SlideShare a Scribd company logo
1 of 4
001 Kalibo st. Lourdes Sur East
Angeles city Philippines
Mobile (Philippines) 00639184860269
Mobile (KSA) 0502493765
SADARA landline 013 510 8465
E-mail czar_lagitnay@yahoo.com
E-mail cesar.lagitnay@sadara.com
Cesar D. Lagitnay
Position Applied Communication QA Inspector
Experience SADARA Communication Inspector (Leverage Asset)
May 26, 2013-Present
a) 8 years accumulated experience both quality in the field of
telecommunication Industry and related field work.
b) Proficient in planning of aerial, underground, direct buried
facilities for copper, & fiber optic cable for OSP works.
c) Implementing all approved RT-SAES Standard under the
Supervision of Sadara Quality Lead (Richard Fairbanks).
d) Involved in inspection of materials from proper storage and
preservation, to installation.
e) Familiar in designed distribution of copper cable from Data
Center to MDF/DP, and Fiber Optic Cable from Patch Panel to
Patch Panel.
f) Always conduct surveillance to every activities to assure the
implementation of standard.
g) Attended assigned RFIs and inspection as per Checklist.
h) Logging of any offense/violation to Log Book’s Entry.
i) Involved & inspection of the ff:
1) Public Address/General Alarm System (PA/GA)
2) Mobile Radio System
3) Outside plant System’s Manholes & Conduits
4) Structured Cabling System (SCS)
5) Data Network and Wireless LAN
6) Intruder Detection and Assessment System (IDAS)
2001–2013 Al Binali and Sons Dammam, KSA
Outside Plant (OSP) Foreman / Technician/Quality Control
 JHUAYMA GAS PLANT:
As a Communication QA/QC:
a) Give recommendation in the design and engineering as per site
requirements and condition.
b) Control of non-conformities, disposition, corrective and
preventive actions.
− c) Review Construction Design/ Shop drawings
material submittals related to the project.
d) Coordinate with other project engineers and other trades
regarding concerns in the design, construction, installation, and
quality control procedures.
e) Forward RFI (Ready for Inspection) to PID 24/48 hours before
scheduled inspection.
f) Attend inspection and rectify any issue by PID.
− f) Ensure any requirement for tools and equipment
calibrations are efficiently and practically implemented.
g) Monitor requirements for storage and preservation of materials
and equipment.
h) Participate in the Pre-Commissioning Activities.
 KHURAIS EXPANSION PROJECT:
a) Responsible for Splicing and Termination of copper cable from
Temporary Communication Shelter MDF (main distribution frame)
thru particular Pedestals.
b) Provides training and assistance on technical control problems to
subordinates.
c) Responsible for installation of Main Distribution Frame (MDF) and
splicing from Quick Connect Modules (QCM) stub out cable to KV
Closure in temporary communication shelter.
d) Supervise personnel (splicers) to complete the task in accordance
of Aramco standard.
e) Distribute cable pairs to certain pedestals as per Aramco cable
Layouts.
f) Implement cable plans and layouts to physical execution of works.
g) Installation of Cabinets, SSS closure, RJ45 panels, Bus Bar, 489
panels, ADC campus RS Modem, Alcatel Omni switch and UPS.
h) Bonding of Main groundings (ground grid or ground rod) in Bus Bar
to equipment, closure, cabinet, 489 panel and cube-IT
i) Installation and activation of voice/data circuitry in each port cabins
and temporary offices.
j) Splicing and Termination of copper cables in RJ45 panels and
SSS Closure inside cabinets and cube-IT.
k) Estimation of materials and personnel on each project.
l) Primary testing (continuity testing) using regular ohmmeter and
Final testing using DSL990 fluke.
 KHURAIS OAM (Operation And Maintenance) ARAMCO:
a) Responsible for Maintenance and keep operation of 6,300 lines
from Temporary Communication Shelter to certain users.
b) In-charged of installing and activation of Positron Teleline Isolator 8
shelves, including Data cards, single and dual POTS cards, and
Power Supply card.
c) Perform quality control checks on newly installed system.
d) Responsible of re-splicing and re-testing of copper cable in DB
