SlideShare a Scribd company logo
1 of 51
LEADERSHIP IN ENERGY AND 
ENVIRONMENTAL DESIGN (LEED) 
where art meets engineering 
Austin Dallas Denver Houston Kansas City Miami Nashville Phoenix Richmond Washington DC
PRESENTERS 
Laura Geiger, LEED AP BD+C 
Electrical Designer 
Paulina Diaz, PE 
Professional Mechanical Engineer
ccrd – OVERVIEW AND LEED PROJECTS 
where art meets engineering 
• Campbell, Colburn, Rome, Duthu 
• Mechanical, electrical, plumbing 
(MEP) consulting engineering firm 
• Acronyms are common during the 
presentation. 
• LEED® Designs 
– 19 Healthcare LEED design projects 
– Design with Sustainability in mind 
Overview Professional Categories Process Other 
Dell Children’s Medical Center 
of Central Texas 
Austin, TX 
475,000 sq. ft. greenfield 
90,000 sq. ft. Tower 3
where art meets engineering 
OUTLINE – LEED V4 
â‘  Overview 
• Definition 
• Versions 
• Rating Systems 
② Professional 
• Accreditations 
③ Categories 
â‘Ł Process 
• Certification Process 
• Award levels 
⑤ Other Rating Systems 
Overview Professional Categories Process Other
OVERVIEW 
where art meets engineering
USGBC- DEFINITION 
• Private non-profit 501(c), 3 membership based organization 
• 76 Chapters and 12,800 member organizations 
• 193,000 LEED Professionals 
• Since 1994, expanded and continues to expand its categories 
• Growth 
• USGBC member based volunteer committee 
• Sub committee 
• Working groups 
where art meets engineering 
• United States Green Building Council 
• Green Building Council 
• International roundtable 
• Global alternative compliance path 
Overview Professional Categories Process Other
LEED 
“…green building tool that addresses the entire building lifecycle 
recognizing best-in-class building strategies.” It is a Rating System 
with pre-requisites and credits weighted in points. 
~ 40% of the energy consumed may be attributed to buildings 
where art meets engineering 
LEED - DEFINITION 
L: Leadership 
E: Energy 
E: Environmental 
D: Design 
Overview Professional Categories Process Other 
Founders - 1993 
Robert K. Watson 
Rick Fedrizzi 
David Gottfried 
Mike Italiano
LEED – QUIZ QUESTION 
Which one of the following has been attributed as the most 
relevant when deciding to build Green Construction? 
Source: World Green Building Trends. Business Benefits Driving New and Retrofit Market Opportunities in Over 60 
Countries. McGraw-Hill Construction 2013 
where art meets engineering 
A. Market Demand 
B. Lower Operating Costs 
C. Branding/Public Relations 
D. Client Demand 
E. Internal Corporate 
Commitment 
F. Right Thing to Do 
G. Market Transformation 
Overview Professional Categories Process Other
LEED – DATA GREEN CONSTRUCTION 
0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 
Client Demand 
Internal Corporate Commitment 
Market Demand 
Low Operating Cost 
Right Thing to Do 
Branding/Public Relations 
Market Transformation 
Percent % 
Source: World Green Building Trends. Business Benefits Driving New and Retrofit Market Opportunities in Over 60 
Countries. McGraw-Hill Construction 2013 
where art meets engineering 
Overview Professional Categories Process Other
LEED – BUZZ IN YOUR COMMUNITY 
where art meets engineering 
What are you doing to go green? 
Overview Professional Categories Process Other
where art meets engineering 
LEED – VERSIONS 
VERSION 2005 
LEED 
V2.2 
VERSION 2009 
LEED 
V3 
Overview Professional Categories Process Other 
VERSION 2013 
LEED 
V4 
Building Life Cycle 
Holistic Design 
Measure / Quantify
where art meets engineering 
LEED - RATING SYSTEMS 
Overview Professional Categories Process Other
PROFESSIONAL LEVEL 
LEED ACCREDITATIONS 
where art meets engineering
LEED ACCREDITATIONS 
LEED Fellow 
• Nominated 
• Significant contributions in teaching, mentoring or research 
where art meets engineering 
LEED Green Associate 
• No pre-requisites 
• Test over 
– Minimum program requirement (MPR) 
– Certification levels 
– Certification process 
– Categories 
LEEP AP 
• Select an emphasis (NC+D, O&M, etc.) 
• Complete credits 
• Perform calculations 
Overview Professional Categories Process Other
LEED CATEGORIES 
where art meets engineering
where art meets engineering 
LEED CATEGORIES 
1% 
14% 
9% 
10% 
30% 
Overview Professional Categories Process Other 
15% 
12% 
5% 
4% 
IP - Integrative Process 
LT - Location & Transportation 
SS - Sustainable Sites 
WE - Water Efficiency 
EA - Energy & Atmosphere 
MR - Material Resources 
IEQ - Indoor Environmental Quality 
ID - Innovation in Design 
RP - Regional Priority
where art meets engineering 
LEED – V4 SCORECARD DRAFT 
Overview Professional Categories Process Other
where art meets engineering 
IP - INTEGRATIVE PROCESS 
Overview Professional Categories Process Other
IP - INTEGRATIVE PROCESS 
Intent 
“To support high-performance, cost-effect project outcome through 
an early analysis of the interrelationships among systems.” 
Beyond 
• Adding a green roof might negatively impact the structural 
implications, but positively impact Heating Ventilation Air-conditioning 
where art meets engineering 
Achieve 
• Achieve synergies among building systems 
• Preform a “simple box” energy model analysis 
• Preform a water budget analysis 
and Cooling (HVAC) loads 
Overview Professional Categories Process Other
LT– LOCATION AND TRANSPORTATION 
where art meets engineering 
Overview Professional Categories Process Other
LT– LOCATION AND TRANSPORTATION 
