Unit 5
Economic Operation of Power System
Introduction
 Economic operation is very important for a power system to return a profit on the
capital invested.
 Two things put pressure on power companies to achieve maximum possible efficiency.
 (a) Rates fixed by regulatory bodies and
 (b) the importance of conservation of fuel place
 Maximum efficiency minimizes the cost of electrical energy consumed by the
consumers. Also it reduces the rising prices for fuel, labor, supplies and maintenance.
 Operational economics involving power generation and delivery of the power.
Delivery can be subdivided into two parts.
 (i) One dealing with minimum cost of power production called Economic dispatch.
 (ii) Other dealing with minimum loss of the generated power delivery to the loads.
 For any specified load condition, economic dispatch (i) determines the power output
of each plant. (ii)Minimizes the overall cost of fuel needed to serve the system load.
Introduction
 The economic dispatch problem can be solved by means of the optimal power flow
(OPF) program.
 We first study the most economic distribution of power within the plant.
 The method that we develop applies to economic scheduling of plant output for a
given loading of the system without considering of transmission losses.
 Next we express transmission loss as a function of the outputs of the various plants.
 Then we determine how the output of each of the plants of a system is scheduled to
achieve the minimum cost of power delivered to the load.
 Because the total load of the power system varies throughout the day, coordinated
control of the power plant outputs is necessary to ensure generation to load balance
so that the system frequency will remain as close as possible to the nominal
operating value, usually 50 or 60 Hz.
 Also because of the daily load variation, the utility has to decide on the basis of
economics which generator to start up, which generators to shut down, and in what
order. The computational procedure for making such decisions, called unit
commitment.
Distribution of load between units within a plant
 Power plant consisting of several generating units which are constructed by
investing huge amount of money. Fuel cost, staff salary, interest and
depreciation charges and maintenance cost are some of the components of
operating cost.
 Fuel cost is the major portion of operating cost and it can be controlled.
Therefore we shall consider the fuel cost alone for further considerations.
 To get different output power, we need to vary the fuel input. Fuel input can
be measured in tones/hr or millions of BTU(British Thermal Unit)/hr.
Knowing the cost of the fuel, in terms of Rs/tone or Rs/Millions of BTU, input
to the generating unit can be expressed as Rs/hr.
 Let Ci Rs/h be the input cost to generate a power of Pi MW in unit i.
 Fig.1 shows a typical input output curve of a generating unit. For each
generating unit there shall be a minimum and maximum power generated as
Pi,min and Pi,max.
 If the input-output curve of Unit ‘I’ is quadratic , we can write
 Where, Ci = Input cost, Pi – Output power in MW, α, β and ϒ are cost coefficient.
Incremental cost curve
 As we shall see the criterion for distribution of the load between any two
units is based on whether increasing the generation of one unit, and
decreasing the generation of other unit by the same amount results in an
increase or decrease in total cost. This can be obtained if we can calculate the
change in input cost ΔCi for a small change in power ΔPi.
 Thus while deciding the optimal scheduling, we are concerned with dCi/dPi,
Incremental cost (IC) which is determined by the slopes of the input-output
curves. Thus the incremental cost curve is the plot of dCi/dPi versus Pi. The
dimension of dCi/dPi is Rs/MWh.
Incremental cost curve
 The fig.2 shows that the incremental cost is quite linear with
respect to power output over an appreciable range.
 In analytical work, the curve is usually approximated by one or
two straight lines.
 The dashed line in the fig-2 is a good representation of the
curve.
Incremental cost curve
Economic loading neglecting transmission losses
 Consider a system having two generating units having costs C1 and C2
 The above concept can be extended to a system with any number of units.
 Thus optimum economy is achieved if every unit operates at the same cost.
Distribution of load between different plants
