SlideShare a Scribd company logo
1 of 3
Samuel C. Adams
I&E Tech/Electrician
1095 Greenwood Highway
Saluda SC 29138
864-980-4925
chadadams95@gmail.com
OBJECTIVE:
A positionasan Electrical Test/FieldEngineerorTechnical Procedure Writer
EXPERIENCE:
4/14 – Present I&E Supervisor Oconee Nuclear Station
Ensure Team isperformingworksafelyandwithhighquality.Reinforce stationanddepartment
standardsand expectations. Ensure teamhasthe correctqualificationsandskillstoperformthe jobat
hand.Constructability/Designreviews. Assistwithdevelopmentof Isolationplansforfieldwork.
Developmentof technical inputtoplannerwith engineeringinstructionforworkordertasks.Walkdown
modsfor pre and post modimplementationissues.Review workorders,toensure effectiveness,for
workbeingperformedbyTNs.Have extensive knowledge of site directives,electrical proceduresand
site specifications.Reporttoengineers,asfound,fieldconditionsandpropose workaroundoptionswith
designchanges.Reviewengineeringdesignchangestoensure compliance withplantproceduresand
specsfor implementation.Reviewproceduresandworkordersforcompletionof the task.
12/13 – 3/14 I&E Tech/Lead Electrician McGuire Nuclear Station
Installed,terminated,andtested new BeckHoff I/Osystemforcontrol room simulatormodification.
Builtnewhydrogenigniterboxeswhich includeinstallingterminal stripsandinternalwiring.Prepared
boxestobe installedbyknockingoutholesforconduits.Removedexistingboxesandinstalledthe new
hydrogenigniterboxes. MeetwithManagement/Engineeringtoensure technical procedures and
electrical drawingscanbe implementedaswritten.Responsible forputtingtogetherElectrical work
packagesand ensuringproperfieldimplementation.
11/12 – 11/13 Lead Testing/I&E Tech Oconee Nuclear Station
Installed,terminated,andtestedlockout,interposing, andovercurrentrelaysincontrol boardsand
othervariousequipmentthroughoutthe plant. Installed,terminated,andtestedpotential andcurrent
transformers.Performedtroubleshootingoncircuits whentestingfailed. Engineeredandbuiltmock-
upsfor testingscenarios. MeetwithManagement/Engineeringtoensure technicalproceduresand
electrical drawingscanbe implementedaswritten.Responsible forputtingtogetherElectrical work
packagesand ensuringproperfieldimplementation.
08/12 -11/12 Lead Testing/I&E Tech McGuire Nuclear Station
Installed,terminated,andtestedlockoutrelays,andselectorswitchesinunitandcontrol boards.
Installed, terminated,andtestedtemperatureelementsandflow meters.Performedpm’sonMOV’s.
MeetwithManagement/Engineeringtoensure technical proceduresandelectrical drawingscanbe
implementedaswritten.ResponsibleforputtingtogetherElectrical workpackagesandensuringproper
fieldimplementation.
11/09 – 08/12 I&E Tech/Lead Electrician Oconee Nuclear Station
Installed cable trays, pulled cables, terminated control cabinets, lighting panels, switches, and
lights in control room panel board, MCC’s, 13.8/4160 switch gear. Medium voltage zero energy
checks. Removed/Installed molded case breakers, fuses, and fuse blocks. Performed
troubleshooting for 13.8/4160 switch gear and AC/DC control power. Meet with
Management/Engineering to ensure technical procedures and electrical drawings can be
implemented as written. Responsible for putting together Electrical work packages and ensuring
proper field implementation.
10/09 – 11/09 I&C/Breaker Tech VC Summer Nuclear Station
De-terminated/terminated generator and penetration cables, PM’s on breakers and valves.
Medium voltage zero energy checks. Racked in and out medium voltage breakers. Bench tested
molded case breakers and over/under voltage relays, field tested trip switches and lock-out
relays, installed battery’s, connection bars, and cables for dc battery back-ups.
07/08 – 01/09 I&E Tech/Lead Electrician MMR Group
Installed Bruckner cabinets, square d motor control centers, transformers, disconnects, and
lighting panels. Installed cable tray six to twenty four inch, and conduit ¾ to three inches.
Terminated Bruckner cabinets, square d motor control centers, transformers, disconnects, and
lightning panels. Assisted workers when foreman was not available. Meet with
Management/Engineering to ensure technical procedures and electrical drawings can be
implemented as written. Responsible for putting together Electrical work packages and ensuring
proper field implementation.
09/05 – 07/08 I&C Tech/Electrician Carolina Eastman
Installed cable tray six to twenty four inch, conduit ¾ to four inches, stainless steel and titanium
tubing ¼ to ½ inch. Installed Allen Bradley and square d motor control centers, transformers,
disconnects, inverters, lighting panels, and Rosemont instruments. Pulled wire number eighteen
to five hundred mcm. Terminated Allen Bradley and square d motor control centers,
transformers, disconnects inventers, lighting panels, and Rosemont instruments.
09/03 – 09/05 I&E Tech/Electrician Fincher Electric/ Dayco
Installed square d motor control centers, disconnects, lighting panels, and Allen Bradley
inverters. Installed conduit ¾ inch to four inch. Replace motors five to one hundred horse power.
Terminated motor control centers disconnects, lighting panels, and inverters.
08/03 – 09/03 I&E Tech/Electrician Austin/ PCS Nitrogen
Repair and replace conduit, and tubing of all sizes. Remove, replace, terminate, and calibrate
Rosemount instruments. Terminate motors, inverters, motor control centers, and control cabinets.
12/00 – 08/03 Electrician/I&C Tech Fincher Electric/
Meherrin Agriculture and Chem
Install conduit ¾ inch to three inch, remove and replace motors five to fifty horse power, install
motor control centers, and lighting panels, repair/replace lights, and terminate motor control
centers, lighting panels, inverters and PLC’s.
PROJECT EXPERIENCE:
SCO Transformation
Vital I&C cable re-route
Keowee Emergency start
HPI
Pressurizer Heater Breaker Replacement
PSW
SUMMARY:
Over eighteen years’ experience working as an I&C Technician/Electrician, with over six years’
experience working in the Nuclear industry, and twelve years in the maintenance and industrial
industry. Proficient at bending and installing conduit and tubing of all sizes, pulling wire of all
sizes, terminating control cabinets, motor control centers, PLC’s, etc., calibrating and testing
transmitters, relays, and transformers, reading blueprints, and wiring diagrams.
REFERENCES:
Tommy Partain (864) 873-4136
Josh Fenten (864) 873-2944
Scott Sutherland (864) 873-6173
Trent Allen Lee (864) 270-8200 (mobile)
Michael F. Fogarty (864) 449-2853 (mobile)