LTc8 - Green Vehicles 
Intent 
“To reduce pollution by promoting alternatives to conventionally 
fueled automobiles” 
Achieve 
• Preferred parking for 5% alternative fueled vehicles 
• Fueling stations for 2% alternative fueled vehicles 
where art meets engineering 
Beyond 
• How many of you drive an electric car? 
Overview Professional Categories Process Other
where art meets engineering 
SS – SUSTAINABLE SITES 
Overview Professional Categories Process Other
SS – SUSTAINABLE SITES 
SSc5 - Heat Island Reduction 
Intent 
“To minimize effect on microclimates and human and wildlife 
habitats by reduction heat islands.” 
Non Roof Area + Reflectance Roof + Vegetated Roof ≥ Total Site Paving + Total RA 
where art meets engineering 
Achieve 
• Roof and site equation: 
0.5 0.75 0.75 
or 
• 75% parking undercover 
Beyond 
• Would you use a vegetated roof for a garden? 
Overview Professional Categories Process Other
where art meets engineering 
WE – WATER EFFICIENCY 
Overview Professional Categories Process Other
WE – WATER EFFICIENCY 
Achieve 
• Reduce water consumption by at least 20% when compared to the 
minimum code building. 
• Specify lower flow rates for toilets, urinals, public and private lavatories, 
• Appliances & process loads must meet EPA and Energy Star Ratings. 
• Meet LEED Standards for processes such as heat rejection & cooling. 
where art meets engineering 
WEp1 Indoor Water use Reduction 
Intent 
“Reduce indoor water consumption” 
Kitchen faucets & showerheads. 
Beyond 
• Reduce water consumption by 30% or more. 
Overview Professional Categories Process Other
where art meets engineering 
WE – WATER EFFICIENCY 
WEp1 Water Use Reduction 
Dual Flush Single Flush Average 
gpf gpf gpf 
1.6 0.9 1.25 
40% less flow 
Standard Faucet non dual flush 
gpf 
1.6 
gpf = gallons per flush 
Overview Professional Categories Process Other
WE – WATER EFFICIENCY 
WEp2 Building Level Water Metering 
Intent 
“Support water management and identify opportunities for additional 
water savings by tracking water consumption.” 
Achieve 
• Install permanent meters to measure potable water use. 
• Commit to share with USGBC whole building water use data. 
where art meets engineering 
Beyond 
• Install sub-metering 
Overview Professional Categories Process Other
where art meets engineering 
EA – ENERGY & ATMOSPHERE 
Overview Professional Categories Process Other
EAp1 – Fundamental Commissioning and Verification 
Intent 
“To support the design, construction, and eventual operation of a 
project that meet the owners project requirements for energy, water, 
indoor environmental quality, and durability.” 
where art meets engineering 
EA – ENERGY & ATMOSPHERE 
Achieve 
• Owner Project Requirement 
• Basis of Design 
Beyond 
• Enhanced commissioning (Cx) 
Overview Professional Categories Process Other
EAc2 – Optimize Energy Performance 
Intent 
“To achieve increasing levels of energy performance beyond the 
prerequisite standard to reduce environmental and economic harms 
associated with excessive energy use.” 
• Measured a percent improvement by performing an energy model 
between the proposed design and the minimum code building 
where art meets engineering 
EA – ENERGY & ATMOSPHERE 
Achieve 
• Establish an energy performance target 
– Energy consumption cost per year 
– Energy usage index (EUI – Kbtu/ft ²yr.) 
Beyond 
• Maximum point opportunity 
Overview Professional Categories Process Other
where art meets engineering 
EA – ENERGY & ATMOSPHERE 
EAc2 – Optimize Energy performance 
Overview Professional Categories Process Other
where art meets engineering 
MR – MATERIALS RESOURCES 
Overview Professional Categories Process Other
where art meets engineering 
MR – MATERIALS RESOURCES 
PR – Storage and Collection of Recyclables 
Intent 
“To reduce the waste that is generated by 
building occupants and hauled to and 
disposed of in landfills.” 
Achieve 
• Dedicated recycling areas. 
• Must include: paper, cardboard, glass, 
plastic, and metal. 
• Recycle two out of the following: 
– Batteries 
– Mercury – containing lamps 
– Electronic waste 
Beyond 
• Where do you take compact fluorescent 
lights (CFL’s)? 
Overview Professional Categories Process Other
where art meets engineering 
MR – MATERIALS RESOURCES 
PR – Storage and Collection of Recyclables 
• search.Earth911.com 
• Waste collection agencies 
• Local retailers 
– ACE 
– IKEA 
– Home Depot 
– Batteries Plus 
• Mail-back service 
– Think green 
– Ecolights 
• Some states don’t allow CFLs in landfills 
Overview Professional Categories Process Other
MR – MATERIALS RESOURCES 
MRc1 – Building Life-cycle Impact Reduction 
Intent 
“To encourage adaptive reuse and optimize the environmental 
performance of products and materials.” 
where art meets engineering 
Achieve 
• Options: 
– Historic building reuse 
– Renovation of abandoned building 
– Building and material reuse 
– Whole building life-cycle assessment 
Overview Professional Categories Process Other
IEQ – INDOOR ENVIRONMENTAL QUALITY 
where art meets engineering 
Overview Professional Categories Process Other
IEQ – INDOOR ENVIRONMENTAL QUALITY 
where art meets engineering 
IEQc5 - Thermal Comfort 
Intent 
“To promote occupants’ productivity, comfort, and 
well-being by providing quality thermal comfort.” 
Achieve 
• Meet American National Standard 
Institute/American Society of Heating Refrigeration 
Air-conditioning Engineering (ANSI/ASHRAE) 
