Having richexperience in the field of Communication and Instrumentation Engineering / QC related to OTN fiber
optic transmission system, and Instrumentation related with substation protection. Sound knowledge indiffer
ent aspects of communication networking and ininstrumentation application and capable of executing projec
t independentlyinaccordance withprojectqualityplan.
Total ProfessionalsExperience: 06 years06 monthsof professional experience inthe fieldof 320/ 230 KV substatio
n protectionandfiberopticcommunication.
Technical certification:
ARAMCOapprovedTelecommunicationQC(status1)
ARAMCOapprovedInstrumentationQC(status2)
Attended60hoursof OFC splicingandOTDRtestingtrainingProgramin
KSA and successfullydone.
Attended50hoursof Industrial Automationtrainingcourse inIndiaandsuccessfullydone.
Attended30hoursPLC programmingtrainingcourse inKSA andsuccessfullydone.
Attended8hoursof trainingprogramon ISO 9001:2008 Awareness
AttendedOSHA safetyprogramfortrenchexcavationandsuccessfullycertified.
Technical Skills:
FiberopticSplicing
Analog/ Digital Communication,
Logic Design,
Digital Signal/IPNetwork,
EPBAX NetworkandDID trunkrouting
SCADA andPLC’sprogram
2. WORK EXPERIENCE:
(1) TelecommunicationQCEngineerinBinq-Quraya,KSA
Duration : Sept2014 to till date
Project : Hadeed SalesGas MeteringSystem
Client : Saudi Aramco & SABIC
Designation : TelecommunicationQCEngineer
(Saudi Aramco Approved)
Preparingtwoweeklook-aheadinspectionSchedule &weeklyQualityreportforsubmittoSaudi
Aramcoinspectiondepartment.
RaisingRFI(RequestforInspection)throughQMIS(QualityManagementInformationSystem)to
NotifyPIDforInspection.
AuthorizedbySAPMT/PIDtoissue NCR(Non-conformance Report) toConstructiondepartment
fornon-conformities.
Reviewingmaterial Requisition(MR),Technical Submittal &Technical queries.
Controlling&ensuringthe implementationof ProjectqualityplanandSchedule“Q”at site.
ControllingqualitydocumentsandMaterialsCertificates
Conductingmaterialsresavinginspectionof all equipmentandMaterialsrequiredforthe project,
verifyingSATIP(Saudi AramcoTypical InspectionPlan),SAIC,Material Request(MR),Non-material
requirement(NMR),Testreport,Technical Submittal,Purchase order,Deliverynote andensure
that the equipment&Materialsare complyingwiththe requirementsSAMSS,Schedule Q,IFC
drawingandConstructionSpecification&Scope of workissue for Project.
Installationof MDF andlayingof coppercommunicationcable
Constructionof communicationductbank
(2) Instrumentationand CommunicationQC Engineer in Energy and Power
Contracting Company,KSA (Dec 2011 to July 2014)
3. (a)
Duration : March 2014 to July 2014
Project : UPGRADE SUBSTATION NO 50 AT JUAYMAHTANK
FARM (BI-10-3444)
Client : Saudi Aramco
Company : Energy & Power Contracting Co. Ltd
Designation : TelecommunicationQCEngineer
(Saudi Aramco Approved)
(b)
Duration : December2013 to July 2014
Project : UPGRADE POWERTRANSMISSION SYSTEM-ABQAIQ
Area BI/JO (BI-10-00633)
Client : Saudi Aramco
Company : Energy& Power Contracting Co. Ltd
Designation : TelecommunicationQCEngineer
(Saudi Aramco Approved)
Preparingtwoweeklook- aheadinspectionSchedule &weeklyQualityreportforsubmittoSaudi
Aramcoinspectiondepartment.
RaisingRFI(RequestforInspection)throughQMIS(QualityManagementInformationSystem)to
NotifyPIDforInspection.
AuthorizedbySAPMT/PIDtoissue NCR(Non-conformance Report) toConstructiondepartment
fornon-conformities.
Reviewingmaterial Requisition(MR),Technical Submittal &Technical queries.
Controlling&ensuringthe implementationof Project qualityplanandSchedule“Q”at site.