closure or Raychem closure of accidentally damaged copper cable.
e) Configuration of ADC campus RS Modem.
f) Activation of Data/Voice circuits, from MDF thru TER/TR to certain
points.
g) Minimized and Troubleshoot faulted Data/Voice circuit.
- 2 -
h) Involved in inspection of newly installed fiber optics/copper cable by
any Aramco contractors to temporary comm. shelter.
 HAWIYAH, HARADH, DAHARAN, JUBAIL, SHEDGUM, YANBU,
Aramco Projects: F.O. and Copper Cables Installation Lead man
a) Supervising craftsmen for installation of F.O.C. and copper cables
to open trench or direct buried by plough machine.
b) Inspection of work flow that all craftsmen must follow all Safety
precaution as per Aramco standard.
c) Responsible for all necessary accessories for all cable lay out such
as: depth/wide of cable trench, sand beddings, terra/warning tapes,
EMS, sub ducts, split and solid plugs, marker post, led tags and
duct banks.
d) Involved in drum testing, splicing, primary and final testing of
F.O.C. from A to B mark point by OTDR and Power Meter.
e) Erection of Communication Cabinets and installation/splicing of
accessories such as: SSS closure, 489 panel, F.O.C. Patch panel,
jumper organizer, buzz bar and termination of electrical outlets.
f) Installation of telephone sets, 502 protector, electrical and relay
box, and telephone acoustic box in Well Sites gate/control valve
and in RTU.
g) Installation of backboards, equipment racks, vertical racks, F.O.C.
Patch panel, 489 panel, SSS closure, jumper organizer, patch cord
organizer, multi media converter, switches, buzz bar and electrical
outlets in communication room.
h) Bonding and grounding to earth ground is must.
i) Rerouting of F.O.C. from original layout and reflect in as built plan.
1992–1998 King Faisal School D.Q. Riyadh, KSA
Telephone Technician
a) Maintained P.A.B.X. system such as: Erricson ASB 900, Merridian
Norstar 7310, Merridian Norstar 7208, and Panasonic
(Easaphone) Electronics Modular and Switching System KX-
T123210DB-T123210D.
b) Maintained Auto-dialing Alarm of float valve flood control.
c) Performed Preventive maintenance as per scheduled.
d) Responsible for installation of any type of telephone set to certain
place required.
e) Testing of telephone cable pairs from MDF to telephone set.
1981–19911961st
Comm. Group Clark Air Base Philippines
Telephone Installer & Repairman Specialist
a) Install, relocates, and performs maintenance on single line, and
electronic telephone instrument.
b) Performed troubleshooting and preventive maintenance on Solid
State Key telephone system.
c) Plans wire and cable routes, and perform operational test.
d) Performed installation and maintenance on Data, Intrusion, Fire
and special circuits.
- 3 -
e) Maintain documentation records on support of installed equipment
and ensure subordinates compliance with US Air Force standard.
1975–1981 Evangelista Tel. Company Angeles city Philippines
Central Office Technician
a) Maintain Semi-automatic step by step switching (Strawger
Switch).
b) Installing jumpers from MDF to Line Finders terminal frame.
c) Troubleshooting of faulted Strawger switch, such as: Line Finder
switch, Selector switch, and Connector switch.
d) Attend and assist the telephone Linemen’s call for testing and
eliminates saturated cable pairs.
e) Running drop wires from aerial terminals to housing.
f) Installing lightning arrester or building protector, cat3 cable,
telephone outlets (RJ11).
g) Ensure telephone number are in correct subscribers.
Education Jan.1981–Oct.1981 Career Development CourseClark Air Base P.I
 Telephone Installer and Repairman Specialist
1971-1973 Angeles University Angeles city,
Philippines
 Radio Electronics Technician (R.E.T)
Certification Certified Aramco Copper Cable Splicer 000557
Certified Aramco Fiber Optic Cable Splicer 000489
Certified Aramco Work Permit Receiver 222577
Certified Aramco Telecomm. QAQC (SAP# 70008785)
Saudi Driver License No. 2346397421 (8954869)
Award &
Recognition
Sustained Superior Performance Award (1990) Clark Air Base
Certification Award for Ten years (1991) Clark Air Base
- 4 -

