SlideShare a Scribd company logo
1 of 8
CURRICULAM VITAE
SAIFUR RAHMAN
B.E (E&C)
Bin-Qurayacompany.
Al-Khobar,31952 , KSA
E-mail:srahman2001@gmail.com,
Contact: 00966540752072
CAREER SUMMARY:
Having richexperience in the field of Communication and Instrumentation Engineering / QC related to OTN fiber
optic transmission system, and Instrumentation related with substation protection. Sound knowledge indiffer
ent aspects of communication networking and ininstrumentation application and capable of executing projec
t independentlyinaccordance withprojectqualityplan.
Total ProfessionalsExperience: 06 years06 monthsof professional experience inthe fieldof 320/ 230 KV substatio
n protectionandfiberopticcommunication.
Technical certification:
 ARAMCOapprovedTelecommunicationQC(status1)
 ARAMCOapprovedInstrumentationQC(status2)
 Attended60hoursof OFC splicingandOTDRtestingtrainingProgramin
KSA and successfullydone.
 Attended50hoursof Industrial Automationtrainingcourse inIndiaandsuccessfullydone.
 Attended30hoursPLC programmingtrainingcourse inKSA andsuccessfullydone.
 Attended8hoursof trainingprogramon ISO 9001:2008 Awareness
 AttendedOSHA safetyprogramfortrenchexcavationandsuccessfullycertified.
Technical Skills:
 FiberopticSplicing
 Analog/ Digital Communication,
 Logic Design,
 Digital Signal/IPNetwork,
 EPBAX NetworkandDID trunkrouting
 SCADA andPLC’sprogram
WORK EXPERIENCE:
(1) TelecommunicationQCEngineerinBinq-Quraya,KSA
Duration : Sept2014 to till date
Project : Hadeed SalesGas MeteringSystem
Client : Saudi Aramco & SABIC
Designation : TelecommunicationQCEngineer
(Saudi Aramco Approved)
 Preparingtwoweeklook-aheadinspectionSchedule &weeklyQualityreportforsubmittoSaudi
Aramcoinspectiondepartment.
 RaisingRFI(RequestforInspection)throughQMIS(QualityManagementInformationSystem)to
NotifyPIDforInspection.
 AuthorizedbySAPMT/PIDtoissue NCR(Non-conformance Report) toConstructiondepartment
fornon-conformities.
 Reviewingmaterial Requisition(MR),Technical Submittal &Technical queries.
 Controlling&ensuringthe implementationof ProjectqualityplanandSchedule“Q”at site.
 ControllingqualitydocumentsandMaterialsCertificates
 Conductingmaterialsresavinginspectionof all equipmentandMaterialsrequiredforthe project,
verifyingSATIP(Saudi AramcoTypical InspectionPlan),SAIC,Material Request(MR),Non-material
requirement(NMR),Testreport,Technical Submittal,Purchase order,Deliverynote andensure
that the equipment&Materialsare complyingwiththe requirementsSAMSS,Schedule Q,IFC
drawingandConstructionSpecification&Scope of workissue for Project.
 Installationof MDF andlayingof coppercommunicationcable
 Constructionof communicationductbank
(2) Instrumentationand CommunicationQC Engineer in Energy and Power
Contracting Company,KSA (Dec 2011 to July 2014)
(a)
Duration : March 2014 to July 2014
Project : UPGRADE SUBSTATION NO 50 AT JUAYMAHTANK
FARM (BI-10-3444)
Client : Saudi Aramco
Company : Energy & Power Contracting Co. Ltd
Designation : TelecommunicationQCEngineer
(Saudi Aramco Approved)
(b)
Duration : December2013 to July 2014
Project : UPGRADE POWERTRANSMISSION SYSTEM-ABQAIQ
Area BI/JO (BI-10-00633)
Client : Saudi Aramco
Company : Energy& Power Contracting Co. Ltd
Designation : TelecommunicationQCEngineer
(Saudi Aramco Approved)
 Preparingtwoweeklook- aheadinspectionSchedule &weeklyQualityreportforsubmittoSaudi
Aramcoinspectiondepartment.
 RaisingRFI(RequestforInspection)throughQMIS(QualityManagementInformationSystem)to
NotifyPIDforInspection.
 AuthorizedbySAPMT/PIDtoissue NCR(Non-conformance Report) toConstructiondepartment
fornon-conformities.
 Reviewingmaterial Requisition(MR),Technical Submittal &Technical queries.