ControllingqualitydocumentsandMaterialsCertificates
Conductingmaterialsresavinginspectionof all equipmentandMaterialsrequiredforthe project,
4. verifyingSATIP(Saudi AramcoTypical InspectionPlan),SAIC ,Material Request(MR),Non-material
requirement(NMR),Testreport,Technical Submittal,Purchase order,Deliverynote andensure
that the equipment&Materialsare complyingwiththe requirementsSAMSS,Schedule Q,IFC
drawingandConstructionSpecification&Scope of workissue forProject.
End to endfibertesting,CheckingPowerlossinfiber,Splicingof fiber,
NetworkConnectivity,Looptesting.Detectionof signalingthroughFIBRE bythe use of OTDR
(Optical Time DomainReflectormeter ) for exactlocationof the pointwhere FIBREbreaksand
communicationfails.
Maintenance of FDF(FiberDistributionFrame).andDrawingof the pathwhere the fiberistobe
laidi.e.ROUTE MAP
(c)
Duration : MARCH - 2012 to DEC – 2013
Project : PowerSupply to Safaniyah (BI-NO-00642)
Client : Saudi Aramco
Company : Energy & Power Contracting Co. Ltd
Designation : COMMUNICATIONANDINSTRUMENTATION
SITE ENGINEER
End to endfibertesting,CheckingPowerlossinfiber,Splicingof fiber,
NetworkConnectivity,Looptesting.Detectionof signalingthroughFIBRE bythe use of OTDR
(Optical Time DomainReflectormeter ) forexactlocationof the pointwhere FIBREbreaksand
communicationfails,
Maintenance of FDF(FiberDistributionFrame).andDrawingof the pathwhere the fiberistobe
laidi.e.ROUTE MAP
Installation,Testingandcommissioningof SYMPLEXFire AlarmSystemforsmokedetector,beam
detector,andSF6 gasdetectorandshutdownof HVACsystem
Installation,Testingandcommissioningof Gas detectionsystemintegratedwithOSASsystem.
Installation,Testingandcommissioningof ‘SAUTEREY module 2’buildingautomationsystemfor
HVAC,batterycharger,andexhaustfanbasedonEY3600 and NOVANET.
8 kmlong FOClayinganditssplicingandterminationinsubstationandcontrol centerforpower
line protectionrelays,OpenSubstationAutomationSystem(OSAS),Powerdistribution
department,RTUmonitoring,LAN system
Stretchingof 1.2 km longNMFOCwithoverheadtransmissionlines
Constructionof 8 Km longFOCduct bank
Layingof fiberopticcable inundergroundconduitanditssplicingatdifferentpedestal,junction
box and patchpanels.
PowerMeterandOTDR testof NMFOC & OPGW Fiberoptic
5. Providingopentransportnetwork( OTN ) fiberoptictransmissionsystemforVoice andPDDRTU
monitoringandcontrol application
ProvidingtelephonelinethroughOTN fiberoptictransmissionsystem
Preparationof groundinggridforanareaof 1500 sq meterinsubstationvicinity.
Installationof 13.8 and 480Kv Switchgearanditsperipheral
(3) SCADA and Electrical In-Charge inAlwatania 50 Mw power station
Duration : MARCH 2010 to MAY 2011
Project : 60 MW POWER STATIONS
Designation : SCADA AND ELECTRICAL In-Charge
End to endfibertesting,CheckingPowerlossinfiber,Splicingof fiber,
NetworkConnectivity,Looptesting.Detectionof signalingthrough FIBRE bythe use of OTDR
(Optical Time DomainReflectormeter ) forexactlocationof the pointwhere FIBREbreaksand
communicationfails,
Maintenance of FDF(FiberDistributionFrame).andDrawingof the pathwhere the fiberistobe
laidi.e.ROUTE MAP
PLC andSCADA programming
Troubleshootingthe problemoccurringwithPLC’sanditsrelatedcommunicationEquipment.
Troubleshootingthe problemsoccurringinoptical fibercommunicationcable
Maintenance of twomainstationof capacity60 MW and 8 Substationsof capacity10 MW.
Responsible foroperatingandmaintainingthe plantequipmentsuchasvoltage Stabilizer,circuit
breaker,Plc.’s Transformer,3-phase inductionmotors,overheadcrane
Responsible formaintenance of operationroompanelsandtransmissionlinebreakdown
Responsible forelectricalscheduledmaintenance of DEUTZM640 engines.
