SlideShare a Scribd company logo
1 of 61
CHRISNA ANAM GUNTARA
NRP : KB21019
DEPARTEMEN : HCGS
POSISI : TRAINEE FGDP GS OFFICER
DISTRIK : INDEXIM COALINDO MINING
PROJECT
ORIENTASI
DEPARTEMEN
CONTENT
PROFIL
PERUSAHAAN
PROSES
BISNIS
STRUKTUR
ORGANISASI
PROFIL
DEPARTEMEN
KPP INDEXIM
IN SITE
ACTIVITY
Competence Integrity Synergy Safety
PROFILE PERUSAHAAN
INFRASTRUKTUR, LOGISTIK
TEKNOLOGI INFORMASI
OTOMOTIF
AGRIBISNIS
JASA KEUANGAN
ALAT BERAT, PERTAMBANGAN, & ENERGI
PROPERTI
PROFIL PERUSAHAAN
INDEXIM
COALINDO LOKASI :
Desa Pengadan Km. 43,
Kec.Kzarangan, Kab.Kutai
Timur, Kalimantan Timur
 ASTO Hauling Project
 BDMA Mining Project
 INDE Mining Project
 MASS Mining Project
 HJUR Mining Project
 SPUT Port Project
 TRMB Mining Project
 SJR Hauling Project
 PLH Mining Project
 PCNS Mining Project
VISI PT KALIMANTAN PRIMA PERSADA
Manajemen
Tambang Yang
Efektif dan Efisien
Effective
Komitmen terhadap
Kualitas dan
Ketepatan Pengirim
Produk
Commitment
Kepedulian
Terhadap Kualitas
Hidup Karyawan dan
Masyarakat Sekitar
Awareness
Kesadaran Terhadap
Keselamatan,
Kesehatan Kerja, &
Lingkungan Hidup
(K3LH)
Safety
Kemampuan
Rekayasa Tambang
Yang Dapat
Diandalkan
Reliable
COMMITMENT AWARENESS RELIABLE EFFECTIVE SAFETY
MISI PT. KALIMANTAN PRIMA PERSADA
Meningkatkan
penciptaan nilai bagi
pemegang saham
Membangun
kompetensi dan rasa
memiliki dalam diri
karyawan melalui
lingkungan yang cerdas
Menciptakan
hubungan yang saling
menguntungkan
dengan para
pemangku
kepentingan
Membangun perilaku
kerja yang
mengutamakan
Keselamatan,
Kesehatan Kerja, dan
Lingkungan Hidup
Memberikan
pelayanan dalam
industri pertambangan
melalui jasa kontraktor
tambang, pengolahan
batu bara, manajemen
jalan angkut,
manajemen pelabuhan
dan perdagangan
batubara dengan
kualitas terbaik, harga
yang kompetitif dan
ketepatan pengiriman
BUDAYA KERJA
Mengutamakan keselamatan
dan kesehatan kerja, peduli
lingkungan hidup, dan
pemberdayaan masyarakat
sekitar
SAFETY
Dapat dipercaya dengan
prinsip Memegang teguh
kejujuran, tanggung jawab,
keterbukaan,dan kedisiplinan
INTEGRITY
Dapat bekerja sama, menghargai
perbedaan dengan menyatukan
keunggulan masing-masing sebagai
sebuah kekuatan yang
mengutamakan kebersamaan serta
kegembiraan untuk mencapai hasil
yang berlipat ganda
COMPETENCE
Dapat Diandalkan dengan semangat
Menjadi yang terbaik untuk
memberikan Nilai tambah terhadap
semua pihak.
SYNERGY
PROSES BISNIS PT. KALIMANTAN PRIMA PERSADA (KPP) DI SITE INDEXIM
PT. Indexim
Coalindo
PT. Indexim
Coalindo
PT. KPP
PT. KPP
Project Manager
(Seno Tirto Hadikusumo)
Deputi Project
Manager
(Sudjianto)
Deputi Project Manager
(Bonarto)
Engineering
Dept Head
(Apri
Pratimor)
Production
Dept Head
(Supiani)
MD Officer
- Rizal Galang
ICT Officer
- Adven
- Andriawan
- Fauzan
HRM
Dept Head
(Umam)
Plant Mining
Dept Head
(Hendri
Albert)
Plant Hauling
Dept Head
(Haryanto)
SM
Dept Head
(Mugiono)
FAT
Dept Head
(M.Rahmani)
HCGS
Dept Head
(Kosmas
Kemit)
SHE
Dept Head
(Ihsan
Mustaqim)
SHE Dept Head
Sect Head Mining
& Environment
Sect Head Safety
Hauling
Safety Health
System
Development
SHE Administrator
SHE Operation
Mining
Environment
Officer
Koordinator
Hauling
Patrol
Manager
ERT SHE Operation
Hauling and
Regrading
SHE
Koordinator
HRM & Safety
Officer Subcont
Anggota
ERT
DEPARTEMEN SHE
ROLE DESIGN DEPT. SHE
01
02
03
04
Memberikan pertolongan pertama pada keadaan gawat darurat di tempat kerja dan melakukan
inspeksi hygiene di tempat kerja/lingkungan kerja guna pemeliharaan dan kepedulian karyawan
terhadap kesehatan
PARAMEDIC
Merencanakan, melaksanakan, mengevaluasi, dan menindaklanjuti dalam rangka menjamin
terpeliharanya K3 sesuai dengan target yang ditetapkan
SAFETY & HEALTH OPERATION
Melakukan development sistem K3LH, memastikan dijalankannya sistem tersebut, serta menganalisa
dan mengevaluasi sistem K3LH agar pelaksanaannya di lapangan sesuai dengan standard yang telah
ditetapkan
SAFETY, HEALTH & ENVIRONMENT DEVELOPMENT
Merencanakan, melaksanakan, mengevaluasi, dan menindak lanjuti sistem manajemen Lingkungan
Hidup dalam rangka menjamin terpeliharanya Lingkungan Hidup sesuai dengan target yang ditetapkan
ENVIRONMENT
HCGS X SHE
1. Fulfill kebutuhan manpower SHE
2. Kebutuhan pekerjaan borongan SHE
1. Support kebutuhan kenyamanan
karyawan SHE
2. Support sarana operasional SHE
1. Melakukan inspeksi & observasi
terencana semua pekerjaan dibawah
ranah HCGS
2. Administrasi terkait In&Out karyawan
subcont/mitra kerja dibawah HCGS
HCGS
SHE
MANPOWER
SUPPORT OPERASIONAL
ADMINISTRASI
DEPARTEMEN FAT
FAT Dept Head
Finance and Taxation
Officer
Cost and Budget
Officer
Asset and Validation
Officer
Cashier Site
ROLE DESIGN FAT
01
02
Memonitor, mengontrol, melaksanakan, dan melaporkan kegiatan finance di site meliputi rencana
pembayaran, cash flow, AR Collection, validasi, dan perpajakan yang bertujuan untuk memenuhi
kebutuhan operasional secara efisien.
Finance & Taxation Officer
Melakukan proses validasi invoice serta pengaklasifikasikan & pengikhtisaran atas transaksi keuangan
site berdasarkan metode & praktek akuntansi yang berlaku dengan tujuan memenuhi kebutuhan
informasi keuangan yang akurat
Cost Accounting & account Payable Officer
03
Memvalidasi & Verifikasi dokumen tagihan. Menghitung cost depresiasi, memonitoring aset baru, aset
pergi, mutasii datang dan mutasi pergi.
Asset And Validation Officer
HCGS X FAT
1. Fulfill kebutuhan manpower FAT
1. Support kebutuhan kenyamanan
karyawan FAT
2. Support sarana operasional FAT
1. Melakukan pengajuan dana baik PP
ataupun invoicing
2. Mengajukan plan IBS guna menunjang
kebutuhan HCGS dalam 1 semester
kedepan
HCGS
FAT
MANPOWER
SUPPORT OPERASIONAL
ADMINISTRASI
HCGS Dept Head
HCGS Administrator
HC Section Head
Human Capital
Officer
Community
Development
Officer
General Service GL
DEPARTEMEN HCGS
GS & Civil Site Sect.
Head
Civil Contruction &
ME GL
Security Chief
ROLE DESIGN DEPT. HCGS
01
02
03
04
Menyediakan kebutuhan & Perawatan prasarana yang berupa bangunan beserta fasilitas pendukungnya
sesuai dengan budget maupun non budget investment yang telah disetujui, mengacu kepada SOP dan
aturan keselamatan kerja guna mendukung kelancaran kegiatan operasional
CIVIL CONSTRUCTION
Mengontrol, mengkoordinir & melaksanakan seluruh kegiatan yang berkaitan dengan Human
Resources dalam organisasi site serta mengatasi permasalahan sesuai dengan kebijakan program dan
prosedur yang telah ditentukan dengan baik darai HO maupun site.
HUMAN RESOURCES
Melaksanakan kegiatan community development di site mencakup bidang HRD, Environment
Management, Economic Development, Social Culture, Infrastructures dan kesehatan masyarakat
dengan tujuan untuk menciptakan kondusifitas project
COMMUNITY DEVELOPMENT
Mengkoordinir, mengontrol dan memonitor seluruh kegiatan General Affair sesuai kebijakan,
peraturan dan prosedur yang berlaku dengan tujuan menjamin kelancaran kegiatan General Affair dan
dilakukan dengan aman, efektif, dan efisien
GENERAL AFFAIR
ROLE DESIGN DEPT. HCGS
05
06
Menyiapkan dan menjalankan proses payroll di site sesuai prosedur dengan akurat dan tepat waktu.
Payroll
Mengkoordinasikan pelaksanaan pengamanan dan mencegah kemungkinan timbulnya
gangguan/hambatan/bahaya, serta mengatasi segala permasalahan yang timbul berkaitan dengan
situasi kemanaan di seluruh area job site KPP.
CHIEF SECURITY
SM Dept Head
SH Warehouse & FAO
Warehouse GL
FAO GL
Inventory GL
Purchasing &
Binning admin
FAO admin
Inventory
Controller
Picking &
Packing admin Fuel & Oilman Cataloger
Purchasing GL
Purchaser
DEPARTEMEN SM
SH Inventory & Purchasing
PERAN DAN FUNGSI DEPT. SM
01
02
03
04
Pengelolaan atas penyimpanan/sparepart, serta memonitoring dan melaksanakan penerimaan dan
pengeluaran barang dan material in transit, sesuai prosedur dan aturang yang berlaku
Warehouse
Mengelola inventory mulai dari pemenuhan dan perhitungan kebutuhan akan jenis, jumlah material/
sparepart, termasuk melakukan inspeksi (stock taking) secara berkala, dan menyusun katalog inventory
INVENTORY
Bertanggung Jawab dalam pengelolaan subcontractor yang sesuai standara perusahaan, perhitungan
standar rate, mengawasi waktu pembayaran, mengontrol jangka waktu serta distribusi kontrak, hingga
mengevaluasi kinerja subcontractor
SUBCONTRACTOR
Mengatur proses pembelian barang, yang dipesan atau dibutuhkan oleh user, dengan tingkat kualitas
dan nilai ekonomis yang terbaik.
PURCHASING
05 Mengelola Fuel dan Oil sehingga kebutuhan Oil dan Fuel dapat selalu terpenuhi untuk semua unit yang
beroperasi
FUEL AND OIL
HCGS X SM
1. Fulfill kebutuhan manpower SM
1. SM menghubungkan kebutuhan HCGS
dengan supplier