 Since plants are generally long distance apart in an integrated system, it becomes essential to
consider transmission losses in deciding the load allocation to different plants.
 This leads to the dispatch of power in an economic way so as to make the overall cost to be the
minimum.
 Let there be ‘m’ no of plants in a system integrated by transmission line.
 PG1, PG2..PGm - Generation output of the plants in MW
 PD -Total load in MW
 PL - Losses in transmission lines
 Where, Cn – Fuel cost of nth plant in Rs/hr
 PGn – output of nth plant in MW.
 Our objective is to obtain a minimum cost for a fixed system load PD subject to the power
balance constraint of equation (13).
 We now present the procedure for solving such minimization problems called the
method of Lagrange multipliers.
 The new cost function C is formed by combining the total fuel cost and the equality
constraint of equation(13) in the following manner.
 The cost function C is often called the lagrangian, and we shall see that the parameter λ
which we now call Lagrange multiplier is the effective incremental fuel cost of the system
when transmission line losses are taken into account. C and λ are expressed in Rs/hr .
 For minimum cost we require the derivative of C with respect to each PGn equal to zero
 Since PD is fixed and the fuel cost of any one unit varies only if the power output of that
unit is varied. Therefore equation (15) becomes
 Because Cm depends on only PGn, the partial derivative of Cm can be replaced by the full
derivative and equation (16) then gives
 where Ln is called the penalty factor for plant n and is given by
 Equation (17) is called the exact coordinate equation.
 From equation (17),
 So, minimum fuel cost is obtained when the incremental fuel cost of each
plant multiplied by its penalty factor is the same for all the plants.
Representation of transmission losses
 The transmission losses depend on line currents and line resistances. It is possible to
represent these losses as a function of plant loadings.
 Let ra, rb, rc be the resistances of line a, b and c respectively. The transmission loss is,
 Since, I1 and I2 are in same phase,
 Let P1 and P2 be the power outputs and V1 and V2 be the bus voltage and cos Φ1 and
cos Φ2 be the power factors of sources 1 and 2 respectively. Then
 Substituting these values in transmission line equation we get,
 Where,
Representation of transmission losses
The transmission loss equation:
 To include the effect of transmission losses in deciding the load allocation, it is
necessary to represent the loss as a function of plant loading. The general form of loss
equation is
 Where, PL – transmission losses in pu
 P-plant loading in pu
 B-Loss coefficient
 For two generating source system
 For a three generating source system’
 The matrix representation of above loss equation is
 Where for a total of k sources
 Where, 𝑃𝑇
is the transposition of P. The B coefficients depend on the system network
parameters, configuration, plant power factor and voltages etc.
The transmission loss equation:
Automatic load dispatching
 Economic load dispatching is the distribution of the load among the
generating units in such a manner so as to minimize the cost of supplying
the minute to-minute requirements of the system.
 In a large interconnected system it is humanly impossible to calculate and
adjust such generations.
 Hence, the help of digital computer system along with analogue devices is
used.
 The whole process is carried out automatically; hence this process is
known as automatic load dispatching.
Unit Commitment
 The total load in the power system varies throughout the day and reaches
different peak value from one day to another.
 Different combination of generators are to be connected in the system to
meet the varying load. When the load increases, the utility has to decide in
advance the sequence in which the generator units are to be brought in.
 Similarly when the load decreases, the operating engineer need to know in
advance the sequence in which the generating units are to be shut down.
 The problem of finding the order in which the units are to be shut down over
a period of time (say one day), so the total operating cost involved on that day
is minimum, is known as Unit Commitment(UC).
 Thus UC problem is economic dispatch over a day. The period considered
may be a week, a month or a year.
Constraints on UC problem
 Spinning reserve: There may be sudden increase in load, more than what
