Saifur Rahman has over 7 years of experience in telecommunication and instrumentation engineering. He has worked on projects in Saudi Arabia for companies like Saudi Aramco and SABIC. Some of his responsibilities included quality control inspection, fiber optic installation, CCTV installation, and ensuring project quality standards were followed. He is skilled in technologies like fiber splicing, networking, PLC programming, and has various technical certifications.
1. CURRICULAM VITAE
SAIFUR RAHMAN
B.E (E&C)
Bin-Qurayacompany.
Al-Khobar,31952 , KSA
E-mail:srahman2001@gmail.com,
Contact: 00966540752072
CAREER SUMMARY:
Havingrich experience inthe fieldof CommunicationandInstrumentationEngineering/QC relatedto OTN fiber
optictransmissionsystem,andInstrumentationrelatedwithsubstationprotection. Soundknowledgeindifferenta
spectsof communicationnetworkingandininstrumentationapplicationandcapable of executingproject indepe-
ndentlyinaccordance withprojectqualityplan.
Total ProfessionalsExperience: 07 years04 monthsof professional experience inthe fieldof OSP/ISPvoiceand
data services, fiberopticcommunication andCCTV surveillance
Technical certification:
ARAMCOapprovedTelecommunicationQC(status1)
ARAMCOapprovedInstrumentationQC (status2)
Attended60hoursof OFC splicingandOTDRtestingtrainingProgramin
KSA and successfullydone.
Attended50hoursof Industrial Automationtrainingcourse inIndiaandsuccessfullydone.
Attended30hoursPLC programmingtrainingcourse inKSA andsuccessfullydone.
Attended8hoursof trainingprogramon ISO 9001:2008 Awareness
AttendedOSHA safetyprogramfortrenchexcavationandsuccessfullycertified.
Technical Skills:
FiberopticSplicing
Analog/ Digital Communication,
Logic Design,
Digital Signal/IPNetwork,
SCADA andPLC’s program
2. WORK EXPERIENCE:
(1) TelecommunicationQCEngineerinSaudi Kad, KSA
Duration : Nov 2015 to Till Date
Project : Onshore MaintainPotential Program
Client : Saudi Aramco
Designation : TelecommunicationQCEngineer
(Saudi Aramco Approved)
Under “Onshore Maintain Potentialpipeline”projectTelecommunicationscope wastoprovide CCTV
SurveillanceandRTU & SCADA communicationfacilitiesviaUHFradiolinkat differentoil wellscoming
underarea Abuhadriya,Fadhili,Khursaniya,Safaniya, TanajibandManifa.
Material receivingandInspectionof CCTV camera
Reel testof FOC andCoaxial cable
PreparingTelecompackagesforFOCandCCTV installation
Layingof Fiberopticcable.
Installationof 97 CCTV camera
Testingandinstallationof co axial cable
Installationof YAGIantenna
Installationof UHFTelemetryradiomodel MDSSD4
(2) TelecommunicationQCEngineerinBinq-Quraya,KSA
Duration : Sept2014 to Sept2015
Project : Hadeed SalesGas MeteringSystem
Client : Saudi Aramco & SABIC
Designation : TelecommunicationQCEngineer
(Saudi Aramco Approved)
Preparingtwoweeklook-aheadinspectionSchedule &weeklyQualityreportto submittoSaudi
Aramcoinspectiondepartment.
RaisingRFI(RequestforInspection)throughQMIS(QualityManagementInformationSystem)to
NotifyPIDforInspection.
3. AuthorizedbySAPMT/PIDtoissue NCR(Non-conformance Report) toConstructiondepartment
fornon-conformities.
Reviewingmaterial Requisition(MR),Technical Submittal &Technical queries.
Controlling&ensuringthe implementationof ProjectqualityplanandSchedule“Q”at site.
ControllingqualitydocumentsandMaterialsCertificates
Conductingmaterialsresavinginspectionof all equipmentandMaterialsrequiredforthe project,
verifyingSATIP(Saudi AramcoTypical InspectionPlan),SAIC,Material Request(MR),Non-material
requirement(NMR),Testreport,Technical Submittal,Purchase order,Deliverynote andensure
that the equipment&Materialsare complyingwiththe requirementsSAMSS,Schedule Q,IFC
drawingandConstructionSpecification&Scope of workissue forProject.
Installationof MDF andlayingof coppercommunicationcable
Constructionof communicationductbank
(3) Instrumentationand CommunicationQC Engineer in Energy and Power
Contracting Company,KSA (Dec 2011 to July 2014)
(a)
Duration : March 2014 to July 2014
Project : UPGRADE 115 KV POWER SUBSTATION NO 50 AT JUAYMAHTANK
FARM (BI-10-3444)
Client : Saudi Aramco
Company : Energy & Power Contracting Co. Ltd
Designation : TelecommunicationQCEngineer
(Saudi Aramco Approved)
Objective of thisprojectwastoconstruct115 kV powersubstationandconnectall peripheralsand feeder
to Aramco DhahranheadquarterthroughOSASnetwork.