 Controlling&ensuringthe implementationof Project qualityplanandSchedule“Q”at site.
 ControllingqualitydocumentsandMaterialsCertificates
 Conductingmaterialsresavinginspectionof all equipmentandMaterialsrequiredforthe project,
verifyingSATIP(Saudi AramcoTypical InspectionPlan),SAIC ,Material Request(MR),Non-material
requirement(NMR),Testreport,Technical Submittal,Purchase order,Deliverynote andensure
that the equipment&Materialsare complyingwiththe requirementsSAMSS,Schedule Q,IFC
drawingandConstructionSpecification&Scope of workissue forProject.
 End to endfibertesting,CheckingPowerlossinfiber,Splicingof fiber,
NetworkConnectivity,Looptesting.Detectionof signalingthroughFIBRE bythe use of OTDR
(Optical Time DomainReflectormeter ) for exactlocationof the pointwhere FIBREbreaksand
communicationfails.
 Maintenance of FDF(FiberDistributionFrame).andDrawingof the pathwhere the fiberistobe
laidi.e.ROUTE MAP
(c)
Duration : MARCH - 2012 to DEC – 2013
Project : PowerSupply to Safaniyah (BI-NO-00642)
Client : Saudi Aramco
Company : Energy & Power Contracting Co. Ltd
Designation : COMMUNICATIONANDINSTRUMENTATION
SITE ENGINEER
 End to endfibertesting,CheckingPowerlossinfiber,Splicingof fiber,
NetworkConnectivity,Looptesting.Detectionof signalingthroughFIBRE bythe use of OTDR
(Optical Time DomainReflectormeter ) forexactlocationof the pointwhere FIBREbreaksand
communicationfails,
 Maintenance of FDF(FiberDistributionFrame).andDrawingof the pathwhere the fiberistobe
laidi.e.ROUTE MAP
 Installation,Testingandcommissioningof SYMPLEXFire AlarmSystemforsmokedetector,beam
detector,andSF6 gasdetectorandshutdownof HVACsystem
 Installation,Testingandcommissioningof Gas detectionsystemintegratedwithOSASsystem.
 Installation,Testingandcommissioningof ‘SAUTEREY module 2’buildingautomationsystemfor
HVAC,batterycharger,andexhaustfanbasedonEY3600 and NOVANET.
 8 kmlong FOClayinganditssplicingandterminationinsubstationandcontrol centerforpower
line protectionrelays,OpenSubstationAutomationSystem(OSAS),Powerdistribution
department,RTUmonitoring,LAN system
 Stretchingof 1.2 km longNMFOCwithoverheadtransmissionlines
 Constructionof 8 Km longFOCduct bank
 Layingof fiberopticcable inundergroundconduitanditssplicingatdifferentpedestal,junction
box and patchpanels.
 PowerMeterandOTDR testof NMFOC & OPGW Fiberoptic
 Providingopentransportnetwork( OTN ) fiberoptictransmissionsystemforVoice andPDDRTU
monitoringandcontrol application
 ProvidingtelephonelinethroughOTN fiberoptictransmissionsystem
 Preparationof groundinggridforanareaof 1500 sq meterinsubstationvicinity.
 Installationof 13.8 and 480Kv Switchgearanditsperipheral
(3) SCADA and Electrical In-Charge inAlwatania 50 Mw power station
Duration : MARCH 2010 to MAY 2011
Project : 60 MW POWER STATIONS
Designation : SCADA AND ELECTRICAL In-Charge
 End to endfibertesting,CheckingPowerlossinfiber,Splicingof fiber,
NetworkConnectivity,Looptesting.Detectionof signalingthrough FIBRE bythe use of OTDR
(Optical Time DomainReflectormeter ) forexactlocationof the pointwhere FIBREbreaksand
communicationfails,
 Maintenance of FDF(FiberDistributionFrame).andDrawingof the pathwhere the fiberistobe
laidi.e.ROUTE MAP
 PLC andSCADA programming
 Troubleshootingthe problemoccurringwithPLC’sanditsrelatedcommunicationEquipment.
 Troubleshootingthe problemsoccurringinoptical fibercommunicationcable
 Maintenance of twomainstationof capacity60 MW and 8 Substationsof capacity10 MW.
 Responsible foroperatingandmaintainingthe plantequipmentsuchasvoltage Stabilizer,circuit
breaker,Plc.’s Transformer,3-phase inductionmotors,overheadcrane
 Responsible formaintenance of operationroompanelsandtransmissionlinebreakdown