2. Support sarana operasional SM
3. Penggunaan Fuel untuk operasional
sarana bus dan LV
1. HCGS mengevaluasi fuel keluar tidak
melebihi fuel dari plan kebutuhan
2. Validasi PR dan penerbitan PO
HCGS
SM
MANPOWER
SUPPORT OPERASIONAL
ADMINISTRASI
Plant Mining Dept Head
Plant Site Section
Head
SSE Mining GL
Fabrication GL Wheel Type GL
Tyre Site Section
Head
Track Type GL
Planner
Plant
Engineer
L&D Site
Sect Head
SSE Mekanik
Support
Truck driver
Track Type
Mekanik Welder
Wheel Type
Mekanik
Plant Site
Admin Tools Keeper Tireman
Tire GL
Plant
Certificator
Plant Site
Certificator
PERAN DAN FUNGSI DEPT. PLANT MINING
01
02
03
04
Mengkoordinir, memonitor dan mengontrol seluruh kegiatan fabrikasi di workshop dalam rangka
mendukung avaiability unit di job site.
FABRICATION
Membuat perencanaan seluruh aktivitas equipment maintenance yang meliputi pembuatan schedule
periodic service, overhaul dan inspection program, dalam rangka pelaksanaan program schedule
equipment maintenance secara konsisten
PLANNER
Melakukan perawatan dan perbaikan terhadap fungsi electrical unit produksi dan support produksi
dengan tujuan menyiapkan unit support produksi yang siap digunakan dan bisa mencapai target physical
availbility yang telah ditetapkan
PLANT ELECTRICIAN
Melakukan pengujian terhadap mekanik yang telah lulus training dan telah memiliki kompetensi yang
terkait dengan pekerjaanya dalam rangka mensertifikasi kompetensi mekanik.
CERTIFICATOR
05 Menganalisa masalah – masalah teknik di lapangan, memberikan rekomendasi serta monitor dan
mengevaluasi pelaksanaan rekomendasi tersebut dalam rangka meningkatkan kualitas program
perawatan alat/unit
PLANT ENGINEER
PERAN DAN FUNGSI DEPT. PLANT MINING
06
07
08
09
Memonitor, mengontrol, dan mengarahkan pekerjaan perawatan, perbaikan, dan overhaul seluruh unit
support equipment dengan tujuan untuk memastikan aktifitas berjalan sesuai dengan standar dan
prosedur kerja serta keselamatan kerja sehingga unit support equipment siap digunakan dan bisa
mencapai target physical availbility yang telah ditetapkan
SITE SUPPORT EQUIPMENT (SSE)
Merencanakan, menganalisa, memonitor, dan mengkoordinasikan pekerjaan yang mencakup schedule
perawatan dan perbaikan, analisa kerusakan ban dan tersedianya material & tool yang diperlukan
dengan tujuan meminimumkan cost, memperpanjang umur ban & utilisasi yang optimal & dilakukan
dengan efektif, efisien, dan aman
TYRE
Memonitor, mengontrol, dan mengarahkan pekerjaan perawatan, perbaikan dan overhaul seluruh unit
alat-alat berat jenis track dengan tujuan untuk memastikan aktifitas berjalan sesuai dengan standar dan
prosedur kerja serta keselamatan kerja sehingga unit alat berat jenis trac siap digunakan dan bisa
mencapai targat PA yang telah ditetapkan.
TRACK
Merencanakan, mengembangkan, melaksanakan program pengajaran dan evaluasi serta memonitor
perkembangannya tujuan meningkatkan kompetensi dalam pelaksanaan repair dan maintenance unit
dengan baik dan benar.
PLANT INSTRUCTORS
PERAN DAN FUNGSI DEPT. PLANT MINING
10
11
Memonitor, mengontrol, dan mengarahkan pekerjaan perawatan, perbaikan, dan overhaul seluruh unit
alat berat jenis wheel, serta melakukan analisa teknikal terhadap setiap kerusakan dengan tujuan untuk
memastikan aktifitas berjalan sesuai dengan standar dan prosedur kerja serta keselamatan kerja
sehingga unit alat berat jenis wheel siap digunakan dan bisa mencapai target PA yang telah ditentukan.
WHEEL
Melakukan pengelasan komponen, unit, alat dalam rangka perbaikan dengan tujuan agar komponen,
unit, alat, tersebut dapat berfungsi secara efektif, aman, dan efisien
WELDER
HCGS X PLAN MINING
1. Fulfill kebutuhan manpower Plan
Mining
2. Pemenuhan kebutuhan borongan
1. Support sarana operasional Plant
Mining
2. Pembangunan building Support Plan
Mining
3. Support Radio untuk unit baru/rusak
1. HCGS mengevaluasi fuel keluar tidak
melebihi fuel dari plan kebutuhan
2. Validasi PR dan penerbitan PO
HCGS
PLANT MINING
MANPOWER
SUPPORT OPERASIONAL
ADMINISTRASI
Plant Hauling Dept Head
Plant Site Section
Head
Plant Hauling GL
Hauling Type
Mechanic
Support Truck
Driver
Plant Hauling
Support Section
Head
Tyre GL Fabrication GL
Tyreman Welder
Fabrication GL
Tools Keeper Plan Site Admin Plan Site Admin
Plan Engineer Plan Certificator Plan Instructor
ROLL DESIGN DEPT. PLANT HAULING
01
02
03
04
Mengkoordinir, memonitor dan mengontrol seluruh kegiatan fabrikasi di workshop dalam rangka
mendukung avaiability unit di job site.
FABRICATION
Membuat perencanaan seluruh aktivitas equipment maintenance yang meliputi pembuatan schedule
periodic service, overhaul dan inspection program, dalam rangka pelaksanaan program schedule
equipment maintenance secara konsisten
PLANNER
Melakukan perawatan dan perbaikan terhadap fungsi electrical unit produksi dan support produksi
dengan tujuan menyiapkan unit support produksi yang siap digunakan dan bisa mencapai target physical
availbility yang telah ditetapkan
PLANT ELECTRICIAN
Melakukan pengujian terhadap mekanik yang telah lulus training dan telah memiliki kompetensi yang
terkait dengan pekerjaanya dalam rangka mensertifikasi kompetensi mekanik.
CERTIFICATOR
05 Menganalisa masalah – masalah teknik di lapangan, memberikan rekomendasi serta monitor dan
mengevaluasi pelaksanaan rekomendasi tersebut dalam rangka meningkatkan kualitas program
perawatan alat/unit
PLANT ENGINEER
PERAN DAN FUNGSI DEPT. PLANT HAULING
06
08
Merencanakan, menganalisa, memonitor, dan mengkoordinasikan pekerjaan yang mencakup schedule
perawatan dan perbaikan, analisa kerusakan ban dan tersedianya material & tool yang diperlukan
dengan tujuan meminimumkan cost, memperpanjang umur ban & utilisasi yang optimal & dilakukan
dengan efektif, efisien, dan aman
TYRE
Merencanakan, mengembangkan, melaksanakan program pengajaran dan evaluasi serta memonitor
perkembangannya tujuan meningkatkan kompetensi dalam pelaksanaan repair dan maintenance unit
dengan baik dan benar.
PLANT INSTRUCTORS
HCGS X PLANT HAULING
1. Fulfill kebutuhan manpower Plan
Mining
2. Pemenuhan kebutuhan borongan
1. Support sarana operasional Plant
Mining
2. Pembangunan building Support Plan
Mining
3. Support Radio untuk unit baru/rusak
1. HCGS mengevaluasi fuel keluar tidak
melebihi fuel dari plan kebutuhan
2. Validasi PR dan penerbitan PO
HCGS
PLANT HAULING
MANPOWER
SUPPORT OPERASIONAL
ADMINISTRASI
Dept. Head
Mine Plan
Engineer
Data Processor
Sect. Head Monitor &
Control
Sect. Head
Mine Infra
Sect. Head
Mine Plan
Drill &
Blasting
Engineer
Mine Infra. Eng Geotech Eng
Chief Surveyor
Data Analyst
CCR Administrator
DEPT. ENGINEERING
Sect. Head
Mine Survey
Surveyor
Asst. Surveyor
Eng. Helper
ROLL DESIGN DEPT. ENGINEERING
01
02
03
04
Mengumpulkan dan mengolah data kinerja alat produksii yang mencakup data-data pencapaian
produksi, utilisasi, avalibility dan kondisi alat serta biaya produksi agar diketahui setiap
perkembangannya yang terjadi pada kegiatan operasional produksi & hauling dan dengan segera
diambil tindakan perbaikan bila terjadi penyimpangan dalam rangka improvement bagi department
terkait
DATA ANALYST
Memproses data hasil survey untuk dijadikan peta/gambar tambang dan infrastrukturnya serta
membuat perhitungan progress survey bulanan sesuai hasil joint survey guna mendukung kelancaran
kegiatan penagihan & pengembangan yang baik dan efisien
DATA PROCESSOR
Memandu & Mengontrol pelaksanaan survei & produksi berdasarkan desain engineering dan kaidah-
kaidah pertambangan dengan tujuan mencapai target desain & produksi yang telah ditetapkan
FIELD ENGINEER
Memastikan kualitas commodity sesuai dengan spesifikasi yang diinginkan oleh buyer untuk
memperoleh customer satisfaction
COMMODITY QUALITY
05 Membuat rencana dan design tambang berdasarkan sequence yang benar serta sesuai dengan teknis
operasional penambangan yang mencakup rencana produksi dan estimasi kebutuhan alat dalam rangka
efektivitas pelaksanaan operasional penambangan yang sesuai dengan keinginan customer.
PLAN ENGINEER
ROLL DESIGN DEPT. ENGINEERING
06 Melaksanakan kegiatan survey penambangan dengan menggunakan alat dan metode yang telah
ditentukan, yang meliputi survey tambang, disposal/waste dump & infrastructure construction dalam
rangka menyediakan data yang akurat untuk kebutuhan mine design and construction
SURVEYOR
HCGS X ENGINEERING
1. Menyediakan alat berat untuk
kebutuhan pembangunan project sipil
2. Memenuhi kebutuhan material untuk
kebutuhan pembangunan project sipil
1. Penyediaan operasional Engineering
2. Pembangunan building support
Engineering
3. Pemenuhan kebutuhan karyawan
HCGS
ENGINEERING
Dept. Head
Sect. Head