was predicted. Further there may be a situation that one generating unit may
have to be shut down because of fault in generator or any of its auxiliaries.
Some system capacity has to be kept as spinning reserve
 i) to meet an unexpected increase in demand and
 ii) to ensure power supply in the event of any generating unit suffering a
forced outage
 Minimum up time: When a thermal unit is brought in, it cannot be turned off
immediately. Once it is committed, it has to be in the system for a specified
minimum up time.
 Minimum down time: When a thermal unit is decommitted, it cannot be
turned on immediately. It has to remain decommitted for a specified
minimum down time.
 Crew constraint: A plant always has two or more generating units. It may not be
possible to turn on more than one generating unit at the same time due to non-
availability of operating personnel.
 Transition cost: Whenever the status of one unit is changed some transition cost is
involved and this has to be taken into account.
 Hydro constraints: Most of the systems have hydroelectric units also. The operation
of hydro units, depend on the availability of water. Moreover, hydro projects are
multipurpose projects. Irrigation requirements also determine the operation of hydro
plants.
 Nuclear constraint: If a nuclear plant is part of the system, another constraint is
added. A nuclear plant has to be operated as a base load plant only.
 Must run unit: Sometime it is a must to run one or two units from the consideration
of voltage support and system stability.
 Fuel supply constraint: Some plants cannot be operated due to deficient fuel supply.
 Transmission line limitation: Reserve must be spread around the power system to
avoid transmission system limitation, often called bottling of reserves.
Constraints on UC problem
Solving the unit commitment problem
 The objective of unit commitment is not economical to run all the units available all
the time.
 To determine the units of plants that should operate for a particular load is the
problem of unit commitment.
 This problem is important for thermal power plant because the operating cost and
start up time are high and hence their on-off status is important.
 A simple approach to the problem is to impose priority ordering, wherein the most
efficient unit is loaded first, and then followed by the less efficient units in order as
the load increases.
 Finding the most economical combination of units that can supply this load demand
is to try all possible combination of units that can supply this load; to divide the load
optimally among the units of each combination by use of the co-ordination equation,
so as to find most economical operating cost of combination then to determine the
combination which has the least operating cost among all these.
 These combinations can be solved by dynamic programming method.
Solution of unit commitment problem by Forward
Dynamic Programming (FDP)
 In FDP, we start with the first duration obtain the unit commitment schedule
for this duration, go to second duration till we reach the last duration.
 In FDP, the initial conditions are easily specified, calculation can be carried
out for any desired length of time and the previous history of each unit can be
calculated at every stage.
 The operating cost for any stage needs method of economic dispatch. This is
due to the fact that for any given combination of units, the operating cost is
minimum if all the units in this combination are operating at equal
incremental cost.
 Two other variables enter the strategy for UC by Forward dynamic
programming.
 This is because a no of possible combinations exist for every state. Let this be
denoted by K.
 Another variable is the no. of paths or strategies to save at every step. Let this
variable be denoted as L.
Procedure
 The stage in load cycle is specified as i. We start with i=1 i.e. first stage.
 The operating cost for this stage is computed. This has to be repeated for all
possible combination K.
 We now go to (i+1)th stage.
 The no. of feasible paths in duration (i-1) is found and stored.
 The minimum total cost is calculated using the formula
 This has to be repeated for all states in the ith interval.
 The lowest cost paths (number L) are saved in computer memory.
 Check whether the program has reached the last stage in load cycle. If yes
optimal schedule is printed.
 Otherwise i is uploaded to (i+1) and program is repeated.

