MIDAS CIVIL
Integrated Design System for Building and General Structures
1
MIDAS CIVIL
Integrated Design System for Building and General Structures
Daftar Isi :
1. Pendahuluan
2. Dimensi Pier
3. Material Properties
4. Penentuan Material Properties dan Section
5. Pemodelan Geometrik
6. Boundary / Perletakan
7. Pembebanan
8. Kombinasi Pembebanan
9. Gaya Dalam
2
MIDAS CIVIL
Integrated Design System for Building and General Structures
1. Pendahuluan
Akan direncanakan suatu struktur pier pada jembatan dengan dimensi dan geometrik
sebagai berikut.
3
MIDAS CIVIL
Integrated Design System for Building and General Structures
2. Dimensi Pier
2.5m
0.75m 0.75m
0.75m 0.75m
1m
4.14m
0.75m
1.5m
8m
4.14m
0.75m
1.22m 1.22m
4.7m
1.875m 0.325m
0.325m 1.875m
1.85m
1.5m 1.5m
4
MIDAS CIVIL
Integrated Design System for Building and General Structures
3. Material Properties
Kuat Mutu beton yang digunakan dalam analisis struktur pier ini : Pier Head, Kolom
dan Pile Cap (K-350/fc’=29.05 Mpa).
PILE CAP
KOLOM
PIER HEAD
5
MIDAS CIVIL
Integrated Design System for Building and General Structures
4. Pemodelan Material Properties dan Section
a. Buka file dan setting units kN,m (SI)
6
MIDAS CIVIL
Integrated Design System for Building and General Structures
b. Model – Properties – Material – add material – Name isi K-350 – Pilih type of
design concrete – Concrete standar pilih none – Isikan Modulus Elasticity E =
25332000 kN/m2 , Poisson’s ratio 0.2, thermal coefficient 10-5 , weight density 25 –
lalu OK.
4. Pemodelan Material Properties dan Section
7
MIDAS CIVIL
Integrated Design System for Building and General Structures
4. Pemodelan Material Properties dan Section
8
MIDAS CIVIL
Integrated Design System for Building and General Structures
c. Model – Section – add – Name isi Pile Cap – pilih bentuk solid rectangle - pilih user
– masukan dimensi section angka 8 (H) dan 4.7 (B) – lalu apply .
4. Pemodelan Material Properties dan Section
9
MIDAS CIVIL
Integrated Design System for Building and General Structures
d. Pilih Tappered – Name isi Pile Cap Tap – pilih bentuk solid rectangle – pilih user –
section i masukan dimensi section angka 8 (H) dan 4.7 (B) I – masukan dimensi
section j angka 1.5 (H) dan 1.5 (B) – lalu apply.
4. Pemodelan Material Properties dan Section
10
MIDAS CIVIL
Integrated Design System for Building and General Structures
e. Pilih DB/user – Name isi Kolom– pilih bentuk solid rectangle – pilih user – masukan
dimensi section angka 1.5 (H) dan 1.5 (B) – lalu apply.
4. Pemodelan Material Properties dan Section
11
MIDAS CIVIL
Integrated Design System for Building and General Structures
f. Pilih DB/user – Name isi Pier Head– pilih bentuk T - section – pilih user – masukan
dimensi section angka 1.97 (H) ,2.5 (B), 1 (tw), 0.75 (tf) – lalu OK – kemudian close.
Ganti center of top
4. Pemodelan Material Properties dan Section
12
MIDAS CIVIL
Integrated Design System for Building and General Structures
5. Pemodelan Geometrik
a. Pilih Model – Nodes – Create Nodes – section – Coordinates (x,y,x) – masukan
(0,0,0) – lalu apply.
Koordinat (0,0,0)
13
MIDAS CIVIL
Integrated Design System for Building and General Structures
b. Pilih Model – Nodes – Translate Nodes – (1) pilih titik (0,0,0) (sorot) – (2) masukan
(0,0,1) – (3) lalu apply – (4) Node berikutnya telah muncul.
1
2
3
4
5. Pemodelan Geometrik
14
MIDAS CIVIL
Integrated Design System for Building and General Structures
c. Dengan cara yang sama diatas diaplikasikan ke 10 titik, seperti pada gambar
dibawah.
1 (0,0,0)
2 (0,0,1)
3 (0,0,1.5)
4 (0,0,5.64)
8 (0,0.925,5.64) 5 (0, -0.925,5.64)
9 (0,2.8,5.64)
10 (0,3.125,5.64)
6 (0,-2.8,5.64)
7 (0,-3.125,5.64)
Node 1 (0,0,0)
Node 2 (0,0,1)
Node 3 (0,0,1.5)
Node 4 (0,0,5.64)
Node 5 (0,-0.925,5.64)
Node 6 (0,-2.8,5.64)
Node 7 (0,-3.125,5.64)
Node 8 (0,0.925,5.64)
Node 9 (0,2.8,5.64)
Node 10 (0,3.125,5.64)
5. Pemodelan Geometrik
15
MIDAS CIVIL
Integrated Design System for Building and General Structures
d. Pilih Model – Element – Create Element – Pilih Material K-350 – Pilih Section Pile
cap – klik node 1 ke node 2.
5. Pemodelan Geometrik
16
MIDAS CIVIL
Integrated Design System for Building and General Structures
Klik node 1 ke
node 2
5. Pemodelan Geometrik
17
MIDAS CIVIL
Integrated Design System for Building and General Structures
Klik node 2 ke
node 3
5. Pemodelan Geometrik
18
MIDAS CIVIL
Integrated Design System for Building and General Structures
Klik node 3 ke
node 4
5. Pemodelan Geometrik
19
MIDAS CIVIL
Integrated Design System for Building and General Structures
Klik node 10 ke
node 7
5. Pemodelan Geometrik
20
MIDAS CIVIL
Integrated Design System for Building and General Structures
Bentuk Penampang
tidak sesuai dengan
geometri desain
Klik untuk melihat
penampang.
5. Pemodelan Geometrik
21
MIDAS CIVIL
Integrated Design System for Building and General Structures
e. Pilih Element Pier Head – Model – Elements – Change Element Parameters – Pilih
Element Local Axis – Mode, Ganti Beta Angle jadi 180 Deg – kemudian Apply.
Sorot element Pier
Head
5. Pemodelan Geometrik
22
MIDAS CIVIL
Integrated Design System for Building and General Structures
5. Pemodelan Geometrik
23
MIDAS CIVIL
Integrated Design System for Building and General Structures
5. Pemodelan Geometrik
24
MIDAS CIVIL
Integrated Design System for Building and General Structures
6. Boundary/Perletakan
Pilih Node 1 – Model – Boundary – Support – Ceklist D-ALL dan R-ALL (perlekan jepit)
– kemudian Apply.
25
MIDAS CIVIL
Integrated Design System for Building and General Structures
6. Boundary/Perletakan
26
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
Pembebanan yang terjadi Pada struktur Pier Jembatan dapat dibagi menjadi 4 bagian,
yaitu :
1. Beban akibat strukturnya sendiri (SW).
2. Beban DL (Dead Load) akibat beban Girder L=35.6m (Interior dan Eksterior), rc
pelat, digfragma dan pelat.
3. Beban SDL (Super Imposed Dead Load) akibat aspalt, median, trotoar dan railing.
4. Beban LL (Live Load) akibat beban UDL (Uniform Dead Load) dan KEL (Knife Edge
Load) dan beban rem.
DL + SDL + UDL + KEL
DL + SDL + UDL + KEL No Jenis
Beban (kN) Arah
Interior Eksterior Global Axis
1RDL 500 600
z
2RSDL 50 200
3RUDL 250
4RKEL 60
5RREM 4 x
REM
27
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
Load – Static Load Case – Isikan name, type dan description - klik close
28
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
a.Pilih node 5,6,8,9– Model – Node – Translate Node – pilih copy – isikan (0.85,0,0.75)
– apply – pilih ikon select previous - isikan (-0.85,0,0.75) – apply – maka akan
muncul node baru 11 – 18 (sebagai node untuk assign beban yang direncanakan).
Node baru (11-18)
29
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
b. Load – Selfweight – isikan pada Z (-1) – kemudian klik add – klik close – maka
program akan menghitung otomotis program tersebut.
30
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
Pilih node 11,13,15,17 – Load – Nodal Load – Pilih Load Case Name DL – tulis di FZ (-
500) (Beban DL interior) – klik apply – pilih node 12,14,16,18 - tulis di FZ (-600)
(Beban DL eksterior) – klik apply.
31
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