Road
Maintenance
Drill Blast
Group
Leader
Pit Service
GL
Commodity
Handling GL
Support
Truck
Driver
Produksi
Helper
A2B/TP
Operator
DEPT. PRODUKSI
Production
Group Leader
A2B/TP
Operator
Production
Helper
Blaster
Production
Helper
A2B/TP
Operator
A2B/TP
Operator
Produksi
Helper
Road
Maintenance GL
A2B/TP
Operator
Produksi
Helper
Sect. Head
Operation
Road
Maintenance
GL
Sect. Head
Blasting
Sect. Head
Blasting
ROLL DESIGN DEPT. PRODUKSI
01
02
03
04
Memonitor, mengontrol, mengkoordinasikan dan mengevaluasi seluruh aktivitas di coal precessing
dengan tujuan untuk mencapai target produksi yang telah ditetapkan
COAL PROCESSING PLANT
Mengontrol dan melaporkan pekerjaan drilling & blasting sesuai desain yang telah ditetapkan dengan
tujuan mendukung pelaksanaan pekerjaan drilling & blasting dengan aman di site.
DRILL AND BLAST
Memimpin, memonitor, & mengontrol bawahan serta berkoordinasi dengan department lain berkaitan
dengan pemeliharaan lokasi operasional tambang, penerangan, dewatering, dan pekerjaan konstruksi di
area tambang dalam rangka mendukung kelancaran dan keselamatan proses induksi
PIT SERVICE
Mengontrol dan memonitor pelaksanaan operasional di stockpile pelabuhan yang mencakup kegiatan
bongkar muat commodity beserta dengan proses administrasinya
COMMODITY HANDLING
05 Mengontrol dan memonitor pelaksanaan seluruh kegiatan produksi sesuai prosedur yang berlaku guna
mencapai target yang telah ditetapkan secara efisien dan aman.
PRODUCTION
HCGS X PRODUKSI
1. Menyediakan alat berat untuk
kebutuhan pembangunan project sipil
2. Memenuhi kebutuhan material untuk
kebutuhan pembangunan project sipil
1. Penyediaan operasional Produksi PA
100%
2. Perbaikan/penyediaan Radio Unit
3. Pembangunan building support
produksi
HCGS
PRODUKSI
HAULING & ROAD MAINTENANCE
HRM Dept Head
(Pak Suwarso)
Hauling Section Head Road Maintenance Section Head
Dispatcher Hauling GL Operator RM Helper
Man Power System and
Implementation
Operator Hauling
ROLL DESIGN DEPT. HRM
01
02
Memonitor dan mengontrol pelaksanaan pemeliharaan jalan yang sesuai dengan prosedur dan metode
pemeliharaan jalan serta keselamatan kerja untuk mencapai target coal hauling secara aman dan
efisien
ROAD MAINTENANCE
Memastikan tercapainya target yang telah ditentukan dengan mengontrol delay yang terjadi baik di
antrian Silo ataupun dijalan hauling
HAULING
HCGS X HRM
1. Memenuhi kebutuhan material untuk
kebutuhan pembangunan project sipil
2. Memenuhi kebutuhan WT untuk
pengisian air di WTP
1. Penyediaan operasional HRM
2. Perbaikan/penyediaan Radio Unit
3. Pembangunan building support
produksi
HCGS
HRM
UNIT
SARANA
VENDOR
UNIT
SARANA
DEPT.
02
01
PA
SARANA
SAFETY TALK
INSIDEN
ALLERTS
DESIGN
FACILITY
MESS
MINING
DESIGN
BUILDING
SUPPORT
03 04 05
06
PLAN IBS &
IBS ACTUAL
07
SARANA DEPARTEMEN
ENGINEERING PRODUKSI
01 INA01 MAP
01
INB01 BMS 10 INB10 MAP
02 INA02 BMS 02 INB02 MAP 11 INB11 TTP
03 INA03 BMS 03 INB03 MAP 12 INB12 MAP
04 INA04 (INF50) BMS 04 INB04 MAP 13 INB13 MAP
05 INA05 DIKALVIN 05 INB05 MAP 14 INF35 MAP
06 INA06 (INF79) MAP 06 INB06 MAP 15 INB15 RODA
07 INA07 MAP 07 INB07 MAP 16 INB16 RODA
08 INF74 TRC 08 INB08 MAP
09 INB09 MAP
SARANA DEPARTEMEN
PLANT MINING PLANT HAULING HCGS
01 IND01 TRC
01
INC01 TRC 1 INF01 HCGS
02 IND02 MAP 02 IND07 TRAC 2 INF50 BMS
03 IND03 TRAC 03 IND08 TRAC 3 INF54 TRAC
04 IND04 RODA 04 IND09 TRAC 4 INF67 DIKALVIN
05 IND05 TRAC 05 IND10 TRAC 5 INF68 MRJ
06 IND06 TRAC 06 INF80 TRAC 6 INF69 TRAC
7 INF79 MAP
8 INF80 TRAC
SARANA DEPARTEMEN
FAT SM SHE
01 ING01 TTP
01
INI01 BMS 1 INJ01 TRC
02 INI02 BMS 2 INJ02 TTP
03 INI03 BMS 3 INJ04 BMS
04 INI04 MAP 4 INJ05 TTP
5 INJ06 TRC
6 INJ08 DIKALVIN
SARANA DEPARTEMEN
HRM SM SHE
01 INF68 MRJ
01
INI01 BMS 1 INJ01 TRC
02 INP02 TRC 02 INI02 BMS 2 INJ02 TTP
03 INP03 MAP 03 INI03 BMS 3 INJ04 BMS
04 INP04 MRJ 04 INI04 MAP 4 INJ05 TTP
05 INP05 MRJ 5 INJ06 TRC
06 INP06 TRC 6 INJ08 DIKALVIN
BUS & ELF
01 INF04 BAGONG 12 INF22 BAGONG 23 INF71 BAGONG
02 INF05 BAGONG 13 INF25 BAGONG 24 INF72 BAGONG
03 INF09 BAGONG 14 INF37 BAGONG 25 INF08 RODA
04 INF10 BAGONG 15 INF38 BAGONG 26 INF18 RODA
05 INF11 BAGONG 16 INF40 BAGONG 27 INF19 RODA
06 INF12 BAGONG 17 INF42 BAGONG 28 INF24 RODA
07 INF13 BAGONG 18 INF43 BAGONG 29 INF26 RODA
08 INF14 BAGONG 19 INF49 BAGONG 30 INF27 RODA
09 INF15 BAGONG 20 INF52 BAGONG 31 INF28 RODA
10 INF20 BAGONG 21 INF56 BAGONG 32 INF30 RODA
11 INF21 BAGONG 22 INF70 BAGONG 33 INF32 RODA
BUS & ELF
34 INF33 RODA 45 INF77 RODA
35 INF34 RODA 46 INF78 RODA
36 INF39 RODA 47 INF07 AJM
37 INF41 RODA 48 INF31 AJM
38 INF45 RODA 49 INF75 AJM
39 INF46 RODA 50 INF16 DIKALVIN
40 INF47 RODA 51
41 INF51 RODA 52
42 INF62 RODA 53
43 INF63 RODA 54
44 INF76 RODA 55
SARANA PER VENDOR
AGUNG JAYA MAKMUR BORNEO MALOY SEJAHTERA DIKALVIN
NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK
01 INF07 31/05/2022 01 INI01 30/11/2021 01 IN01
02 INF31
30/09/2021
(WAITING NEW
UNIT)
02 INI02 30/11/2022 02 IN02 30/11/2021
03 INF75 08/08/2023 03 INI03 31/07/2022 03 INF67 31/12/2022
04 INB01 30/11/2022 04 INA05 31/10/2021
05 INA02 30/11/2022 05 INJ08 31/01/2022
06 INA03 31/03/2022 06 INF16 31/10/2021
07 INF50 30/11/2022
08 INJ04 30/11/2022
09 INF53 (INBS01) 30/11/2022
SARANA PER VENDOR
MARITIM ASIA PASIFIK
NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG
HABIS
KONTRAK
01 INF03 31/05/2022 10 INB06 11/07/2023 19 INI04 09/09/2023
02 IND02 30/11/2021 11 INB07 30/06/2023 20 INA06 28/02/2022
03 INA01 31/05/2022 12 INB08 31/05/2023
04 INF79 30/11/2021 13 INB09 30/07/2023
05 INP03 31/05/2022 14 INB10 24/05/2023
06 INB02 31/03/2022 15 INB12 31/07/2023
07 INB03 31/05/2023 16 INB13 31/05/2023
08 INB04 31/05/2023 17 INF35 30/11/2021
09 INB05 31/05/2023 18 INA07 30/08/2023
SARANA PER VENDOR
MITRA RAMAYANA JAYA TEKNO PUTRA PERKASA TRAC
NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK
01 INF68 31/12/2021 01 INJ06 31/10/2021 01 INF69 31/07/2022
02 INP04 05/10/2023 02 INP06 31/10/2021 02 INF80 31/03/2022
03 INP05 05/10/2023 03 INC01 02/09/2023 03 IND09 31/03/2022
04 IND01 02/09/2023 04 IND05 31/07/2022
05 IN03 31/12/2023 05 IND07 31/03/2022
06 INP02 22/08/2023 06 IND08 31/07/2022
07 INJ01 05/09/2023 07 INF54 31/03/2022
08 INF74 24/11/2023 08 IND06 31/07/2022
09 09 IND03 31/07/2022
10 IND10 31/07/2022
SARANA PER VENDOR
TURANGGA TRIDITYA
PERKASA BAGONG DEKAKA MAKMUR
NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK
01 ING01 30/11/2021 01 INF04 08/03/2022 11 INF37 18/12/2021
02 INF01 31/12/2022 02 INF05 30/04/2022 12 INF38 18/12/2021
03 INJ05 30/11/2021 03 INF09 11/12/2022 13 INF52 11/12/2022
04 INB11 31/12/2022 04 INF11 11/12/2022 14 INF10 11/12/2022
05 INJ02 31/12/2022 05 INF12 08/03/2022 15 INF40 15/06/2024
06 INF13 30/04/2022 16 INF48 15/06/2024
07 INF20 07/01/2024 17 INF49 15/06/2024
08 INF21 07/01/2024 18 INF56 23/06/2024
09 INF22 07/01/2024 19 INF70 23/06/2024
10 INF25 07/01/2024 20 INF14 30/06/2024
SARANA PER VENDOR
BAGONG DEKAKA MAKMUR RODA PRATAMA JAYA
NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK
21 INF71 11/07/2024 01 IND04 30/09/2022 11 INF33 30/09/2021
22 INF42 04/07/2024 02 INF08 31/10/2021 12 INF34 28/02/2023
23 INF43 22/03/2023 03 INF18 28/02/2023 13 INF39 31/08/2022
24 INF15 30/06/2024 04 INF19 28/02/2023 14 INF41 18/09/2022
25 INF72 30/06/2024 05 INF24 31/10/2021 15 INF45 30/09/2021
06 INF26 31/10/2021 16 INF46 30/09/2021
07 INF27 30/09/2021 17 INF47 30/09/2021
08 INF28 28/02/2023 18 INF51 30/10/2021
09 INF30 03/09/2024 19 INF62 31/08/2022
10 INF32 30/09/21 20 INF63 01/10/2022
SARANA PER VENDOR
RODA PRATAMA JAYA
NO NO. LAMBUNG HABIS KONTRAK
21 INF76 03/09/2024
22 INF77 03/09/2024
23 INF78 03/09/2024
24 INB15 04/08/2023
25 INB16 12/08/2024
PA SARANA JULI
AJM
100%
BAGONG
100%
BMS
96,56%
RODA
100%
MAP
98,79%
TRAC
74,19%
MRJ
83,87%
TTP
99,19%
DIKALVIN
99,35%
TPP
97,85%
PA SARANA AGUSTUS
AJM
91%
BAGONG
100%
BMS
91,40%
RODA
100%
MAP
92%
TRAC
99,03%
MRJ
87,10%
TTP
100%
DIKALVIN
100%
TPP
100%
PA SARANA SEPTEMBER
AJM
76%
BAGONG
100%
BMS
99,67%
RODA
100%
MAP
92%
TRAC
85,80%
MRJ
86,13%
TTP
100%
DIKALVIN
97,60%
TPP
100%
SAFETY TALK & INSIDEN ALLERT
06 – 07 – 2021 18 – 07 – 2021 05 – 09 – 2021
11 – 07 – 2021
15 – 08 - 2021 10 – 10 – 2021
DESIGN FACILITY MESS MINING
RUMAH LAUNDRY CAMP OFFICE & GUDANG GS
DESIGN BUILDING SUPPORT
WORKSHOP SARANA T2
POS SECURITY KHVR TPS B3
MUSHOLA PIT STOP T6
IBS PLAN X IBS ACTUAL
94% 96% 98% 100%
SEPTEMBER
AGUSTUS
JULI
PLAN
ACTUAL
PLAN ACTUAL SELISIH
SEPTEMBER 4.161.600.000,00
Rp 4.003.490.000,00
Rp 158.110.000,00
Rp
AGUSTUS 4.089.600.000,00
Rp 4.051.490.000,00
Rp 38.110.000,00
Rp
JULI 3.915.600.000,00
Rp 3.848.090.000,00
Rp 67.510.000,00
Rp