 Responsible forelectricalscheduledmaintenance of DEUTZM640 engines.
 Responsible forbreakdownmaintenance of HT transmissionlinesand step- downtransformersat
RTU’s
 Responsible formaintenance of stepuptransformers
 Responsible formaintenance of circuitbreakerof eachfeeder
 Tookthe leadershipin assuringthatelectrical activitiesare performedsafelyandin accordance
withSOPmanualswhichwasmade as per ISOstandards.
 Responsible forthe implementationof relevant IEEEEngineeringStandardsandapprovedindustry
standard.
 Performedqualitycontrolsurveillance forconstructionandinstallation,ensuringthatwork
proceduresare carriedoutaccordingto establishedQualityPlansandProcedure
 Reviewthe calibrationstatusof anytestequipmentbeingutilizedonthe project, ensuringthe
equipmentiswithincalibrationpriortouse.
 Provide supportandadvice tothe constructionpersonnel inrelationtothe ProjectQuality
Program
 Coordinate withthe enduser’sto ensure thatinspectionsare carriedoutexpediently
 Conductingregularinternalauditsandreviewsatsupplierlocationtoensure adherence
(4) Job Profile: CommunicationQC Engineerin Max Balaji Pvt. Ltd. India
Duration : AUG - 2008 to DEC – 2009
Designation : QA/QC Engineer
 Reviewingapproveddrawingandpreparingmaterial takeoff.
 Preparationof ITP(Inspection&TestPlan),QCP(QualityControlProcedure) &QCF (Quality
Control Forms)
 ObtainedcompetencyinunderstandingMethodstatements,Inspections&TestPlans,Test
Procedures,PreparingSite InspectionformsandTestreports
 Preparationof Site documentationtoensure the shopDrawings,MethodStatements,Material
Submittals,TestingProcedures,Testingequipmentandcertificatesare uptodate.
 Preparationof submittalsof FourweeklooksAheadProcurementScheduletothe Construction
department.
 AttendingweeklyprojectProcurement,progressmeetingandto discussmattersrelevantto
QualityissuesandProjectprogress.
 Responsible for Preparation of Bill of Quantity of Materials requiredfor the smooth run of Projects.
 End to endfibertesting,CheckingPowerlossinFiber,Splicingof fiber.
TestingatShort haul andlong haul.
NetworkConnectivity,Looptesting.Detectionof signalingthroughFIBRE bythe use of OTDR
(Optical Time DomainReflectormeter ) forexactlocationof the pointwhere FIBREbreaksand
communicationfails,Maintenance of FDF(FiberDistributionFrame).andDrawingof the path
where the fiberistobe laidi.e.ROUTE MAP
 ProficientinLAN/WAN Design&Support,FiberOpticTechnologiesandDataNetworking
Implementation.
 ExpertinDWDM, SDH/ SONET,Optical Switches,IPTechnologies,Digital andOptical Cross
Connects,NetworkIntegration,ManagementSystems(EMS/NMS),etc.
 FamiliarwithITU,IEEE and otherInternationalStandardsapplicable toTelecomandITfields.
 Excellentqualitiessuchasteamwork,leadership,negotiation,analysis,andcommunication.
PERSONAL QUALIFICATIONS
BachelorinEngineering : (Electronics&Communication)
University : VTU Karnataka
College : M.S. EngineeringCollege,Bangalore
LANGUAGEAND APPLICATIONS
 C/C++, SQL,
 Internet/HTML
 MS Office
 WordPerfect
 Xilinx, Matlab
OPERATING SYSTEM AND DATABASE
 WindowsVista/XP
 UNIX,MS-DOS, O/S2,
 Macintosh,Oracle
PASSPORT DETAILS
 PassportNumber : H 8210390
 IssuedFrom : Bangalore
 IssuedDate : 06-11-2009
 Expire on : 07-11-2019
DRIVING LICENSE
 IssuedFrom : Saudi Arabia
 Expire on : 27-08-2020
 License number : 2287232835
PERSONAL DETAILS
 Name : SaifurRahman
 Gender : Male
 Date of Birth : 13-02-1986
 Religion : Islam
 Nationality : Indian
 Marital Status : Married
 Languages : English,Hindi &Urdu, Arabic
 Height : 172 cm
 Weight : 65 kg
 BloodGroup : ‘B’ Positive
DECLARATION
I herebydeclare thatall the above informationprovidediscorrecttothe bestof my knowledgeandbeli
ef.
Place:Saudi Arabia
Date: 11-05-2015 ( SAIFURRAHMAN )