Dengan cara yang sama seperti sebelumnya maka beban - beban telah diaplikasikan
terhadap struktur pier tersebut.
Assign Node Beban (kN) Jenis Beban Global Axis
11,13,15,17 -600
RDL
Eksterior
Z
12,14,16,18 -500 Interior
11,13,15,17 -200
RSDL
Eksterior
12,14,16,18 -50 Interior
11 to 18
-250 RUDL
-60 RKEL
4 RREM X
RDL RSDL
RUDL
RKEL RREM
32
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
Untuk menghubungkan node beban dengan element strukturnya maka diberi
bondary condition yaitu elastic link. Model – Boundary – pilih Elastic Link – Link Type
– Pilih Rigid – pada tabel 2 nodes pilih titik yang di link contoh node 9 dengan 18 –
klik node 18 ke node 9 – Maka elastik link akan muncul.
Klik node 18 ke 9
33
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
Dengan cara yang sama lakukan untuk node 14 -9 , 17 – 8 , 13 – 8, 15 – 5, 11 – 5, 16 –
6 dan 12 – 6.
34
MIDAS CIVIL
Integrated Design System for Building and General Structures
8. Kombinasi Pembebanan
(1). Result – Combination – tulis pada kolom Name ULS 1 di Load Kombination List –
Pilih SW pada Load Case tulis 1.3 pada Factor – Pilih RDL tulis 1.3 – Pilih SDL tulis 2.
(2). Tulis pada kolom Name ULS 2 di Load Kombination List – Pilih SW pada Load Case
tulis 1.3 pada Factor – Pilih RDL tulis 1.3 – Pilih SDL tulis 2 – Pilih UDL tulis 1.8 – Pilih
KEL tulis 1.8 – Pilih REM tulis 1.8.
(3). Tulis pada kolom Name ENV-ULS – ganti type add jadi Envelope – Pada kolom
Load Case and factor pilih ULS1 dan ULS2 tulis 1 – kemudian close.
KOMBINASI PEMBEBANAN
ULS-1 1.3SW + 1.3RDL + 2SDL
ULS-2 1.3SW + 1.3RDL + 2SDL + 1.8UDL + 1.8KEL + 1.8REM
35
MIDAS CIVIL
Integrated Design System for Building and General Structures
8. Kombinasi Pembebanan
36
MIDAS CIVIL
Integrated Design System for Building and General Structures
9. Analisis Struktur Gaya Dalam
Setelah material dan section didefiniskan, geometri dan dimensi telah digambar,
boundary telah ditentukan lalu kemudian beban dan load sudah dimasukan, maka
tahap terakhir adalah analisis gaya dalam struktur tersebut. Pilih ikon run analysis
Apabila berhasil di run maka akan keluar tulisan your midas job is successfully
completed.
Klik
Run OK
37
MIDAS CIVIL
Integrated Design System for Building and General Structures
9. Analisis Struktur Gaya Dalam
Untuk melihat gaya dalam yang terjadi pada pier, pilih result – forces – beam diagram
– klik load cases/combination pilih Cball : ENV –ULS – Pilih Fx (Gaya Aksial) – Solid fill
– type of display ceklis countur , legend pilih fixed tulis decimal point 2 – kemudian
OK.
38
MIDAS CIVIL
Integrated Design System for Building and General Structures
9. Analisis Struktur Gaya Dalam
39
Bidang Momen Pada Pier Head
Bidang Geser Pada Pier Head
Bidang Momen Pada Kolom
Bidang Geser Pada Kolom
MIDAS CIVIL
Integrated Design System for Building and General Structures
40
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Terdapat cara lain untuk menggambar atau mendefiniskan section penampang selain
menggunakan menu Section Data yaitu dengan program SPC. Program SPC ini
digunakan untuk menggambar section penampang serta menghitung section
propertiesnya. Program ini berguna sekali apabila bentuk penampang sudah tidak
simetri lagi.
41
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Sebagai contoh akan dibuat section pier head yang sudah di desain pada section data
midas, akan dicoba dengan menggunakan program SPC.
Node 1 (-0.5,0)
Node 2 (0.5,0)
Node 3 (0.5,-1.22)
Node 4 (1.25,-1.22)
Node 5 (1.25,-1.97)
Node 6 (-1.25,-1.97)
Node 7 (-1.25,-1.22)
Node 8 (-0.5,-1.22)
2.5m
X
Y
1 2
3
4
5
6
7 8
0.75m
0.75m 0.75m
1m
1.22m
0.75m
42
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
a. Buka Program SPC – Setting – General – Unit System Force (kN) – Length ganti jadi
m – Klik OK.
43
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
b. Model – Curve – Create – Line – isi point 1 (-0.5,0) – isi point 2 (0.5,0) – klik Apply.
44
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
c. Model – Curve – Create – Line – isi point 1 (0.5,0) – isi point 2 (0.5,-1.22) – klik
Apply.
45
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
d. Model – Curve – Create – Line – isi point 1 (0.5,-1.22) – isi point 2 (1.25,-1.22) – klik
Apply.
46
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
e. Model – Curve – Create – Line – isi point 1 (1.25,-1.22) – isi point 2 (1.25,-1.97) –
klik Apply.
47
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
f. Model – Curve – Create – Line – isi point 1 (1.25,-1.97) – isi point 2 (-1.25,-1.97) –
klik Apply.
48
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
g. Model – Curve – Create – Line – isi point 1 (-1.25,-1.97) – isi point 2 (-1.25,-1.22) –
klik Apply.
49
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
h. Model – Curve – Create – Line – isi point 1 (-1.25,-1.22) – isi point 2 (-0.5,-1.22) –
klik Apply.
50
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
i. Model – Curve – Create – Line – isi point 1 (-0.5,-1.22) – isi point 2 (-0.50) – klik
Apply – kemudian Close.
51
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
i. Pilih Model – Section – Generate – Sorot semua Line yang telah dibuat sampai
garisnya berwarna merah – ceklist calculates properties now – kemudian pilih apply.
52
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Program akan secara otomatis menghitung section penampang tersebut, bila benar
akan muncul tulisan new plane section {section – P1} is generated and its properties
are calculated.
53
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Untuk melihat propertiesnya dapat dilihat pada ikon maka akan keluar tabel
properties penampang yang kita buat.
54
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Penampang yang telah dibuat sekarang akan di eksport ke program MIDAS pada data
section list caranya adalah pilih Model – Section – Eksport – Pilih Midas Section File –
lalu klik ikon beri nama Pier Head SPC – lalu sorot section yang kita buat sampai
berubah jadi warna merah – klik apply – maka section penampang telah disimpan
pada section list pada program MIDAS.
55
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Buka program Midas buka file modul 1 yang telah dibuat – Model – Properties –
Section – Add – klik Value – Cari section penampang General Section – klik import
form SPC – cari file dengan nama Pier Head SPC – klik open – pilih section P1 – klik
OK.
56
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
57
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Maka akan muncul section penampang yang telah dibuat tadi pada program SPC
beserta tabel section propertiesnya – beri nama Pier Head SPC – ubah offsetnya jadi
center of bottom – lalu klik apply – lalu klik cancel.
58
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Pilih section element 4,5,6,7,8,9 yang sebelumnya dengan nama Pier Head ganti Pier
Head SPC dengan sistem drag and drop.
Drag and Drop
59
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Ubah dahalu element local axisnya di model – element - change element parameters
– pilih element local axis – Mode beta angle pilih 0 – Apply.
60
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
61