More Related Content

What's hot

DARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resumeDARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resumeDarius Angeles
 
BALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEBALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEAnil Kumar
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkJoshua Clark
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERAMIT BISWAS
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1Kiran Sasi
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companiesbala madhu
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
CV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_ForemanCV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_Foremansyed meraj
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerjohn britto
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gasvineeth ravi
 
Resume of suvendu senapati
Resume of suvendu senapatiResume of suvendu senapati
Resume of suvendu senapatiSuvendu Senapati
 

What's hot (20)

Cover letter
Cover letterCover letter
Cover letter
 
DARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resumeDARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resume
 
Ravishankar-CV
Ravishankar-CVRavishankar-CV
Ravishankar-CV
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
BALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEBALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUME
 
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua Clark
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_India
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Resume
ResumeResume
Resume
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companies
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
CV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_ForemanCV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_Foreman
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineer
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
 
Resume of suvendu senapati
Resume of suvendu senapatiResume of suvendu senapati
Resume of suvendu senapati
 

Viewers also liked

CV Bhupendra updated 08.2015
CV Bhupendra updated 08.2015CV Bhupendra updated 08.2015
CV Bhupendra updated 08.2015BHUPENDRA SHARMA
 
JKoch res v2 - generic
JKoch res v2 - genericJKoch res v2 - generic
JKoch res v2 - genericJeffrey Koch
 
