SlideShare a Scribd company logo
1 of 7
RESUME
KANIRAJ.K
S/o. C. Karuppasamy, Mobile No-9524440665
3/108, North Street,
Kalinghapatti (P.O),
Thiruvengadem (via),
Sankarankovil (t.k)
Nellai (DT),
Tamilnadu (state).
Professional Objectives:
To be an innovator in use of Industrial technology to its fullest potential and
willing to work in an Organization that can bring out my abilities.
Academic chronicle:
Diploma in mechanical engineer - Secured 79% from Chennai University –
ARULMIGU KALASALINGAM COLLEGE, Krishnan kovil.
Professional Experience:
 Mechanical Erection of boilers
Site engineer – Project Execution in M/s. CETHAR VESSELS LIMITED,
TRICHY (T.N.)
Duration: May 2006 to April 2011
Execution of High Pressure Piping Fabrication and Erection works as per
isometric and P& I Drawings
Work Experience:
Employment Profile:
SITE ENGINEER – Project Execution in M/s. CETHAR VESSELS
LIMITED, TRICHY(TN)
Duration : MAY 2006 T0 April 2011
Project Details
 135TPH - WATER TUBE TRAVELLING GRATE BOILER
Client: M/s SAKTHEI SUGHAR LTD,
PADAMTUR (VILLAGE)
SIVAGANGAI (D.T), TAMIL NADU
 67TPH - AFBC Boiler
Client: M/s MAITHAN ISPAT (P) LTD, JAJPUR
(D.T), ORISSA (STATE)
 37TPH - WHRB Boiler
Client: M/s MAITHAN ISPAT (P) LTD, JAJPUR (D.T),
ORISSA
 2 X 67TPH - CFBC Boiler
Client M/s ACCLTD, BARDOL (P.O), BARGARH
(D.T), ORISSA
 67TPH - AFBC Boiler
Client: M/s MAHESHWARI ISPAT (P) LTD,
KUNDURNI (D.T), ORISSA
 90TPH - AFBC Boiler SHUTDOWN WORK
Client: M/s SARDA ENERGY & ISPAT LTD., RAIPUR
(C.G)
 90 TPH - AFBC Boiler
Client: M/s SHREE GANESH METALIKS LTD.,
ROURKELA, ORISSA
 4 X 10 TPH - WHRB Boiler
Client: M/s SHREE GANESH METALIKS LTD.,
ROURKELA, ORISSA
Technical Responsibilities:
 Erection of Boiler Pressure & Non- Pressure parts
 Erection of Steam, Water & Auxiliary piping as per IBR standards
 Perform inspection of incoming material as per project requirement.
 Performing welding inspection activity.
 Involved in supervision of Erection works of static and Rotating equipments
such as feed pumps, fans, blowers etc.
 Signing of Protocols, Records, Punching check list prior to Hydro test and
witnessing the hydro test and hand over to commissioning department
 Involve in Preparation of Quality plan & Implemented in various stages of
Erection
 Assisting commissioning Team in Pre – commissioning
Managerial Responsibilities:
 Involved in site activities, customer co-ordination, Man power
Management, Project schedule & Implementation
 Planning Man Power resources with required tools, consumables
 Planning the monthly & weekly erection & fabrication schedule
 Co-ordination with consulting management and clients to handover all
relevant documents.
 Maintained safety procedures and records conducted safety meeting and
audits Planned and reviewed daily progress of projects and experienced in
implementation of project schedule with effective man power
 Settling of Sub-contractors Bills & Payments.
Job Responsibilities
 Job and machine allocation according to the process flow chart
 Off loading the job to sub-contractor to achieve time management
 Ensuring the job to the drawing requirement with quality principles
 Follow up the job off loaded in sub-contractor
Professional Experience:
Company: M/s. Thermax Limited
Job Title: Senior Project Engineer
Date of Employment: Since May 2011 to Till Date
M/s. Thermax Group is a company having a turnover of INR. 5577 Crores providing
a range of engineering solutions to the energy and environment sectors
headquartered in Pune, India and operate globally through 19 International offices,
12 Sales & Service offices and 12 manufacturing facilities - 7 of which are in India
and 5 overseas & presence spans 75 countries across Asia Pacific, Africa and the
Middle East, CIS countries, Europe, USA and South America
Project Details:
6TPH - COMPIPAC BOILER Client: M/s KPR
fertilizer, Koppal, Karnataka(state)
12TBH - AFBC Boiler
Client- A.M BREWERIES PVT LIMITED,
WALAGABAD,KANCHEEPURAM-2
Safety automation system :
1.BOILER AUTOMATION SYSTEM -M/s. Hindustan Coca Cola Beverage Pvt
Limited,
Mangalagiri Village, Gundur (D.t), Andra Pradesh
2.BOILER AUTOMATION SYSTEM-M/S Hindustan coca cola Beverage pvt
limited, ameenpur, Hydrabad
3.BOILER AUTOMATION SYSTEM-M/S Hindustan coca cola Beverage pvt,
Ameenpur, Hydrabad
4.BOILER AUTOMATION SYSTEM-M/S Hindustan coca cola Beverages Pvt
limited, Bidadi, Banglore
Old chimney dismantling and New Chimney Erection at M/S Hindustan coca cola
Beverages pvt Ltd, Ameenpur, Hyderabad
12TON - CPFD120
Client-M/s Karnja Industries Pvt Limited, Bidar,Karnataka
12TON - CPFD120
Client-mylan lab limited,parawada,visakhapatinam
16TON - AFBC Boiler
Client-Tata coffee Limited,PeriyakulamttK),Theni(DT)
8TON - CPD80
Client-M/s Cavinkare pvt ltd,Bhavani,Erode(DT)
6TON - CPD60S
Client-M/S Aurobindo Pharma Limited,Menakur
,Naidupeta
village, Naidupeta, Andra Pradesh
6TON - CPD60S
Client-M/S Crest cellulose pvt Ltd,Menakur
village,Naidupeta
Thermopac - VTIF30
Client-M/s crest cellulose pvt Ltd,Menakur,
Village,Naidupeta Steeam & contensate and Thermicfluid piping system outlet to
process
6TON - CPD60S
Client-M/S Aurobindo pharma
limited, Parawada, Visakapatinam, Andra Pradesh.
16 TPH - AFBC Boiler
Client-M/S AP Paper Mills Pvt Ltd,DerraBassi,
Mohali(D.T),Punjap(State)
Roles & Responsibilities:
 Participating in OTM (Order Transfer Meeting) with sales team i.e., Project will be
transferred from sales to project team.
 Preparing costing annexure.
 Preparing bill of material & bill of quantity.
 Preparing GRN & other material dispatch formalities.
 Vendor management. This includes selection of proper vendor from the list of
registered vendors based on their Quality, Price & speed.
 Follow up of enquiry to different supply vendors & new vendor registration
formalities.
 Conducting Kick-off meeting with customer & Resource mobilization for start of
site activities.
 Conducting & involving in customer meetings for timely completion of project.
 Follow up of contractual terms & conditions both technical and commercial with
customer.
 Resource management to obtain optimum results.
 Vendor bill check up & certification for the release of payments.
 IBR Liasoining & corresponding documentation.
 Preparing & involving in daily, weekly, site status meetings with customer &
interaction with HOD.
 Monitoring with other departments for smooth running of project.
 Final handover of project to customer & other commercial terms.
Personal Details
Date of Birth : 21April 1985
Father’s Name : Mr. Karuppasamy
Nationality : Indian
Gender : Male
Marital status : Married
Present Salary : 5Lac/40 thousand Year
Expected Salary : Negotiable
Expecting your call for an early interview to share my background
KANIRAJ.K