Standard 55-2010 Thermal Comfort Conditions for 
Human Occupancy 
or 
• Meet International Standard Organization (ISO) 
7730-2005=Ergonomics of the Thermal 
Environment and CEN Standard EN 1525-2007 
Indoor Environmental Input Parameters for Design 
and Assessment of Energy Performance of 
Buildings. 
Beyond 
• Hot or cold? 
Overview Professional Categories Process Other
IEQ – INDOOR ENVIRONMENTAL QUALITY 
where art meets engineering 
IEQc6 – Interior Lighting 
Intent 
“To promote occupants’ productivity, comfort, and 
well-being by providing high-quality lighting.” 
Achieve 
Comply with one of the following: 
• Control 
– 90 % lighting control of individual spaces with 3 levels of 
control (on, off, mid level) 
– All multi occupant spaces must have multizone controls 
• Quality 
– Choose 4 of the listed options 
• Color Rendering Index (CRI) of 80+ 
• Limit direct lighting 
• Use reflective furniture 
Beyond 
• How often would you use a midlevel control? 
Overview Professional Categories Process Other
where art meets engineering 
ID – INNOVATION IN DESIGN 
Overview Professional Categories Process Other
where art meets engineering 
ID – INNOVATION IN DESIGN 
IDc1 - Innovation 
Intent 
“To encourage projects to achieve 
exceptional or innovative performance.” 
Achieve 
• Achieve significant, measurable 
environment performance using a 
strategy not in the LEED system. 
Beyond 
• For example: low mercury lamps used to 
be in this category, and now have been 
moved to materials and resources. 
Overview Professional Categories Process Other
where art meets engineering 
RP – REGIONAL PRIORITY 
Overview Professional Categories Process Other
where art meets engineering 
RP – REGIONAL PRIORITY 
RPc1 - Zipcode Based 
Intent 
“To provide an incentive for the 
achievement of credits that address 
geographically specific environmental, 
social equity, and public health 
priorities.” 
Overview Professional Categories Process Other 
Achieve 
Earn up to 4 of the 6 credits 
found on USGBC website 
based on zip code. 
Abundance 
Abundance 
Abundance 
Scarcity
where art meets engineering 
LEED CERTIFICATION 
PROCESS/ LEVELS
LEED - CERTIFICATION PROCESS 
where art meets engineering 
1 
RATING 
SYSTEM 
Overview Professional Categories Process Other 
2 
REGISTRATION 
USGBC 
3 
SUBMITTAL 
PROCESS 
4 
REVIEW 
5 
CERTIFY 
Integrative 
process 
LEED online 
/USGBC 
Templates
where art meets engineering 
LEED – CERTIFICATION LEVELS 
Certified 
40 – 49 Points 
Silver 
50 – 59 Points 
Gold 
60 – 79 Points 
Platinum 
80 + Points 
Overview Professional Categories Process Other
where art meets engineering 
OTHER – RATING SYSTEMS 
• Green Globes 
– Online Building management tool 
– Maximum points is 1,000 
– Award level 1,2 ,3 or 4 globes. 
• Energy Star Building 
– EPA Environmental Protection Agency 
– Maximum number of points is 100 
– Earn an Energy Star 
• Envision TM Sustainable Infrastructure 
Rating Systems 
– 5 categories 
– Holistic approach to design 
Overview Professional Categories Process Other
• Whole Building Design (WBDG) 
• EPA Portfolio Manager 
• National Renewable Energy Laboratory (NREL) 
• Carbon Neutral Curriculum 
• ASHRAE 189.1 Standard for the Design of High-Performance 
Green Building Except Low-Rise Residential Buildings 
where art meets engineering 
OTHER - GREEN RESOURCES 
• Architecture 2030 Challenge 
• Green Star 
Overview Professional Categories Process Other
ASHRAE American Society of Heating , Refrigerating, Air-Conditioning Engineers 
BTU British Thermal Units 
CFL Compact Fluorescent Lights 
CRI Color rendering Index MEP 
Cx Commissioning Agent 
EPA US Environmental Protection Agency 
EUI Energy Usage Index (Kbtu/ft² yr.) 
GBC Green Building Council 
HVAC Heating, Ventilation and Air-Conditioning 
IAQ Indoor Air Quality 
ISO International Standardization Organization 
K 1000 Btu 
LEED Leading in Energy and Environmental Design 
MEP Mechanical, Electrical and Plumbing 
NC+D New Construction and Design 
O&M Operations and Maintenance 
SRI Solar reflective Index 
USGBC United States Green Building Council 
GC Green Construction 
OPR Owner Project Requirements 
BOD Basis of Design 
where art meets engineering 
ACRONYMS 
Overview Professional Categories Process Other
ASHRAE. American Society if Heating, Refrigerating and Air-Conditioning Engineers. 
www.ashrae.org/ 
EPA. US Environmental Protection Agency. www.epa.gov/ 
USGBC. United States green Building Council. www.usgbc.org 
LEED V4. Leading in Energy and Environmental Design. www.usgbc.org/leed/v4 
NREL. National Energy Renewable Laboratory. www.nrel.gov 
WBDG. Whole Building Design Guide. www.wbdg.org 
LEED Manual V4. Publications and resources. Leadership in Energy and Environmental 
Design. Reference Guide for Building Design and Construction. Edition 2013. 
EIA. US Energy Information Administration. www.eia.gov 
McGraw Hill Construction. World Green Trends. Business Benefits Driving 
New and Retrofit Market Opportunities in Over 60 Countries. 
www.worldgbc.org/files/8613/6295/6420/World_Green_Building_Trends_SmartMarket_ 
Report_2013.pdf 
where art meets engineering 
REFERENCES 
Overview Professional Categories Process Other
Answers 
where art meets engineering 
Questions
Laura Geiger, LEED AP BD+C 
Electrical Designer 
laurag@ccrd.com 
where art meets engineering 
THANK YOU 
Paulina Diaz, PE 
Mechanical Engineer 
paulinad@ccrd.com