More Related Content

What's hot

Tabel Profil Konstruksi Baja
Tabel Profil Konstruksi BajaTabel Profil Konstruksi Baja
Tabel Profil Konstruksi BajaYusrizal Mahendra
 
3. koefisien momen pbi 71-two way #1
3. koefisien momen pbi 71-two way #13. koefisien momen pbi 71-two way #1
3. koefisien momen pbi 71-two way #1MuhammadYasin301812
 
Laporan Pratikum Perkerasan Jalan Raya
Laporan Pratikum Perkerasan Jalan RayaLaporan Pratikum Perkerasan Jalan Raya
Laporan Pratikum Perkerasan Jalan RayaSahno Hilhami
 
Baja tulangan beton SNI 2052-2014
Baja tulangan beton SNI 2052-2014Baja tulangan beton SNI 2052-2014
Baja tulangan beton SNI 2052-2014WSKT
 
Rsni t 12-2004
Rsni t 12-2004Rsni t 12-2004
Rsni t 12-2004iky
 
Perencanaan struktur baja
Perencanaan struktur bajaPerencanaan struktur baja
Perencanaan struktur bajaAmi_Roy
 
contoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balokcontoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balokShaleh Afif Hasibuan
 
Contoh soal komposit
Contoh soal kompositContoh soal komposit
Contoh soal kompositkahar pasca
 
Jurnal jembatan rangka baja
Jurnal jembatan rangka bajaJurnal jembatan rangka baja
Jurnal jembatan rangka bajaE Sanjani
 