More Related Content

What's hot (19)

Jerry S. Morris resume
Jerry S. Morris resumeJerry S. Morris resume
Jerry S. Morris resume
 
Danny-Manseau
Danny-ManseauDanny-Manseau
Danny-Manseau
 
Gireesh broadcast engineer
Gireesh broadcast engineerGireesh broadcast engineer
Gireesh broadcast engineer
 
John_W resume 6-16-15
John_W resume 6-16-15John_W resume 6-16-15
John_W resume 6-16-15
 
ErnestHomerPinpin_CV
ErnestHomerPinpin_CVErnestHomerPinpin_CV
ErnestHomerPinpin_CV
 
tJohnson
tJohnsontJohnson
tJohnson
 
CV2016
CV2016CV2016
CV2016
 
Felix_Bonilla Resume
Felix_Bonilla ResumeFelix_Bonilla Resume
Felix_Bonilla Resume
 
Resume_of_Jeffrey_Litman
Resume_of_Jeffrey_LitmanResume_of_Jeffrey_Litman
Resume_of_Jeffrey_Litman
 
Eslam CV-19062016
Eslam CV-19062016Eslam CV-19062016
Eslam CV-19062016
 
Nathaniel weathers resume linkedin
Nathaniel weathers resume linkedinNathaniel weathers resume linkedin
Nathaniel weathers resume linkedin
 
ATT_1419883665642_leroydouglasresume
ATT_1419883665642_leroydouglasresumeATT_1419883665642_leroydouglasresume
ATT_1419883665642_leroydouglasresume
 
resume_2016 (3)
resume_2016 (3)resume_2016 (3)
resume_2016 (3)
 
Steve McRae_Sr. Engineering Test Specialist Resume_X12G
Steve McRae_Sr. Engineering Test Specialist Resume_X12GSteve McRae_Sr. Engineering Test Specialist Resume_X12G
Steve McRae_Sr. Engineering Test Specialist Resume_X12G
 
Resume
ResumeResume
Resume
 
FGibbons2015
FGibbons2015FGibbons2015
FGibbons2015
 
22Solutions Services Summary
22Solutions Services Summary22Solutions Services Summary
22Solutions Services Summary
 
J_Resume_CA_112015
J_Resume_CA_112015J_Resume_CA_112015
J_Resume_CA_112015
 
RAS Resume_20160610
RAS Resume_20160610RAS Resume_20160610
RAS Resume_20160610
 

Viewers also liked

Skype
SkypeSkype
Electrical Production Portfolio
Electrical Production PortfolioElectrical Production Portfolio
Electrical Production Portfolio
Rachel Ieda
 

Viewers also liked (14)

Saber para servir
Saber para servirSaber para servir
Saber para servir
 
Actividad 0
Actividad 0Actividad 0
Actividad 0
 
Identificacion de problematicas
Identificacion de problematicasIdentificacion de problematicas
Identificacion de problematicas
 
Ecci catedra (1)
Ecci catedra (1)Ecci catedra (1)
Ecci catedra (1)
 
Plantilla resumen de proyectos
Plantilla resumen de proyectosPlantilla resumen de proyectos
Plantilla resumen de proyectos
 
Wk7 assgnjamesd
Wk7 assgnjamesdWk7 assgnjamesd
Wk7 assgnjamesd
 
Skype
SkypeSkype
Skype
 
Trabajo diseño final
Trabajo diseño finalTrabajo diseño final
Trabajo diseño final
 
Aprendizaje y atonomo
Aprendizaje y atonomoAprendizaje y atonomo
Aprendizaje y atonomo
 
Electrical Production Portfolio
Electrical Production PortfolioElectrical Production Portfolio
Electrical Production Portfolio
 
