SlideShare a Scribd company logo
1 of 1
Download to read offline
T239
100m
T115
T115
50
T208-L
T11550
NEWROAD
LAYOUTAHEAD
80
T113
T113
T113
T301
T301
T301
T300
T302
R108-L
R108-L
T115
50
100m
R214
T200
P900
120
80
T115
T117
50
T115
50
NEWROAD
LAYOUTAHEAD
80
200m
400m
T117
80
T115
80
T200
MAIN CONTRACTOR:
PROJECT MANAGER (SIGNATURE AND CONTACT ADDRESS)
MINISTRY OF INTERIOR
HEAD OF PLANNING, SAFETY AND RADARS DIVISION (SIGNATURE)
TRAFFIC & PATROL DEPARTMENT
LOCATION PLAN
WAKRAH BYPASS ROAD EXW- P015
PROJECT CODE : P 015
CHECKED
DATE
DWG. NO.
DESIGNED
TITLE
DD APPROVAL
SCALE
STATUS
PROJECT
LOGO OR OFFICIAL STAMPASHGHAL TDP APPROVER LOGO OR OFFICIAL STAMP
APPROVER (SIGNATURE)
ASHGHAL TDP REVIEWER LOGO OR OFFICIAL STAMP
REVIEWER (SIGNATURE)
PROJECT MANAGEMENT CONSULTANT: LOGO OR OFFICIAL STAMP
REVIEWER (SIGNATURE AND STAMP)
GENERAL ENGINEERING CONSULTANT: LOGO OR OFFICIAL STAMP
PROJECT MANAGER (SIGNATURE AND CONTACT ADDRESS)
LOGO OR OFFICIAL STAMP
TRAFFIC DIVERSION PLAN APPROVALS GROUP COMMENTS
TRAFFIC POLICE DEPARTMENT COMMENTS
NOTES:
-CONCRETE BARRIER WITH FLASHING
LEGEND:
-SIGN POST / A FRAME
-TRAFFIC SIGN AND REFERENCE
BEACON AND REFLECTIVE TAPE
-PLASTIC WATER FILLED BARRICADE
@A1
REV. NO.
INFRASTRUCTURE AFFAIRS
PUBLIC WORKS AUTHORITY
P.O. BOX 22188
TEL: 44950055
FAX: 44950441
Client:
AM
TM
REV DATE DESCRIPTION
NUMBER
N
-WORK ZONE
TDP Designer:
LARSEN & TOUBRO LTD.
LOCATION
13/12/2015 AS SHOWN
N
See TDP Documents
CA
CA ISSUED FOR APPROVAL13/12/2015
SCALE 1:1000
-EXISTING ROAD
-PROPOSED DIVERSION
CONTINUEDONEXW-P015-0000-TM-LNT-SK-00002-010
MATCHLINE"B"
MATCHLINE"C"
MATCHLINE"C"MATCHLINE"D"
MATCHLINE"D"
SCALE 1:1000
N
N
SCALE 1:1000
SCALE 1:1000
N
Existing Mesaieed Road
Proposed Diversion
Existing Mesaieed Road
Existing Mesaieed Road
Existing Mesaieed Road
MATCHLINE"B"
EXW-P015-0000-TM-LNT-SK-00002-011
TRAFFIC DIVERSION PLAN
PHASE 1 - STATIC WORKS
DURATION OF TRAFFIC DIVERSION WORKS
Static Works
START DATE: 10.01.2016
COMPLETION DATE: 21.04.2016
DESCRIPTION OF WORKS:
Static traffic diversion along Mesaieed road at
junction IC12 to create workzone to facilitate the
construction of the Wakra Bypass.
WZTMG LAYOUT NO: - TL-DC 12 (Modified)

More Related Content

Viewers also liked

Tabel penghitung biaya fungsi tata air dalam amdal
Tabel penghitung biaya fungsi tata air dalam amdalTabel penghitung biaya fungsi tata air dalam amdal
Tabel penghitung biaya fungsi tata air dalam amdalhelmut simamora
 
Jornal de Piracicaba 18/10
Jornal de Piracicaba 18/10Jornal de Piracicaba 18/10
Jornal de Piracicaba 18/10Florespi
 
El Índice de Confianza del Consumidor a nivel nacional cae 4,6% respecto a oc...
El Índice de Confianza del Consumidor a nivel nacional cae 4,6% respecto a oc...El Índice de Confianza del Consumidor a nivel nacional cae 4,6% respecto a oc...
El Índice de Confianza del Consumidor a nivel nacional cae 4,6% respecto a oc...Eduardo Nelson German
 
досвід ткач м.в.
досвід ткач м.в.досвід ткач м.в.
досвід ткач м.в.Sergiy5225
 
портфоліо
портфоліопортфоліо
портфоліоSergiy5225
 
Cantero Letter of Rec
Cantero Letter of RecCantero Letter of Rec
Cantero Letter of RecJamie Cantero
 