More Related Content

What's hot

Economic load dispatch
Economic load  dispatchEconomic load  dispatch
Economic load dispatchDeepak John
 
Economic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic Dispatch of Generated Power Using Modified Lambda-Iteration MethodEconomic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic Dispatch of Generated Power Using Modified Lambda-Iteration MethodIOSR Journals
 
Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment Pritesh Priyadarshi
 
Closed loop control of converter fed motor
Closed loop control of converter fed motorClosed loop control of converter fed motor
Closed loop control of converter fed motorRishabh Dutt Shukla
 
Introduction to reactive power control in electrical power
Introduction to reactive power control in electrical powerIntroduction to reactive power control in electrical power
Introduction to reactive power control in electrical powerDr.Raja R
 
Power system stability
Power system stabilityPower system stability
Power system stabilityBalaram Das
 
Solution of Combined Heat and Power Economic Dispatch Problem Using Different...
Solution of Combined Heat and Power Economic Dispatch Problem Using Different...Solution of Combined Heat and Power Economic Dispatch Problem Using Different...
Solution of Combined Heat and Power Economic Dispatch Problem Using Different...Arkadev Ghosh
 
Input output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costInput output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costEklavya Sharma
 
Optimal load scheduling
Optimal load schedulingOptimal load scheduling
Optimal load schedulingMayank Sharma
 
Hydrothermal scheduling
Hydrothermal schedulingHydrothermal scheduling
Hydrothermal schedulingASHIRBAD BARIK
 
Power electronic converter in wind turbine
Power electronic converter in wind turbinePower electronic converter in wind turbine
Power electronic converter in wind turbineSonuKumarBairwa
 
Objectives of shunt compensation
Objectives of shunt compensationObjectives of shunt compensation
Objectives of shunt compensationAyyarao T S L V
 

What's hot (20)

Power flow analysis
Power flow analysisPower flow analysis
Power flow analysis
 
Economic load dispatch
Economic load  dispatchEconomic load  dispatch
Economic load dispatch
 
Economic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic Dispatch of Generated Power Using Modified Lambda-Iteration MethodEconomic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic Dispatch of Generated Power Using Modified Lambda-Iteration Method
 
Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment
 
Closed loop control of converter fed motor
Closed loop control of converter fed motorClosed loop control of converter fed motor
Closed loop control of converter fed motor
 
CONTROL OF ACTIVE POWER & FREQUENCY
CONTROL OF ACTIVE POWER & FREQUENCYCONTROL OF ACTIVE POWER & FREQUENCY
CONTROL OF ACTIVE POWER & FREQUENCY
 
Introduction to reactive power control in electrical power
Introduction to reactive power control in electrical powerIntroduction to reactive power control in electrical power
Introduction to reactive power control in electrical power
 
Power system stability
Power system stabilityPower system stability
Power system stability
 
Power system planing and operation (pce5312) chapter five
Power system planing and operation (pce5312) chapter fivePower system planing and operation (pce5312) chapter five
Power system planing and operation (pce5312) chapter five
 
Solution of Combined Heat and Power Economic Dispatch Problem Using Different...
Solution of Combined Heat and Power Economic Dispatch Problem Using Different...Solution of Combined Heat and Power Economic Dispatch Problem Using Different...
Solution of Combined Heat and Power Economic Dispatch Problem Using Different...
 
Input output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costInput output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental cost
 
Optimal load scheduling
Optimal load schedulingOptimal load scheduling
Optimal load scheduling
 
Inductance and capacitance
Inductance and capacitanceInductance and capacitance
Inductance and capacitance
 
Hydrothermal scheduling
Hydrothermal schedulingHydrothermal scheduling
Hydrothermal scheduling
 
Computer Application in Power system: Chapter two - load flow analysis
Computer Application in Power system: Chapter two - load flow analysisComputer Application in Power system: Chapter two - load flow analysis
Computer Application in Power system: Chapter two - load flow analysis
 
Load flow studies 19
Load flow studies 19Load flow studies 19
Load flow studies 19
 
voltage stability
voltage stabilityvoltage stability
voltage stability
 
Power electronic converter in wind turbine
Power electronic converter in wind turbinePower electronic converter in wind turbine
Power electronic converter in wind turbine
 
Objectives of shunt compensation
Objectives of shunt compensationObjectives of shunt compensation
Objectives of shunt compensation
 
TRANSIENT ANGLE STABILITY
TRANSIENT ANGLE STABILITYTRANSIENT ANGLE STABILITY
TRANSIENT ANGLE STABILITY
 

Similar to Unit 5.pptx

Economicloaddispatch 111213025406-phpapp01
Economicloaddispatch 111213025406-phpapp01Economicloaddispatch 111213025406-phpapp01
Economicloaddispatch 111213025406-phpapp01vikram anand
 
Mr. Bakar Presentation for group discussion.docx
Mr. Bakar Presentation for group discussion.docxMr. Bakar Presentation for group discussion.docx
Mr. Bakar Presentation for group discussion.docxCyberMohdSalahShoty
 