More Related Content

What's hot (20)

Resume
ResumeResume
Resume
 
CV_S.Athan_2017_01
CV_S.Athan_2017_01CV_S.Athan_2017_01
CV_S.Athan_2017_01
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 
Shabd saran sahu
Shabd saran sahuShabd saran sahu
Shabd saran sahu
 
afzal c.v
afzal c.vafzal c.v
afzal c.v
 
Cv mm
Cv mmCv mm
Cv mm
 
Resume - M Anil Kumar - 16-07-2016
Resume - M Anil Kumar - 16-07-2016Resume - M Anil Kumar - 16-07-2016
Resume - M Anil Kumar - 16-07-2016
 
Venkata Chandra Sekhar Sure
Venkata Chandra Sekhar SureVenkata Chandra Sekhar Sure
Venkata Chandra Sekhar Sure
 
Cv mechanical engineer (hamid)
Cv  mechanical engineer (hamid)Cv  mechanical engineer (hamid)
Cv mechanical engineer (hamid)
 
Resume_HVAC Engineer
Resume_HVAC EngineerResume_HVAC Engineer
Resume_HVAC Engineer
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
Date Mandar ( CV )
Date Mandar ( CV ) Date Mandar ( CV )
Date Mandar ( CV )
 
C.V. OF Mr.Arindam Guha.
C.V. OF Mr.Arindam Guha.C.V. OF Mr.Arindam Guha.
C.V. OF Mr.Arindam Guha.
 
khiva resume
khiva resumekhiva resume
khiva resume
 
Resume_VPrabu
Resume_VPrabuResume_VPrabu
Resume_VPrabu
 
Project Engineer_Ravi
Project Engineer_RaviProject Engineer_Ravi
Project Engineer_Ravi
 
RAMESH_Resume
RAMESH_ResumeRAMESH_Resume
RAMESH_Resume
 
HVAC Engineer
HVAC EngineerHVAC Engineer
HVAC Engineer
 
Resume_Jan 2017
Resume_Jan 2017Resume_Jan 2017
Resume_Jan 2017
 
Jestin - Resume
Jestin - ResumeJestin - Resume
Jestin - Resume
 

Similar to resume-01 (20)

Madhankumar 1984..
Madhankumar 1984..Madhankumar 1984..
Madhankumar 1984..
 
Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.
 
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
 
Kartik CV
Kartik CVKartik CV
Kartik CV
 
Resume
ResumeResume
Resume
 
Samrat Khanorkar_Resume
Samrat Khanorkar_ResumeSamrat Khanorkar_Resume
Samrat Khanorkar_Resume
 
Resume of SSK
Resume of SSKResume of SSK
Resume of SSK
 
Gaurav Shukla_CV
Gaurav Shukla_CVGaurav Shukla_CV
Gaurav Shukla_CV
 
CV Pragati Mane-00
CV Pragati Mane-00CV Pragati Mane-00
CV Pragati Mane-00
 
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
 
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
 
CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016
 
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
 
CV_Vijay
CV_VijayCV_Vijay
CV_Vijay
 
PATHIK MITRA-PROJECTS
PATHIK MITRA-PROJECTSPATHIK MITRA-PROJECTS
PATHIK MITRA-PROJECTS
 
B.Tech (Mechanical Engineer.)
B.Tech (Mechanical Engineer.)B.Tech (Mechanical Engineer.)
B.Tech (Mechanical Engineer.)
 
Curriculam_Vijay supervisor-2-2-2-3 (1)
Curriculam_Vijay supervisor-2-2-2-3 (1)Curriculam_Vijay supervisor-2-2-2-3 (1)
Curriculam_Vijay supervisor-2-2-2-3 (1)
 