More Related Content

What's hot

Green Building Construction: Case study on Green Building
Green Building Construction: Case study on Green BuildingGreen Building Construction: Case study on Green Building
Green Building Construction: Case study on Green BuildingKetulKhatri
 
Green building ppt
Green building pptGreen building ppt
Green building pptmirandazadeng
 
Green building rating system
Green building rating systemGreen building rating system
Green building rating systemHajrah Nanda Putri
 
SUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIES
SUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIESSUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIES
SUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIESSamanth kumar
 
BREEAM Presentation
BREEAM PresentationBREEAM Presentation
BREEAM PresentationMatthew Combe
 
Energy efficient building
Energy efficient buildingEnergy efficient building
Energy efficient buildingShivani Singh
 
Green/sustainable buildings
Green/sustainable buildingsGreen/sustainable buildings
Green/sustainable buildingsgibran siddiqui
 
BREEAM
BREEAMBREEAM
BREEAMmisschand
 
Sustainable housing
Sustainable housingSustainable housing
Sustainable housingRajat Nainwal
 
Zero energy building original
Zero energy building originalZero energy building original
Zero energy building originalMeryamKaria
 
LEED for Interior Designer
LEED  for Interior DesignerLEED  for Interior Designer
LEED for Interior DesignerSusann Geithner
 
Sustainable Design Part Six: Carbon Neutral Design
Sustainable Design Part Six: Carbon Neutral DesignSustainable Design Part Six: Carbon Neutral Design
Sustainable Design Part Six: Carbon Neutral DesignTerri Meyer Boake
 
Sustainable building design
Sustainable building designSustainable building design
Sustainable building designDeepika Verma
 
ppt on sustainable buildings
ppt on sustainable buildingsppt on sustainable buildings
ppt on sustainable buildingsnavyavani kola
 

What's hot (20)

Green Building Construction: Case study on Green Building
Green Building Construction: Case study on Green BuildingGreen Building Construction: Case study on Green Building
Green Building Construction: Case study on Green Building
 
LEED
LEEDLEED
LEED
 
Green building ppt
Green building pptGreen building ppt
Green building ppt
 
Breeam
BreeamBreeam
Breeam
 
Green building rating system
Green building rating systemGreen building rating system
Green building rating system
 
Green building
Green buildingGreen building
Green building
 
SUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIES
SUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIESSUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIES
SUSTAINABLE, ENERGY EFFICIENT BUILDING MATERIALS AND TECHNOLOGIES
 
Leed
Leed Leed
Leed
 
Green rating systems
Green rating systemsGreen rating systems
Green rating systems
 
BREEAM Presentation
BREEAM PresentationBREEAM Presentation
BREEAM Presentation
 
Energy efficient building
Energy efficient buildingEnergy efficient building
Energy efficient building
 
Green/sustainable buildings
Green/sustainable buildingsGreen/sustainable buildings
Green/sustainable buildings
 
BREEAM
BREEAMBREEAM
BREEAM
 
Sustainable housing
Sustainable housingSustainable housing
Sustainable housing
 
Zero energy building original
Zero energy building originalZero energy building original
Zero energy building original
 
LEED for Interior Designer
LEED  for Interior DesignerLEED  for Interior Designer
LEED for Interior Designer
 
Sustainable Design Part Six: Carbon Neutral Design
Sustainable Design Part Six: Carbon Neutral DesignSustainable Design Part Six: Carbon Neutral Design
Sustainable Design Part Six: Carbon Neutral Design
 
Breeam
BreeamBreeam
Breeam
 
Sustainable building design
Sustainable building designSustainable building design
Sustainable building design
 
ppt on sustainable buildings
ppt on sustainable buildingsppt on sustainable buildings
ppt on sustainable buildings
 

Viewers also liked

An Introduction to the LEED Rating Systems
An Introduction to the LEED Rating SystemsAn Introduction to the LEED Rating Systems
An Introduction to the LEED Rating SystemsAllison Beer
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Centerbaburajiv2007
 
Inscape Leed Presentation
Inscape Leed PresentationInscape Leed Presentation
Inscape Leed Presentationcharliel50
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklistJ C
 
Green leed projects
Green leed projectsGreen leed projects
Green leed projectsRobert Bazewicz
 
Materials & resources presentation(final version may 2012)
Materials & resources presentation(final version may 2012)Materials & resources presentation(final version may 2012)
Materials & resources presentation(final version may 2012)greenbuilding
 
Presentation or kuwait green building forum
Presentation or kuwait green building forum Presentation or kuwait green building forum
Presentation or kuwait green building forum greenbuilding
 
Dr omar khattab kuwait green building forum
Dr omar khattab   kuwait green building forumDr omar khattab   kuwait green building forum
Dr omar khattab kuwait green building forumgreenbuilding
 
LEED 2009 applied to a mixed - use building
LEED 2009 applied to a mixed - use buildingLEED 2009 applied to a mixed - use building
LEED 2009 applied to a mixed - use buildingWaleed Liaqat
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architectureAyman Mohamed
 
Green Architecture
Green ArchitectureGreen Architecture
Green Architecturecatherine lewis
 
Sustainable Architecture
Sustainable ArchitectureSustainable Architecture
Sustainable ArchitectureFu Sunke
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architectureTanzil Faraz
 
Sustainable Architecture Design
Sustainable Architecture DesignSustainable Architecture Design
Sustainable Architecture DesignKevin Francis
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architectureArundathi Pinky
 

Viewers also liked (20)

LEED Presentation
LEED PresentationLEED Presentation
LEED Presentation
 
LEED
LEEDLEED
LEED
 
An Introduction to the LEED Rating Systems
An Introduction to the LEED Rating SystemsAn Introduction to the LEED Rating Systems
An Introduction to the LEED Rating Systems
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
 
Inscape Leed Presentation
Inscape Leed PresentationInscape Leed Presentation
Inscape Leed Presentation
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
 
Green leed projects
Green leed projectsGreen leed projects
Green leed projects
 
Materials & resources presentation(final version may 2012)
Materials & resources presentation(final version may 2012)Materials & resources presentation(final version may 2012)
Materials & resources presentation(final version may 2012)
 