4. (b)
Duration : December2013 to July 2014
Project : UPGRADE POWERTRANSMISSION SYSTEM-ABQAIQ
Area BI/JO (BI-10-00633)
Client : Saudi Aramco
Company : Energy& Power Contracting Co. Ltd
Designation : TelecommunicationQCEngineer
(Saudi Aramco Approved)
Objective of thisprojectwastoconstructfour numbersof 115 kV powersubstationandconnectall periph
eralsand feederstoAramcoDhahranheadquarterthroughOSASnetwork.
Preparingtwoweeklook- aheadinspectionSchedule &weeklyQualityreportforsubmittoSaudi
Aramcoinspectiondepartment.
RaisingRFI(RequestforInspection)throughQMIS(QualityManagementInformationSystem)to
NotifyPIDforInspection.
AuthorizedbySAPMT/PIDtoissue NCR(Non-conformance Report) toConstructiondepartment
fornon-conformities.
Reviewingmaterial Requisition(MR),Technical Submittal &Technical queries.
Controlling&ensuringthe implementationof ProjectqualityplanandSchedule “Q”at site.
ControllingqualitydocumentsandMaterialsCertificates
Conductingmaterialsresavinginspectionof all equipmentandMaterialsrequiredforthe project,
verifyingSATIP(Saudi AramcoTypical InspectionPlan),SAIC,Material Request(MR),Non-material
requirement(NMR),Testreport,Technical Submittal,Purchase order,Deliverynote andensure
that the equipment&Materialsare complyingwiththe requirementsSAMSS,Schedule Q,IFC
drawingandConstructionSpecification&Scope of workissue forProject.
End to endfibertesting,CheckingPowerlossinfiber,Splicingof fiber,
NetworkConnectivity,Looptesting.Detectionof signalingthroughFIBREbythe use of OTDR
(Optical Time DomainReflectormeter) forexactlocationof the pointwhereFIBREbreaksand
communicationfails.
Maintenance of FDF(FiberDistributionFrame).andDrawingof the pathwhere the fiberistobe
laidi.e.ROUTE MAP
5. (c)
Duration : MARCH - 2012 to DEC – 2013
Project : PowerSupply to Safaniyah (BI-NO-00642)
Client : Saudi Aramco
Company : Energy & Power Contracting Co. Ltd
Designation : COMMUNICATION QC/SITE ENGINEER
Objective of thisprojectwastoconstruct 115 kV powersubstationandconnect all peripherals and
feederstoAramcoDhahran headquarterthroughOSASnetwork
End to endfibertesting,CheckingPowerlossinfiber,Splicingof fiber,
NetworkConnectivity,Looptesting.Detectionof signalingthroughFIBREbythe use of OTDR
(Optical Time DomainReflectormeter) forexactlocationof the pointwhereFIBREbreaksand
communicationfails,
Maintenance of FDF(FiberDistributionFrame).andDrawingof the pathwhere the fiberistobe
laidi.e.ROUTE MAP
Installation,Testingandcommissioningof SYMPLEXFire Alarm Systemforsmokedetector,beam
detector,andSF6 gasdetectorandshutdownof HVACsystem
Installation,Testingandcommissioningof GasdetectionsystemintegratedwithOSASsystem.
Installation,Testingandcommissioningof ‘SAUTEREY module 2’buildingautomationsystemfor
HVAC,batterycharger,andexhaustfanbasedonEY3600 and NOVANET.
8 kmlong FOClayinganditssplicingandterminationinsubstationandcontrol centerforpower
line protectionrelays,OpenSubstationAutomationSystem(OSAS),Powerdistribution
department,RTUmonitoring,LAN system
Stretchingof 1.2 km longNMFOCwithoverheadtransmissionlines
Constructionof 8 Km longFOCduct bank
Layingof fiberopticcable inundergroundconduitanditssplicingatdifferentpedestal,junction
box and patchpanels.
PowerMeterandOTDR testof NMFOC & OPGW Fiberoptic
Providingopentransportnetwork(OTN) fiberoptictransmissionsystemforVoice andPDDRTU
monitoringandcontrol application
ProvidingtelephonelinethroughOTN fiberoptictransmissionsystem
Preparationof groundinggridforanareaof 1500 SQ meterinsubstationvicinity.
Installationof 13.8 and 480Kv Switchgearanditsperipheral
6. (4) SCADA and Electrical In-Charge inAlwatania 50 Mw power station
Duration : MARCH 2010 to MAY 2011
Project : 60 MW POWER STATIONS
Designation : SCADA AND ELECTRICAL In-Charge
End to endfibertesting,CheckingPowerlossinfiber,Splicingof fiber,
NetworkConnectivity,Looptesting.Detectionof signalingthroughFIBREbythe use of OTDR
(Optical Time DomainReflectormeter) forexactlocationof the pointwhereFIBREbreaks and
communicationfails,
Maintenance of FDF(FiberDistributionFrame).andDrawingof the pathwhere the fiberistobe
laidi.e.ROUTE MAP
PLC andSCADA programming
Troubleshootingthe problemoccurringwithPLC’sanditsrelatedcommunicationEquipment.