211658558-Chapter-4-Economic-Dispatch.pdf
211658558-Chapter-4-Economic-Dispatch.pdf211658558-Chapter-4-Economic-Dispatch.pdf
211658558-Chapter-4-Economic-Dispatch.pdfyoziscijunior
 
economic load dispatch and unit commitment power_system_operation.pdf
economic load dispatch and unit commitment power_system_operation.pdfeconomic load dispatch and unit commitment power_system_operation.pdf
economic load dispatch and unit commitment power_system_operation.pdfArnabChakraborty499766
 
Computer Application in Power system: Chapter six - optimization and security
Computer Application in Power system: Chapter six - optimization and securityComputer Application in Power system: Chapter six - optimization and security
Computer Application in Power system: Chapter six - optimization and securityAdama Science and Technology University
 
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...paperpublications3
 
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...IJAPEJOURNAL
 
Implementation effects of economics and market operations based model for tra...
Implementation effects of economics and market operations based model for tra...Implementation effects of economics and market operations based model for tra...
Implementation effects of economics and market operations based model for tra...nooriasukmaningtyas
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)inventionjournals
 
Project on economic load dispatch
Project on economic load dispatchProject on economic load dispatch
Project on economic load dispatchayantudu
 
frequency regulation of deregulated power system having grc integrated with r...
frequency regulation of deregulated power system having grc integrated with r...frequency regulation of deregulated power system having grc integrated with r...
frequency regulation of deregulated power system having grc integrated with r...Yedukondalachari B
 
3 Economic Dispatch Of Thermal
3 Economic Dispatch Of Thermal3 Economic Dispatch Of Thermal
3 Economic Dispatch Of ThermalKimberly Pulley
 
A Decomposition Aggregation Method for Solving Electrical Power Dispatch Prob...
A Decomposition Aggregation Method for Solving Electrical Power Dispatch Prob...A Decomposition Aggregation Method for Solving Electrical Power Dispatch Prob...
A Decomposition Aggregation Method for Solving Electrical Power Dispatch Prob...raj20072
 
The optimal solution for unit commitment problem using binary hybrid grey wol...
The optimal solution for unit commitment problem using binary hybrid grey wol...The optimal solution for unit commitment problem using binary hybrid grey wol...
The optimal solution for unit commitment problem using binary hybrid grey wol...IJECEIAES
 

Similar to Unit 5.pptx (20)

Economic dipatch
Economic dipatch Economic dipatch
Economic dipatch
 
Economicloaddispatch 111213025406-phpapp01
Economicloaddispatch 111213025406-phpapp01Economicloaddispatch 111213025406-phpapp01
Economicloaddispatch 111213025406-phpapp01
 
Mr. Bakar Presentation for group discussion.docx
Mr. Bakar Presentation for group discussion.docxMr. Bakar Presentation for group discussion.docx
Mr. Bakar Presentation for group discussion.docx
 
211658558-Chapter-4-Economic-Dispatch.pdf
211658558-Chapter-4-Economic-Dispatch.pdf211658558-Chapter-4-Economic-Dispatch.pdf
211658558-Chapter-4-Economic-Dispatch.pdf
 
UNIT-4-PPT.ppt
UNIT-4-PPT.pptUNIT-4-PPT.ppt
UNIT-4-PPT.ppt
 
economic load dispatch and unit commitment power_system_operation.pdf
economic load dispatch and unit commitment power_system_operation.pdfeconomic load dispatch and unit commitment power_system_operation.pdf
economic load dispatch and unit commitment power_system_operation.pdf
 
Computer Application in Power system: Chapter six - optimization and security
Computer Application in Power system: Chapter six - optimization and securityComputer Application in Power system: Chapter six - optimization and security
Computer Application in Power system: Chapter six - optimization and security
 
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
 
PSOC.pptx
PSOC.pptxPSOC.pptx
PSOC.pptx
 
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
 
Economic load dispatch
Economic load  dispatchEconomic load  dispatch
Economic load dispatch
 
Implementation effects of economics and market operations based model for tra...
Implementation effects of economics and market operations based model for tra...Implementation effects of economics and market operations based model for tra...
Implementation effects of economics and market operations based model for tra...
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
Project on economic load dispatch
Project on economic load dispatchProject on economic load dispatch
Project on economic load dispatch
 
frequency regulation of deregulated power system having grc integrated with r...
frequency regulation of deregulated power system having grc integrated with r...frequency regulation of deregulated power system having grc integrated with r...
frequency regulation of deregulated power system having grc integrated with r...
 