More Related Content

What's hot

Syarat pembentukan P2K3
Syarat pembentukan  P2K3Syarat pembentukan  P2K3
Syarat pembentukan P2K3
Herry Prakoso
 
75455276 diktat ventilasitambang
75455276 diktat ventilasitambang75455276 diktat ventilasitambang
75455276 diktat ventilasitambang
Nando Ltoruan
 
estimasi bucket fill factor berdasarkan volume angkut DumpTruck
estimasi bucket fill factor berdasarkan volume angkut DumpTruckestimasi bucket fill factor berdasarkan volume angkut DumpTruck
estimasi bucket fill factor berdasarkan volume angkut DumpTruck
evamanroe
 

What's hot (20)

KPI Manajer SDM - KPI HR Manager
KPI Manajer SDM - KPI HR ManagerKPI Manajer SDM - KPI HR Manager
KPI Manajer SDM - KPI HR Manager
 
Keselamatan dan Kesehatan Kerja Pelabuhan
Keselamatan dan Kesehatan Kerja Pelabuhan Keselamatan dan Kesehatan Kerja Pelabuhan
Keselamatan dan Kesehatan Kerja Pelabuhan
 
Syarat pembentukan P2K3
Syarat pembentukan  P2K3Syarat pembentukan  P2K3
Syarat pembentukan P2K3
 
PPT kesehatan dan keselamatan kerja (K3)
PPT kesehatan dan keselamatan kerja (K3)PPT kesehatan dan keselamatan kerja (K3)
PPT kesehatan dan keselamatan kerja (K3)
 
Form laporan inspeksi bersama
Form laporan inspeksi bersamaForm laporan inspeksi bersama
Form laporan inspeksi bersama
 
SOP Pekerjaan Konstruksi
SOP Pekerjaan KonstruksiSOP Pekerjaan Konstruksi
SOP Pekerjaan Konstruksi
 
Contoh KPI SDM dan HR
Contoh KPI SDM dan HR Contoh KPI SDM dan HR
Contoh KPI SDM dan HR
 
Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00
 
Interpretasi Kriteria Audit SMK3
Interpretasi Kriteria Audit SMK3Interpretasi Kriteria Audit SMK3
Interpretasi Kriteria Audit SMK3
 
75455276 diktat ventilasitambang
75455276 diktat ventilasitambang75455276 diktat ventilasitambang
75455276 diktat ventilasitambang
 
Lingkungan kerja
Lingkungan kerjaLingkungan kerja
Lingkungan kerja
 
Contoh/Template JOB DESC dalam Perusahaan
Contoh/Template JOB DESC dalam PerusahaanContoh/Template JOB DESC dalam Perusahaan
Contoh/Template JOB DESC dalam Perusahaan
 
Identifikasi Bahaya - K3
Identifikasi Bahaya - K3Identifikasi Bahaya - K3
Identifikasi Bahaya - K3
 
Manajemen proyek
Manajemen proyekManajemen proyek
Manajemen proyek
 
Presentation K3 ( PPT Kesehatan Keselamatan Kerja )
Presentation K3 ( PPT Kesehatan Keselamatan Kerja )Presentation K3 ( PPT Kesehatan Keselamatan Kerja )
Presentation K3 ( PPT Kesehatan Keselamatan Kerja )
 
Presentasi K3 Proyek.
Presentasi K3 Proyek.Presentasi K3 Proyek.
Presentasi K3 Proyek.
 
estimasi bucket fill factor berdasarkan volume angkut DumpTruck
estimasi bucket fill factor berdasarkan volume angkut DumpTruckestimasi bucket fill factor berdasarkan volume angkut DumpTruck
estimasi bucket fill factor berdasarkan volume angkut DumpTruck
 
Inspeksi
InspeksiInspeksi
Inspeksi
 
Job Desc HSE Staff
Job Desc HSE StaffJob Desc HSE Staff
Job Desc HSE Staff
 
CONTOH METODE PELAKSANAAN
CONTOH METODE PELAKSANAANCONTOH METODE PELAKSANAAN
CONTOH METODE PELAKSANAAN
 

Similar to PRESENTASI ORDEP ANAM FINAL.pptx

materi tentang cross function di perusahaan pertambangan.pptx
materi tentang cross function di perusahaan pertambangan.pptxmateri tentang cross function di perusahaan pertambangan.pptx
materi tentang cross function di perusahaan pertambangan.pptx
ZondaPramanaPutra
 