Think Green Project
Think Green ProjectThink Green Project
Think Green Project
 
Presentation or kuwait green building forum
Presentation or kuwait green building forum Presentation or kuwait green building forum
Presentation or kuwait green building forum
 
Dr omar khattab kuwait green building forum
Dr omar khattab   kuwait green building forumDr omar khattab   kuwait green building forum
Dr omar khattab kuwait green building forum
 
Green architecturE
Green architecturEGreen architecturE
Green architecturE
 
LEED 2009 applied to a mixed - use building
LEED 2009 applied to a mixed - use buildingLEED 2009 applied to a mixed - use building
LEED 2009 applied to a mixed - use building
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architecture
 
Green Architecture
Green ArchitectureGreen Architecture
Green Architecture
 
Green Architecture
Green ArchitectureGreen Architecture
Green Architecture
 
Sustainable Architecture
Sustainable ArchitectureSustainable Architecture
Sustainable Architecture
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architecture
 
Sustainable Architecture Design
Sustainable Architecture DesignSustainable Architecture Design
Sustainable Architecture Design
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architecture
 

Similar to Leadership in Energy and Environmental Design

High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design WorkshopJerry Yudelson
 
Integrate Early; Integrate Often
Integrate Early; Integrate OftenIntegrate Early; Integrate Often
Integrate Early; Integrate OftenScott Bowman
 
Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Scott Bowman
 
Presentation_LeedCD_245
Presentation_LeedCD_245Presentation_LeedCD_245
Presentation_LeedCD_245Adam Carducci
 
Paths to Net-Zero Energy Sustainable Homes
Paths to Net-Zero Energy Sustainable HomesPaths to Net-Zero Energy Sustainable Homes
Paths to Net-Zero Energy Sustainable HomesDerek Satnik
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminarOsama Khadra
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminarOsama Khadra
 
LEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfLEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfSunshineBeats
 
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Shanti Pless
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.pptMd Mizanur Rahman
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.pptSWAPNILKRISHNA3
 
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)pptGREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)pptDataFile3
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.pptssuserbc5970
 
Energy Show 2022 - EXEED Outline and Sample Projects
Energy Show 2022 - EXEED Outline and Sample ProjectsEnergy Show 2022 - EXEED Outline and Sample Projects
Energy Show 2022 - EXEED Outline and Sample ProjectsSustainableEnergyAut
 
Sustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsSustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsTerri Meyer Boake
 

Similar to Leadership in Energy and Environmental Design (20)

High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design Workshop
 
Integrate Early; Integrate Often
Integrate Early; Integrate OftenIntegrate Early; Integrate Often
Integrate Early; Integrate Often
 
Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429
 
Presentation_LeedCD_245
Presentation_LeedCD_245Presentation_LeedCD_245
Presentation_LeedCD_245
 
LEED-v4.1.pptx.pdf
LEED-v4.1.pptx.pdfLEED-v4.1.pptx.pdf
LEED-v4.1.pptx.pdf
 
Usgbc intro
Usgbc introUsgbc intro
Usgbc intro
 
Paths to Net-Zero Energy Sustainable Homes
Paths to Net-Zero Energy Sustainable HomesPaths to Net-Zero Energy Sustainable Homes
Paths to Net-Zero Energy Sustainable Homes
 
Green Building 101 For Contractors
Green Building 101 For ContractorsGreen Building 101 For Contractors
Green Building 101 For Contractors
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminar
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminar
 
LEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfLEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdf
 
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
 
Leed
LeedLeed
Leed
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt
 
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)pptGREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt
 
Energy Show 2022 - EXEED Outline and Sample Projects
Energy Show 2022 - EXEED Outline and Sample ProjectsEnergy Show 2022 - EXEED Outline and Sample Projects
Energy Show 2022 - EXEED Outline and Sample Projects
 
ACT 2014 LEED and TDM Continuing Opportunities to Market Your TDM Services
ACT 2014 LEED and TDM Continuing Opportunities to Market Your TDM ServicesACT 2014 LEED and TDM Continuing Opportunities to Market Your TDM Services
ACT 2014 LEED and TDM Continuing Opportunities to Market Your TDM Services
 
Sustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsSustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment Systems
 

More from Society of Women Engineers

Schneider electric overview laurie addisonlavelle_2
Schneider electric overview laurie addisonlavelle_2Schneider electric overview laurie addisonlavelle_2
Schneider electric overview laurie addisonlavelle_2Society of Women Engineers
 
How to Develop Your Section's Corporate Relations
How to Develop Your Section's Corporate Relations How to Develop Your Section's Corporate Relations
How to Develop Your Section's Corporate Relations Society of Women Engineers
 
How to Find Your Section's Next Officer Team
How to Find Your Section's Next Officer Team How to Find Your Section's Next Officer Team
How to Find Your Section's Next Officer Team Society of Women Engineers
 
How to Have a Difficult Conversation with an Underperforming SWE Leader
How to Have a Difficult Conversation with an Underperforming SWE LeaderHow to Have a Difficult Conversation with an Underperforming SWE Leader
How to Have a Difficult Conversation with an Underperforming SWE LeaderSociety of Women Engineers
 
How to Get the Most out of your LCC Coach!
How to Get the Most out of your LCC Coach!How to Get the Most out of your LCC Coach!
How to Get the Most out of your LCC Coach!Society of Women Engineers
 

More from Society of Women Engineers (20)

Schneider electric overview laurie addisonlavelle_2
Schneider electric overview laurie addisonlavelle_2Schneider electric overview laurie addisonlavelle_2
Schneider electric overview laurie addisonlavelle_2
 
Opening keynote
Opening keynoteOpening keynote
Opening keynote
 
Moonshot rodriguez slides
Moonshot rodriguez slidesMoonshot rodriguez slides
Moonshot rodriguez slides
 
Moonshot fetch slides
Moonshot fetch slidesMoonshot fetch slides
Moonshot fetch slides
 
H ivs ai_wehr_slides
H ivs ai_wehr_slidesH ivs ai_wehr_slides
H ivs ai_wehr_slides
 
