SlideShare a Scribd company logo
1 of 5
Download to read offline
Majeed Ullah
Email: khanmajeed007@gmail.com
Postal: Sabz ali town, street J, house no 2, back side Peshawar Model School boys2 Warsak road
Peshawar KPK Pakistan.
Cell No: +923068186517
OBJECTIVE:
To work in a reputed organization that acknowledges performance and gives reward for
hard work and also to excel my potentialities within the structure of that organization.
PERSONAL:
F.Name: Ghulam Wahid Khan
 CNIC #: 15305-3832599-5
 Date of Birth: 07/03/ 1990
 Gender: Male
 Passport : BX0575991
 Nationality: Pakistani
 Domicile: KPK /Dir Lower
ACADEMIC QUALIFICATIONS:
Degree Institute Board Year/Passing Division/CGPA
BS-Telecom &
Networking
Gandahara
University
Peshawar
_____
2010-2013 74%
CGPA 3.0
F.Sc
Pre-
Engineering
Hira College
Timergara Dir L
KPK
BISE
Malakand KPK
2007– 2009 1st
Grade-B
60%
Matric
Science
Govt:High
School Manial
Dir L KPK
BISE
Malakand KPK
2007 1st
Grade-B
68%
PROFESSIONAL EXPERIENCE
6 Months working experience in SYNCHCOM (pvt) Limited From November 1st , 2013 to
April 30 , 2014 as a Internee Engineer in the Fiber Optic Department.
SYNCHCOM (Pvt) Limited, 915, Street 90, I-8/4 Islamabad.
I was responsible for the Fiber Optic Installation, Splicing, Jointing and Testing.
Hands-on Experience
1. IFS-09 & IFS-10 ARC Fusion splicer
2. OTDR-AQ7270 & AQ7275 YOKO GAWA
3. PCM EMUX-3044 By Erionics
4. Fiber Optics Tool Kit By FIS
.
PROFESSIONAL EXPERIENCE 2:
Relacom .
Currently working at Relacom Telecom Islamabad as a BSS Engineer
On Telenor ZTE 2G/3G Project from 1 May 2014 to February 2015 .
Job Description
1. Feasibility survey for installation of GSM at sites
2. Installation of BTS sites both indoor and outdoor
3. Integration and Commissioning of 2G and 3G MW sites
4. Testing of BTS at sites including power measurement
and VSWR checking.
5. Handing over of sites to the end customer
6. Installation of BTS and MW sites both indoor and
outdoor
7. BSS Alarm Troubleshooting
8. Checking and Maintaining Quality at BSS sites as
per Motorola standards.
9. Installation of BBU ZTE ZXDR B8200
10. Installation & commissioning of Microwave 0.3 &
0.6 dish.
11. Installation of IDU & ODU.
Softwares
1. ZTE Local Maintenance Terminal for 3G
2. Paso link Network Monitor Terminal
Testing Devices
1. Site Master, Anritsu S133A, S133B
2. Power Meter
3. Link Tester
4. Frequency counter, Agilent
PROFESSIONAL EXPERIENCE 3.
Currently working at IES (TWC) as a BSS Team Lead Engineer on ZTE
Mobilink BTS Swap in South region From 1 March 2015 To date.
Job Description
 Dismantle old Huawei/Ericson and Acatel BTS.
 Installing & Commissioning New ZTE BTS.
 E1/T1 patching
 Alarm Patching
Professional Certificates
1. FIBER OPTICS PROFESSIONAL CERTIFICATE:
Six Months Diploma
Certified From NTB (National Training Bureau)
Government of Pakistan
Hands-on Experience during The Course
1. IFS-09 & IFS-10 ARC Fusion splicer
2. OTDR-AQ7270 & AQ7275 YOKO GAWA
3. PCM EMUX-3044 By Erionics
4. Fiber Optics Tool Kit By FIS
5. Fiber Optics Link Budgeting ,Network Design, Topology
Structure.
6. Fiber Optics Cable Installation Techniques
2. CCNA (CISCO):
Course Completion Certified From Cisco.
Government Advance Technical Training Centre Peshawar
Hands on Experience
1. Cisco Routers & Switches Configuration.
2. Work on Packet Tracer 531 & GNS3-0.7.3
3. Configuration Access Point Link-SYS , TP-LINK
4. ADSL & Wi-Fi Configuration by PTCL
5. Work on Cat-5 and Cat-6 cable RJ-45 Connecters.
6.
3. RF PLANNING & OPTIMIZATION:
Sina Institute of Networks & Aesthetics Islamabad
Hands on Experience
1. MapInfo Professional 9.0
2. TEMS-Investigation-8.0.3
3. Drive Testing & RF Optimization
4.Microwave transmission
Six Months Diploma On Microwave Technician
Certified From NTB (National Training Bureau)
Government Of Pakistan
Hands on Experience
1. Microwave Network Design.
2. Microwave Link (pathloss)
3. Microwave installations.
4. Line Of Sight surveys.
5. Frequency Coordination.
6. ON/OFF power installation.
7. Material & Equipment procurement
Duties and Responsibilities
 Cisco Router/ Adsl Configuration/ Access Point
Configration
 Cisco Switches
 Nominal Planning
 Frequency Planning
 Neighbour Planning
 Channel Logical Planning
 Handover
 Capacity Planning
 TSC
 Drive Testing
 RF Optimization
 Checking and Maintaining Quality at BSS sites
 Include Rx, Tx
 Measuring VSWR
 ZTE LMT (Local Maintenance Terminal) for 3G
 Fiber Optics Link Budgeting ,Network Design,
Topology Structure.
 Fiber Optics Cable Installation Techniques
 Fiber Connector Techniques
 Testing & Fault Localization of Optical Fiber
Cable Network.
 Fiber Optics Splicing.
 Fiber Optics Jointing & Joint Box.
 Fiber Testing.
 Microwave Network Design.
 Microwave Link (pathloss)
 Microwave installations.
 Line Of Sight surveys.
 Frequency Coordination.
 ON/OFF power installation.
 Material & Equipment procurement
 Maintenance
Equipment/Instruments
 Cisco Router 1841 ,2620, 2621
 Cisco Switches 2650-24 , 2950T-24,
 MapInfo Professional 9.0
 TEMS-Investigation-8.0.3
 Google Earth
 GPS Handset
 IFS-09 & IFS-10 Arc Fusion Splice by INNO
Instrument.
 Keymansi Arc Fusion splice by IlsinTech.
 Fiber Optic Preparation tool kit by FIS.
 OTDR AQ7270, OTDR AQ7275 YOKOGAWA
 Optical LASER Source SC-OLS-DH
 Optical Power Meter SC OPM-B6H
 Variable Optical Attenuator OLA-15B By WWG.
 PCM EMUX-3044 By CRIONIOS.
 Site Master, Anritsu S133A, S133B.
 Link Tester
 Frequency counter, Agilent

