These documents shall be signed by YDP or empowerment to the Director of Planning Department Local Authority. Step 6 Preparationof Notificationof Planning Approval to Land Administrator The OSC Secretariat shall prepare the necessary documents to be submitted to the Land Administrator:  Approved documents (layout and pre-computation plans that had been signed);  Form C1, Schedule I Development Control (General Rules), 1986 - planning permission approval;  letter of confirmation of approval Step 7 Prepare RecommendationPaperto the State Executive Council (EXCO) The Land Administrator shall prepare a recommendation paper to the State Director of Lands and Mines to be tabled at the meeting of the State Exectuive Council for decision. The State Director for Lands and Mines shall inform the State's decision to the Land Administrator and make copyof the decision to the One Stop Centre Secretariat.
  • 17. Step 8 The Land Administrator informs the Applicant of the Decisin on the Land DevelopmentApplication Under section 124A, the Land Administrator shall inform the applicant of the following:- 1. the subdivision that has been approved; 2. for every subdivision, the category, conditions and expressed conditions (if applicable) as directed by the State Authority; 3. additional premium rate and quit rent for every subdivision as well as other payments that need to be made; 4. the period for the payment of additional premium, quit rent and others; and 5. other conditions of approval as imposed by the State Authority. As the same time, the Land Administrator need to present the notice in Form 7G requesting the applicant to make the necessary payments within the stipulated time as follows:- 1. Surveying fees if the survey is to be done by the Department of Land Survey; and 2. Payment for the preparation and registration of the Qualified Title for every lot in the subdivision. For section 204D, the Land Administrator shall inform the applicant of the following:-  The terms of the approval for each unit that shall be re-alienated;  The additional premium and tax rates for each unit that shall be re- alienated;  Period of payment of the additional premium, tax and other payments that is charged; and
  • 18.  The amount of premium in Form 5A in relation with each unit. The survey charges shall not be included in Form 5A if the survey is to be undertaken by a licensed surveyor and the Land Administrator has been given the assurance by the Board of Surveyors. Step 9 Prepare DecisionPaperfor Acknowledgementto the Full Council The OSC secretariat shall prepare decision paper of the One Stop Centre Committee to be acknowledged at the Full Council Meeting of the Local Authority. Step 10 Inform the Approval to the Applicant The One Stop Centre secretariat shall:  collect the approved documents signed by the YDP or through empowerment to the Director of Planning, Director of Building and Director of Engineering.  inform the applicant the on the decision of the application enclosing the approved layout plan, building plan and other related plans. The total time frame for the processing of simultaneous application is suggested as 92 days (3 months and 2 days). If the application falls within an area with the gazetted local plan, the normal time to process shall be 67 days (2 months and 7 days).