MEKANISME & TEHNIK AUDIT SMK3 - Copy - Copy.pdf
MEKANISME & TEHNIK AUDIT SMK3 - Copy - Copy.pdfMEKANISME & TEHNIK AUDIT SMK3 - Copy - Copy.pdf
MEKANISME & TEHNIK AUDIT SMK3 - Copy - Copy.pdf
IanMardiansyah2
 
237db pengendalian pelaksanaan_proyek_pisk2
237db pengendalian pelaksanaan_proyek_pisk2237db pengendalian pelaksanaan_proyek_pisk2
237db pengendalian pelaksanaan_proyek_pisk2
AndikaAkbar8
 
pengendalian pelaksanaan
pengendalian pelaksanaanpengendalian pelaksanaan
pengendalian pelaksanaan
nrumata
 
Astekindo Materi spam bahan presentase s
Astekindo Materi spam bahan presentase sAstekindo Materi spam bahan presentase s
Astekindo Materi spam bahan presentase s
muhammadarby79
 
Manajemen Proyek Lengkap di Lingkungan PU Bina Margappt
Manajemen Proyek Lengkap di Lingkungan PU Bina MargapptManajemen Proyek Lengkap di Lingkungan PU Bina Margappt
Manajemen Proyek Lengkap di Lingkungan PU Bina Margappt
HuiSan6
 

Similar to PRESENTASI ORDEP ANAM FINAL.pptx (20)

REVISI PCM SUPV. DI JATENG 2.pptx
REVISI PCM SUPV. DI JATENG 2.pptxREVISI PCM SUPV. DI JATENG 2.pptx
REVISI PCM SUPV. DI JATENG 2.pptx
 
PRESESNTASI DODDY.pptx
PRESESNTASI DODDY.pptxPRESESNTASI DODDY.pptx
PRESESNTASI DODDY.pptx
 
MODUL PENGAWASAN DAN PENGENDALIAN MUTU PEKERJAAN JALAN
MODUL PENGAWASAN DAN PENGENDALIAN MUTU PEKERJAAN JALANMODUL PENGAWASAN DAN PENGENDALIAN MUTU PEKERJAAN JALAN
MODUL PENGAWASAN DAN PENGENDALIAN MUTU PEKERJAAN JALAN
 
Materi Keselamatan dan Kesehatan Kerja CSMS.ppt
Materi Keselamatan dan Kesehatan Kerja CSMS.pptMateri Keselamatan dan Kesehatan Kerja CSMS.ppt
Materi Keselamatan dan Kesehatan Kerja CSMS.ppt
 
materi tentang cross function di perusahaan pertambangan.pptx
materi tentang cross function di perusahaan pertambangan.pptxmateri tentang cross function di perusahaan pertambangan.pptx
materi tentang cross function di perusahaan pertambangan.pptx
 
PERENCANAAN & PENGENDALIAN PRODUKSI.pdf
PERENCANAAN & PENGENDALIAN PRODUKSI.pdfPERENCANAAN & PENGENDALIAN PRODUKSI.pdf
PERENCANAAN & PENGENDALIAN PRODUKSI.pdf
 
MEKANISME & TEHNIK AUDIT SMK3 - Copy - Copy.pdf
MEKANISME & TEHNIK AUDIT SMK3 - Copy - Copy.pdfMEKANISME & TEHNIK AUDIT SMK3 - Copy - Copy.pdf
MEKANISME & TEHNIK AUDIT SMK3 - Copy - Copy.pdf
 
Buku
BukuBuku
Buku
 
Pengawasan proyek
Pengawasan proyekPengawasan proyek
Pengawasan proyek
 
Smk3 endang 2019
Smk3 endang 2019Smk3 endang 2019
Smk3 endang 2019
 
Bab v fix zona 3
Bab v fix zona 3Bab v fix zona 3
Bab v fix zona 3
 
_PENGENDALIAN_PELAKSANAAN_PROYEK_PISK2 pelatihan.pptx
_PENGENDALIAN_PELAKSANAAN_PROYEK_PISK2 pelatihan.pptx_PENGENDALIAN_PELAKSANAAN_PROYEK_PISK2 pelatihan.pptx
_PENGENDALIAN_PELAKSANAAN_PROYEK_PISK2 pelatihan.pptx
 
237db pengendalian pelaksanaan_proyek_pisk2
237db pengendalian pelaksanaan_proyek_pisk2237db pengendalian pelaksanaan_proyek_pisk2
237db pengendalian pelaksanaan_proyek_pisk2
 
pengendalian pelaksanaan
pengendalian pelaksanaanpengendalian pelaksanaan
pengendalian pelaksanaan
 
Contractor_Safety_Management_System.pdf
Contractor_Safety_Management_System.pdfContractor_Safety_Management_System.pdf
Contractor_Safety_Management_System.pdf
 
Astekindo Materi spam bahan presentase s
Astekindo Materi spam bahan presentase sAstekindo Materi spam bahan presentase s
Astekindo Materi spam bahan presentase s
 
Smk3 pp 50 2012
Smk3 pp 50 2012Smk3 pp 50 2012
Smk3 pp 50 2012
 
Manajemen Proyek Lengkap di Lingkungan PU Bina Margappt
Manajemen Proyek Lengkap di Lingkungan PU Bina MargapptManajemen Proyek Lengkap di Lingkungan PU Bina Margappt
Manajemen Proyek Lengkap di Lingkungan PU Bina Margappt
 
01-WEBINAR pelaksannan proyek 5 dES 2023xx.ppt
01-WEBINAR pelaksannan proyek 5 dES 2023xx.ppt01-WEBINAR pelaksannan proyek 5 dES 2023xx.ppt
01-WEBINAR pelaksannan proyek 5 dES 2023xx.ppt
 
rini skp sasaran juni 23.pdf
rini skp sasaran juni 23.pdfrini skp sasaran juni 23.pdf
rini skp sasaran juni 23.pdf
 

Recently uploaded

Obat Aborsi Surabaya WA 082223109953 Jual Obat Aborsi Cytotec Asli Di Surabaya
Obat Aborsi Surabaya WA 082223109953 Jual Obat Aborsi Cytotec Asli Di SurabayaObat Aborsi Surabaya WA 082223109953 Jual Obat Aborsi Cytotec Asli Di Surabaya
Obat Aborsi Surabaya WA 082223109953 Jual Obat Aborsi Cytotec Asli Di Surabaya
Obat Aborsi Surabaya Cytotec Asli Di Surabaya
 
Cytotec Abortion pills : Online shop [ +966543202731) At best price riyadh Sa...
Cytotec Abortion pills : Online shop [ +966543202731) At best price riyadh Sa...Cytotec Abortion pills : Online shop [ +966543202731) At best price riyadh Sa...
Cytotec Abortion pills : Online shop [ +966543202731) At best price riyadh Sa...
Abortion pills in Riyadh +966572737505 get cytotec
 
💊💊 OBAT PENGGUGUR KANDUNGAN BANDUNG 082223109953 ATAU CARA GUGURKAN JANIN KLI...
💊💊 OBAT PENGGUGUR KANDUNGAN BANDUNG 082223109953 ATAU CARA GUGURKAN JANIN KLI...💊💊 OBAT PENGGUGUR KANDUNGAN BANDUNG 082223109953 ATAU CARA GUGURKAN JANIN KLI...
💊💊 OBAT PENGGUGUR KANDUNGAN BANDUNG 082223109953 ATAU CARA GUGURKAN JANIN KLI...
💊💊 OBAT PENGGUGUR KANDUNGAN 082223109953 GUGURKAN JANIN KLINIK Bandung💊
 
strategi pemasaran Kewirausahaan-Pertemuan-5.ppt
strategi pemasaran Kewirausahaan-Pertemuan-5.pptstrategi pemasaran Kewirausahaan-Pertemuan-5.ppt
strategi pemasaran Kewirausahaan-Pertemuan-5.ppt
areeistyk
 
Modul-5-Pdgk-4101 jhfgfgfgfkelompok 3.pptx
Modul-5-Pdgk-4101 jhfgfgfgfkelompok 3.pptxModul-5-Pdgk-4101 jhfgfgfgfkelompok 3.pptx
Modul-5-Pdgk-4101 jhfgfgfgfkelompok 3.pptx
ahmadirhamni
 
PPT Pelaksana Lapangan Pekerjaan Bangunan Pengaman Pantai.pptx
PPT Pelaksana Lapangan Pekerjaan Bangunan Pengaman Pantai.pptxPPT Pelaksana Lapangan Pekerjaan Bangunan Pengaman Pantai.pptx
PPT Pelaksana Lapangan Pekerjaan Bangunan Pengaman Pantai.pptx
davidsagita2
 
In Kuwait City ((+918761049707)) Get Cytotec in Salmiyah Mifepristone
In Kuwait City ((+918761049707)) Get Cytotec in Salmiyah MifepristoneIn Kuwait City ((+918761049707)) Get Cytotec in Salmiyah Mifepristone
In Kuwait City ((+918761049707)) Get Cytotec in Salmiyah Mifepristone
jaanualu31
 
Obat Cytotec Asli Pfizer 082220077622 Jual Obat Cytotec Asli
Obat Cytotec Asli Pfizer 082220077622 Jual Obat Cytotec AsliObat Cytotec Asli Pfizer 082220077622 Jual Obat Cytotec Asli
Obat Cytotec Asli Pfizer 082220077622 Jual Obat Cytotec Asli
Obat Cytotec Asli Terpercaya 082220077622
 

Recently uploaded (12)

Obat Aborsi Surabaya WA 082223109953 Jual Obat Aborsi Cytotec Asli Di Surabaya
Obat Aborsi Surabaya WA 082223109953 Jual Obat Aborsi Cytotec Asli Di SurabayaObat Aborsi Surabaya WA 082223109953 Jual Obat Aborsi Cytotec Asli Di Surabaya
Obat Aborsi Surabaya WA 082223109953 Jual Obat Aborsi Cytotec Asli Di Surabaya
 
Cytotec Abortion pills : Online shop [ +966543202731) At best price riyadh Sa...
Cytotec Abortion pills : Online shop [ +966543202731) At best price riyadh Sa...Cytotec Abortion pills : Online shop [ +966543202731) At best price riyadh Sa...
Cytotec Abortion pills : Online shop [ +966543202731) At best price riyadh Sa...
 