Test soil spt-ang-2009
Test soil spt-ang-2009Test soil spt-ang-2009
Test soil spt-ang-2009samudra.gs
 
SNI 03 - 1729 - 2002 TATA CARA PERENCANAAN STRUKTUR BAJA UNTUK BANGUNAN GEDUNG
SNI 03 - 1729 - 2002 TATA CARA PERENCANAAN STRUKTUR BAJA UNTUK BANGUNAN GEDUNGSNI 03 - 1729 - 2002 TATA CARA PERENCANAAN STRUKTUR BAJA UNTUK BANGUNAN GEDUNG
SNI 03 - 1729 - 2002 TATA CARA PERENCANAAN STRUKTUR BAJA UNTUK BANGUNAN GEDUNGMira Pemayun
 
Perkerasan jalan raya kelompok dhanes
Perkerasan jalan raya kelompok dhanesPerkerasan jalan raya kelompok dhanes
Perkerasan jalan raya kelompok dhanesrakesword
 
Sni 1725 2016 pembebanan untuk jembatan
Sni 1725 2016 pembebanan untuk jembatanSni 1725 2016 pembebanan untuk jembatan
Sni 1725 2016 pembebanan untuk jembatanterbott
 
Cek penampang kolom baja gable
Cek penampang kolom baja gableCek penampang kolom baja gable
Cek penampang kolom baja gableAfret Nobel
 

What's hot (20)

Tabel Profil Konstruksi Baja
Tabel Profil Konstruksi BajaTabel Profil Konstruksi Baja
Tabel Profil Konstruksi Baja
 
Contoh baja
Contoh bajaContoh baja
Contoh baja
 
3. koefisien momen pbi 71-two way #1
3. koefisien momen pbi 71-two way #13. koefisien momen pbi 71-two way #1
3. koefisien momen pbi 71-two way #1
 
Laporan Pratikum Perkerasan Jalan Raya
Laporan Pratikum Perkerasan Jalan RayaLaporan Pratikum Perkerasan Jalan Raya
Laporan Pratikum Perkerasan Jalan Raya
 
Sistem rangka pemikul momen
Sistem rangka pemikul momenSistem rangka pemikul momen
Sistem rangka pemikul momen
 
Baja tulangan beton SNI 2052-2014
Baja tulangan beton SNI 2052-2014Baja tulangan beton SNI 2052-2014
Baja tulangan beton SNI 2052-2014
 
Rsni t 12-2004
Rsni t 12-2004Rsni t 12-2004
Rsni t 12-2004
 
Perencanaan struktur baja
Perencanaan struktur bajaPerencanaan struktur baja
Perencanaan struktur baja
 
contoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balokcontoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balok
 
Contoh soal komposit
Contoh soal kompositContoh soal komposit
Contoh soal komposit
 
Jurnal jembatan rangka baja
Jurnal jembatan rangka bajaJurnal jembatan rangka baja
Jurnal jembatan rangka baja
 
Test soil spt-ang-2009
Test soil spt-ang-2009Test soil spt-ang-2009
Test soil spt-ang-2009
 
Buku etabs
Buku etabsBuku etabs
Buku etabs
 
Tiang Pancang I
Tiang Pancang ITiang Pancang I
Tiang Pancang I
 
SNI 03 - 1729 - 2002 TATA CARA PERENCANAAN STRUKTUR BAJA UNTUK BANGUNAN GEDUNG
SNI 03 - 1729 - 2002 TATA CARA PERENCANAAN STRUKTUR BAJA UNTUK BANGUNAN GEDUNGSNI 03 - 1729 - 2002 TATA CARA PERENCANAAN STRUKTUR BAJA UNTUK BANGUNAN GEDUNG
SNI 03 - 1729 - 2002 TATA CARA PERENCANAAN STRUKTUR BAJA UNTUK BANGUNAN GEDUNG
 
Perkerasan jalan raya kelompok dhanes
Perkerasan jalan raya kelompok dhanesPerkerasan jalan raya kelompok dhanes
Perkerasan jalan raya kelompok dhanes
 
PERENCANAAN TURAP
PERENCANAAN TURAPPERENCANAAN TURAP
PERENCANAAN TURAP
 
Sni 1725 2016 pembebanan untuk jembatan
Sni 1725 2016 pembebanan untuk jembatanSni 1725 2016 pembebanan untuk jembatan
Sni 1725 2016 pembebanan untuk jembatan
 
Cek penampang kolom baja gable
Cek penampang kolom baja gableCek penampang kolom baja gable
Cek penampang kolom baja gable
 
pelat sni 2013
pelat sni 2013pelat sni 2013
pelat sni 2013
 

Similar to midas-civil-integrated-design-system-for-building-and-general-structures.pdf

Materi-Bahan Presentasi_013362.pdf
Materi-Bahan Presentasi_013362.pdfMateri-Bahan Presentasi_013362.pdf
Materi-Bahan Presentasi_013362.pdfArif Matondang
 
Its paper-32776-4107100041-paper
Its paper-32776-4107100041-paperIts paper-32776-4107100041-paper
Its paper-32776-4107100041-paperlina meliana
 
Desainstrukturportalbajadandetailing
DesainstrukturportalbajadandetailingDesainstrukturportalbajadandetailing
Desainstrukturportalbajadandetailingdicky budiyanto
 
Desain struktur portal baja dan detailing
Desain struktur portal baja dan detailingDesain struktur portal baja dan detailing
Desain struktur portal baja dan detailingrhtrusli
 
06. bab 6 kajian perencanaan struktur
06. bab 6 kajian perencanaan struktur06. bab 6 kajian perencanaan struktur
06. bab 6 kajian perencanaan strukturDevian Tri Andriana
 