resume
resumeresume
resume
 
Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utility
 

resume-01

  • 1. RESUME KANIRAJ.K S/o. C. Karuppasamy, Mobile No-9524440665 3/108, North Street, Kalinghapatti (P.O), Thiruvengadem (via), Sankarankovil (t.k) Nellai (DT), Tamilnadu (state). Professional Objectives: To be an innovator in use of Industrial technology to its fullest potential and willing to work in an Organization that can bring out my abilities. Academic chronicle: Diploma in mechanical engineer - Secured 79% from Chennai University – ARULMIGU KALASALINGAM COLLEGE, Krishnan kovil. Professional Experience:  Mechanical Erection of boilers Site engineer – Project Execution in M/s. CETHAR VESSELS LIMITED, TRICHY (T.N.) Duration: May 2006 to April 2011 Execution of High Pressure Piping Fabrication and Erection works as per isometric and P& I Drawings
  • 2. Work Experience: Employment Profile: SITE ENGINEER – Project Execution in M/s. CETHAR VESSELS LIMITED, TRICHY(TN) Duration : MAY 2006 T0 April 2011 Project Details  135TPH - WATER TUBE TRAVELLING GRATE BOILER Client: M/s SAKTHEI SUGHAR LTD, PADAMTUR (VILLAGE) SIVAGANGAI (D.T), TAMIL NADU  67TPH - AFBC Boiler Client: M/s MAITHAN ISPAT (P) LTD, JAJPUR (D.T), ORISSA (STATE)  37TPH - WHRB Boiler Client: M/s MAITHAN ISPAT (P) LTD, JAJPUR (D.T), ORISSA  2 X 67TPH - CFBC Boiler Client M/s ACCLTD, BARDOL (P.O), BARGARH (D.T), ORISSA  67TPH - AFBC Boiler Client: M/s MAHESHWARI ISPAT (P) LTD, KUNDURNI (D.T), ORISSA  90TPH - AFBC Boiler SHUTDOWN WORK Client: M/s SARDA ENERGY & ISPAT LTD., RAIPUR (C.G)
  • 3.  90 TPH - AFBC Boiler Client: M/s SHREE GANESH METALIKS LTD., ROURKELA, ORISSA  4 X 10 TPH - WHRB Boiler Client: M/s SHREE GANESH METALIKS LTD., ROURKELA, ORISSA Technical Responsibilities:  Erection of Boiler Pressure & Non- Pressure parts  Erection of Steam, Water & Auxiliary piping as per IBR standards  Perform inspection of incoming material as per project requirement.  Performing welding inspection activity.  Involved in supervision of Erection works of static and Rotating equipments such as feed pumps, fans, blowers etc.  Signing of Protocols, Records, Punching check list prior to Hydro test and witnessing the hydro test and hand over to commissioning department  Involve in Preparation of Quality plan & Implemented in various stages of Erection  Assisting commissioning Team in Pre – commissioning Managerial Responsibilities:  Involved in site activities, customer co-ordination, Man power
  • 4. Management, Project schedule & Implementation  Planning Man Power resources with required tools, consumables  Planning the monthly & weekly erection & fabrication schedule  Co-ordination with consulting management and clients to handover all relevant documents.  Maintained safety procedures and records conducted safety meeting and audits Planned and reviewed daily progress of projects and experienced in implementation of project schedule with effective man power  Settling of Sub-contractors Bills & Payments. Job Responsibilities  Job and machine allocation according to the process flow chart  Off loading the job to sub-contractor to achieve time management  Ensuring the job to the drawing requirement with quality principles  Follow up the job off loaded in sub-contractor Professional Experience: Company: M/s. Thermax Limited Job Title: Senior Project Engineer Date of Employment: Since May 2011 to Till Date M/s. Thermax Group is a company having a turnover of INR. 5577 Crores providing a range of engineering solutions to the energy and environment sectors headquartered in Pune, India and operate globally through 19 International offices, 12 Sales & Service offices and 12 manufacturing facilities - 7 of which are in India and 5 overseas & presence spans 75 countries across Asia Pacific, Africa and the Middle East, CIS countries, Europe, USA and South America
  • 5. Project Details: 6TPH - COMPIPAC BOILER Client: M/s KPR fertilizer, Koppal, Karnataka(state) 12TBH - AFBC Boiler Client- A.M BREWERIES PVT LIMITED, WALAGABAD,KANCHEEPURAM-2 Safety automation system : 1.BOILER AUTOMATION SYSTEM -M/s. Hindustan Coca Cola Beverage Pvt Limited, Mangalagiri Village, Gundur (D.t), Andra Pradesh 2.BOILER AUTOMATION SYSTEM-M/S Hindustan coca cola Beverage pvt limited, ameenpur, Hydrabad 3.BOILER AUTOMATION SYSTEM-M/S Hindustan coca cola Beverage pvt, Ameenpur, Hydrabad 4.BOILER AUTOMATION SYSTEM-M/S Hindustan coca cola Beverages Pvt limited, Bidadi, Banglore Old chimney dismantling and New Chimney Erection at M/S Hindustan coca cola Beverages pvt Ltd, Ameenpur, Hyderabad 12TON - CPFD120 Client-M/s Karnja Industries Pvt Limited, Bidar,Karnataka 12TON - CPFD120 Client-mylan lab limited,parawada,visakhapatinam 16TON - AFBC Boiler
  • 6. Client-Tata coffee Limited,PeriyakulamttK),Theni(DT) 8TON - CPD80 Client-M/s Cavinkare pvt ltd,Bhavani,Erode(DT) 6TON - CPD60S Client-M/S Aurobindo Pharma Limited,Menakur ,Naidupeta village, Naidupeta, Andra Pradesh 6TON - CPD60S Client-M/S Crest cellulose pvt Ltd,Menakur village,Naidupeta Thermopac - VTIF30 Client-M/s crest cellulose pvt Ltd,Menakur, Village,Naidupeta Steeam & contensate and Thermicfluid piping system outlet to process 6TON - CPD60S Client-M/S Aurobindo pharma limited, Parawada, Visakapatinam, Andra Pradesh. 16 TPH - AFBC Boiler Client-M/S AP Paper Mills Pvt Ltd,DerraBassi, Mohali(D.T),Punjap(State) Roles & Responsibilities:  Participating in OTM (Order Transfer Meeting) with sales team i.e., Project will be transferred from sales to project team.  Preparing costing annexure.  Preparing bill of material & bill of quantity.  Preparing GRN & other material dispatch formalities.  Vendor management. This includes selection of proper vendor from the list of registered vendors based on their Quality, Price & speed.  Follow up of enquiry to different supply vendors & new vendor registration formalities.
  • 7.  Conducting Kick-off meeting with customer & Resource mobilization for start of site activities.  Conducting & involving in customer meetings for timely completion of project.  Follow up of contractual terms & conditions both technical and commercial with customer.  Resource management to obtain optimum results.  Vendor bill check up & certification for the release of payments.  IBR Liasoining & corresponding documentation.  Preparing & involving in daily, weekly, site status meetings with customer & interaction with HOD.  Monitoring with other departments for smooth running of project.  Final handover of project to customer & other commercial terms. Personal Details Date of Birth : 21April 1985 Father’s Name : Mr. Karuppasamy Nationality : Indian Gender : Male Marital status : Married Present Salary : 5Lac/40 thousand Year Expected Salary : Negotiable Expecting your call for an early interview to share my background KANIRAJ.K