Mitologia griega
Mitologia griegaMitologia griega
Mitologia griega
 
Actividad 3 Diseño de OVA
Actividad 3 Diseño de OVAActividad 3 Diseño de OVA
Actividad 3 Diseño de OVA
 
Introduccion al derecho
Introduccion al derechoIntroduccion al derecho
Introduccion al derecho
 
Aviva Corporate Presentation
Aviva Corporate PresentationAviva Corporate Presentation
Aviva Corporate Presentation
 

Similar to Professional Resume of cesar 01

Gail Mosley-Brown resume (1).doc
Gail Mosley-Brown resume (1).docGail Mosley-Brown resume (1).doc
Gail Mosley-Brown resume (1).doc
Gail Mosley-Brown
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
Mazhar Ali
 
REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013
Reynaldo Revilla
 
Antonio Bocanegra Resume 2015
Antonio Bocanegra Resume 2015Antonio Bocanegra Resume 2015
Antonio Bocanegra Resume 2015
Antono Bocanegra
 
Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016
Marvani M. GT Estrella
 
FRANK BALLESTERO Resume 3-5-2015
FRANK BALLESTERO Resume 3-5-2015FRANK BALLESTERO Resume 3-5-2015
FRANK BALLESTERO Resume 3-5-2015
Frank Ballestero
 
Cory Ilchuk - Resume-1 (4)
Cory Ilchuk - Resume-1 (4)Cory Ilchuk - Resume-1 (4)
Cory Ilchuk - Resume-1 (4)
Cory Ilchuk
 
CV E Atienza new 2 - Copy
CV E Atienza new 2 - CopyCV E Atienza new 2 - Copy
CV E Atienza new 2 - Copy
Edgar Atienza
 

Similar to Professional Resume of cesar 01 (20)

Gail Mosley-Brown resume (1).doc
Gail Mosley-Brown resume (1).docGail Mosley-Brown resume (1).doc
Gail Mosley-Brown resume (1).doc
 
Seymour Gordon Resume
Seymour Gordon ResumeSeymour Gordon Resume
Seymour Gordon Resume
 
Jun-Jun ( my resume )
Jun-Jun ( my resume )Jun-Jun ( my resume )
Jun-Jun ( my resume )
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013REVILLA RESUME_final recent dated sept 7,2013
REVILLA RESUME_final recent dated sept 7,2013
 
Felix_Bonilla Resume
Felix_Bonilla ResumeFelix_Bonilla Resume
Felix_Bonilla Resume
 
Antonio Bocanegra Resume 2015
Antonio Bocanegra Resume 2015Antonio Bocanegra Resume 2015
Antonio Bocanegra Resume 2015
 
Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
 
Modassar Resume
Modassar ResumeModassar Resume
Modassar Resume
 
Comcast SIP Technical Description
Comcast SIP Technical DescriptionComcast SIP Technical Description
Comcast SIP Technical Description
 
Resume
ResumeResume
Resume
 
latest2
latest2latest2
latest2
 
latest2
latest2latest2
latest2
 
New TP
New TPNew TP
New TP
 
Abdallah Al Sagheir Cv
Abdallah Al Sagheir CvAbdallah Al Sagheir Cv
Abdallah Al Sagheir Cv
 
Pakistan cv 1
Pakistan  cv 1Pakistan  cv 1
Pakistan cv 1
 
FRANK BALLESTERO Resume 3-5-2015
FRANK BALLESTERO Resume 3-5-2015FRANK BALLESTERO Resume 3-5-2015
FRANK BALLESTERO Resume 3-5-2015
 
Cory Ilchuk - Resume-1 (4)
Cory Ilchuk - Resume-1 (4)Cory Ilchuk - Resume-1 (4)
Cory Ilchuk - Resume-1 (4)
 
CV E Atienza new 2 - Copy
CV E Atienza new 2 - CopyCV E Atienza new 2 - Copy
CV E Atienza new 2 - Copy
 