221096408 dasar-dasar-sap-2000-puski-its
221096408 dasar-dasar-sap-2000-puski-its221096408 dasar-dasar-sap-2000-puski-its
221096408 dasar-dasar-sap-2000-puski-itsRoni Fauzi
 
Manual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptxManual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptxRemigius1984
 
Modul sap seffope For Traning
Modul sap seffope For TraningModul sap seffope For Traning
Modul sap seffope For Traningreysbere1987
 
Modul sap seffope (1)
Modul sap seffope (1)Modul sap seffope (1)
Modul sap seffope (1)reysbere1987
 
6. FORMAT Lampiran C AP DIKMATA REVISI.docx
6. FORMAT Lampiran C AP DIKMATA REVISI.docx6. FORMAT Lampiran C AP DIKMATA REVISI.docx
6. FORMAT Lampiran C AP DIKMATA REVISI.docxTriMardianto3
 
3 body part_234aee85-51e9-49da-bb77-1756f0b137d2
3 body part_234aee85-51e9-49da-bb77-1756f0b137d23 body part_234aee85-51e9-49da-bb77-1756f0b137d2
3 body part_234aee85-51e9-49da-bb77-1756f0b137d2Dewi Gultom
 
Ship building process & shipyard productivity
Ship building process & shipyard productivityShip building process & shipyard productivity
Ship building process & shipyard productivityFatimatuzzahra Zaza
 
TUTORIAL kapal arif.pptx
TUTORIAL kapal arif.pptxTUTORIAL kapal arif.pptx
TUTORIAL kapal arif.pptxssuser942fdb
 
109922 id-perencanaan-alternatif-struktur-beton-be
109922 id-perencanaan-alternatif-struktur-beton-be109922 id-perencanaan-alternatif-struktur-beton-be
109922 id-perencanaan-alternatif-struktur-beton-besiswoST
 
53309952 utf-8-desain-struktur-beton-bertulang-dengan-sap2000
53309952 utf-8-desain-struktur-beton-bertulang-dengan-sap200053309952 utf-8-desain-struktur-beton-bertulang-dengan-sap2000
53309952 utf-8-desain-struktur-beton-bertulang-dengan-sap2000Botak Doohan Jr
 
2006 06-pengukuran dan pematokan
2006 06-pengukuran dan pematokan2006 06-pengukuran dan pematokan
2006 06-pengukuran dan pematokanahmad fuadi
 

Similar to midas-civil-integrated-design-system-for-building-and-general-structures.pdf (20)

Materi-Bahan Presentasi_013362.pdf
Materi-Bahan Presentasi_013362.pdfMateri-Bahan Presentasi_013362.pdf
Materi-Bahan Presentasi_013362.pdf
 
Struktur Atap gedung
Struktur Atap gedungStruktur Atap gedung
Struktur Atap gedung
 
Sap2000
Sap2000Sap2000
Sap2000
 
Its paper-32776-4107100041-paper
Its paper-32776-4107100041-paperIts paper-32776-4107100041-paper
Its paper-32776-4107100041-paper
 
PAPARAN RSUD.ppt
PAPARAN RSUD.pptPAPARAN RSUD.ppt
PAPARAN RSUD.ppt
 
Desainstrukturportalbajadandetailing
DesainstrukturportalbajadandetailingDesainstrukturportalbajadandetailing
Desainstrukturportalbajadandetailing
 
Desain struktur portal baja dan detailing
Desain struktur portal baja dan detailingDesain struktur portal baja dan detailing
Desain struktur portal baja dan detailing
 
06. bab 6 kajian perencanaan struktur
06. bab 6 kajian perencanaan struktur06. bab 6 kajian perencanaan struktur
06. bab 6 kajian perencanaan struktur
 
221096408 dasar-dasar-sap-2000-puski-its
221096408 dasar-dasar-sap-2000-puski-its221096408 dasar-dasar-sap-2000-puski-its
221096408 dasar-dasar-sap-2000-puski-its
 
Manual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptxManual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptx
 
Modul sap seffope For Traning
Modul sap seffope For TraningModul sap seffope For Traning
Modul sap seffope For Traning
 
Modul sap seffope (1)
Modul sap seffope (1)Modul sap seffope (1)
Modul sap seffope (1)
 
6. FORMAT Lampiran C AP DIKMATA REVISI.docx
6. FORMAT Lampiran C AP DIKMATA REVISI.docx6. FORMAT Lampiran C AP DIKMATA REVISI.docx
6. FORMAT Lampiran C AP DIKMATA REVISI.docx
 
3 body part_234aee85-51e9-49da-bb77-1756f0b137d2
3 body part_234aee85-51e9-49da-bb77-1756f0b137d23 body part_234aee85-51e9-49da-bb77-1756f0b137d2
3 body part_234aee85-51e9-49da-bb77-1756f0b137d2
 
Ship building process & shipyard productivity
Ship building process & shipyard productivityShip building process & shipyard productivity
Ship building process & shipyard productivity
 
TUTORIAL kapal arif.pptx
TUTORIAL kapal arif.pptxTUTORIAL kapal arif.pptx
TUTORIAL kapal arif.pptx
 
Tutorial sap v11
Tutorial sap v11Tutorial sap v11
Tutorial sap v11
 
109922 id-perencanaan-alternatif-struktur-beton-be
109922 id-perencanaan-alternatif-struktur-beton-be109922 id-perencanaan-alternatif-struktur-beton-be
109922 id-perencanaan-alternatif-struktur-beton-be
 
53309952 utf-8-desain-struktur-beton-bertulang-dengan-sap2000
53309952 utf-8-desain-struktur-beton-bertulang-dengan-sap200053309952 utf-8-desain-struktur-beton-bertulang-dengan-sap2000
53309952 utf-8-desain-struktur-beton-bertulang-dengan-sap2000
 
2006 06-pengukuran dan pematokan
2006 06-pengukuran dan pematokan2006 06-pengukuran dan pematokan
2006 06-pengukuran dan pematokan
 