More Related Content

What's hot (19)

Telecom Instument engineer
Telecom  Instument engineerTelecom  Instument engineer
Telecom Instument engineer
 
Rahul resume.
Rahul resume.Rahul resume.
Rahul resume.
 
Wilmar Sibayan CV
Wilmar Sibayan CVWilmar Sibayan CV
Wilmar Sibayan CV
 
shajeer cv
shajeer cvshajeer cv
shajeer cv
 
BSS Updated cv
BSS Updated cvBSS Updated cv
BSS Updated cv
 
Arslan Sarwar_CV
Arslan Sarwar_CVArslan Sarwar_CV
Arslan Sarwar_CV
 
Cv shafiq
Cv shafiqCv shafiq
Cv shafiq
 
Waqas_Abbasi
Waqas_AbbasiWaqas_Abbasi
Waqas_Abbasi
 
imran cv (1)
imran cv (1)imran cv (1)
imran cv (1)
 
Hitender Sharma Resume
Hitender Sharma ResumeHitender Sharma Resume
Hitender Sharma Resume
 
LTE crash course
LTE crash courseLTE crash course
LTE crash course
 
Professional Resume of cesar 01
Professional Resume of cesar 01Professional Resume of cesar 01
Professional Resume of cesar 01
 
Yan zhang resume
Yan zhang   resumeYan zhang   resume
Yan zhang resume
 
Divaker resume updated
Divaker resume updatedDivaker resume updated
Divaker resume updated
 
Pravin netalkar
Pravin netalkarPravin netalkar
Pravin netalkar
 
suresh resume
suresh resumesuresh resume
suresh resume
 
ATEI PII SBIR Proj Description 5 Feb 2013
ATEI PII SBIR Proj Description 5 Feb 2013ATEI PII SBIR Proj Description 5 Feb 2013
ATEI PII SBIR Proj Description 5 Feb 2013
 
Rohit Choudhary Resume
Rohit Choudhary ResumeRohit Choudhary Resume
Rohit Choudhary Resume
 
Network protocol testing_5+ Yrs. Exp._CCNP Certified
Network protocol testing_5+ Yrs. Exp._CCNP CertifiedNetwork protocol testing_5+ Yrs. Exp._CCNP Certified
Network protocol testing_5+ Yrs. Exp._CCNP Certified
 

Viewers also liked

Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, JaipurTraining from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, JaipurR-One Power
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protectionBinit Das
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION moiz89
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-StationTowfiqur Rahman
 

Viewers also liked (7)

2016 CAREER FAIR RESUME
2016 CAREER FAIR RESUME2016 CAREER FAIR RESUME
2016 CAREER FAIR RESUME
 
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, JaipurTraining from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protection
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-Station
 

Similar to SRahman.CV

Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020minhaj uddin khan
 
CV- Vinu Kumar
CV- Vinu KumarCV- Vinu Kumar
CV- Vinu KumarViNu Kumar
 
Mohd.RiyazKhan_Resume.docx
Mohd.RiyazKhan_Resume.docxMohd.RiyazKhan_Resume.docx
Mohd.RiyazKhan_Resume.docxRIYAZ Khan
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMazhar Ali
 
Engr.kamran shahid cv
Engr.kamran shahid cvEngr.kamran shahid cv
Engr.kamran shahid cvKamran Shahid
 
Peter Rafferty CV Permenant
Peter Rafferty CV PermenantPeter Rafferty CV Permenant
Peter Rafferty CV PermenantPeter Rafferty
 
Alpesh Joshi Optical Expert
Alpesh Joshi Optical ExpertAlpesh Joshi Optical Expert
Alpesh Joshi Optical ExpertAlpesh Joshi
 