Professional Resume of cesar 01

  • 1. 001 Kalibo st. Lourdes Sur East Angeles city Philippines Mobile (Philippines) 00639184860269 Mobile (KSA) 0502493765 SADARA landline 013 510 8465 E-mail czar_lagitnay@yahoo.com E-mail cesar.lagitnay@sadara.com Cesar D. Lagitnay Position Applied Communication QA Inspector Experience SADARA Communication Inspector (Leverage Asset) May 26, 2013-Present a) 8 years accumulated experience both quality in the field of telecommunication Industry and related field work. b) Proficient in planning of aerial, underground, direct buried facilities for copper, & fiber optic cable for OSP works. c) Implementing all approved RT-SAES Standard under the Supervision of Sadara Quality Lead (Richard Fairbanks). d) Involved in inspection of materials from proper storage and preservation, to installation. e) Familiar in designed distribution of copper cable from Data Center to MDF/DP, and Fiber Optic Cable from Patch Panel to Patch Panel. f) Always conduct surveillance to every activities to assure the implementation of standard. g) Attended assigned RFIs and inspection as per Checklist. h) Logging of any offense/violation to Log Book’s Entry. i) Involved & inspection of the ff: 1) Public Address/General Alarm System (PA/GA) 2) Mobile Radio System 3) Outside plant System’s Manholes & Conduits 4) Structured Cabling System (SCS) 5) Data Network and Wireless LAN 6) Intruder Detection and Assessment System (IDAS) 2001–2013 Al Binali and Sons Dammam, KSA Outside Plant (OSP) Foreman / Technician/Quality Control  JHUAYMA GAS PLANT: As a Communication QA/QC: a) Give recommendation in the design and engineering as per site requirements and condition. b) Control of non-conformities, disposition, corrective and preventive actions. − c) Review Construction Design/ Shop drawings material submittals related to the project.
  • 2. d) Coordinate with other project engineers and other trades regarding concerns in the design, construction, installation, and quality control procedures. e) Forward RFI (Ready for Inspection) to PID 24/48 hours before scheduled inspection. f) Attend inspection and rectify any issue by PID. − f) Ensure any requirement for tools and equipment calibrations are efficiently and practically implemented. g) Monitor requirements for storage and preservation of materials and equipment. h) Participate in the Pre-Commissioning Activities.  KHURAIS EXPANSION PROJECT: a) Responsible for Splicing and Termination of copper cable from Temporary Communication Shelter MDF (main distribution frame) thru particular Pedestals. b) Provides training and assistance on technical control problems to subordinates. c) Responsible for installation of Main Distribution Frame (MDF) and splicing from Quick Connect Modules (QCM) stub out cable to KV Closure in temporary communication shelter. d) Supervise personnel (splicers) to complete the task in accordance of Aramco standard. e) Distribute cable pairs to certain pedestals as per Aramco cable Layouts. f) Implement cable plans and layouts to physical execution of works. g) Installation of Cabinets, SSS closure, RJ45 panels, Bus Bar, 489 panels, ADC campus RS Modem, Alcatel Omni switch and UPS. h) Bonding of Main groundings (ground grid or ground rod) in Bus Bar to equipment, closure, cabinet, 489 panel and cube-IT i) Installation and activation of voice/data circuitry in each port cabins and temporary offices. j) Splicing and Termination of copper cables in RJ45 panels and SSS Closure inside cabinets and cube-IT. k) Estimation of materials and personnel on each project. l) Primary testing (continuity testing) using regular ohmmeter and Final testing using DSL990 fluke.  KHURAIS OAM (Operation And Maintenance) ARAMCO: a) Responsible for Maintenance and keep operation of 6,300 lines from Temporary Communication Shelter to certain users. b) In-charged of installing and activation of Positron Teleline Isolator 8 shelves, including Data cards, single and dual POTS cards, and Power Supply card. c) Perform quality control checks on newly installed system. d) Responsible of re-splicing and re-testing of copper cable in DB closure or Raychem closure of accidentally damaged copper cable. e) Configuration of ADC campus RS Modem. f) Activation of Data/Voice circuits, from MDF thru TER/TR to certain points. g) Minimized and Troubleshoot faulted Data/Voice circuit. - 2 -