Recently uploaded

Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxPembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxmuhammadrizky331164
 
Strategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaStrategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaRenaYunita2
 
MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++FujiAdam
 
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdfTEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdfYogiCahyoPurnomo
 
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptxMuhararAhmad
 
materi pengendalian proyek konstruksi.pptx
materi pengendalian proyek konstruksi.pptxmateri pengendalian proyek konstruksi.pptx
materi pengendalian proyek konstruksi.pptxsiswoST
 
Slide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open StudioSlide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open Studiossuser52d6bf
 

Recently uploaded (7)

Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxPembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
 
Strategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaStrategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di Indonesia
 
MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++
 
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdfTEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
 
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
 
materi pengendalian proyek konstruksi.pptx
materi pengendalian proyek konstruksi.pptxmateri pengendalian proyek konstruksi.pptx
materi pengendalian proyek konstruksi.pptx
 
Slide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open StudioSlide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open Studio
 

midas-civil-integrated-design-system-for-building-and-general-structures.pdf

  • 1. MIDAS CIVIL Integrated Design System for Building and General Structures 1
  • 2. MIDAS CIVIL Integrated Design System for Building and General Structures Daftar Isi : 1. Pendahuluan 2. Dimensi Pier 3. Material Properties 4. Penentuan Material Properties dan Section 5. Pemodelan Geometrik 6. Boundary / Perletakan 7. Pembebanan 8. Kombinasi Pembebanan 9. Gaya Dalam 2
  • 3. MIDAS CIVIL Integrated Design System for Building and General Structures 1. Pendahuluan Akan direncanakan suatu struktur pier pada jembatan dengan dimensi dan geometrik sebagai berikut. 3
  • 4. MIDAS CIVIL Integrated Design System for Building and General Structures 2. Dimensi Pier 2.5m 0.75m 0.75m 0.75m 0.75m 1m 4.14m 0.75m 1.5m 8m 4.14m 0.75m 1.22m 1.22m 4.7m 1.875m 0.325m 0.325m 1.875m 1.85m 1.5m 1.5m 4
  • 5. MIDAS CIVIL Integrated Design System for Building and General Structures 3. Material Properties Kuat Mutu beton yang digunakan dalam analisis struktur pier ini : Pier Head, Kolom dan Pile Cap (K-350/fc’=29.05 Mpa). PILE CAP KOLOM PIER HEAD 5
  • 6. MIDAS CIVIL Integrated Design System for Building and General Structures 4. Pemodelan Material Properties dan Section a. Buka file dan setting units kN,m (SI) 6
  • 7. MIDAS CIVIL Integrated Design System for Building and General Structures b. Model – Properties – Material – add material – Name isi K-350 – Pilih type of design concrete – Concrete standar pilih none – Isikan Modulus Elasticity E = 25332000 kN/m2 , Poisson’s ratio 0.2, thermal coefficient 10-5 , weight density 25 – lalu OK. 4. Pemodelan Material Properties dan Section 7
  • 8. MIDAS CIVIL Integrated Design System for Building and General Structures 4. Pemodelan Material Properties dan Section 8
  • 9. MIDAS CIVIL Integrated Design System for Building and General Structures c. Model – Section – add – Name isi Pile Cap – pilih bentuk solid rectangle - pilih user – masukan dimensi section angka 8 (H) dan 4.7 (B) – lalu apply . 4. Pemodelan Material Properties dan Section 9
  • 10. MIDAS CIVIL Integrated Design System for Building and General Structures d. Pilih Tappered – Name isi Pile Cap Tap – pilih bentuk solid rectangle – pilih user – section i masukan dimensi section angka 8 (H) dan 4.7 (B) I – masukan dimensi section j angka 1.5 (H) dan 1.5 (B) – lalu apply. 4. Pemodelan Material Properties dan Section 10
  • 11. MIDAS CIVIL Integrated Design System for Building and General Structures e. Pilih DB/user – Name isi Kolom– pilih bentuk solid rectangle – pilih user – masukan dimensi section angka 1.5 (H) dan 1.5 (B) – lalu apply. 4. Pemodelan Material Properties dan Section 11
  • 12. MIDAS CIVIL Integrated Design System for Building and General Structures f. Pilih DB/user – Name isi Pier Head– pilih bentuk T - section – pilih user – masukan dimensi section angka 1.97 (H) ,2.5 (B), 1 (tw), 0.75 (tf) – lalu OK – kemudian close. Ganti center of top 4. Pemodelan Material Properties dan Section 12
  • 13. MIDAS CIVIL Integrated Design System for Building and General Structures 5. Pemodelan Geometrik a. Pilih Model – Nodes – Create Nodes – section – Coordinates (x,y,x) – masukan (0,0,0) – lalu apply. Koordinat (0,0,0) 13
  • 14. MIDAS CIVIL Integrated Design System for Building and General Structures b. Pilih Model – Nodes – Translate Nodes – (1) pilih titik (0,0,0) (sorot) – (2) masukan (0,0,1) – (3) lalu apply – (4) Node berikutnya telah muncul. 1 2 3 4 5. Pemodelan Geometrik 14
  • 15. MIDAS CIVIL Integrated Design System for Building and General Structures c. Dengan cara yang sama diatas diaplikasikan ke 10 titik, seperti pada gambar dibawah. 1 (0,0,0) 2 (0,0,1) 3 (0,0,1.5) 4 (0,0,5.64) 8 (0,0.925,5.64) 5 (0, -0.925,5.64) 9 (0,2.8,5.64) 10 (0,3.125,5.64) 6 (0,-2.8,5.64) 7 (0,-3.125,5.64) Node 1 (0,0,0) Node 2 (0,0,1) Node 3 (0,0,1.5) Node 4 (0,0,5.64) Node 5 (0,-0.925,5.64) Node 6 (0,-2.8,5.64) Node 7 (0,-3.125,5.64) Node 8 (0,0.925,5.64) Node 9 (0,2.8,5.64) Node 10 (0,3.125,5.64) 5. Pemodelan Geometrik 15