H ivs ai_faust_slides
H ivs ai_faust_slidesH ivs ai_faust_slides
H ivs ai_faust_slides
 
H ivs ai_bestelmeyer_slides
H ivs ai_bestelmeyer_slidesH ivs ai_bestelmeyer_slides
H ivs ai_bestelmeyer_slides
 
Closing keynote
Closing keynoteClosing keynote
Closing keynote
 
Ball d 8
Ball d 8Ball d 8
Ball d 8
 
Ball d 7
Ball d 7Ball d 7
Ball d 7
 
Ball d 6
Ball d 6Ball d 6
Ball d 6
 
Ball d 4
Ball d 4Ball d 4
Ball d 4
 
How to Develop Your Section's Corporate Relations
How to Develop Your Section's Corporate Relations How to Develop Your Section's Corporate Relations
How to Develop Your Section's Corporate Relations
 
How to Find Your Section's Next Officer Team
How to Find Your Section's Next Officer Team How to Find Your Section's Next Officer Team
How to Find Your Section's Next Officer Team
 
Using SWE to Complement your Career
Using SWE to Complement your Career Using SWE to Complement your Career
Using SWE to Complement your Career
 
How to Have a Difficult Conversation with an Underperforming SWE Leader
How to Have a Difficult Conversation with an Underperforming SWE LeaderHow to Have a Difficult Conversation with an Underperforming SWE Leader
How to Have a Difficult Conversation with an Underperforming SWE Leader
 
18 cd 32
18 cd 3218 cd 32
18 cd 32
 
How to Get the Most out of your LCC Coach!
How to Get the Most out of your LCC Coach!How to Get the Most out of your LCC Coach!
How to Get the Most out of your LCC Coach!
 
The Mars Ice Challenge (RASC-AL)
The Mars Ice Challenge (RASC-AL)The Mars Ice Challenge (RASC-AL)
The Mars Ice Challenge (RASC-AL)
 
Beyond Disruption
Beyond Disruption Beyond Disruption
Beyond Disruption
 

Recently uploaded

Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 

Recently uploaded (20)

Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 

Leadership in Energy and Environmental Design

  • 1. LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN (LEED) where art meets engineering Austin Dallas Denver Houston Kansas City Miami Nashville Phoenix Richmond Washington DC
  • 2. PRESENTERS Laura Geiger, LEED AP BD+C Electrical Designer Paulina Diaz, PE Professional Mechanical Engineer
  • 3. ccrd – OVERVIEW AND LEED PROJECTS where art meets engineering • Campbell, Colburn, Rome, Duthu • Mechanical, electrical, plumbing (MEP) consulting engineering firm • Acronyms are common during the presentation. • LEED® Designs – 19 Healthcare LEED design projects – Design with Sustainability in mind Overview Professional Categories Process Other Dell Children’s Medical Center of Central Texas Austin, TX 475,000 sq. ft. greenfield 90,000 sq. ft. Tower 3
  • 4. where art meets engineering OUTLINE – LEED V4 â‘  Overview • Definition • Versions • Rating Systems ② Professional • Accreditations ③ Categories â‘Ł Process • Certification Process • Award levels ⑤ Other Rating Systems Overview Professional Categories Process Other
  • 5. OVERVIEW where art meets engineering
  • 6. USGBC- DEFINITION • Private non-profit 501(c), 3 membership based organization • 76 Chapters and 12,800 member organizations • 193,000 LEED Professionals • Since 1994, expanded and continues to expand its categories • Growth • USGBC member based volunteer committee • Sub committee • Working groups where art meets engineering • United States Green Building Council • Green Building Council • International roundtable • Global alternative compliance path Overview Professional Categories Process Other
  • 7. LEED “…green building tool that addresses the entire building lifecycle recognizing best-in-class building strategies.” It is a Rating System with pre-requisites and credits weighted in points. ~ 40% of the energy consumed may be attributed to buildings where art meets engineering LEED - DEFINITION L: Leadership E: Energy E: Environmental D: Design Overview Professional Categories Process Other Founders - 1993 Robert K. Watson Rick Fedrizzi David Gottfried Mike Italiano
  • 8. LEED – QUIZ QUESTION Which one of the following has been attributed as the most relevant when deciding to build Green Construction? Source: World Green Building Trends. Business Benefits Driving New and Retrofit Market Opportunities in Over 60 Countries. McGraw-Hill Construction 2013 where art meets engineering A. Market Demand B. Lower Operating Costs C. Branding/Public Relations D. Client Demand E. Internal Corporate Commitment F. Right Thing to Do G. Market Transformation Overview Professional Categories Process Other
  • 9. LEED – DATA GREEN CONSTRUCTION 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% Client Demand Internal Corporate Commitment Market Demand Low Operating Cost Right Thing to Do Branding/Public Relations Market Transformation Percent % Source: World Green Building Trends. Business Benefits Driving New and Retrofit Market Opportunities in Over 60 Countries. McGraw-Hill Construction 2013 where art meets engineering Overview Professional Categories Process Other
  • 10. LEED – BUZZ IN YOUR COMMUNITY where art meets engineering What are you doing to go green? Overview Professional Categories Process Other
  • 11. where art meets engineering LEED – VERSIONS VERSION 2005 LEED V2.2 VERSION 2009 LEED V3 Overview Professional Categories Process Other VERSION 2013 LEED V4 Building Life Cycle Holistic Design Measure / Quantify
  • 12. where art meets engineering LEED - RATING SYSTEMS Overview Professional Categories Process Other
  • 13. PROFESSIONAL LEVEL LEED ACCREDITATIONS where art meets engineering
  • 14. LEED ACCREDITATIONS LEED Fellow • Nominated • Significant contributions in teaching, mentoring or research where art meets engineering LEED Green Associate • No pre-requisites • Test over – Minimum program requirement (MPR) – Certification levels – Certification process – Categories LEEP AP • Select an emphasis (NC+D, O&M, etc.) • Complete credits • Perform calculations Overview Professional Categories Process Other
  • 15. LEED CATEGORIES where art meets engineering
  • 16. where art meets engineering LEED CATEGORIES 1% 14% 9% 10% 30% Overview Professional Categories Process Other 15% 12% 5% 4% IP - Integrative Process LT - Location & Transportation SS - Sustainable Sites WE - Water Efficiency EA - Energy & Atmosphere MR - Material Resources IEQ - Indoor Environmental Quality ID - Innovation in Design RP - Regional Priority
  • 17. where art meets engineering LEED – V4 SCORECARD DRAFT Overview Professional Categories Process Other
  • 18. where art meets engineering IP - INTEGRATIVE PROCESS Overview Professional Categories Process Other
  • 19. IP - INTEGRATIVE PROCESS Intent “To support high-performance, cost-effect project outcome through an early analysis of the interrelationships among systems.” Beyond • Adding a green roof might negatively impact the structural implications, but positively impact Heating Ventilation Air-conditioning where art meets engineering Achieve • Achieve synergies among building systems • Preform a “simple box” energy model analysis • Preform a water budget analysis and Cooling (HVAC) loads Overview Professional Categories Process Other
  • 20. LT– LOCATION AND TRANSPORTATION where art meets engineering Overview Professional Categories Process Other
  • 21. LT– LOCATION AND TRANSPORTATION LTc8 - Green Vehicles Intent “To reduce pollution by promoting alternatives to conventionally fueled automobiles” Achieve • Preferred parking for 5% alternative fueled vehicles • Fueling stations for 2% alternative fueled vehicles where art meets engineering Beyond • How many of you drive an electric car? Overview Professional Categories Process Other
  • 22. where art meets engineering SS – SUSTAINABLE SITES Overview Professional Categories Process Other
  • 23. SS – SUSTAINABLE SITES SSc5 - Heat Island Reduction Intent “To minimize effect on microclimates and human and wildlife habitats by reduction heat islands.” Non Roof Area + Reflectance Roof + Vegetated Roof ≥ Total Site Paving + Total RA where art meets engineering Achieve • Roof and site equation: 0.5 0.75 0.75 or • 75% parking undercover Beyond • Would you use a vegetated roof for a garden? Overview Professional Categories Process Other
  • 24. where art meets engineering WE – WATER EFFICIENCY Overview Professional Categories Process Other
  • 25. WE – WATER EFFICIENCY Achieve • Reduce water consumption by at least 20% when compared to the minimum code building. • Specify lower flow rates for toilets, urinals, public and private lavatories, • Appliances & process loads must meet EPA and Energy Star Ratings. • Meet LEED Standards for processes such as heat rejection & cooling. where art meets engineering WEp1 Indoor Water use Reduction Intent “Reduce indoor water consumption” Kitchen faucets & showerheads. Beyond • Reduce water consumption by 30% or more. Overview Professional Categories Process Other
  • 26. where art meets engineering WE – WATER EFFICIENCY WEp1 Water Use Reduction Dual Flush Single Flush Average gpf gpf gpf 1.6 0.9 1.25 40% less flow Standard Faucet non dual flush gpf 1.6 gpf = gallons per flush Overview Professional Categories Process Other
  • 27. WE – WATER EFFICIENCY WEp2 Building Level Water Metering Intent “Support water management and identify opportunities for additional water savings by tracking water consumption.” Achieve • Install permanent meters to measure potable water use. • Commit to share with USGBC whole building water use data. where art meets engineering Beyond • Install sub-metering Overview Professional Categories Process Other
  • 28. where art meets engineering EA – ENERGY & ATMOSPHERE Overview Professional Categories Process Other
  • 29. EAp1 – Fundamental Commissioning and Verification Intent “To support the design, construction, and eventual operation of a project that meet the owners project requirements for energy, water, indoor environmental quality, and durability.” where art meets engineering EA – ENERGY & ATMOSPHERE Achieve • Owner Project Requirement • Basis of Design Beyond • Enhanced commissioning (Cx) Overview Professional Categories Process Other