Mari otiniano ascue p
Mari otiniano ascue pMari otiniano ascue p
Mari otiniano ascue pMarivel7
 
CV Sassi_Zied VA
CV Sassi_Zied VACV Sassi_Zied VA
CV Sassi_Zied VAZied Sassi
 
Healtho5 Introductory deck for Investors
Healtho5 Introductory deck for InvestorsHealtho5 Introductory deck for Investors
Healtho5 Introductory deck for InvestorsHealtho5 Solutions
 
用深情相陪到最後
用深情相陪到最後用深情相陪到最後
用深情相陪到最後健興 郭
 
promotie big data in urban technology
promotie big data in urban technologypromotie big data in urban technology
promotie big data in urban technologyJurjen Helmus
 
толвики
толвикитолвики
толвикиLudmilaO
 
2016 bonfiglio tax group
2016 bonfiglio tax group2016 bonfiglio tax group
2016 bonfiglio tax groupBrahim Lagueb
 
толвики
толвикитолвики
толвикиLudmilaO
 
Marketing strategy
Marketing strategyMarketing strategy
Marketing strategyShoonnaa
 
DRAFT PERBAIKAN KOMPETENSI DASAR PPKN DARI SD SAMPAI SENGAN SMA
 DRAFT PERBAIKAN KOMPETENSI DASAR PPKN DARI SD SAMPAI SENGAN SMA DRAFT PERBAIKAN KOMPETENSI DASAR PPKN DARI SD SAMPAI SENGAN SMA
DRAFT PERBAIKAN KOMPETENSI DASAR PPKN DARI SD SAMPAI SENGAN SMAIWAN SUKMA NURICHT
 

Viewers also liked (20)

d
dd
d
 
CV Bhupendra updated 08.2015
CV Bhupendra updated 08.2015CV Bhupendra updated 08.2015
CV Bhupendra updated 08.2015
 
sol resume
sol resumesol resume
sol resume
 
JKoch res v2 - generic
JKoch res v2 - genericJKoch res v2 - generic
JKoch res v2 - generic
 
Mari otiniano ascue p
Mari otiniano ascue pMari otiniano ascue p
Mari otiniano ascue p
 
วิธีจอง
วิธีจองวิธีจอง
วิธีจอง
 
CV Sassi_Zied VA
CV Sassi_Zied VACV Sassi_Zied VA
CV Sassi_Zied VA
 
QUALIFICATIONS
QUALIFICATIONSQUALIFICATIONS
QUALIFICATIONS
 
Healtho5 Introductory deck for Investors
Healtho5 Introductory deck for InvestorsHealtho5 Introductory deck for Investors
Healtho5 Introductory deck for Investors
 
用深情相陪到最後
用深情相陪到最後用深情相陪到最後
用深情相陪到最後
 
promotie big data in urban technology
promotie big data in urban technologypromotie big data in urban technology
promotie big data in urban technology
 
толвики
толвикитолвики
толвики
 
2016 bonfiglio tax group
2016 bonfiglio tax group2016 bonfiglio tax group
2016 bonfiglio tax group
 
La UX come semi-cosa
La UX come semi-cosaLa UX come semi-cosa
La UX come semi-cosa
 
толвики
толвикитолвики
толвики
 
Marketing strategy
Marketing strategyMarketing strategy
Marketing strategy
 
Nakajime kc038tokyo
Nakajime kc038tokyoNakajime kc038tokyo
Nakajime kc038tokyo
 
Dalla fa d
Dalla fa dDalla fa d
Dalla fa d
 
DRAFT PERBAIKAN KOMPETENSI DASAR PPKN DARI SD SAMPAI SENGAN SMA
 DRAFT PERBAIKAN KOMPETENSI DASAR PPKN DARI SD SAMPAI SENGAN SMA DRAFT PERBAIKAN KOMPETENSI DASAR PPKN DARI SD SAMPAI SENGAN SMA
DRAFT PERBAIKAN KOMPETENSI DASAR PPKN DARI SD SAMPAI SENGAN SMA
 
Letture 29 gennaio 2012
Letture 29 gennaio 2012Letture 29 gennaio 2012
Letture 29 gennaio 2012
 