I05216877
I05216877I05216877
I05216877
 
Economic load dispatch
Economic load dispatchEconomic load dispatch
Economic load dispatch
 
3 Economic Dispatch Of Thermal
3 Economic Dispatch Of Thermal3 Economic Dispatch Of Thermal
3 Economic Dispatch Of Thermal
 
A Decomposition Aggregation Method for Solving Electrical Power Dispatch Prob...
A Decomposition Aggregation Method for Solving Electrical Power Dispatch Prob...A Decomposition Aggregation Method for Solving Electrical Power Dispatch Prob...
A Decomposition Aggregation Method for Solving Electrical Power Dispatch Prob...
 
The optimal solution for unit commitment problem using binary hybrid grey wol...
The optimal solution for unit commitment problem using binary hybrid grey wol...The optimal solution for unit commitment problem using binary hybrid grey wol...
The optimal solution for unit commitment problem using binary hybrid grey wol...
 

Recently uploaded

Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 

Recently uploaded (20)

Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 

Unit 5.pptx

  • 1. Unit 5 Economic Operation of Power System
  • 2. Introduction  Economic operation is very important for a power system to return a profit on the capital invested.  Two things put pressure on power companies to achieve maximum possible efficiency.  (a) Rates fixed by regulatory bodies and  (b) the importance of conservation of fuel place  Maximum efficiency minimizes the cost of electrical energy consumed by the consumers. Also it reduces the rising prices for fuel, labor, supplies and maintenance.  Operational economics involving power generation and delivery of the power. Delivery can be subdivided into two parts.  (i) One dealing with minimum cost of power production called Economic dispatch.  (ii) Other dealing with minimum loss of the generated power delivery to the loads.  For any specified load condition, economic dispatch (i) determines the power output of each plant. (ii)Minimizes the overall cost of fuel needed to serve the system load.
  • 3. Introduction  The economic dispatch problem can be solved by means of the optimal power flow (OPF) program.  We first study the most economic distribution of power within the plant.  The method that we develop applies to economic scheduling of plant output for a given loading of the system without considering of transmission losses.  Next we express transmission loss as a function of the outputs of the various plants.  Then we determine how the output of each of the plants of a system is scheduled to achieve the minimum cost of power delivered to the load.  Because the total load of the power system varies throughout the day, coordinated control of the power plant outputs is necessary to ensure generation to load balance so that the system frequency will remain as close as possible to the nominal operating value, usually 50 or 60 Hz.  Also because of the daily load variation, the utility has to decide on the basis of economics which generator to start up, which generators to shut down, and in what order. The computational procedure for making such decisions, called unit commitment.
  • 4. Distribution of load between units within a plant  Power plant consisting of several generating units which are constructed by investing huge amount of money. Fuel cost, staff salary, interest and depreciation charges and maintenance cost are some of the components of operating cost.  Fuel cost is the major portion of operating cost and it can be controlled. Therefore we shall consider the fuel cost alone for further considerations.  To get different output power, we need to vary the fuel input. Fuel input can be measured in tones/hr or millions of BTU(British Thermal Unit)/hr. Knowing the cost of the fuel, in terms of Rs/tone or Rs/Millions of BTU, input to the generating unit can be expressed as Rs/hr.  Let Ci Rs/h be the input cost to generate a power of Pi MW in unit i.  Fig.1 shows a typical input output curve of a generating unit. For each generating unit there shall be a minimum and maximum power generated as Pi,min and Pi,max.
  • 5.  If the input-output curve of Unit ‘I’ is quadratic , we can write  Where, Ci = Input cost, Pi – Output power in MW, α, β and ϒ are cost coefficient.
  • 6. Incremental cost curve  As we shall see the criterion for distribution of the load between any two units is based on whether increasing the generation of one unit, and decreasing the generation of other unit by the same amount results in an increase or decrease in total cost. This can be obtained if we can calculate the change in input cost ΔCi for a small change in power ΔPi.
  • 7.  Thus while deciding the optimal scheduling, we are concerned with dCi/dPi, Incremental cost (IC) which is determined by the slopes of the input-output curves. Thus the incremental cost curve is the plot of dCi/dPi versus Pi. The dimension of dCi/dPi is Rs/MWh. Incremental cost curve