Troubleshootingthe problemsoccurringinoptical fibercommunicationcable
Maintenance of twomainstationof capacity60 MW and 8 Substationsof capacity10 MW.
Responsible foroperatingandmaintainingthe plantequipmentsuchasvoltage Stabilizer,circuit
breaker,Plc.’sTransformer,3-phase inductionmotors,overheadcrane
Responsible formaintenance of operationroompanelsandtransmissionlinebreakdown
Responsible forelectricalscheduledmaintenance of DEUTZM640 engines.
Responsible forbreakdownmaintenance of HTtransmissionlinesand step- downtransformersat
RTU’s
Responsible formaintenance of stepuptransformers
Responsible formaintenance of circuitbreakerof eachfeeder
Tookthe leadershipin assuringthatelectrical activitiesare performedsafelyandin accordance
withSOPmanualswhichwasmade as per ISOstandards.
Responsible forthe implementationof relevantIEEEEngineeringStandardsandapprovedindustry
standard.
Performedqualitycontrolsurveillance forconstructionandinstallation,ensuringthatwork
proceduresare carriedoutaccordingto establishedQualityPlansandProcedure
Reviewthe calibrationstatusof anytestequipmentbeingutilizedonthe project, ensuringthe
equipmentiswithincalibrationpriortouse.
Provide supportandadvice tothe constructionpersonnel inrelationtothe ProjectQuality
Program
Coordinate withthe end users toensure thatinspectionsare carriedoutexpediently
Conductingregularinternalauditsandreviewsatsupplierlocationtoensure adherence
(5) Job Profile: CommunicationQC Engineerin Max Balaji Pvt. Ltd. India
Duration : AUG - 2008 to DEC – 2009
Designation : QA/QC Engineer
7. Reviewingapproveddrawingandpreparingmaterial takeoff.
Preparationof ITP(Inspection&TestPlan),QCP(QualityControlProcedure) &QCF(Quality
Control Forms)
ObtainedcompetencyinunderstandingMethodstatements,Inspections&TestPlans,Test
Procedures,PreparingSite InspectionformsandTestreports
Preparationof Site documentationtoensure the shopDrawings,MethodStatements,Material
Submittals,TestingProcedures, testingequipmentandcertificatesare uptodate.
Preparationof submittalsof FourweeklooksAheadProcurementScheduletothe Construction
department.
AttendingweeklyprojectProcurement,progressmeetingandtodiscussmattersrelevantto
Qualityissuesand Projectprogress.
Responsible forPreparationof Bill of Quantityof Materialsrequiredforthe smoothrunof
Projects.
End to endfibertesting,CheckingPowerlossinFiber, splicingof fiber.
TestingatShort haul andlong haul.
NetworkConnectivity, Looptesting.Detectionof signalingthroughFIBREbythe use of OTDR
(Optical Time DomainReflectormeter ) forexactlocationof the pointwhere FIBREbreaksand
communicationfails,Maintenance of FDF(FiberDistributionFrame).andDrawingof the path
where the fiberistobe laidi.e.ROUTE MAP
ProficientinLAN/WAN Design&Support,FiberOpticTechnologiesandDataNetworking
Implementation.
ExpertinDWDM, SDH/ SONET,Optical Switches,IPTechnologies,Digital andOptical Cross
Connects,NetworkIntegration,ManagementSystems(EMS/NMS),etc.
FamiliarwithITU,IEEE and otherInternationalStandardsapplicable toTelecomandITfields.
Excellentqualitiessuchasteamwork,leadership,negotiation,analysis,andcommunication.
PERSONAL QUALIFICATIONS
BachelorinEngineering : (Electronics&Communication)
University : VTU Karnataka
College : M.S. EngineeringCollege,Bangalore
LANGUAGEAND APPLICATIONS
C/C++, SQL,
Internet/HTML
MS Office
WordPerfect
Xilinx, Matlab
8. OPERATING SYSTEM AND DATABASE
WindowsVista/XP
UNIX,MS-DOS, O/S2,
Macintosh,Oracle
PASSPORT DETAILS
PassportNumber : H 8210390
IssuedFrom : Bangalore
IssuedDate : 06-11-2009
Expire on : 07-11-2019
DRIVING LICENSE
IssuedFrom : Saudi Arabia
Expire on : 27-08-2020
License number : 2287232835
PERSONAL DETAILS
Name : SaifurRahman
Gender : Male
Date of Birth : 13-02-1986
Religion : Islam
Nationality : Indian
Marital Status : Married
Languages : English,Hindi &Urdu, Arabic
Height : 172 cm
Weight : 65 kg
BloodGroup : ‘B’Positive
DECLARATION
I herebydeclare thatall the above informationprovidediscorrectto the bestof my knowledgeandbelief.
Place:Saudi Arabia
Date: 02-03-2016
(SAIFURRAHMAN)