  • 30. EAc2 – Optimize Energy Performance Intent “To achieve increasing levels of energy performance beyond the prerequisite standard to reduce environmental and economic harms associated with excessive energy use.” • Measured a percent improvement by performing an energy model between the proposed design and the minimum code building where art meets engineering EA – ENERGY & ATMOSPHERE Achieve • Establish an energy performance target – Energy consumption cost per year – Energy usage index (EUI – Kbtu/ft ²yr.) Beyond • Maximum point opportunity Overview Professional Categories Process Other
  • 31. where art meets engineering EA – ENERGY & ATMOSPHERE EAc2 – Optimize Energy performance Overview Professional Categories Process Other
  • 32. where art meets engineering MR – MATERIALS RESOURCES Overview Professional Categories Process Other
  • 33. where art meets engineering MR – MATERIALS RESOURCES PR – Storage and Collection of Recyclables Intent “To reduce the waste that is generated by building occupants and hauled to and disposed of in landfills.” Achieve • Dedicated recycling areas. • Must include: paper, cardboard, glass, plastic, and metal. • Recycle two out of the following: – Batteries – Mercury – containing lamps – Electronic waste Beyond • Where do you take compact fluorescent lights (CFL’s)? Overview Professional Categories Process Other
  • 34. where art meets engineering MR – MATERIALS RESOURCES PR – Storage and Collection of Recyclables • search.Earth911.com • Waste collection agencies • Local retailers – ACE – IKEA – Home Depot – Batteries Plus • Mail-back service – Think green – Ecolights • Some states don’t allow CFLs in landfills Overview Professional Categories Process Other
  • 35. MR – MATERIALS RESOURCES MRc1 – Building Life-cycle Impact Reduction Intent “To encourage adaptive reuse and optimize the environmental performance of products and materials.” where art meets engineering Achieve • Options: – Historic building reuse – Renovation of abandoned building – Building and material reuse – Whole building life-cycle assessment Overview Professional Categories Process Other
  • 36. IEQ – INDOOR ENVIRONMENTAL QUALITY where art meets engineering Overview Professional Categories Process Other
  • 37. IEQ – INDOOR ENVIRONMENTAL QUALITY where art meets engineering IEQc5 - Thermal Comfort Intent “To promote occupants’ productivity, comfort, and well-being by providing quality thermal comfort.” Achieve • Meet American National Standard Institute/American Society of Heating Refrigeration Air-conditioning Engineering (ANSI/ASHRAE) Standard 55-2010 Thermal Comfort Conditions for Human Occupancy or • Meet International Standard Organization (ISO) 7730-2005=Ergonomics of the Thermal Environment and CEN Standard EN 1525-2007 Indoor Environmental Input Parameters for Design and Assessment of Energy Performance of Buildings. Beyond • Hot or cold? Overview Professional Categories Process Other
  • 38. IEQ – INDOOR ENVIRONMENTAL QUALITY where art meets engineering IEQc6 – Interior Lighting Intent “To promote occupants’ productivity, comfort, and well-being by providing high-quality lighting.” Achieve Comply with one of the following: • Control – 90 % lighting control of individual spaces with 3 levels of control (on, off, mid level) – All multi occupant spaces must have multizone controls • Quality – Choose 4 of the listed options • Color Rendering Index (CRI) of 80+ • Limit direct lighting • Use reflective furniture Beyond • How often would you use a midlevel control? Overview Professional Categories Process Other
  • 39. where art meets engineering ID – INNOVATION IN DESIGN Overview Professional Categories Process Other
  • 40. where art meets engineering ID – INNOVATION IN DESIGN IDc1 - Innovation Intent “To encourage projects to achieve exceptional or innovative performance.” Achieve • Achieve significant, measurable environment performance using a strategy not in the LEED system. Beyond • For example: low mercury lamps used to be in this category, and now have been moved to materials and resources. Overview Professional Categories Process Other
  • 41. where art meets engineering RP – REGIONAL PRIORITY Overview Professional Categories Process Other
  • 42. where art meets engineering RP – REGIONAL PRIORITY RPc1 - Zipcode Based Intent “To provide an incentive for the achievement of credits that address geographically specific environmental, social equity, and public health priorities.” Overview Professional Categories Process Other Achieve Earn up to 4 of the 6 credits found on USGBC website based on zip code. Abundance Abundance Abundance Scarcity
  • 43. where art meets engineering LEED CERTIFICATION PROCESS/ LEVELS
  • 44. LEED - CERTIFICATION PROCESS where art meets engineering 1 RATING SYSTEM Overview Professional Categories Process Other 2 REGISTRATION USGBC 3 SUBMITTAL PROCESS 4 REVIEW 5 CERTIFY Integrative process LEED online /USGBC Templates
  • 45. where art meets engineering LEED – CERTIFICATION LEVELS Certified 40 – 49 Points Silver 50 – 59 Points Gold 60 – 79 Points Platinum 80 + Points Overview Professional Categories Process Other
  • 46. where art meets engineering OTHER – RATING SYSTEMS • Green Globes – Online Building management tool – Maximum points is 1,000 – Award level 1,2 ,3 or 4 globes. • Energy Star Building – EPA Environmental Protection Agency – Maximum number of points is 100 – Earn an Energy Star • Envision TM Sustainable Infrastructure Rating Systems – 5 categories – Holistic approach to design Overview Professional Categories Process Other
  • 47. • Whole Building Design (WBDG) • EPA Portfolio Manager • National Renewable Energy Laboratory (NREL) • Carbon Neutral Curriculum • ASHRAE 189.1 Standard for the Design of High-Performance Green Building Except Low-Rise Residential Buildings where art meets engineering OTHER - GREEN RESOURCES • Architecture 2030 Challenge • Green Star Overview Professional Categories Process Other
  • 48. ASHRAE American Society of Heating , Refrigerating, Air-Conditioning Engineers BTU British Thermal Units CFL Compact Fluorescent Lights CRI Color rendering Index MEP Cx Commissioning Agent EPA US Environmental Protection Agency EUI Energy Usage Index (Kbtu/ft² yr.) GBC Green Building Council HVAC Heating, Ventilation and Air-Conditioning IAQ Indoor Air Quality ISO International Standardization Organization K 1000 Btu LEED Leading in Energy and Environmental Design MEP Mechanical, Electrical and Plumbing NC+D New Construction and Design O&M Operations and Maintenance SRI Solar reflective Index USGBC United States Green Building Council GC Green Construction OPR Owner Project Requirements BOD Basis of Design where art meets engineering ACRONYMS Overview Professional Categories Process Other
  • 49. ASHRAE. American Society if Heating, Refrigerating and Air-Conditioning Engineers. www.ashrae.org/ EPA. US Environmental Protection Agency. www.epa.gov/ USGBC. United States green Building Council. www.usgbc.org LEED V4. Leading in Energy and Environmental Design. www.usgbc.org/leed/v4 NREL. National Energy Renewable Laboratory. www.nrel.gov WBDG. Whole Building Design Guide. www.wbdg.org LEED Manual V4. Publications and resources. Leadership in Energy and Environmental Design. Reference Guide for Building Design and Construction. Edition 2013. EIA. US Energy Information Administration. www.eia.gov McGraw Hill Construction. World Green Trends. Business Benefits Driving New and Retrofit Market Opportunities in Over 60 Countries. www.worldgbc.org/files/8613/6295/6420/World_Green_Building_Trends_SmartMarket_ Report_2013.pdf where art meets engineering REFERENCES Overview Professional Categories Process Other
  • 50. Answers where art meets engineering Questions
  • 51. Laura Geiger, LEED AP BD+C Electrical Designer laurag@ccrd.com where art meets engineering THANK YOU Paulina Diaz, PE Mechanical Engineer paulinad@ccrd.com