  • 16. MIDAS CIVIL Integrated Design System for Building and General Structures d. Pilih Model – Element – Create Element – Pilih Material K-350 – Pilih Section Pile cap – klik node 1 ke node 2. 5. Pemodelan Geometrik 16
  • 17. MIDAS CIVIL Integrated Design System for Building and General Structures Klik node 1 ke node 2 5. Pemodelan Geometrik 17
  • 18. MIDAS CIVIL Integrated Design System for Building and General Structures Klik node 2 ke node 3 5. Pemodelan Geometrik 18
  • 19. MIDAS CIVIL Integrated Design System for Building and General Structures Klik node 3 ke node 4 5. Pemodelan Geometrik 19
  • 20. MIDAS CIVIL Integrated Design System for Building and General Structures Klik node 10 ke node 7 5. Pemodelan Geometrik 20
  • 21. MIDAS CIVIL Integrated Design System for Building and General Structures Bentuk Penampang tidak sesuai dengan geometri desain Klik untuk melihat penampang. 5. Pemodelan Geometrik 21
  • 22. MIDAS CIVIL Integrated Design System for Building and General Structures e. Pilih Element Pier Head – Model – Elements – Change Element Parameters – Pilih Element Local Axis – Mode, Ganti Beta Angle jadi 180 Deg – kemudian Apply. Sorot element Pier Head 5. Pemodelan Geometrik 22
  • 23. MIDAS CIVIL Integrated Design System for Building and General Structures 5. Pemodelan Geometrik 23
  • 24. MIDAS CIVIL Integrated Design System for Building and General Structures 5. Pemodelan Geometrik 24
  • 25. MIDAS CIVIL Integrated Design System for Building and General Structures 6. Boundary/Perletakan Pilih Node 1 – Model – Boundary – Support – Ceklist D-ALL dan R-ALL (perlekan jepit) – kemudian Apply. 25
  • 26. MIDAS CIVIL Integrated Design System for Building and General Structures 6. Boundary/Perletakan 26
  • 27. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan Pembebanan yang terjadi Pada struktur Pier Jembatan dapat dibagi menjadi 4 bagian, yaitu : 1. Beban akibat strukturnya sendiri (SW). 2. Beban DL (Dead Load) akibat beban Girder L=35.6m (Interior dan Eksterior), rc pelat, digfragma dan pelat. 3. Beban SDL (Super Imposed Dead Load) akibat aspalt, median, trotoar dan railing. 4. Beban LL (Live Load) akibat beban UDL (Uniform Dead Load) dan KEL (Knife Edge Load) dan beban rem. DL + SDL + UDL + KEL DL + SDL + UDL + KEL No Jenis Beban (kN) Arah Interior Eksterior Global Axis 1RDL 500 600 z 2RSDL 50 200 3RUDL 250 4RKEL 60 5RREM 4 x REM 27
  • 28. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan Load – Static Load Case – Isikan name, type dan description - klik close 28
  • 29. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan a.Pilih node 5,6,8,9– Model – Node – Translate Node – pilih copy – isikan (0.85,0,0.75) – apply – pilih ikon select previous - isikan (-0.85,0,0.75) – apply – maka akan muncul node baru 11 – 18 (sebagai node untuk assign beban yang direncanakan). Node baru (11-18) 29
  • 30. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan b. Load – Selfweight – isikan pada Z (-1) – kemudian klik add – klik close – maka program akan menghitung otomotis program tersebut. 30
  • 31. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan Pilih node 11,13,15,17 – Load – Nodal Load – Pilih Load Case Name DL – tulis di FZ (- 500) (Beban DL interior) – klik apply – pilih node 12,14,16,18 - tulis di FZ (-600) (Beban DL eksterior) – klik apply. 31
  • 32. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan Dengan cara yang sama seperti sebelumnya maka beban - beban telah diaplikasikan terhadap struktur pier tersebut. Assign Node Beban (kN) Jenis Beban Global Axis 11,13,15,17 -600 RDL Eksterior Z 12,14,16,18 -500 Interior 11,13,15,17 -200 RSDL Eksterior 12,14,16,18 -50 Interior 11 to 18 -250 RUDL -60 RKEL 4 RREM X RDL RSDL RUDL RKEL RREM 32
  • 33. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan Untuk menghubungkan node beban dengan element strukturnya maka diberi bondary condition yaitu elastic link. Model – Boundary – pilih Elastic Link – Link Type – Pilih Rigid – pada tabel 2 nodes pilih titik yang di link contoh node 9 dengan 18 – klik node 18 ke node 9 – Maka elastik link akan muncul. Klik node 18 ke 9 33
  • 34. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan Dengan cara yang sama lakukan untuk node 14 -9 , 17 – 8 , 13 – 8, 15 – 5, 11 – 5, 16 – 6 dan 12 – 6. 34
  • 35. MIDAS CIVIL Integrated Design System for Building and General Structures 8. Kombinasi Pembebanan (1). Result – Combination – tulis pada kolom Name ULS 1 di Load Kombination List – Pilih SW pada Load Case tulis 1.3 pada Factor – Pilih RDL tulis 1.3 – Pilih SDL tulis 2. (2). Tulis pada kolom Name ULS 2 di Load Kombination List – Pilih SW pada Load Case tulis 1.3 pada Factor – Pilih RDL tulis 1.3 – Pilih SDL tulis 2 – Pilih UDL tulis 1.8 – Pilih KEL tulis 1.8 – Pilih REM tulis 1.8. (3). Tulis pada kolom Name ENV-ULS – ganti type add jadi Envelope – Pada kolom Load Case and factor pilih ULS1 dan ULS2 tulis 1 – kemudian close. KOMBINASI PEMBEBANAN ULS-1 1.3SW + 1.3RDL + 2SDL ULS-2 1.3SW + 1.3RDL + 2SDL + 1.8UDL + 1.8KEL + 1.8REM 35
  • 36. MIDAS CIVIL Integrated Design System for Building and General Structures 8. Kombinasi Pembebanan 36
