1. RESUME
KANIRAJ.K
S/o. C. Karuppasamy, Mobile No-9524440665
3/108, North Street,
Kalinghapatti (P.O),
Thiruvengadem (via),
Sankarankovil (t.k)
Nellai (DT),
Tamilnadu (state).
Professional Objectives:
To be an innovator in use of Industrial technology to its fullest potential and
willing to work in an Organization that can bring out my abilities.
Academic chronicle:
Diploma in mechanical engineer - Secured 79% from Chennai University –
ARULMIGU KALASALINGAM COLLEGE, Krishnan kovil.
Professional Experience:
Mechanical Erection of boilers
Site engineer – Project Execution in M/s. CETHAR VESSELS LIMITED,
TRICHY (T.N.)
Duration: May 2006 to April 2011
Execution of High Pressure Piping Fabrication and Erection works as per
isometric and P& I Drawings
2. Work Experience:
Employment Profile:
SITE ENGINEER – Project Execution in M/s. CETHAR VESSELS
LIMITED, TRICHY(TN)
Duration : MAY 2006 T0 April 2011
Project Details
135TPH - WATER TUBE TRAVELLING GRATE BOILER
Client: M/s SAKTHEI SUGHAR LTD,
PADAMTUR (VILLAGE)
SIVAGANGAI (D.T), TAMIL NADU
67TPH - AFBC Boiler
Client: M/s MAITHAN ISPAT (P) LTD, JAJPUR
(D.T), ORISSA (STATE)
37TPH - WHRB Boiler
Client: M/s MAITHAN ISPAT (P) LTD, JAJPUR (D.T),
ORISSA
2 X 67TPH - CFBC Boiler
Client M/s ACCLTD, BARDOL (P.O), BARGARH
(D.T), ORISSA
67TPH - AFBC Boiler
Client: M/s MAHESHWARI ISPAT (P) LTD,
KUNDURNI (D.T), ORISSA
90TPH - AFBC Boiler SHUTDOWN WORK
Client: M/s SARDA ENERGY & ISPAT LTD., RAIPUR
(C.G)
3. 90 TPH - AFBC Boiler
Client: M/s SHREE GANESH METALIKS LTD.,
ROURKELA, ORISSA
4 X 10 TPH - WHRB Boiler
Client: M/s SHREE GANESH METALIKS LTD.,
ROURKELA, ORISSA
Technical Responsibilities:
Erection of Boiler Pressure & Non- Pressure parts
Erection of Steam, Water & Auxiliary piping as per IBR standards
Perform inspection of incoming material as per project requirement.
Performing welding inspection activity.
Involved in supervision of Erection works of static and Rotating equipments
such as feed pumps, fans, blowers etc.
Signing of Protocols, Records, Punching check list prior to Hydro test and
witnessing the hydro test and hand over to commissioning department
Involve in Preparation of Quality plan & Implemented in various stages of
Erection
Assisting commissioning Team in Pre – commissioning
Managerial Responsibilities:
Involved in site activities, customer co-ordination, Man power
4. Management, Project schedule & Implementation
Planning Man Power resources with required tools, consumables
Planning the monthly & weekly erection & fabrication schedule
Co-ordination with consulting management and clients to handover all
relevant documents.
Maintained safety procedures and records conducted safety meeting and
audits Planned and reviewed daily progress of projects and experienced in
implementation of project schedule with effective man power
Settling of Sub-contractors Bills & Payments.
Job Responsibilities
Job and machine allocation according to the process flow chart
Off loading the job to sub-contractor to achieve time management
Ensuring the job to the drawing requirement with quality principles
Follow up the job off loaded in sub-contractor
Professional Experience:
Company: M/s. Thermax Limited
Job Title: Senior Project Engineer
Date of Employment: Since May 2011 to Till Date
M/s. Thermax Group is a company having a turnover of INR. 5577 Crores providing
a range of engineering solutions to the energy and environment sectors
headquartered in Pune, India and operate globally through 19 International offices,
12 Sales & Service offices and 12 manufacturing facilities - 7 of which are in India
and 5 overseas & presence spans 75 countries across Asia Pacific, Africa and the
Middle East, CIS countries, Europe, USA and South America
5. Project Details:
6TPH - COMPIPAC BOILER Client: M/s KPR
fertilizer, Koppal, Karnataka(state)
12TBH - AFBC Boiler
Client- A.M BREWERIES PVT LIMITED,
WALAGABAD,KANCHEEPURAM-2
Safety automation system :
1.BOILER AUTOMATION SYSTEM -M/s. Hindustan Coca Cola Beverage Pvt
Limited,
Mangalagiri Village, Gundur (D.t), Andra Pradesh
2.BOILER AUTOMATION SYSTEM-M/S Hindustan coca cola Beverage pvt
limited, ameenpur, Hydrabad
3.BOILER AUTOMATION SYSTEM-M/S Hindustan coca cola Beverage pvt,
Ameenpur, Hydrabad
4.BOILER AUTOMATION SYSTEM-M/S Hindustan coca cola Beverages Pvt
limited, Bidadi, Banglore
Old chimney dismantling and New Chimney Erection at M/S Hindustan coca cola
Beverages pvt Ltd, Ameenpur, Hyderabad
12TON - CPFD120
Client-M/s Karnja Industries Pvt Limited, Bidar,Karnataka
12TON - CPFD120
Client-mylan lab limited,parawada,visakhapatinam
16TON - AFBC Boiler
6. Client-Tata coffee Limited,PeriyakulamttK),Theni(DT)
8TON - CPD80
Client-M/s Cavinkare pvt ltd,Bhavani,Erode(DT)
6TON - CPD60S
Client-M/S Aurobindo Pharma Limited,Menakur
,Naidupeta
village, Naidupeta, Andra Pradesh
6TON - CPD60S
Client-M/S Crest cellulose pvt Ltd,Menakur
village,Naidupeta
Thermopac - VTIF30
Client-M/s crest cellulose pvt Ltd,Menakur,
Village,Naidupeta Steeam & contensate and Thermicfluid piping system outlet to
process
6TON - CPD60S
Client-M/S Aurobindo pharma
limited, Parawada, Visakapatinam, Andra Pradesh.
16 TPH - AFBC Boiler
Client-M/S AP Paper Mills Pvt Ltd,DerraBassi,
Mohali(D.T),Punjap(State)
Roles & Responsibilities:
Participating in OTM (Order Transfer Meeting) with sales team i.e., Project will be
transferred from sales to project team.
Preparing costing annexure.
Preparing bill of material & bill of quantity.
Preparing GRN & other material dispatch formalities.
Vendor management. This includes selection of proper vendor from the list of
registered vendors based on their Quality, Price & speed.
Follow up of enquiry to different supply vendors & new vendor registration
formalities.
7. Conducting Kick-off meeting with customer & Resource mobilization for start of
site activities.
Conducting & involving in customer meetings for timely completion of project.
Follow up of contractual terms & conditions both technical and commercial with
customer.
Resource management to obtain optimum results.
Vendor bill check up & certification for the release of payments.
IBR Liasoining & corresponding documentation.
Preparing & involving in daily, weekly, site status meetings with customer &
interaction with HOD.
Monitoring with other departments for smooth running of project.
Final handover of project to customer & other commercial terms.
Personal Details
Date of Birth : 21April 1985
Father’s Name : Mr. Karuppasamy
Nationality : Indian
Gender : Male
Marital status : Married
Present Salary : 5Lac/40 thousand Year
Expected Salary : Negotiable
Expecting your call for an early interview to share my background
KANIRAJ.K