Responsible forbreakdownmaintenance of HT transmissionlinesand step- downtransformersat
RTU’s
Responsible formaintenance of stepuptransformers
Responsible formaintenance of circuitbreakerof eachfeeder
Tookthe leadershipin assuringthatelectrical activitiesare performedsafelyandin accordance
withSOPmanualswhichwasmade as per ISOstandards.
Responsible forthe implementationof relevant IEEEEngineeringStandardsandapprovedindustry
standard.
Performedqualitycontrolsurveillance forconstructionandinstallation,ensuringthatwork
proceduresare carriedoutaccordingto establishedQualityPlansandProcedure
Reviewthe calibrationstatusof anytestequipmentbeingutilizedonthe project, ensuringthe
equipmentiswithincalibrationpriortouse.
6. Provide supportandadvice tothe constructionpersonnel inrelationtothe ProjectQuality
Program
Coordinate withthe enduser’sto ensure thatinspectionsare carriedoutexpediently
Conductingregularinternalauditsandreviewsatsupplierlocationtoensure adherence
(4) Job Profile: CommunicationQC Engineerin Max Balaji Pvt. Ltd. India
Duration : AUG - 2008 to DEC – 2009
Designation : QA/QC Engineer
Reviewingapproveddrawingandpreparingmaterial takeoff.
Preparationof ITP(Inspection&TestPlan),QCP(QualityControlProcedure) &QCF (Quality
Control Forms)
ObtainedcompetencyinunderstandingMethodstatements,Inspections&TestPlans,Test
Procedures,PreparingSite InspectionformsandTestreports
Preparationof Site documentationtoensure the shopDrawings,MethodStatements,Material
Submittals,TestingProcedures,Testingequipmentandcertificatesare uptodate.
Preparationof submittalsof FourweeklooksAheadProcurementScheduletothe Construction
department.
AttendingweeklyprojectProcurement,progressmeetingandto discussmattersrelevantto
QualityissuesandProjectprogress.
Responsible for Preparation of Bill of Quantity of Materials requiredfor the smooth run of Projects.
End to endfibertesting,CheckingPowerlossinFiber,Splicingof fiber.
TestingatShort haul andlong haul.
NetworkConnectivity,Looptesting.Detectionof signalingthroughFIBRE bythe use of OTDR
(Optical Time DomainReflectormeter ) forexactlocationof the pointwhere FIBREbreaksand
communicationfails,Maintenance of FDF(FiberDistributionFrame).andDrawingof the path
where the fiberistobe laidi.e.ROUTE MAP
ProficientinLAN/WAN Design&Support,FiberOpticTechnologiesandDataNetworking
Implementation.
ExpertinDWDM, SDH/ SONET,Optical Switches,IPTechnologies,Digital andOptical Cross
Connects,NetworkIntegration,ManagementSystems(EMS/NMS),etc.
FamiliarwithITU,IEEE and otherInternationalStandardsapplicable toTelecomandITfields.
Excellentqualitiessuchasteamwork,leadership,negotiation,analysis,andcommunication.
PERSONAL QUALIFICATIONS
BachelorinEngineering : (Electronics&Communication)
University : VTU Karnataka
College : M.S. EngineeringCollege,Bangalore
7. LANGUAGEAND APPLICATIONS
C/C++, SQL,
Internet/HTML
MS Office
WordPerfect
Xilinx, Matlab
OPERATING SYSTEM AND DATABASE
WindowsVista/XP
UNIX,MS-DOS, O/S2,
Macintosh,Oracle
PASSPORT DETAILS
PassportNumber : H 8210390
IssuedFrom : Bangalore
IssuedDate : 06-11-2009
Expire on : 07-11-2019
DRIVING LICENSE
IssuedFrom : Saudi Arabia
Expire on : 27-08-2020
License number : 2287232835
PERSONAL DETAILS
Name : SaifurRahman
Gender : Male
Date of Birth : 13-02-1986
Religion : Islam
Nationality : Indian
Marital Status : Married
Languages : English,Hindi &Urdu, Arabic
Height : 172 cm
Weight : 65 kg
BloodGroup : ‘B’ Positive
8. DECLARATION
I herebydeclare thatall the above informationprovidediscorrecttothe bestof my knowledgeandbeli
ef.
Place:Saudi Arabia
Date: 11-05-2015 ( SAIFURRAHMAN )