  • 8.  The fig.2 shows that the incremental cost is quite linear with respect to power output over an appreciable range.  In analytical work, the curve is usually approximated by one or two straight lines.  The dashed line in the fig-2 is a good representation of the curve. Incremental cost curve
  • 9. Economic loading neglecting transmission losses  Consider a system having two generating units having costs C1 and C2
  • 10.  The above concept can be extended to a system with any number of units.  Thus optimum economy is achieved if every unit operates at the same cost.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16. Distribution of load between different plants  Since plants are generally long distance apart in an integrated system, it becomes essential to consider transmission losses in deciding the load allocation to different plants.  This leads to the dispatch of power in an economic way so as to make the overall cost to be the minimum.  Let there be ‘m’ no of plants in a system integrated by transmission line.  PG1, PG2..PGm - Generation output of the plants in MW  PD -Total load in MW  PL - Losses in transmission lines  Where, Cn – Fuel cost of nth plant in Rs/hr  PGn – output of nth plant in MW.
  • 17.  Our objective is to obtain a minimum cost for a fixed system load PD subject to the power balance constraint of equation (13).  We now present the procedure for solving such minimization problems called the method of Lagrange multipliers.  The new cost function C is formed by combining the total fuel cost and the equality constraint of equation(13) in the following manner.  The cost function C is often called the lagrangian, and we shall see that the parameter λ which we now call Lagrange multiplier is the effective incremental fuel cost of the system when transmission line losses are taken into account. C and λ are expressed in Rs/hr .
  • 18.  For minimum cost we require the derivative of C with respect to each PGn equal to zero  Since PD is fixed and the fuel cost of any one unit varies only if the power output of that unit is varied. Therefore equation (15) becomes  Because Cm depends on only PGn, the partial derivative of Cm can be replaced by the full derivative and equation (16) then gives
  • 19.  where Ln is called the penalty factor for plant n and is given by  Equation (17) is called the exact coordinate equation.  From equation (17),  So, minimum fuel cost is obtained when the incremental fuel cost of each plant multiplied by its penalty factor is the same for all the plants.
  • 20. Representation of transmission losses  The transmission losses depend on line currents and line resistances. It is possible to represent these losses as a function of plant loadings.  Let ra, rb, rc be the resistances of line a, b and c respectively. The transmission loss is,  Since, I1 and I2 are in same phase,  Let P1 and P2 be the power outputs and V1 and V2 be the bus voltage and cos Φ1 and cos Φ2 be the power factors of sources 1 and 2 respectively. Then
  • 21.  Substituting these values in transmission line equation we get,  Where, Representation of transmission losses
  • 22. The transmission loss equation:  To include the effect of transmission losses in deciding the load allocation, it is necessary to represent the loss as a function of plant loading. The general form of loss equation is  Where, PL – transmission losses in pu  P-plant loading in pu  B-Loss coefficient  For two generating source system
  • 23.  For a three generating source system’  The matrix representation of above loss equation is  Where for a total of k sources  Where, 𝑃𝑇 is the transposition of P. The B coefficients depend on the system network parameters, configuration, plant power factor and voltages etc. The transmission loss equation:
  • 24. Automatic load dispatching  Economic load dispatching is the distribution of the load among the generating units in such a manner so as to minimize the cost of supplying the minute to-minute requirements of the system.  In a large interconnected system it is humanly impossible to calculate and adjust such generations.  Hence, the help of digital computer system along with analogue devices is used.  The whole process is carried out automatically; hence this process is known as automatic load dispatching.
  • 25. Unit Commitment  The total load in the power system varies throughout the day and reaches different peak value from one day to another.  Different combination of generators are to be connected in the system to meet the varying load. When the load increases, the utility has to decide in advance the sequence in which the generator units are to be brought in.  Similarly when the load decreases, the operating engineer need to know in advance the sequence in which the generating units are to be shut down.  The problem of finding the order in which the units are to be shut down over a period of time (say one day), so the total operating cost involved on that day is minimum, is known as Unit Commitment(UC).  Thus UC problem is economic dispatch over a day. The period considered may be a week, a month or a year.