Food Safety Risks Management in Vietnam: CHALLENGES AND PRIORITIES
Food Safety Risks Management in Vietnam: CHALLENGES AND PRIORITIESFood Safety Risks Management in Vietnam: CHALLENGES AND PRIORITIES
Food Safety Risks Management in Vietnam: CHALLENGES AND PRIORITIESHa Thu
 
Consider-a-Bull Quacksequences
Consider-a-Bull QuacksequencesConsider-a-Bull Quacksequences
Consider-a-Bull QuacksequencesChristina Centron
 
кейсы
кейсыкейсы
кейсыsikai23
 
8 women in leadership
8 women in leadership 8 women in leadership
8 women in leadership CPA Australia
 

Viewers also liked (14)

Tabel penghitung biaya fungsi tata air dalam amdal
Tabel penghitung biaya fungsi tata air dalam amdalTabel penghitung biaya fungsi tata air dalam amdal
Tabel penghitung biaya fungsi tata air dalam amdal
 
Jornal de Piracicaba 18/10
Jornal de Piracicaba 18/10Jornal de Piracicaba 18/10
Jornal de Piracicaba 18/10
 
El Índice de Confianza del Consumidor a nivel nacional cae 4,6% respecto a oc...
El Índice de Confianza del Consumidor a nivel nacional cae 4,6% respecto a oc...El Índice de Confianza del Consumidor a nivel nacional cae 4,6% respecto a oc...
El Índice de Confianza del Consumidor a nivel nacional cae 4,6% respecto a oc...
 
досвід ткач м.в.
досвід ткач м.в.досвід ткач м.в.
досвід ткач м.в.
 
портфоліо
портфоліопортфоліо
портфоліо
 
Memoria de actividades COEPA 2012
Memoria de actividades COEPA 2012Memoria de actividades COEPA 2012
Memoria de actividades COEPA 2012
 
Ivan
IvanIvan
Ivan
 
Gost 8320.2 83
 Gost 8320.2 83 Gost 8320.2 83
Gost 8320.2 83
 
Cantero Letter of Rec
Cantero Letter of RecCantero Letter of Rec
Cantero Letter of Rec
 
Food Safety Risks Management in Vietnam: CHALLENGES AND PRIORITIES
Food Safety Risks Management in Vietnam: CHALLENGES AND PRIORITIESFood Safety Risks Management in Vietnam: CHALLENGES AND PRIORITIES
Food Safety Risks Management in Vietnam: CHALLENGES AND PRIORITIES
 
Informatica basica
Informatica basicaInformatica basica
Informatica basica
 
Consider-a-Bull Quacksequences
Consider-a-Bull QuacksequencesConsider-a-Bull Quacksequences
Consider-a-Bull Quacksequences
 
кейсы
кейсыкейсы
кейсы
 
8 women in leadership
8 women in leadership 8 women in leadership
8 women in leadership
 

Similar to IC-12, Phase-1 Static Diversion layout (2 off 2)

LIFTING PLAN ERECTION.pdf
LIFTING PLAN ERECTION.pdfLIFTING PLAN ERECTION.pdf
LIFTING PLAN ERECTION.pdfYogaSaputra89
 
Flowplus company profile and product
Flowplus company profile and productFlowplus company profile and product
Flowplus company profile and productKomsan Thiengnadon
 
Buildings so r 14 15
Buildings so r 14 15Buildings so r 14 15
Buildings so r 14 15Ptpg Stuc
 
Updated CV (LEONARDO M VILLAMIL JR) 19-1-16
Updated CV  (LEONARDO M  VILLAMIL JR) 19-1-16Updated CV  (LEONARDO M  VILLAMIL JR) 19-1-16
Updated CV (LEONARDO M VILLAMIL JR) 19-1-16Leonardo Villamil
 
회사소개서(항공) 낙우산업(주) 영문
회사소개서(항공) 낙우산업(주) 영문회사소개서(항공) 낙우산업(주) 영문
회사소개서(항공) 낙우산업(주) 영문ssuser8d2a8a
 
At of modern building which create abvolated view
At of modern building which create abvolated viewAt of modern building which create abvolated view
At of modern building which create abvolated viewdreem073
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASunit Dhingra
 
49700707 t9085-estimate-blank
49700707 t9085-estimate-blank49700707 t9085-estimate-blank
49700707 t9085-estimate-blankimaduddin91
 
12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdf12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdfDaizukiIchiro
 
PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00Mansoor Sakharkar
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawingsGirish Ravikumar
 

Similar to IC-12, Phase-1 Static Diversion layout (2 off 2) (16)

LIFTING PLAN ERECTION.pdf
LIFTING PLAN ERECTION.pdfLIFTING PLAN ERECTION.pdf
LIFTING PLAN ERECTION.pdf
 
Flowplus company profile and product
Flowplus company profile and productFlowplus company profile and product
Flowplus company profile and product
 
Building ssr 2013-14
Building ssr 2013-14Building ssr 2013-14
Building ssr 2013-14
 