Similar to Samuel C. Adams I&E Tech Resume

Similar to Samuel C. Adams I&E Tech Resume (20)

Elmer Lainez
Elmer LainezElmer Lainez
Elmer Lainez
 
A. A attch file industrial Electrician (good one)
A. A  attch file industrial Electrician (good one)A. A  attch file industrial Electrician (good one)
A. A attch file industrial Electrician (good one)
 
Ali-Ahmad Resume
Ali-Ahmad ResumeAli-Ahmad Resume
Ali-Ahmad Resume
 
Kenneth Ward Resume AA2
Kenneth Ward Resume AA2Kenneth Ward Resume AA2
Kenneth Ward Resume AA2
 
Russell bruce cv 2016.
Russell bruce cv 2016.Russell bruce cv 2016.
Russell bruce cv 2016.
 
electrician
electricianelectrician
electrician
 
ZISHAN
ZISHANZISHAN
ZISHAN
 
SEKHER
SEKHERSEKHER
SEKHER
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
Alvin Dennis Resume 8-24-14
Alvin Dennis Resume 8-24-14Alvin Dennis Resume 8-24-14
Alvin Dennis Resume 8-24-14
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resume
 
Paulpandy CV.
Paulpandy  CV.Paulpandy  CV.
Paulpandy CV.
 
Jose_resume 1
Jose_resume 1Jose_resume 1
Jose_resume 1
 
Clement Mensah 13
Clement Mensah 13Clement Mensah 13
Clement Mensah 13
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh Resume 1
Blair Mcintosh Resume 1
 