My updated CV January 2015
My updated CV January  2015My updated CV January  2015
My updated CV January 2015Joson Fernando
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071Nithy Anantham
 
Telecom Radio RF Engineer
Telecom Radio RF EngineerTelecom Radio RF Engineer
Telecom Radio RF EngineerKamran Saeed
 
Resume from bhupathi ramu
Resume from bhupathi ramuResume from bhupathi ramu
Resume from bhupathi ramuSriramBhupathi1
 
Iprofessional
IprofessionalIprofessional
Iprofessionalkaraguppi
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeIqbal Mohamed
 

Similar to SRahman.CV (20)

Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020
 
CV- Vinu Kumar
CV- Vinu KumarCV- Vinu Kumar
CV- Vinu Kumar
 
Mohd.RiyazKhan_Resume.docx
Mohd.RiyazKhan_Resume.docxMohd.RiyazKhan_Resume.docx
Mohd.RiyazKhan_Resume.docx
 
BAHAELDIN CV.
BAHAELDIN CV.BAHAELDIN CV.
BAHAELDIN CV.
 
ANJUM CV-1
ANJUM CV-1ANJUM CV-1
ANJUM CV-1
 
Obaidullah_CV
Obaidullah_CVObaidullah_CV
Obaidullah_CV
 
Riaz mahmood
Riaz mahmoodRiaz mahmood
Riaz mahmood
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
CV
CVCV
CV
 
Pakistan cv 1
Pakistan  cv 1Pakistan  cv 1
Pakistan cv 1
 
Engr.kamran shahid cv
Engr.kamran shahid cvEngr.kamran shahid cv
Engr.kamran shahid cv
 
RESUME1 (2)
RESUME1 (2)RESUME1 (2)
RESUME1 (2)
 
Peter Rafferty CV Permenant
Peter Rafferty CV PermenantPeter Rafferty CV Permenant
Peter Rafferty CV Permenant
 
Alpesh Joshi Optical Expert
Alpesh Joshi Optical ExpertAlpesh Joshi Optical Expert
Alpesh Joshi Optical Expert
 
My updated CV January 2015
My updated CV January  2015My updated CV January  2015
My updated CV January 2015
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
 
Telecom Radio RF Engineer
Telecom Radio RF EngineerTelecom Radio RF Engineer
Telecom Radio RF Engineer
 
Resume from bhupathi ramu
Resume from bhupathi ramuResume from bhupathi ramu
Resume from bhupathi ramu
 
Iprofessional
IprofessionalIprofessional
Iprofessional
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 

More from Saifur rahman

OMPPD-Saudi kad status 1
OMPPD-Saudi kad status 1OMPPD-Saudi kad status 1
OMPPD-Saudi kad status 1Saifur rahman
 
Alwatania Experience
Alwatania ExperienceAlwatania Experience
Alwatania ExperienceSaifur rahman
 
Aramco experience letter
Aramco experience letterAramco experience letter
Aramco experience letterSaifur rahman
 
JUAYMAH QC approval.PDF
JUAYMAH QC approval.PDFJUAYMAH QC approval.PDF
JUAYMAH QC approval.PDFSaifur rahman
 
Abqaiq status 1 approval-1
Abqaiq status 1 approval-1Abqaiq status 1 approval-1
Abqaiq status 1 approval-1Saifur rahman
 

More from Saifur rahman (6)

OMPPD-Saudi kad status 1
OMPPD-Saudi kad status 1OMPPD-Saudi kad status 1
OMPPD-Saudi kad status 1
 
Alwatania Experience
Alwatania ExperienceAlwatania Experience
Alwatania Experience
 
Aramco experience letter
Aramco experience letterAramco experience letter
Aramco experience letter
 
bq approval
bq approvalbq approval
bq approval
 
JUAYMAH QC approval.PDF
JUAYMAH QC approval.PDFJUAYMAH QC approval.PDF
JUAYMAH QC approval.PDF
 
Abqaiq status 1 approval-1
Abqaiq status 1 approval-1Abqaiq status 1 approval-1
Abqaiq status 1 approval-1
 