More Related Content

What's hot

Call Setup Success Rate Definition and Troubleshooting
Call Setup Success Rate Definition and Troubleshooting Call Setup Success Rate Definition and Troubleshooting
Call Setup Success Rate Definition and Troubleshooting Assim Mubder
 
Packet core network basics
Packet core network basicsPacket core network basics
Packet core network basicsMustafa Golam
 
Gsm fundamental-uku
Gsm fundamental-ukuGsm fundamental-uku
Gsm fundamental-ukusivakumar D
 
Cluster optimization procedure v1
Cluster optimization procedure v1Cluster optimization procedure v1
Cluster optimization procedure v1Terra Sacrifice
 
2 g training optimization
2 g training optimization2 g training optimization
2 g training optimizationAhmed Gad
 
RAMAKANTA SAHOO Resume
RAMAKANTA SAHOO ResumeRAMAKANTA SAHOO Resume
RAMAKANTA SAHOO Resumerksahoo14
 
Ericsson optimization opti
Ericsson optimization optiEricsson optimization opti
Ericsson optimization optiTerra Sacrifice
 
2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiata2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiataHasitha Neelaka
 
Huawei case analysis call drop
Huawei case analysis call dropHuawei case analysis call drop
Huawei case analysis call dropMuffat Itoro
 
11 gsm bss network kpi (paging success rate) optimization manual
11 gsm bss network kpi (paging success rate) optimization manual11 gsm bss network kpi (paging success rate) optimization manual
11 gsm bss network kpi (paging success rate) optimization manualtharinduwije
 
02 gsm bss network kpi (sdcch call drop rate) optimization manual
02 gsm bss network kpi (sdcch call drop rate) optimization manual02 gsm bss network kpi (sdcch call drop rate) optimization manual
02 gsm bss network kpi (sdcch call drop rate) optimization manualtharinduwije
 
telecom engineer cv-1
telecom engineer cv-1telecom engineer cv-1
telecom engineer cv-1mohamed ccf
 