sai resume new
sai resume newsai resume new
sai resume new
 

Samuel C. Adams I&E Tech Resume

  • 1. Samuel C. Adams I&E Tech/Electrician 1095 Greenwood Highway Saluda SC 29138 864-980-4925 chadadams95@gmail.com OBJECTIVE: A positionasan Electrical Test/FieldEngineerorTechnical Procedure Writer EXPERIENCE: 4/14 – Present I&E Supervisor Oconee Nuclear Station Ensure Team isperformingworksafelyandwithhighquality.Reinforce stationanddepartment standardsand expectations. Ensure teamhasthe correctqualificationsandskillstoperformthe jobat hand.Constructability/Designreviews. Assistwithdevelopmentof Isolationplansforfieldwork. Developmentof technical inputtoplannerwith engineeringinstructionforworkordertasks.Walkdown modsfor pre and post modimplementationissues.Review workorders,toensure effectiveness,for workbeingperformedbyTNs.Have extensive knowledge of site directives,electrical proceduresand site specifications.Reporttoengineers,asfound,fieldconditionsandpropose workaroundoptionswith designchanges.Reviewengineeringdesignchangestoensure compliance withplantproceduresand specsfor implementation.Reviewproceduresandworkordersforcompletionof the task. 12/13 – 3/14 I&E Tech/Lead Electrician McGuire Nuclear Station Installed,terminated,andtested new BeckHoff I/Osystemforcontrol room simulatormodification. Builtnewhydrogenigniterboxeswhich includeinstallingterminal stripsandinternalwiring.Prepared boxestobe installedbyknockingoutholesforconduits.Removedexistingboxesandinstalledthe new hydrogenigniterboxes. MeetwithManagement/Engineeringtoensure technical procedures and electrical drawingscanbe implementedaswritten.Responsible forputtingtogetherElectrical work packagesand ensuringproperfieldimplementation. 11/12 – 11/13 Lead Testing/I&E Tech Oconee Nuclear Station Installed,terminated,andtestedlockout,interposing, andovercurrentrelaysincontrol boardsand othervariousequipmentthroughoutthe plant. Installed,terminated,andtestedpotential andcurrent transformers.Performedtroubleshootingoncircuits whentestingfailed. Engineeredandbuiltmock- upsfor testingscenarios. MeetwithManagement/Engineeringtoensure technicalproceduresand electrical drawingscanbe implementedaswritten.Responsible forputtingtogetherElectrical work packagesand ensuringproperfieldimplementation. 08/12 -11/12 Lead Testing/I&E Tech McGuire Nuclear Station Installed,terminated,andtestedlockoutrelays,andselectorswitchesinunitandcontrol boards. Installed, terminated,andtestedtemperatureelementsandflow meters.Performedpm’sonMOV’s. MeetwithManagement/Engineeringtoensure technical proceduresandelectrical drawingscanbe implementedaswritten.ResponsibleforputtingtogetherElectrical workpackagesandensuringproper fieldimplementation. 11/09 – 08/12 I&E Tech/Lead Electrician Oconee Nuclear Station
  • 2. Installed cable trays, pulled cables, terminated control cabinets, lighting panels, switches, and lights in control room panel board, MCC’s, 13.8/4160 switch gear. Medium voltage zero energy checks. Removed/Installed molded case breakers, fuses, and fuse blocks. Performed troubleshooting for 13.8/4160 switch gear and AC/DC control power. Meet with Management/Engineering to ensure technical procedures and electrical drawings can be implemented as written. Responsible for putting together Electrical work packages and ensuring proper field implementation. 10/09 – 11/09 I&C/Breaker Tech VC Summer Nuclear Station De-terminated/terminated generator and penetration cables, PM’s on breakers and valves. Medium voltage zero energy checks. Racked in and out medium voltage breakers. Bench tested molded case breakers and over/under voltage relays, field tested trip switches and lock-out relays, installed battery’s, connection bars, and cables for dc battery back-ups. 07/08 – 01/09 I&E Tech/Lead Electrician MMR Group Installed Bruckner cabinets, square d motor control centers, transformers, disconnects, and lighting panels. Installed cable tray six to twenty four inch, and conduit ¾ to three inches. Terminated Bruckner cabinets, square d motor control centers, transformers, disconnects, and lightning panels. Assisted workers when foreman was not available. Meet with Management/Engineering to ensure technical procedures and electrical drawings can be implemented as written. Responsible for putting together Electrical work packages and ensuring proper field implementation. 09/05 – 07/08 I&C Tech/Electrician Carolina Eastman Installed cable tray six to twenty four inch, conduit ¾ to four inches, stainless steel and titanium tubing ¼ to ½ inch. Installed Allen Bradley and square d motor control centers, transformers, disconnects, inverters, lighting panels, and Rosemont instruments. Pulled wire number eighteen to five hundred mcm. Terminated Allen Bradley and square d motor control centers, transformers, disconnects inventers, lighting panels, and Rosemont instruments. 09/03 – 09/05 I&E Tech/Electrician Fincher Electric/ Dayco Installed square d motor control centers, disconnects, lighting panels, and Allen Bradley inverters. Installed conduit ¾ inch to four inch. Replace motors five to one hundred horse power. Terminated motor control centers disconnects, lighting panels, and inverters. 08/03 – 09/03 I&E Tech/Electrician Austin/ PCS Nitrogen Repair and replace conduit, and tubing of all sizes. Remove, replace, terminate, and calibrate Rosemount instruments. Terminate motors, inverters, motor control centers, and control cabinets. 12/00 – 08/03 Electrician/I&C Tech Fincher Electric/ Meherrin Agriculture and Chem Install conduit ¾ inch to three inch, remove and replace motors five to fifty horse power, install motor control centers, and lighting panels, repair/replace lights, and terminate motor control centers, lighting panels, inverters and PLC’s.
  • 3. PROJECT EXPERIENCE: SCO Transformation Vital I&C cable re-route Keowee Emergency start HPI Pressurizer Heater Breaker Replacement PSW SUMMARY: Over eighteen years’ experience working as an I&C Technician/Electrician, with over six years’ experience working in the Nuclear industry, and twelve years in the maintenance and industrial industry. Proficient at bending and installing conduit and tubing of all sizes, pulling wire of all sizes, terminating control cabinets, motor control centers, PLC’s, etc., calibrating and testing transmitters, relays, and transformers, reading blueprints, and wiring diagrams. REFERENCES: Tommy Partain (864) 873-4136 Josh Fenten (864) 873-2944 Scott Sutherland (864) 873-6173 Trent Allen Lee (864) 270-8200 (mobile) Michael F. Fogarty (864) 449-2853 (mobile)