UNIKBET : Link Slot Gacor Pragmatic Play Yang Bisa Pakai Doku Banyak Bonus
UNIKBET : Link Slot Gacor Pragmatic Play Yang Bisa Pakai Doku Banyak BonusUNIKBET : Link Slot Gacor Pragmatic Play Yang Bisa Pakai Doku Banyak Bonus
UNIKBET : Link Slot Gacor Pragmatic Play Yang Bisa Pakai Doku Banyak Bonus
 
💊💊 OBAT PENGGUGUR KANDUNGAN BANDUNG 082223109953 ATAU CARA GUGURKAN JANIN KLI...
💊💊 OBAT PENGGUGUR KANDUNGAN BANDUNG 082223109953 ATAU CARA GUGURKAN JANIN KLI...💊💊 OBAT PENGGUGUR KANDUNGAN BANDUNG 082223109953 ATAU CARA GUGURKAN JANIN KLI...
💊💊 OBAT PENGGUGUR KANDUNGAN BANDUNG 082223109953 ATAU CARA GUGURKAN JANIN KLI...
 
strategi pemasaran Kewirausahaan-Pertemuan-5.ppt
strategi pemasaran Kewirausahaan-Pertemuan-5.pptstrategi pemasaran Kewirausahaan-Pertemuan-5.ppt
strategi pemasaran Kewirausahaan-Pertemuan-5.ppt
 
Modul-5-Pdgk-4101 jhfgfgfgfkelompok 3.pptx
Modul-5-Pdgk-4101 jhfgfgfgfkelompok 3.pptxModul-5-Pdgk-4101 jhfgfgfgfkelompok 3.pptx
Modul-5-Pdgk-4101 jhfgfgfgfkelompok 3.pptx
 
PPT Pelaksana Lapangan Pekerjaan Bangunan Pengaman Pantai.pptx
PPT Pelaksana Lapangan Pekerjaan Bangunan Pengaman Pantai.pptxPPT Pelaksana Lapangan Pekerjaan Bangunan Pengaman Pantai.pptx
PPT Pelaksana Lapangan Pekerjaan Bangunan Pengaman Pantai.pptx
 
resiko, pengembalian dan kebijakan dividen
resiko, pengembalian dan kebijakan dividenresiko, pengembalian dan kebijakan dividen
resiko, pengembalian dan kebijakan dividen
 
DRAFT PROGRAM KERJA UMUM SEKSI BIDANG.pdf
DRAFT PROGRAM KERJA UMUM SEKSI BIDANG.pdfDRAFT PROGRAM KERJA UMUM SEKSI BIDANG.pdf
DRAFT PROGRAM KERJA UMUM SEKSI BIDANG.pdf
 
PEDOMAN PEMBENTUKAN PANWASLU KECAMATAN UNTUK PEMILIHAN TAHUN 2024 OKE.pdf
PEDOMAN PEMBENTUKAN PANWASLU KECAMATAN UNTUK PEMILIHAN TAHUN 2024 OKE.pdfPEDOMAN PEMBENTUKAN PANWASLU KECAMATAN UNTUK PEMILIHAN TAHUN 2024 OKE.pdf
PEDOMAN PEMBENTUKAN PANWASLU KECAMATAN UNTUK PEMILIHAN TAHUN 2024 OKE.pdf
 
In Kuwait City ((+918761049707)) Get Cytotec in Salmiyah Mifepristone
In Kuwait City ((+918761049707)) Get Cytotec in Salmiyah MifepristoneIn Kuwait City ((+918761049707)) Get Cytotec in Salmiyah Mifepristone
In Kuwait City ((+918761049707)) Get Cytotec in Salmiyah Mifepristone
 
Obat Cytotec Asli Pfizer 082220077622 Jual Obat Cytotec Asli
Obat Cytotec Asli Pfizer 082220077622 Jual Obat Cytotec AsliObat Cytotec Asli Pfizer 082220077622 Jual Obat Cytotec Asli
Obat Cytotec Asli Pfizer 082220077622 Jual Obat Cytotec Asli
 