  • 26. Constraints on UC problem  Spinning reserve: There may be sudden increase in load, more than what was predicted. Further there may be a situation that one generating unit may have to be shut down because of fault in generator or any of its auxiliaries. Some system capacity has to be kept as spinning reserve  i) to meet an unexpected increase in demand and  ii) to ensure power supply in the event of any generating unit suffering a forced outage  Minimum up time: When a thermal unit is brought in, it cannot be turned off immediately. Once it is committed, it has to be in the system for a specified minimum up time.  Minimum down time: When a thermal unit is decommitted, it cannot be turned on immediately. It has to remain decommitted for a specified minimum down time.
  • 27.  Crew constraint: A plant always has two or more generating units. It may not be possible to turn on more than one generating unit at the same time due to non- availability of operating personnel.  Transition cost: Whenever the status of one unit is changed some transition cost is involved and this has to be taken into account.  Hydro constraints: Most of the systems have hydroelectric units also. The operation of hydro units, depend on the availability of water. Moreover, hydro projects are multipurpose projects. Irrigation requirements also determine the operation of hydro plants.  Nuclear constraint: If a nuclear plant is part of the system, another constraint is added. A nuclear plant has to be operated as a base load plant only.  Must run unit: Sometime it is a must to run one or two units from the consideration of voltage support and system stability.  Fuel supply constraint: Some plants cannot be operated due to deficient fuel supply.  Transmission line limitation: Reserve must be spread around the power system to avoid transmission system limitation, often called bottling of reserves. Constraints on UC problem
  • 28. Solving the unit commitment problem  The objective of unit commitment is not economical to run all the units available all the time.  To determine the units of plants that should operate for a particular load is the problem of unit commitment.  This problem is important for thermal power plant because the operating cost and start up time are high and hence their on-off status is important.  A simple approach to the problem is to impose priority ordering, wherein the most efficient unit is loaded first, and then followed by the less efficient units in order as the load increases.  Finding the most economical combination of units that can supply this load demand is to try all possible combination of units that can supply this load; to divide the load optimally among the units of each combination by use of the co-ordination equation, so as to find most economical operating cost of combination then to determine the combination which has the least operating cost among all these.  These combinations can be solved by dynamic programming method.
  • 29. Solution of unit commitment problem by Forward Dynamic Programming (FDP)  In FDP, we start with the first duration obtain the unit commitment schedule for this duration, go to second duration till we reach the last duration.  In FDP, the initial conditions are easily specified, calculation can be carried out for any desired length of time and the previous history of each unit can be calculated at every stage.  The operating cost for any stage needs method of economic dispatch. This is due to the fact that for any given combination of units, the operating cost is minimum if all the units in this combination are operating at equal incremental cost.  Two other variables enter the strategy for UC by Forward dynamic programming.  This is because a no of possible combinations exist for every state. Let this be denoted by K.  Another variable is the no. of paths or strategies to save at every step. Let this variable be denoted as L.
  • 30. Procedure  The stage in load cycle is specified as i. We start with i=1 i.e. first stage.  The operating cost for this stage is computed. This has to be repeated for all possible combination K.  We now go to (i+1)th stage.  The no. of feasible paths in duration (i-1) is found and stored.  The minimum total cost is calculated using the formula  This has to be repeated for all states in the ith interval.  The lowest cost paths (number L) are saved in computer memory.  Check whether the program has reached the last stage in load cycle. If yes optimal schedule is printed.  Otherwise i is uploaded to (i+1) and program is repeated.