  • 3. h) Involved in inspection of newly installed fiber optics/copper cable by any Aramco contractors to temporary comm. shelter.  HAWIYAH, HARADH, DAHARAN, JUBAIL, SHEDGUM, YANBU, Aramco Projects: F.O. and Copper Cables Installation Lead man a) Supervising craftsmen for installation of F.O.C. and copper cables to open trench or direct buried by plough machine. b) Inspection of work flow that all craftsmen must follow all Safety precaution as per Aramco standard. c) Responsible for all necessary accessories for all cable lay out such as: depth/wide of cable trench, sand beddings, terra/warning tapes, EMS, sub ducts, split and solid plugs, marker post, led tags and duct banks. d) Involved in drum testing, splicing, primary and final testing of F.O.C. from A to B mark point by OTDR and Power Meter. e) Erection of Communication Cabinets and installation/splicing of accessories such as: SSS closure, 489 panel, F.O.C. Patch panel, jumper organizer, buzz bar and termination of electrical outlets. f) Installation of telephone sets, 502 protector, electrical and relay box, and telephone acoustic box in Well Sites gate/control valve and in RTU. g) Installation of backboards, equipment racks, vertical racks, F.O.C. Patch panel, 489 panel, SSS closure, jumper organizer, patch cord organizer, multi media converter, switches, buzz bar and electrical outlets in communication room. h) Bonding and grounding to earth ground is must. i) Rerouting of F.O.C. from original layout and reflect in as built plan. 1992–1998 King Faisal School D.Q. Riyadh, KSA Telephone Technician a) Maintained P.A.B.X. system such as: Erricson ASB 900, Merridian Norstar 7310, Merridian Norstar 7208, and Panasonic (Easaphone) Electronics Modular and Switching System KX- T123210DB-T123210D. b) Maintained Auto-dialing Alarm of float valve flood control. c) Performed Preventive maintenance as per scheduled. d) Responsible for installation of any type of telephone set to certain place required. e) Testing of telephone cable pairs from MDF to telephone set. 1981–19911961st Comm. Group Clark Air Base Philippines Telephone Installer & Repairman Specialist a) Install, relocates, and performs maintenance on single line, and electronic telephone instrument. b) Performed troubleshooting and preventive maintenance on Solid State Key telephone system. c) Plans wire and cable routes, and perform operational test. d) Performed installation and maintenance on Data, Intrusion, Fire and special circuits. - 3 -
  • 4. e) Maintain documentation records on support of installed equipment and ensure subordinates compliance with US Air Force standard. 1975–1981 Evangelista Tel. Company Angeles city Philippines Central Office Technician a) Maintain Semi-automatic step by step switching (Strawger Switch). b) Installing jumpers from MDF to Line Finders terminal frame. c) Troubleshooting of faulted Strawger switch, such as: Line Finder switch, Selector switch, and Connector switch. d) Attend and assist the telephone Linemen’s call for testing and eliminates saturated cable pairs. e) Running drop wires from aerial terminals to housing. f) Installing lightning arrester or building protector, cat3 cable, telephone outlets (RJ11). g) Ensure telephone number are in correct subscribers. Education Jan.1981–Oct.1981 Career Development CourseClark Air Base P.I  Telephone Installer and Repairman Specialist 1971-1973 Angeles University Angeles city, Philippines  Radio Electronics Technician (R.E.T) Certification Certified Aramco Copper Cable Splicer 000557 Certified Aramco Fiber Optic Cable Splicer 000489 Certified Aramco Work Permit Receiver 222577 Certified Aramco Telecomm. QAQC (SAP# 70008785) Saudi Driver License No. 2346397421 (8954869) Award & Recognition Sustained Superior Performance Award (1990) Clark Air Base Certification Award for Ten years (1991) Clark Air Base - 4 -