PRESENTASI ORDEP ANAM FINAL.pptx

  • 1. CHRISNA ANAM GUNTARA NRP : KB21019 DEPARTEMEN : HCGS POSISI : TRAINEE FGDP GS OFFICER DISTRIK : INDEXIM COALINDO MINING PROJECT
  • 4. PROFILE PERUSAHAAN INFRASTRUKTUR, LOGISTIK TEKNOLOGI INFORMASI OTOMOTIF AGRIBISNIS JASA KEUANGAN ALAT BERAT, PERTAMBANGAN, & ENERGI PROPERTI
  • 5. PROFIL PERUSAHAAN INDEXIM COALINDO LOKASI : Desa Pengadan Km. 43, Kec.Kzarangan, Kab.Kutai Timur, Kalimantan Timur  ASTO Hauling Project  BDMA Mining Project  INDE Mining Project  MASS Mining Project  HJUR Mining Project  SPUT Port Project  TRMB Mining Project  SJR Hauling Project  PLH Mining Project  PCNS Mining Project
  • 6. VISI PT KALIMANTAN PRIMA PERSADA Manajemen Tambang Yang Efektif dan Efisien Effective Komitmen terhadap Kualitas dan Ketepatan Pengirim Produk Commitment Kepedulian Terhadap Kualitas Hidup Karyawan dan Masyarakat Sekitar Awareness Kesadaran Terhadap Keselamatan, Kesehatan Kerja, & Lingkungan Hidup (K3LH) Safety Kemampuan Rekayasa Tambang Yang Dapat Diandalkan Reliable COMMITMENT AWARENESS RELIABLE EFFECTIVE SAFETY
  • 7. MISI PT. KALIMANTAN PRIMA PERSADA Meningkatkan penciptaan nilai bagi pemegang saham Membangun kompetensi dan rasa memiliki dalam diri karyawan melalui lingkungan yang cerdas Menciptakan hubungan yang saling menguntungkan dengan para pemangku kepentingan Membangun perilaku kerja yang mengutamakan Keselamatan, Kesehatan Kerja, dan Lingkungan Hidup Memberikan pelayanan dalam industri pertambangan melalui jasa kontraktor tambang, pengolahan batu bara, manajemen jalan angkut, manajemen pelabuhan dan perdagangan batubara dengan kualitas terbaik, harga yang kompetitif dan ketepatan pengiriman
  • 8. BUDAYA KERJA Mengutamakan keselamatan dan kesehatan kerja, peduli lingkungan hidup, dan pemberdayaan masyarakat sekitar SAFETY Dapat dipercaya dengan prinsip Memegang teguh kejujuran, tanggung jawab, keterbukaan,dan kedisiplinan INTEGRITY Dapat bekerja sama, menghargai perbedaan dengan menyatukan keunggulan masing-masing sebagai sebuah kekuatan yang mengutamakan kebersamaan serta kegembiraan untuk mencapai hasil yang berlipat ganda COMPETENCE Dapat Diandalkan dengan semangat Menjadi yang terbaik untuk memberikan Nilai tambah terhadap semua pihak. SYNERGY
  • 9. PROSES BISNIS PT. KALIMANTAN PRIMA PERSADA (KPP) DI SITE INDEXIM PT. Indexim Coalindo PT. Indexim Coalindo PT. KPP PT. KPP
  • 10. Project Manager (Seno Tirto Hadikusumo) Deputi Project Manager (Sudjianto) Deputi Project Manager (Bonarto) Engineering Dept Head (Apri Pratimor) Production Dept Head (Supiani) MD Officer - Rizal Galang ICT Officer - Adven - Andriawan - Fauzan HRM Dept Head (Umam) Plant Mining Dept Head (Hendri Albert) Plant Hauling Dept Head (Haryanto) SM Dept Head (Mugiono) FAT Dept Head (M.Rahmani) HCGS Dept Head (Kosmas Kemit) SHE Dept Head (Ihsan Mustaqim)
  • 11. SHE Dept Head Sect Head Mining & Environment Sect Head Safety Hauling Safety Health System Development SHE Administrator SHE Operation Mining Environment Officer Koordinator Hauling Patrol Manager ERT SHE Operation Hauling and Regrading SHE Koordinator HRM & Safety Officer Subcont Anggota ERT DEPARTEMEN SHE
  • 12. ROLE DESIGN DEPT. SHE 01 02 03 04 Memberikan pertolongan pertama pada keadaan gawat darurat di tempat kerja dan melakukan inspeksi hygiene di tempat kerja/lingkungan kerja guna pemeliharaan dan kepedulian karyawan terhadap kesehatan PARAMEDIC Merencanakan, melaksanakan, mengevaluasi, dan menindaklanjuti dalam rangka menjamin terpeliharanya K3 sesuai dengan target yang ditetapkan SAFETY & HEALTH OPERATION Melakukan development sistem K3LH, memastikan dijalankannya sistem tersebut, serta menganalisa dan mengevaluasi sistem K3LH agar pelaksanaannya di lapangan sesuai dengan standard yang telah ditetapkan SAFETY, HEALTH & ENVIRONMENT DEVELOPMENT Merencanakan, melaksanakan, mengevaluasi, dan menindak lanjuti sistem manajemen Lingkungan Hidup dalam rangka menjamin terpeliharanya Lingkungan Hidup sesuai dengan target yang ditetapkan ENVIRONMENT
  • 13. HCGS X SHE 1. Fulfill kebutuhan manpower SHE 2. Kebutuhan pekerjaan borongan SHE 1. Support kebutuhan kenyamanan karyawan SHE 2. Support sarana operasional SHE 1. Melakukan inspeksi & observasi terencana semua pekerjaan dibawah ranah HCGS 2. Administrasi terkait In&Out karyawan subcont/mitra kerja dibawah HCGS HCGS SHE MANPOWER SUPPORT OPERASIONAL ADMINISTRASI
  • 14. DEPARTEMEN FAT FAT Dept Head Finance and Taxation Officer Cost and Budget Officer Asset and Validation Officer Cashier Site
  • 15. ROLE DESIGN FAT 01 02 Memonitor, mengontrol, melaksanakan, dan melaporkan kegiatan finance di site meliputi rencana pembayaran, cash flow, AR Collection, validasi, dan perpajakan yang bertujuan untuk memenuhi kebutuhan operasional secara efisien. Finance & Taxation Officer Melakukan proses validasi invoice serta pengaklasifikasikan & pengikhtisaran atas transaksi keuangan site berdasarkan metode & praktek akuntansi yang berlaku dengan tujuan memenuhi kebutuhan informasi keuangan yang akurat Cost Accounting & account Payable Officer 03 Memvalidasi & Verifikasi dokumen tagihan. Menghitung cost depresiasi, memonitoring aset baru, aset pergi, mutasii datang dan mutasi pergi. Asset And Validation Officer
  • 16. HCGS X FAT 1. Fulfill kebutuhan manpower FAT 1. Support kebutuhan kenyamanan karyawan FAT 2. Support sarana operasional FAT 1. Melakukan pengajuan dana baik PP ataupun invoicing 2. Mengajukan plan IBS guna menunjang kebutuhan HCGS dalam 1 semester kedepan HCGS FAT MANPOWER SUPPORT OPERASIONAL ADMINISTRASI
  • 17. HCGS Dept Head HCGS Administrator HC Section Head Human Capital Officer Community Development Officer General Service GL DEPARTEMEN HCGS GS & Civil Site Sect. Head Civil Contruction & ME GL Security Chief
  • 18. ROLE DESIGN DEPT. HCGS 01 02 03 04 Menyediakan kebutuhan & Perawatan prasarana yang berupa bangunan beserta fasilitas pendukungnya sesuai dengan budget maupun non budget investment yang telah disetujui, mengacu kepada SOP dan aturan keselamatan kerja guna mendukung kelancaran kegiatan operasional CIVIL CONSTRUCTION Mengontrol, mengkoordinir & melaksanakan seluruh kegiatan yang berkaitan dengan Human Resources dalam organisasi site serta mengatasi permasalahan sesuai dengan kebijakan program dan prosedur yang telah ditentukan dengan baik darai HO maupun site. HUMAN RESOURCES Melaksanakan kegiatan community development di site mencakup bidang HRD, Environment Management, Economic Development, Social Culture, Infrastructures dan kesehatan masyarakat dengan tujuan untuk menciptakan kondusifitas project COMMUNITY DEVELOPMENT Mengkoordinir, mengontrol dan memonitor seluruh kegiatan General Affair sesuai kebijakan, peraturan dan prosedur yang berlaku dengan tujuan menjamin kelancaran kegiatan General Affair dan dilakukan dengan aman, efektif, dan efisien GENERAL AFFAIR
  • 19. ROLE DESIGN DEPT. HCGS 05 06 Menyiapkan dan menjalankan proses payroll di site sesuai prosedur dengan akurat dan tepat waktu. Payroll Mengkoordinasikan pelaksanaan pengamanan dan mencegah kemungkinan timbulnya gangguan/hambatan/bahaya, serta mengatasi segala permasalahan yang timbul berkaitan dengan situasi kemanaan di seluruh area job site KPP. CHIEF SECURITY
  • 20. SM Dept Head SH Warehouse & FAO Warehouse GL FAO GL Inventory GL Purchasing & Binning admin FAO admin Inventory Controller Picking & Packing admin Fuel & Oilman Cataloger Purchasing GL Purchaser DEPARTEMEN SM SH Inventory & Purchasing
  • 21. PERAN DAN FUNGSI DEPT. SM 01 02 03 04 Pengelolaan atas penyimpanan/sparepart, serta memonitoring dan melaksanakan penerimaan dan pengeluaran barang dan material in transit, sesuai prosedur dan aturang yang berlaku Warehouse Mengelola inventory mulai dari pemenuhan dan perhitungan kebutuhan akan jenis, jumlah material/ sparepart, termasuk melakukan inspeksi (stock taking) secara berkala, dan menyusun katalog inventory INVENTORY Bertanggung Jawab dalam pengelolaan subcontractor yang sesuai standara perusahaan, perhitungan standar rate, mengawasi waktu pembayaran, mengontrol jangka waktu serta distribusi kontrak, hingga mengevaluasi kinerja subcontractor SUBCONTRACTOR Mengatur proses pembelian barang, yang dipesan atau dibutuhkan oleh user, dengan tingkat kualitas dan nilai ekonomis yang terbaik. PURCHASING 05 Mengelola Fuel dan Oil sehingga kebutuhan Oil dan Fuel dapat selalu terpenuhi untuk semua unit yang beroperasi FUEL AND OIL
  • 22. HCGS X SM 1. Fulfill kebutuhan manpower SM 1. SM menghubungkan kebutuhan HCGS dengan supplier 2. Support sarana operasional SM 3. Penggunaan Fuel untuk operasional sarana bus dan LV 1. HCGS mengevaluasi fuel keluar tidak melebihi fuel dari plan kebutuhan 2. Validasi PR dan penerbitan PO HCGS SM MANPOWER SUPPORT OPERASIONAL ADMINISTRASI
  • 23. Plant Mining Dept Head Plant Site Section Head SSE Mining GL Fabrication GL Wheel Type GL Tyre Site Section Head Track Type GL Planner Plant Engineer L&D Site Sect Head SSE Mekanik Support Truck driver Track Type Mekanik Welder Wheel Type Mekanik Plant Site Admin Tools Keeper Tireman Tire GL Plant Certificator Plant Site Certificator
  • 24. PERAN DAN FUNGSI DEPT. PLANT MINING 01 02 03 04 Mengkoordinir, memonitor dan mengontrol seluruh kegiatan fabrikasi di workshop dalam rangka mendukung avaiability unit di job site. FABRICATION Membuat perencanaan seluruh aktivitas equipment maintenance yang meliputi pembuatan schedule periodic service, overhaul dan inspection program, dalam rangka pelaksanaan program schedule equipment maintenance secara konsisten PLANNER Melakukan perawatan dan perbaikan terhadap fungsi electrical unit produksi dan support produksi dengan tujuan menyiapkan unit support produksi yang siap digunakan dan bisa mencapai target physical availbility yang telah ditetapkan PLANT ELECTRICIAN Melakukan pengujian terhadap mekanik yang telah lulus training dan telah memiliki kompetensi yang terkait dengan pekerjaanya dalam rangka mensertifikasi kompetensi mekanik. CERTIFICATOR 05 Menganalisa masalah – masalah teknik di lapangan, memberikan rekomendasi serta monitor dan mengevaluasi pelaksanaan rekomendasi tersebut dalam rangka meningkatkan kualitas program perawatan alat/unit PLANT ENGINEER