SRahman.CV

  • 1. CURRICULAM VITAE SAIFUR RAHMAN B.E (E&C) Bin-Qurayacompany. Al-Khobar,31952 , KSA E-mail:srahman2001@gmail.com, Contact: 00966540752072 CAREER SUMMARY: Having richexperience in the field of Communication and Instrumentation Engineering / QC related to OTN fiber optic transmission system, and Instrumentation related with substation protection. Sound knowledge indiffer ent aspects of communication networking and ininstrumentation application and capable of executing projec t independentlyinaccordance withprojectqualityplan. Total ProfessionalsExperience: 06 years06 monthsof professional experience inthe fieldof 320/ 230 KV substatio n protectionandfiberopticcommunication. Technical certification:  ARAMCOapprovedTelecommunicationQC(status1)  ARAMCOapprovedInstrumentationQC(status2)  Attended60hoursof OFC splicingandOTDRtestingtrainingProgramin KSA and successfullydone.  Attended50hoursof Industrial Automationtrainingcourse inIndiaandsuccessfullydone.  Attended30hoursPLC programmingtrainingcourse inKSA andsuccessfullydone.  Attended8hoursof trainingprogramon ISO 9001:2008 Awareness  AttendedOSHA safetyprogramfortrenchexcavationandsuccessfullycertified. Technical Skills:  FiberopticSplicing  Analog/ Digital Communication,  Logic Design,  Digital Signal/IPNetwork,  EPBAX NetworkandDID trunkrouting  SCADA andPLC’sprogram
  • 2. WORK EXPERIENCE: (1) TelecommunicationQCEngineerinBinq-Quraya,KSA Duration : Sept2014 to till date Project : Hadeed SalesGas MeteringSystem Client : Saudi Aramco & SABIC Designation : TelecommunicationQCEngineer (Saudi Aramco Approved)  Preparingtwoweeklook-aheadinspectionSchedule &weeklyQualityreportforsubmittoSaudi Aramcoinspectiondepartment.  RaisingRFI(RequestforInspection)throughQMIS(QualityManagementInformationSystem)to NotifyPIDforInspection.  AuthorizedbySAPMT/PIDtoissue NCR(Non-conformance Report) toConstructiondepartment fornon-conformities.  Reviewingmaterial Requisition(MR),Technical Submittal &Technical queries.  Controlling&ensuringthe implementationof ProjectqualityplanandSchedule“Q”at site.  ControllingqualitydocumentsandMaterialsCertificates  Conductingmaterialsresavinginspectionof all equipmentandMaterialsrequiredforthe project, verifyingSATIP(Saudi AramcoTypical InspectionPlan),SAIC,Material Request(MR),Non-material requirement(NMR),Testreport,Technical Submittal,Purchase order,Deliverynote andensure that the equipment&Materialsare complyingwiththe requirementsSAMSS,Schedule Q,IFC drawingandConstructionSpecification&Scope of workissue for Project.  Installationof MDF andlayingof coppercommunicationcable  Constructionof communicationductbank (2) Instrumentationand CommunicationQC Engineer in Energy and Power Contracting Company,KSA (Dec 2011 to July 2014)
  • 3. (a) Duration : March 2014 to July 2014 Project : UPGRADE SUBSTATION NO 50 AT JUAYMAHTANK FARM (BI-10-3444) Client : Saudi Aramco Company : Energy & Power Contracting Co. Ltd Designation : TelecommunicationQCEngineer (Saudi Aramco Approved) (b) Duration : December2013 to July 2014 Project : UPGRADE POWERTRANSMISSION SYSTEM-ABQAIQ Area BI/JO (BI-10-00633) Client : Saudi Aramco Company : Energy& Power Contracting Co. Ltd Designation : TelecommunicationQCEngineer (Saudi Aramco Approved)  Preparingtwoweeklook- aheadinspectionSchedule &weeklyQualityreportforsubmittoSaudi Aramcoinspectiondepartment.  RaisingRFI(RequestforInspection)throughQMIS(QualityManagementInformationSystem)to NotifyPIDforInspection.  AuthorizedbySAPMT/PIDtoissue NCR(Non-conformance Report) toConstructiondepartment fornon-conformities.  Reviewingmaterial Requisition(MR),Technical Submittal &Technical queries.  Controlling&ensuringthe implementationof Project qualityplanandSchedule“Q”at site.  ControllingqualitydocumentsandMaterialsCertificates  Conductingmaterialsresavinginspectionof all equipmentandMaterialsrequiredforthe project,