76125491 2 g-ericsson-recommended-parameters-g10
76125491 2 g-ericsson-recommended-parameters-g1076125491 2 g-ericsson-recommended-parameters-g10
76125491 2 g-ericsson-recommended-parameters-g10Rakesh Singh
 

What's hot (20)

Sdcch drop rate
Sdcch  drop  rateSdcch  drop  rate
Sdcch drop rate
 
Call Setup Success Rate Definition and Troubleshooting
Call Setup Success Rate Definition and Troubleshooting Call Setup Success Rate Definition and Troubleshooting
Call Setup Success Rate Definition and Troubleshooting
 
Packet core network basics
Packet core network basicsPacket core network basics
Packet core network basics
 
Gsm fundamental-uku
Gsm fundamental-ukuGsm fundamental-uku
Gsm fundamental-uku
 
Cluster optimization procedure v1
Cluster optimization procedure v1Cluster optimization procedure v1
Cluster optimization procedure v1
 
2 g training optimization
2 g training optimization2 g training optimization
2 g training optimization
 
Connection management
Connection managementConnection management
Connection management
 
3 g call flow
3 g call flow3 g call flow
3 g call flow
 
RAMAKANTA SAHOO Resume
RAMAKANTA SAHOO ResumeRAMAKANTA SAHOO Resume
RAMAKANTA SAHOO Resume
 
Ericsson optimization opti
Ericsson optimization optiEricsson optimization opti
Ericsson optimization opti
 
2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiata2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiata
 
Huawei case analysis call drop
Huawei case analysis call dropHuawei case analysis call drop
Huawei case analysis call drop
 
11 gsm bss network kpi (paging success rate) optimization manual
11 gsm bss network kpi (paging success rate) optimization manual11 gsm bss network kpi (paging success rate) optimization manual
11 gsm bss network kpi (paging success rate) optimization manual
 
GSM CALL FLOW
GSM CALL FLOWGSM CALL FLOW
GSM CALL FLOW
 
CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_
 
02 gsm bss network kpi (sdcch call drop rate) optimization manual
02 gsm bss network kpi (sdcch call drop rate) optimization manual02 gsm bss network kpi (sdcch call drop rate) optimization manual
02 gsm bss network kpi (sdcch call drop rate) optimization manual
 
3 g call flow
3 g call flow3 g call flow
3 g call flow
 
telecom engineer cv-1
telecom engineer cv-1telecom engineer cv-1
telecom engineer cv-1
 
63077585 idle-mode-parameter-optimization
63077585 idle-mode-parameter-optimization63077585 idle-mode-parameter-optimization
63077585 idle-mode-parameter-optimization
 
76125491 2 g-ericsson-recommended-parameters-g10
76125491 2 g-ericsson-recommended-parameters-g1076125491 2 g-ericsson-recommended-parameters-g10
76125491 2 g-ericsson-recommended-parameters-g10
 

Viewers also liked

Top 8 bss engineer resume samples
Top 8 bss engineer resume samplesTop 8 bss engineer resume samples
Top 8 bss engineer resume samplesleoharris452
 
Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2Rabia MOKEDDEM
 
Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resumeAhmad Hedib
 
Abdurahiman.HV TERMINATOR-CURRICULUM VITAE
Abdurahiman.HV TERMINATOR-CURRICULUM VITAEAbdurahiman.HV TERMINATOR-CURRICULUM VITAE
Abdurahiman.HV TERMINATOR-CURRICULUM VITAEabdurahiman kodiyathoor
 
Resume ajay shukla windows server vmware admin
Resume ajay shukla windows server vmware adminResume ajay shukla windows server vmware admin
Resume ajay shukla windows server vmware adminAjay Kumar Shukla
 

Viewers also liked (7)

Top 8 bss engineer resume samples
Top 8 bss engineer resume samplesTop 8 bss engineer resume samples
Top 8 bss engineer resume samples
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2
 
Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resume
 
Debashis resume
Debashis resumeDebashis resume
Debashis resume
 
Abdurahiman.HV TERMINATOR-CURRICULUM VITAE
Abdurahiman.HV TERMINATOR-CURRICULUM VITAEAbdurahiman.HV TERMINATOR-CURRICULUM VITAE
Abdurahiman.HV TERMINATOR-CURRICULUM VITAE
 
Resume ajay shukla windows server vmware admin
Resume ajay shukla windows server vmware adminResume ajay shukla windows server vmware admin
Resume ajay shukla windows server vmware admin
 

Similar to BSS Updated cv (20)

