2. Revised Specifications
CDOT standard specifications revised fall 2019
Onboarding, graphic design, and CoTrip audit tasks expanded or added
CDOT Design Engineers and Mgmt team discussed PIM should be 1% of project value
Compensation method changed from lump sum to daily rate
3. CDOT Project Bid Tab Results
December 2019 – Dec 2020
111 projects, total project values:
27 under 1 Million
58 between $ 1-5 Million
16 between $ 5-10 Million
10 over $10 Million
4. $3.9 million left on the table
Total Project Value/Cost = $ 507,659,140
1% = $ 5.07 million
Actual PIM Amounts Bid = $ 1.16 million
PIM’s have left over $3.9 million on the table.
5. What is PIM worth?
1%
Facilitating
Public
Meetings
Writing Press
Releases
Keeping
Web Page
Updated
Distributing
Traffic
Advisories
Stakeholder
Mgmt
Organizing
Mailings
6. Public Information Bid Results
PIM bid results of 111 CDOT projects compared to 1% of project cost:
Above 1% = 12
.9 - 1% project value = 5
.7% - .8% project value = 17
.4% - .5% project value = 24
.2% - 3% project value = 27
0 - .1% project value = 24
Number of PIM bids less that 1% of the project valuation = 96, (%86.4)
7. PIM Bid vs. 1% Project Value
$-
$100.00
$200.00
$300.00
$400.00
$500.00
$600.00
$700.00
$800.00
$900.00
$1,000.00
STM
067A-040
CC
080-038
FSA
C010-124
STM
R200-249
BR
101A-004
IM
025A-048
STM
M086-083
NHPP
R100-303
NHPP1602-172
BR025A-046
SHE
R400-373
CC080-037
C
R100-288
SHE094A-035
C
088A-036
STR196A-001
SHE
016A-043
SHE0881-031
NHPP1601-077
MTCER400-378
STA0241-065
STRR300-249
STA0504-905
FBR0343-042
MTCE
R200-265
BR0343-040
&
FBR0343-043
NHPP0502-082
ER0361-118
C
0741-020
STR330A-002
STA059A-036
STR141A-044
NH
0503-093
STR116A-001
CC0852-106
FBR0852-108
STA0703-443
ITS
070A-033
STR092A-030
PI Project Actual Bid Amount vs 1% of Project Value
Winning Bid Unit Price 1% of Project Value Per Day
8. PIM Bid vs. the Engineer Estimate
Number of PI bids equal to or above CDOT Engineers estimate = 31
Number of PI bids below the CDOT Engineers estimate = 80
72% of the time, PIM bids are below the CDOT engineers estimate
9. PIM Bid Prices lower than
Engineers Estimate
$-
$100.00
$200.00
$300.00
$400.00
$500.00
$600.00
C
0853-112
BR025A-046
ITS
SW02-304
C
R100-288
BR
101A-004
ITS
SW02-303
IM0252-473
BR
2871-036
FBR0761-232
SHE
0703-461
FBR0343-042
STM
M086-083
HPP
0501-067
SHE
R100-345
C
0741-020
SHE0881-031
SHE
072A-046
STR330A-002
SFTY2254-091
MTCE
R200-265
NHPP0881-030
NHPP0502-082
STA006A-067
STA0831-120
C0641-106
NHPP145A-080
STR2871-038
STA0703-443
STA0241-065
STAR100-265
STR092A-030
FSA0253-258
NH
0503-093
NHPP1602-169
PWQM240-172
STR0341-101
ER0361-118
STR116A-001
STA059A-036
STR141A-044
IM0761-226
Engineers Estimate Vs. Bid Price
Engineer Est. Unit Price Winning Bid Unit Price
11. Bid Results for the BEEs
Project Name Tier
Total
Project
Amount
Value
Days
Engineer Est.
Unit Price
Winning
Bid Unit
Price
Contractor
STR 184A-006 IV $497,913.75 68 $80.00 $50.00 American West
NH 0504-908 IV $570,845.95 120 $70.00 $45.95 Tezak
CC 080-038 IV $745,000.00 152 $120.00 $25.00 KSK
NHPP R100-282 IV $801,268.00 74 $80.00 $47.00 Insituform Technologies
NHPP1601-077 IV $1,303,347.00 83 $72.00 $40.00 Intermountain Slurry
C 145A-077 IV $1,356,173.00 180 $80.00 $33.00 Old Castle
STR M331-008 IV $1,394,503.00 287 $90.00 $40.00 Western Gravel
BR025A-046 III $2,071,985.91 195 $80.00 $45.51 Tezak
BR 101A-004 IV $2,200,000.00 322 $110.00 $35.00 Labato
BR 2871-036 III $2,348,413.60 234 $65.00 $45.00 Myers & Sons
HPP 0501-067 III $2,761,591.15 150 $120.00 $34.00 Mtn Valley
C 133A-049 III $2,799,915.00 270 $110.00 $41.00 GeoVert LLC
STR 330A-002 IV $3,216,440.00 84 $143.00 $41.00 Old Castle
SFTY2254-091 III $3,226,884.00 67 $225.00 $64.00 ABCO
NHPP0502-082 IV $3,758,750.22 120 $60.00 $35.00 Old Castle
ITS ITSB-003 IV $3,935,021.00 90 $175.00 $50.00 PAONIA
C0641-106 III $4,422,918.00 166 $80.00 $50.00 Old Castle
NHPP145A-080 IV $4,469,722.20 131 $80.00 $49.00 Old Castle
NHPP 1602-168 IV $7,992,798.00 290 $65.00 $26.00 Main
STR116A-001 IV $9,600,000.00 169 $75.00 $41.00 A&S
STR141A-044 IV $11,566,766.00 270 $80.00 $29.00 Old Castle
12. Ideas for Solutions
Writing letter to CDOT Suggest the CDOT Regional COM manager review
resume/qualifications
Change the spec from daily plus, an upfront mobilization.
Conduct surveys of CDOT Engineers/Regional COM on satisfaction of the PIM
Education of all PI firms – Develop and offer certification of completion for CDOT PIM
Create awards for campaigns that are creative, PI that is done well
Write/approach to the contractors that are accepting such low bids about accepting low rates –
living wages