1. Samuel C. Adams
I&E Tech/Electrician
1095 Greenwood Highway
Saluda SC 29138
864-980-4925
chadadams95@gmail.com
OBJECTIVE:
A positionasan Electrical Test/FieldEngineerorTechnical Procedure Writer
EXPERIENCE:
4/14 – Present I&E Supervisor Oconee Nuclear Station
Ensure Team isperformingworksafelyandwithhighquality.Reinforce stationanddepartment
standardsand expectations. Ensure teamhasthe correctqualificationsandskillstoperformthe jobat
hand.Constructability/Designreviews. Assistwithdevelopmentof Isolationplansforfieldwork.
Developmentof technical inputtoplannerwith engineeringinstructionforworkordertasks.Walkdown
modsfor pre and post modimplementationissues.Review workorders,toensure effectiveness,for
workbeingperformedbyTNs.Have extensive knowledge of site directives,electrical proceduresand
site specifications.Reporttoengineers,asfound,fieldconditionsandpropose workaroundoptionswith
designchanges.Reviewengineeringdesignchangestoensure compliance withplantproceduresand
specsfor implementation.Reviewproceduresandworkordersforcompletionof the task.
12/13 – 3/14 I&E Tech/Lead Electrician McGuire Nuclear Station
Installed,terminated,andtested new BeckHoff I/Osystemforcontrol room simulatormodification.
Builtnewhydrogenigniterboxeswhich includeinstallingterminal stripsandinternalwiring.Prepared
boxestobe installedbyknockingoutholesforconduits.Removedexistingboxesandinstalledthe new
hydrogenigniterboxes. MeetwithManagement/Engineeringtoensure technical procedures and
electrical drawingscanbe implementedaswritten.Responsible forputtingtogetherElectrical work
packagesand ensuringproperfieldimplementation.
11/12 – 11/13 Lead Testing/I&E Tech Oconee Nuclear Station
Installed,terminated,andtestedlockout,interposing, andovercurrentrelaysincontrol boardsand
othervariousequipmentthroughoutthe plant. Installed,terminated,andtestedpotential andcurrent
transformers.Performedtroubleshootingoncircuits whentestingfailed. Engineeredandbuiltmock-
upsfor testingscenarios. MeetwithManagement/Engineeringtoensure technicalproceduresand
electrical drawingscanbe implementedaswritten.Responsible forputtingtogetherElectrical work
packagesand ensuringproperfieldimplementation.
08/12 -11/12 Lead Testing/I&E Tech McGuire Nuclear Station
Installed,terminated,andtestedlockoutrelays,andselectorswitchesinunitandcontrol boards.
Installed, terminated,andtestedtemperatureelementsandflow meters.Performedpm’sonMOV’s.
MeetwithManagement/Engineeringtoensure technical proceduresandelectrical drawingscanbe
implementedaswritten.ResponsibleforputtingtogetherElectrical workpackagesandensuringproper
fieldimplementation.
11/09 – 08/12 I&E Tech/Lead Electrician Oconee Nuclear Station
2. Installed cable trays, pulled cables, terminated control cabinets, lighting panels, switches, and
lights in control room panel board, MCC’s, 13.8/4160 switch gear. Medium voltage zero energy
checks. Removed/Installed molded case breakers, fuses, and fuse blocks. Performed
troubleshooting for 13.8/4160 switch gear and AC/DC control power. Meet with
Management/Engineering to ensure technical procedures and electrical drawings can be
implemented as written. Responsible for putting together Electrical work packages and ensuring
proper field implementation.
10/09 – 11/09 I&C/Breaker Tech VC Summer Nuclear Station
De-terminated/terminated generator and penetration cables, PM’s on breakers and valves.
Medium voltage zero energy checks. Racked in and out medium voltage breakers. Bench tested
molded case breakers and over/under voltage relays, field tested trip switches and lock-out
relays, installed battery’s, connection bars, and cables for dc battery back-ups.
07/08 – 01/09 I&E Tech/Lead Electrician MMR Group
Installed Bruckner cabinets, square d motor control centers, transformers, disconnects, and
lighting panels. Installed cable tray six to twenty four inch, and conduit ¾ to three inches.
Terminated Bruckner cabinets, square d motor control centers, transformers, disconnects, and
lightning panels. Assisted workers when foreman was not available. Meet with
Management/Engineering to ensure technical procedures and electrical drawings can be
implemented as written. Responsible for putting together Electrical work packages and ensuring
proper field implementation.
09/05 – 07/08 I&C Tech/Electrician Carolina Eastman
Installed cable tray six to twenty four inch, conduit ¾ to four inches, stainless steel and titanium
tubing ¼ to ½ inch. Installed Allen Bradley and square d motor control centers, transformers,
disconnects, inverters, lighting panels, and Rosemont instruments. Pulled wire number eighteen
to five hundred mcm. Terminated Allen Bradley and square d motor control centers,
transformers, disconnects inventers, lighting panels, and Rosemont instruments.
09/03 – 09/05 I&E Tech/Electrician Fincher Electric/ Dayco
Installed square d motor control centers, disconnects, lighting panels, and Allen Bradley
inverters. Installed conduit ¾ inch to four inch. Replace motors five to one hundred horse power.
Terminated motor control centers disconnects, lighting panels, and inverters.
08/03 – 09/03 I&E Tech/Electrician Austin/ PCS Nitrogen
Repair and replace conduit, and tubing of all sizes. Remove, replace, terminate, and calibrate
Rosemount instruments. Terminate motors, inverters, motor control centers, and control cabinets.
12/00 – 08/03 Electrician/I&C Tech Fincher Electric/
Meherrin Agriculture and Chem
Install conduit ¾ inch to three inch, remove and replace motors five to fifty horse power, install
motor control centers, and lighting panels, repair/replace lights, and terminate motor control
centers, lighting panels, inverters and PLC’s.
3. PROJECT EXPERIENCE:
SCO Transformation
Vital I&C cable re-route
Keowee Emergency start
HPI
Pressurizer Heater Breaker Replacement
PSW
SUMMARY:
Over eighteen years’ experience working as an I&C Technician/Electrician, with over six years’
experience working in the Nuclear industry, and twelve years in the maintenance and industrial
industry. Proficient at bending and installing conduit and tubing of all sizes, pulling wire of all
sizes, terminating control cabinets, motor control centers, PLC’s, etc., calibrating and testing
transmitters, relays, and transformers, reading blueprints, and wiring diagrams.
REFERENCES:
Tommy Partain (864) 873-4136
Josh Fenten (864) 873-2944
Scott Sutherland (864) 873-6173
Trent Allen Lee (864) 270-8200 (mobile)
Michael F. Fogarty (864) 449-2853 (mobile)