Sarowar zahan _cv
Sarowar zahan  _cvSarowar zahan  _cv
Sarowar zahan _cv
 
Rajbir Resume
Rajbir ResumeRajbir Resume
Rajbir Resume
 
CV 2015 vipin
CV 2015 vipinCV 2015 vipin
CV 2015 vipin
 
Muhammad Faisal
Muhammad FaisalMuhammad Faisal
Muhammad Faisal
 
M.Atif's CV
M.Atif's CVM.Atif's CV
M.Atif's CV
 
Abbas Hussain
Abbas HussainAbbas Hussain
Abbas Hussain
 
AHMAD HUSSAIN CV
AHMAD HUSSAIN CVAHMAD HUSSAIN CV
AHMAD HUSSAIN CV
 
HAMZA ALI CV
HAMZA ALI CVHAMZA ALI CV
HAMZA ALI CV
 
kashif raza
kashif razakashif raza
kashif raza
 
Siyad_Pullatt_Engineer_Resume
Siyad_Pullatt_Engineer_ResumeSiyad_Pullatt_Engineer_Resume
Siyad_Pullatt_Engineer_Resume
 
gulfam hussain cv
gulfam hussain cvgulfam hussain cv
gulfam hussain cv
 
Hafizullah_CV
Hafizullah_CVHafizullah_CV
Hafizullah_CV
 
CV- Vinu Kumar
CV- Vinu KumarCV- Vinu Kumar
CV- Vinu Kumar
 
Telecom Resume
Telecom ResumeTelecom Resume
Telecom Resume
 
CV Vinit Patil
CV Vinit PatilCV Vinit Patil
CV Vinit Patil
 
cv_asep zb
cv_asep zbcv_asep zb
cv_asep zb
 
ARNAB DAS KABIRAJ3 (1)
ARNAB DAS KABIRAJ3 (1)ARNAB DAS KABIRAJ3 (1)
ARNAB DAS KABIRAJ3 (1)
 
kamal_resume(1)
kamal_resume(1)kamal_resume(1)
kamal_resume(1)
 
m.zaheer ali (1)
m.zaheer ali (1)m.zaheer ali (1)
m.zaheer ali (1)
 
CV_Fauzi Muslim Syamsuddin
CV_Fauzi Muslim SyamsuddinCV_Fauzi Muslim Syamsuddin
CV_Fauzi Muslim Syamsuddin
 