  • 4. verifyingSATIP(Saudi AramcoTypical InspectionPlan),SAIC ,Material Request(MR),Non-material requirement(NMR),Testreport,Technical Submittal,Purchase order,Deliverynote andensure that the equipment&Materialsare complyingwiththe requirementsSAMSS,Schedule Q,IFC drawingandConstructionSpecification&Scope of workissue forProject.  End to endfibertesting,CheckingPowerlossinfiber,Splicingof fiber, NetworkConnectivity,Looptesting.Detectionof signalingthroughFIBRE bythe use of OTDR (Optical Time DomainReflectormeter ) for exactlocationof the pointwhere FIBREbreaksand communicationfails.  Maintenance of FDF(FiberDistributionFrame).andDrawingof the pathwhere the fiberistobe laidi.e.ROUTE MAP (c) Duration : MARCH - 2012 to DEC – 2013 Project : PowerSupply to Safaniyah (BI-NO-00642) Client : Saudi Aramco Company : Energy & Power Contracting Co. Ltd Designation : COMMUNICATIONANDINSTRUMENTATION SITE ENGINEER  End to endfibertesting,CheckingPowerlossinfiber,Splicingof fiber, NetworkConnectivity,Looptesting.Detectionof signalingthroughFIBRE bythe use of OTDR (Optical Time DomainReflectormeter ) forexactlocationof the pointwhere FIBREbreaksand communicationfails,  Maintenance of FDF(FiberDistributionFrame).andDrawingof the pathwhere the fiberistobe laidi.e.ROUTE MAP  Installation,Testingandcommissioningof SYMPLEXFire AlarmSystemforsmokedetector,beam detector,andSF6 gasdetectorandshutdownof HVACsystem  Installation,Testingandcommissioningof Gas detectionsystemintegratedwithOSASsystem.  Installation,Testingandcommissioningof ‘SAUTEREY module 2’buildingautomationsystemfor HVAC,batterycharger,andexhaustfanbasedonEY3600 and NOVANET.  8 kmlong FOClayinganditssplicingandterminationinsubstationandcontrol centerforpower line protectionrelays,OpenSubstationAutomationSystem(OSAS),Powerdistribution department,RTUmonitoring,LAN system  Stretchingof 1.2 km longNMFOCwithoverheadtransmissionlines  Constructionof 8 Km longFOCduct bank  Layingof fiberopticcable inundergroundconduitanditssplicingatdifferentpedestal,junction box and patchpanels.  PowerMeterandOTDR testof NMFOC & OPGW Fiberoptic
  • 5.  Providingopentransportnetwork( OTN ) fiberoptictransmissionsystemforVoice andPDDRTU monitoringandcontrol application  ProvidingtelephonelinethroughOTN fiberoptictransmissionsystem  Preparationof groundinggridforanareaof 1500 sq meterinsubstationvicinity.  Installationof 13.8 and 480Kv Switchgearanditsperipheral (3) SCADA and Electrical In-Charge inAlwatania 50 Mw power station Duration : MARCH 2010 to MAY 2011 Project : 60 MW POWER STATIONS Designation : SCADA AND ELECTRICAL In-Charge  End to endfibertesting,CheckingPowerlossinfiber,Splicingof fiber, NetworkConnectivity,Looptesting.Detectionof signalingthrough FIBRE bythe use of OTDR (Optical Time DomainReflectormeter ) forexactlocationof the pointwhere FIBREbreaksand communicationfails,  Maintenance of FDF(FiberDistributionFrame).andDrawingof the pathwhere the fiberistobe laidi.e.ROUTE MAP  PLC andSCADA programming  Troubleshootingthe problemoccurringwithPLC’sanditsrelatedcommunicationEquipment.  Troubleshootingthe problemsoccurringinoptical fibercommunicationcable  Maintenance of twomainstationof capacity60 MW and 8 Substationsof capacity10 MW.  Responsible foroperatingandmaintainingthe plantequipmentsuchasvoltage Stabilizer,circuit breaker,Plc.’s Transformer,3-phase inductionmotors,overheadcrane  Responsible formaintenance of operationroompanelsandtransmissionlinebreakdown  Responsible forelectricalscheduledmaintenance of DEUTZM640 engines.  