  • 37. MIDAS CIVIL Integrated Design System for Building and General Structures 9. Analisis Struktur Gaya Dalam Setelah material dan section didefiniskan, geometri dan dimensi telah digambar, boundary telah ditentukan lalu kemudian beban dan load sudah dimasukan, maka tahap terakhir adalah analisis gaya dalam struktur tersebut. Pilih ikon run analysis Apabila berhasil di run maka akan keluar tulisan your midas job is successfully completed. Klik Run OK 37
  • 38. MIDAS CIVIL Integrated Design System for Building and General Structures 9. Analisis Struktur Gaya Dalam Untuk melihat gaya dalam yang terjadi pada pier, pilih result – forces – beam diagram – klik load cases/combination pilih Cball : ENV –ULS – Pilih Fx (Gaya Aksial) – Solid fill – type of display ceklis countur , legend pilih fixed tulis decimal point 2 – kemudian OK. 38
  • 39. MIDAS CIVIL Integrated Design System for Building and General Structures 9. Analisis Struktur Gaya Dalam 39 Bidang Momen Pada Pier Head Bidang Geser Pada Pier Head Bidang Momen Pada Kolom Bidang Geser Pada Kolom
  • 40. MIDAS CIVIL Integrated Design System for Building and General Structures 40
  • 41. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Terdapat cara lain untuk menggambar atau mendefiniskan section penampang selain menggunakan menu Section Data yaitu dengan program SPC. Program SPC ini digunakan untuk menggambar section penampang serta menghitung section propertiesnya. Program ini berguna sekali apabila bentuk penampang sudah tidak simetri lagi. 41
  • 42. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Sebagai contoh akan dibuat section pier head yang sudah di desain pada section data midas, akan dicoba dengan menggunakan program SPC. Node 1 (-0.5,0) Node 2 (0.5,0) Node 3 (0.5,-1.22) Node 4 (1.25,-1.22) Node 5 (1.25,-1.97) Node 6 (-1.25,-1.97) Node 7 (-1.25,-1.22) Node 8 (-0.5,-1.22) 2.5m X Y 1 2 3 4 5 6 7 8 0.75m 0.75m 0.75m 1m 1.22m 0.75m 42
  • 43. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang a. Buka Program SPC – Setting – General – Unit System Force (kN) – Length ganti jadi m – Klik OK. 43
  • 44. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang b. Model – Curve – Create – Line – isi point 1 (-0.5,0) – isi point 2 (0.5,0) – klik Apply. 44
  • 45. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang c. Model – Curve – Create – Line – isi point 1 (0.5,0) – isi point 2 (0.5,-1.22) – klik Apply. 45
  • 46. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang d. Model – Curve – Create – Line – isi point 1 (0.5,-1.22) – isi point 2 (1.25,-1.22) – klik Apply. 46
  • 47. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang e. Model – Curve – Create – Line – isi point 1 (1.25,-1.22) – isi point 2 (1.25,-1.97) – klik Apply. 47
  • 48. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang f. Model – Curve – Create – Line – isi point 1 (1.25,-1.97) – isi point 2 (-1.25,-1.97) – klik Apply. 48
  • 49. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang g. Model – Curve – Create – Line – isi point 1 (-1.25,-1.97) – isi point 2 (-1.25,-1.22) – klik Apply. 49
  • 50. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang h. Model – Curve – Create – Line – isi point 1 (-1.25,-1.22) – isi point 2 (-0.5,-1.22) – klik Apply. 50
  • 51. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang i. Model – Curve – Create – Line – isi point 1 (-0.5,-1.22) – isi point 2 (-0.50) – klik Apply – kemudian Close. 51
  • 52. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang i. Pilih Model – Section – Generate – Sorot semua Line yang telah dibuat sampai garisnya berwarna merah – ceklist calculates properties now – kemudian pilih apply. 52
  • 53. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Program akan secara otomatis menghitung section penampang tersebut, bila benar akan muncul tulisan new plane section {section – P1} is generated and its properties are calculated. 53
  • 54. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Untuk melihat propertiesnya dapat dilihat pada ikon maka akan keluar tabel properties penampang yang kita buat. 54
  • 55. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Penampang yang telah dibuat sekarang akan di eksport ke program MIDAS pada data section list caranya adalah pilih Model – Section – Eksport – Pilih Midas Section File – lalu klik ikon beri nama Pier Head SPC – lalu sorot section yang kita buat sampai berubah jadi warna merah – klik apply – maka section penampang telah disimpan pada section list pada program MIDAS. 55
  • 56. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Buka program Midas buka file modul 1 yang telah dibuat – Model – Properties – Section – Add – klik Value – Cari section penampang General Section – klik import form SPC – cari file dengan nama Pier Head SPC – klik open – pilih section P1 – klik OK. 56
  • 57. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang 57
  • 58. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Maka akan muncul section penampang yang telah dibuat tadi pada program SPC beserta tabel section propertiesnya – beri nama Pier Head SPC – ubah offsetnya jadi center of bottom – lalu klik apply – lalu klik cancel. 58
  • 59. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Pilih section element 4,5,6,7,8,9 yang sebelumnya dengan nama Pier Head ganti Pier Head SPC dengan sistem drag and drop. Drag and Drop 59
  • 60. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Ubah dahalu element local axisnya di model – element - change element parameters – pilih element local axis – Mode beta angle pilih 0 – Apply. 60
  • 61. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang 61