1. Production Log
Title of piece: Cabin
Group members: Sam Allen, Danny King, Luke Wrate
Time
Date
Event
10/10/2013 Today we decided that we will be shooting the idea for Cabin soon
because of all of us having a free schedule on the friday 14th
however in order for us to get prepared for this date will have to
complete the costume and props, character profiles, site analysis,
shooting script and then get the camera and tripod from the school,
because of Danny having a tripod and camera we only need to
acquire one from the school. We have also casted the two actors in
the opening also, this is also why we would prefer to film on this
day as our actors have a tight schedule and they are perfect for the
roles.
Future Action
Create shooting script
Create props and
costume
Create character
profiles
Do site analysis
Acquire equipment
from school
Person responsible
Sam will do the shooting
script and site analysis
Luke will do the props and
costume and get the
equipment from school
Danny will do the
character profiles and set
up his camera and tripod
ready to go