BSS Updated cv

  • 1. Majeed Ullah Email: khanmajeed007@gmail.com Postal: Sabz ali town, street J, house no 2, back side Peshawar Model School boys2 Warsak road Peshawar KPK Pakistan. Cell No: +923068186517 OBJECTIVE: To work in a reputed organization that acknowledges performance and gives reward for hard work and also to excel my potentialities within the structure of that organization. PERSONAL: F.Name: Ghulam Wahid Khan  CNIC #: 15305-3832599-5  Date of Birth: 07/03/ 1990  Gender: Male  Passport : BX0575991  Nationality: Pakistani  Domicile: KPK /Dir Lower ACADEMIC QUALIFICATIONS: Degree Institute Board Year/Passing Division/CGPA BS-Telecom & Networking Gandahara University Peshawar _____ 2010-2013 74% CGPA 3.0 F.Sc Pre- Engineering Hira College Timergara Dir L KPK BISE Malakand KPK 2007– 2009 1st Grade-B 60% Matric Science Govt:High School Manial Dir L KPK BISE Malakand KPK 2007 1st Grade-B 68% PROFESSIONAL EXPERIENCE 6 Months working experience in SYNCHCOM (pvt) Limited From November 1st , 2013 to April 30 , 2014 as a Internee Engineer in the Fiber Optic Department. SYNCHCOM (Pvt) Limited, 915, Street 90, I-8/4 Islamabad. I was responsible for the Fiber Optic Installation, Splicing, Jointing and Testing. Hands-on Experience 1. IFS-09 & IFS-10 ARC Fusion splicer 2. OTDR-AQ7270 & AQ7275 YOKO GAWA 3. PCM EMUX-3044 By Erionics 4. Fiber Optics Tool Kit By FIS .
  • 2. PROFESSIONAL EXPERIENCE 2: Relacom . Currently working at Relacom Telecom Islamabad as a BSS Engineer On Telenor ZTE 2G/3G Project from 1 May 2014 to February 2015 . Job Description 1. Feasibility survey for installation of GSM at sites 2. Installation of BTS sites both indoor and outdoor 3. Integration and Commissioning of 2G and 3G MW sites 4. Testing of BTS at sites including power measurement and VSWR checking. 5. Handing over of sites to the end customer 6. Installation of BTS and MW sites both indoor and outdoor 7. BSS Alarm Troubleshooting 8. Checking and Maintaining Quality at BSS sites as per Motorola standards. 9. Installation of BBU ZTE ZXDR B8200 10. Installation & commissioning of Microwave 0.3 & 0.6 dish. 11. Installation of IDU & ODU. Softwares 1. ZTE Local Maintenance Terminal for 3G 2. Paso link Network Monitor Terminal Testing Devices 1. Site Master, Anritsu S133A, S133B 2. Power Meter 3. Link Tester 4. Frequency counter, Agilent
  • 3. PROFESSIONAL EXPERIENCE 3. Currently working at IES (TWC) as a BSS Team Lead Engineer on ZTE Mobilink BTS Swap in South region From 1 March 2015 To date. Job Description  Dismantle old Huawei/Ericson and Acatel BTS.  Installing & Commissioning New ZTE BTS.  E1/T1 patching  Alarm Patching Professional Certificates 1. FIBER OPTICS PROFESSIONAL CERTIFICATE: Six Months Diploma Certified From NTB (National Training Bureau) Government of Pakistan Hands-on Experience during The Course 1. IFS-09 & IFS-10 ARC Fusion splicer 2. OTDR-AQ7270 & AQ7275 YOKO GAWA 3. PCM EMUX-3044 By Erionics 4. Fiber Optics Tool Kit By FIS 5. Fiber Optics Link Budgeting ,Network Design, Topology Structure. 6. Fiber Optics Cable Installation Techniques 2. CCNA (CISCO): Course Completion Certified From Cisco. Government Advance Technical Training Centre Peshawar Hands on Experience 1. Cisco Routers & Switches Configuration. 2. Work on Packet Tracer 531 & GNS3-0.7.3 3. Configuration Access Point Link-SYS , TP-LINK 4. ADSL & Wi-Fi Configuration by PTCL 5. Work on Cat-5 and Cat-6 cable RJ-45 Connecters. 6. 3. RF PLANNING & OPTIMIZATION: Sina Institute of Networks & Aesthetics Islamabad Hands on Experience 1. MapInfo Professional 9.0 2. TEMS-Investigation-8.0.3 3. Drive Testing & RF Optimization
  • 4. 4.Microwave transmission Six Months Diploma On Microwave Technician Certified From NTB (National Training Bureau) Government Of Pakistan Hands on Experience 1. Microwave Network Design. 2. Microwave Link (pathloss) 3. Microwave installations. 4. Line Of Sight surveys. 5. Frequency Coordination. 6. ON/OFF power installation. 7. Material & Equipment procurement Duties and Responsibilities  Cisco Router/ Adsl Configuration/ Access Point Configration  Cisco Switches  Nominal Planning  Frequency Planning  Neighbour Planning  Channel Logical Planning  Handover  Capacity Planning  TSC  Drive Testing  RF Optimization  Checking and Maintaining Quality at BSS sites  Include Rx, Tx  Measuring VSWR  ZTE LMT (Local Maintenance Terminal) for 3G  Fiber Optics Link Budgeting ,Network Design, Topology Structure.  Fiber Optics Cable Installation Techniques  Fiber Connector Techniques  Testing & Fault Localization of Optical Fiber Cable Network.  Fiber Optics Splicing.  Fiber Optics Jointing & Joint Box.  Fiber Testing.
  • 5.  Microwave Network Design.  Microwave Link (pathloss)  Microwave installations.  Line Of Sight surveys.  Frequency Coordination.  ON/OFF power installation.  Material & Equipment procurement  Maintenance Equipment/Instruments  Cisco Router 1841 ,2620, 2621  Cisco Switches 2650-24 , 2950T-24,  MapInfo Professional 9.0  TEMS-Investigation-8.0.3  Google Earth  GPS Handset  IFS-09 & IFS-10 Arc Fusion Splice by INNO Instrument.  Keymansi Arc Fusion splice by IlsinTech.  Fiber Optic Preparation tool kit by FIS.  OTDR AQ7270, OTDR AQ7275 YOKOGAWA  Optical LASER Source SC-OLS-DH  Optical Power Meter SC OPM-B6H  Variable Optical Attenuator OLA-15B By WWG.  PCM EMUX-3044 By CRIONIOS.  Site Master, Anritsu S133A, S133B.  Link Tester  Frequency counter, Agilent