Responsible forbreakdownmaintenance of HT transmissionlinesand step- downtransformersat RTU’s  Responsible formaintenance of stepuptransformers  Responsible formaintenance of circuitbreakerof eachfeeder  Tookthe leadershipin assuringthatelectrical activitiesare performedsafelyandin accordance withSOPmanualswhichwasmade as per ISOstandards.  Responsible forthe implementationof relevant IEEEEngineeringStandardsandapprovedindustry standard.  Performedqualitycontrolsurveillance forconstructionandinstallation,ensuringthatwork proceduresare carriedoutaccordingto establishedQualityPlansandProcedure  Reviewthe calibrationstatusof anytestequipmentbeingutilizedonthe project, ensuringthe equipmentiswithincalibrationpriortouse.
  • 6.  Provide supportandadvice tothe constructionpersonnel inrelationtothe ProjectQuality Program  Coordinate withthe enduser’sto ensure thatinspectionsare carriedoutexpediently  Conductingregularinternalauditsandreviewsatsupplierlocationtoensure adherence (4) Job Profile: CommunicationQC Engineerin Max Balaji Pvt. Ltd. India Duration : AUG - 2008 to DEC – 2009 Designation : QA/QC Engineer  Reviewingapproveddrawingandpreparingmaterial takeoff.  Preparationof ITP(Inspection&TestPlan),QCP(QualityControlProcedure) &QCF (Quality Control Forms)  ObtainedcompetencyinunderstandingMethodstatements,Inspections&TestPlans,Test Procedures,PreparingSite InspectionformsandTestreports  Preparationof Site documentationtoensure the shopDrawings,MethodStatements,Material Submittals,TestingProcedures,Testingequipmentandcertificatesare uptodate.  Preparationof submittalsof FourweeklooksAheadProcurementScheduletothe Construction department.  AttendingweeklyprojectProcurement,progressmeetingandto discussmattersrelevantto QualityissuesandProjectprogress.  Responsible for Preparation of Bill of Quantity of Materials requiredfor the smooth run of Projects.  End to endfibertesting,CheckingPowerlossinFiber,Splicingof fiber. TestingatShort haul andlong haul. NetworkConnectivity,Looptesting.Detectionof signalingthroughFIBRE bythe use of OTDR (Optical Time DomainReflectormeter ) forexactlocationof the pointwhere FIBREbreaksand communicationfails,Maintenance of FDF(FiberDistributionFrame).andDrawingof the path where the fiberistobe laidi.e.ROUTE MAP  ProficientinLAN/WAN Design&Support,FiberOpticTechnologiesandDataNetworking Implementation.  ExpertinDWDM, SDH/ SONET,Optical Switches,IPTechnologies,Digital andOptical Cross Connects,NetworkIntegration,ManagementSystems(EMS/NMS),etc.  FamiliarwithITU,IEEE and otherInternationalStandardsapplicable toTelecomandITfields.  Excellentqualitiessuchasteamwork,leadership,negotiation,analysis,andcommunication. PERSONAL QUALIFICATIONS BachelorinEngineering : (Electronics&Communication) University : VTU Karnataka College : M.S. EngineeringCollege,Bangalore
  • 7. LANGUAGEAND APPLICATIONS  C/C++, SQL,  Internet/HTML  MS Office  WordPerfect  Xilinx, Matlab OPERATING SYSTEM AND DATABASE  WindowsVista/XP  UNIX,MS-DOS, O/S2,  Macintosh,Oracle PASSPORT DETAILS  PassportNumber : H 8210390  IssuedFrom : Bangalore  IssuedDate : 06-11-2009  Expire on : 07-11-2019 DRIVING LICENSE  IssuedFrom : Saudi Arabia  Expire on : 27-08-2020  License number : 2287232835 PERSONAL DETAILS  Name : SaifurRahman  Gender : Male  Date of Birth : 13-02-1986  Religion : Islam  Nationality : Indian  Marital Status : Married  Languages : English,Hindi &Urdu, Arabic  Height : 172 cm  Weight : 65 kg  BloodGroup : ‘B’ Positive
  • 8. DECLARATION I herebydeclare thatall the above informationprovidediscorrecttothe bestof my knowledgeandbeli ef. Place:Saudi Arabia Date: 11-05-2015 ( SAIFURRAHMAN )