Buildings so r 14 15
Buildings so r 14 15Buildings so r 14 15
Buildings so r 14 15
 
Updated CV (LEONARDO M VILLAMIL JR) 19-1-16
Updated CV  (LEONARDO M  VILLAMIL JR) 19-1-16Updated CV  (LEONARDO M  VILLAMIL JR) 19-1-16
Updated CV (LEONARDO M VILLAMIL JR) 19-1-16
 
회사소개서(항공) 낙우산업(주) 영문
회사소개서(항공) 낙우산업(주) 영문회사소개서(항공) 낙우산업(주) 영문
회사소개서(항공) 낙우산업(주) 영문
 
Assem2_FINAL.PDF
Assem2_FINAL.PDFAssem2_FINAL.PDF
Assem2_FINAL.PDF
 
At of modern building which create abvolated view
At of modern building which create abvolated viewAt of modern building which create abvolated view
At of modern building which create abvolated view
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
 
Masters s
Masters sMasters s
Masters s
 
49700707 t9085-estimate-blank
49700707 t9085-estimate-blank49700707 t9085-estimate-blank
49700707 t9085-estimate-blank
 
ORION ONE 32.pdf
ORION ONE 32.pdfORION ONE 32.pdf
ORION ONE 32.pdf
 
12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdf12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdf
 
PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00
 
Capitulo 02 grupo 01
Capitulo 02 grupo 01Capitulo 02 grupo 01
Capitulo 02 grupo 01
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawings
 

IC-12, Phase-1 Static Diversion layout (2 off 2)

  • 1. T239 100m T115 T115 50 T208-L T11550 NEWROAD LAYOUTAHEAD 80 T113 T113 T113 T301 T301 T301 T300 T302 R108-L R108-L T115 50 100m R214 T200 P900 120 80 T115 T117 50 T115 50 NEWROAD LAYOUTAHEAD 80 200m 400m T117 80 T115 80 T200 MAIN CONTRACTOR: PROJECT MANAGER (SIGNATURE AND CONTACT ADDRESS) MINISTRY OF INTERIOR HEAD OF PLANNING, SAFETY AND RADARS DIVISION (SIGNATURE) TRAFFIC & PATROL DEPARTMENT LOCATION PLAN WAKRAH BYPASS ROAD EXW- P015 PROJECT CODE : P 015 CHECKED DATE DWG. NO. DESIGNED TITLE DD APPROVAL SCALE STATUS PROJECT LOGO OR OFFICIAL STAMPASHGHAL TDP APPROVER LOGO OR OFFICIAL STAMP APPROVER (SIGNATURE) ASHGHAL TDP REVIEWER LOGO OR OFFICIAL STAMP REVIEWER (SIGNATURE) PROJECT MANAGEMENT CONSULTANT: LOGO OR OFFICIAL STAMP REVIEWER (SIGNATURE AND STAMP) GENERAL ENGINEERING CONSULTANT: LOGO OR OFFICIAL STAMP PROJECT MANAGER (SIGNATURE AND CONTACT ADDRESS) LOGO OR OFFICIAL STAMP TRAFFIC DIVERSION PLAN APPROVALS GROUP COMMENTS TRAFFIC POLICE DEPARTMENT COMMENTS NOTES: -CONCRETE BARRIER WITH FLASHING LEGEND: -SIGN POST / A FRAME -TRAFFIC SIGN AND REFERENCE BEACON AND REFLECTIVE TAPE -PLASTIC WATER FILLED BARRICADE @A1 REV. NO. INFRASTRUCTURE AFFAIRS PUBLIC WORKS AUTHORITY P.O. BOX 22188 TEL: 44950055 FAX: 44950441 Client: AM TM REV DATE DESCRIPTION NUMBER N -WORK ZONE TDP Designer: LARSEN & TOUBRO LTD. LOCATION 13/12/2015 AS SHOWN N See TDP Documents CA CA ISSUED FOR APPROVAL13/12/2015 SCALE 1:1000 -EXISTING ROAD -PROPOSED DIVERSION CONTINUEDONEXW-P015-0000-TM-LNT-SK-00002-010 MATCHLINE"B" MATCHLINE"C" MATCHLINE"C"MATCHLINE"D" MATCHLINE"D" SCALE 1:1000 N N SCALE 1:1000 SCALE 1:1000 N Existing Mesaieed Road Proposed Diversion Existing Mesaieed Road Existing Mesaieed Road Existing Mesaieed Road MATCHLINE"B" EXW-P015-0000-TM-LNT-SK-00002-011 TRAFFIC DIVERSION PLAN PHASE 1 - STATIC WORKS DURATION OF TRAFFIC DIVERSION WORKS Static Works START DATE: 10.01.2016 COMPLETION DATE: 21.04.2016 DESCRIPTION OF WORKS: Static traffic diversion along Mesaieed road at junction IC12 to create workzone to facilitate the construction of the Wakra Bypass. WZTMG LAYOUT NO: - TL-DC 12 (Modified)