  • 25. PERAN DAN FUNGSI DEPT. PLANT MINING 06 07 08 09 Memonitor, mengontrol, dan mengarahkan pekerjaan perawatan, perbaikan, dan overhaul seluruh unit support equipment dengan tujuan untuk memastikan aktifitas berjalan sesuai dengan standar dan prosedur kerja serta keselamatan kerja sehingga unit support equipment siap digunakan dan bisa mencapai target physical availbility yang telah ditetapkan SITE SUPPORT EQUIPMENT (SSE) Merencanakan, menganalisa, memonitor, dan mengkoordinasikan pekerjaan yang mencakup schedule perawatan dan perbaikan, analisa kerusakan ban dan tersedianya material & tool yang diperlukan dengan tujuan meminimumkan cost, memperpanjang umur ban & utilisasi yang optimal & dilakukan dengan efektif, efisien, dan aman TYRE Memonitor, mengontrol, dan mengarahkan pekerjaan perawatan, perbaikan dan overhaul seluruh unit alat-alat berat jenis track dengan tujuan untuk memastikan aktifitas berjalan sesuai dengan standar dan prosedur kerja serta keselamatan kerja sehingga unit alat berat jenis trac siap digunakan dan bisa mencapai targat PA yang telah ditetapkan. TRACK Merencanakan, mengembangkan, melaksanakan program pengajaran dan evaluasi serta memonitor perkembangannya tujuan meningkatkan kompetensi dalam pelaksanaan repair dan maintenance unit dengan baik dan benar. PLANT INSTRUCTORS
  • 26. PERAN DAN FUNGSI DEPT. PLANT MINING 10 11 Memonitor, mengontrol, dan mengarahkan pekerjaan perawatan, perbaikan, dan overhaul seluruh unit alat berat jenis wheel, serta melakukan analisa teknikal terhadap setiap kerusakan dengan tujuan untuk memastikan aktifitas berjalan sesuai dengan standar dan prosedur kerja serta keselamatan kerja sehingga unit alat berat jenis wheel siap digunakan dan bisa mencapai target PA yang telah ditentukan. WHEEL Melakukan pengelasan komponen, unit, alat dalam rangka perbaikan dengan tujuan agar komponen, unit, alat, tersebut dapat berfungsi secara efektif, aman, dan efisien WELDER
  • 27. HCGS X PLAN MINING 1. Fulfill kebutuhan manpower Plan Mining 2. Pemenuhan kebutuhan borongan 1. Support sarana operasional Plant Mining 2. Pembangunan building Support Plan Mining 3. Support Radio untuk unit baru/rusak 1. HCGS mengevaluasi fuel keluar tidak melebihi fuel dari plan kebutuhan 2. Validasi PR dan penerbitan PO HCGS PLANT MINING MANPOWER SUPPORT OPERASIONAL ADMINISTRASI
  • 28. Plant Hauling Dept Head Plant Site Section Head Plant Hauling GL Hauling Type Mechanic Support Truck Driver Plant Hauling Support Section Head Tyre GL Fabrication GL Tyreman Welder Fabrication GL Tools Keeper Plan Site Admin Plan Site Admin Plan Engineer Plan Certificator Plan Instructor
  • 29. ROLL DESIGN DEPT. PLANT HAULING 01 02 03 04 Mengkoordinir, memonitor dan mengontrol seluruh kegiatan fabrikasi di workshop dalam rangka mendukung avaiability unit di job site. FABRICATION Membuat perencanaan seluruh aktivitas equipment maintenance yang meliputi pembuatan schedule periodic service, overhaul dan inspection program, dalam rangka pelaksanaan program schedule equipment maintenance secara konsisten PLANNER Melakukan perawatan dan perbaikan terhadap fungsi electrical unit produksi dan support produksi dengan tujuan menyiapkan unit support produksi yang siap digunakan dan bisa mencapai target physical availbility yang telah ditetapkan PLANT ELECTRICIAN Melakukan pengujian terhadap mekanik yang telah lulus training dan telah memiliki kompetensi yang terkait dengan pekerjaanya dalam rangka mensertifikasi kompetensi mekanik. CERTIFICATOR 05 Menganalisa masalah – masalah teknik di lapangan, memberikan rekomendasi serta monitor dan mengevaluasi pelaksanaan rekomendasi tersebut dalam rangka meningkatkan kualitas program perawatan alat/unit PLANT ENGINEER
  • 30. PERAN DAN FUNGSI DEPT. PLANT HAULING 06 08 Merencanakan, menganalisa, memonitor, dan mengkoordinasikan pekerjaan yang mencakup schedule perawatan dan perbaikan, analisa kerusakan ban dan tersedianya material & tool yang diperlukan dengan tujuan meminimumkan cost, memperpanjang umur ban & utilisasi yang optimal & dilakukan dengan efektif, efisien, dan aman TYRE Merencanakan, mengembangkan, melaksanakan program pengajaran dan evaluasi serta memonitor perkembangannya tujuan meningkatkan kompetensi dalam pelaksanaan repair dan maintenance unit dengan baik dan benar. PLANT INSTRUCTORS
  • 31. HCGS X PLANT HAULING 1. Fulfill kebutuhan manpower Plan Mining 2. Pemenuhan kebutuhan borongan 1. Support sarana operasional Plant Mining 2. Pembangunan building Support Plan Mining 3. Support Radio untuk unit baru/rusak 1. HCGS mengevaluasi fuel keluar tidak melebihi fuel dari plan kebutuhan 2. Validasi PR dan penerbitan PO HCGS PLANT HAULING MANPOWER SUPPORT OPERASIONAL ADMINISTRASI
  • 32. Dept. Head Mine Plan Engineer Data Processor Sect. Head Monitor & Control Sect. Head Mine Infra Sect. Head Mine Plan Drill & Blasting Engineer Mine Infra. Eng Geotech Eng Chief Surveyor Data Analyst CCR Administrator DEPT. ENGINEERING Sect. Head Mine Survey Surveyor Asst. Surveyor Eng. Helper
  • 33. ROLL DESIGN DEPT. ENGINEERING 01 02 03 04 Mengumpulkan dan mengolah data kinerja alat produksii yang mencakup data-data pencapaian produksi, utilisasi, avalibility dan kondisi alat serta biaya produksi agar diketahui setiap perkembangannya yang terjadi pada kegiatan operasional produksi & hauling dan dengan segera diambil tindakan perbaikan bila terjadi penyimpangan dalam rangka improvement bagi department terkait DATA ANALYST Memproses data hasil survey untuk dijadikan peta/gambar tambang dan infrastrukturnya serta membuat perhitungan progress survey bulanan sesuai hasil joint survey guna mendukung kelancaran kegiatan penagihan & pengembangan yang baik dan efisien DATA PROCESSOR Memandu & Mengontrol pelaksanaan survei & produksi berdasarkan desain engineering dan kaidah- kaidah pertambangan dengan tujuan mencapai target desain & produksi yang telah ditetapkan FIELD ENGINEER Memastikan kualitas commodity sesuai dengan spesifikasi yang diinginkan oleh buyer untuk memperoleh customer satisfaction COMMODITY QUALITY 05 Membuat rencana dan design tambang berdasarkan sequence yang benar serta sesuai dengan teknis operasional penambangan yang mencakup rencana produksi dan estimasi kebutuhan alat dalam rangka efektivitas pelaksanaan operasional penambangan yang sesuai dengan keinginan customer. PLAN ENGINEER
  • 34. ROLL DESIGN DEPT. ENGINEERING 06 Melaksanakan kegiatan survey penambangan dengan menggunakan alat dan metode yang telah ditentukan, yang meliputi survey tambang, disposal/waste dump & infrastructure construction dalam rangka menyediakan data yang akurat untuk kebutuhan mine design and construction SURVEYOR
  • 35. HCGS X ENGINEERING 1. Menyediakan alat berat untuk kebutuhan pembangunan project sipil 2. Memenuhi kebutuhan material untuk kebutuhan pembangunan project sipil 1. Penyediaan operasional Engineering 2. Pembangunan building support Engineering 3. Pemenuhan kebutuhan karyawan HCGS ENGINEERING
  • 36. Dept. Head Sect. Head Road Maintenance Drill Blast Group Leader Pit Service GL Commodity Handling GL Support Truck Driver Produksi Helper A2B/TP Operator DEPT. PRODUKSI Production Group Leader A2B/TP Operator Production Helper Blaster Production Helper A2B/TP Operator A2B/TP Operator Produksi Helper Road Maintenance GL A2B/TP Operator Produksi Helper Sect. Head Operation Road Maintenance GL Sect. Head Blasting Sect. Head Blasting
  • 37. ROLL DESIGN DEPT. PRODUKSI 01 02 03 04 Memonitor, mengontrol, mengkoordinasikan dan mengevaluasi seluruh aktivitas di coal precessing dengan tujuan untuk mencapai target produksi yang telah ditetapkan COAL PROCESSING PLANT Mengontrol dan melaporkan pekerjaan drilling & blasting sesuai desain yang telah ditetapkan dengan tujuan mendukung pelaksanaan pekerjaan drilling & blasting dengan aman di site. DRILL AND BLAST Memimpin, memonitor, & mengontrol bawahan serta berkoordinasi dengan department lain berkaitan dengan pemeliharaan lokasi operasional tambang, penerangan, dewatering, dan pekerjaan konstruksi di area tambang dalam rangka mendukung kelancaran dan keselamatan proses induksi PIT SERVICE Mengontrol dan memonitor pelaksanaan operasional di stockpile pelabuhan yang mencakup kegiatan bongkar muat commodity beserta dengan proses administrasinya COMMODITY HANDLING 05 Mengontrol dan memonitor pelaksanaan seluruh kegiatan produksi sesuai prosedur yang berlaku guna mencapai target yang telah ditetapkan secara efisien dan aman. PRODUCTION
  • 38. HCGS X PRODUKSI 1. Menyediakan alat berat untuk kebutuhan pembangunan project sipil 2. Memenuhi kebutuhan material untuk kebutuhan pembangunan project sipil 1. Penyediaan operasional Produksi PA 100% 2. Perbaikan/penyediaan Radio Unit 3. Pembangunan building support produksi HCGS PRODUKSI
  • 39. HAULING & ROAD MAINTENANCE HRM Dept Head (Pak Suwarso) Hauling Section Head Road Maintenance Section Head Dispatcher Hauling GL Operator RM Helper Man Power System and Implementation Operator Hauling
  • 40. ROLL DESIGN DEPT. HRM 01 02 Memonitor dan mengontrol pelaksanaan pemeliharaan jalan yang sesuai dengan prosedur dan metode pemeliharaan jalan serta keselamatan kerja untuk mencapai target coal hauling secara aman dan efisien ROAD MAINTENANCE Memastikan tercapainya target yang telah ditentukan dengan mengontrol delay yang terjadi baik di antrian Silo ataupun dijalan hauling HAULING
  • 41. HCGS X HRM 1. Memenuhi kebutuhan material untuk kebutuhan pembangunan project sipil 2. Memenuhi kebutuhan WT untuk pengisian air di WTP 1. Penyediaan operasional HRM 2. Perbaikan/penyediaan Radio Unit 3. Pembangunan building support produksi HCGS HRM
  • 43. SARANA DEPARTEMEN ENGINEERING PRODUKSI 01 INA01 MAP 01 INB01 BMS 10 INB10 MAP 02 INA02 BMS 02 INB02 MAP 11 INB11 TTP 03 INA03 BMS 03 INB03 MAP 12 INB12 MAP 04 INA04 (INF50) BMS 04 INB04 MAP 13 INB13 MAP 05 INA05 DIKALVIN 05 INB05 MAP 14 INF35 MAP 06 INA06 (INF79) MAP 06 INB06 MAP 15 INB15 RODA 07 INA07 MAP 07 INB07 MAP 16 INB16 RODA 08 INF74 TRC 08 INB08 MAP 09 INB09 MAP
  • 44. SARANA DEPARTEMEN PLANT MINING PLANT HAULING HCGS 01 IND01 TRC 01 INC01 TRC 1 INF01 HCGS 02 IND02 MAP 02 IND07 TRAC 2 INF50 BMS 03 IND03 TRAC 03 IND08 TRAC 3 INF54 TRAC 04 IND04 RODA 04 IND09 TRAC 4 INF67 DIKALVIN 05 IND05 TRAC 05 IND10 TRAC 5 INF68 MRJ 06 IND06 TRAC 06 INF80 TRAC 6 INF69 TRAC 7 INF79 MAP 8 INF80 TRAC
  • 45. SARANA DEPARTEMEN FAT SM SHE 01 ING01 TTP 01 INI01 BMS 1 INJ01 TRC 02 INI02 BMS 2 INJ02 TTP 03 INI03 BMS 3 INJ04 BMS 04 INI04 MAP 4 INJ05 TTP 5 INJ06 TRC 6 INJ08 DIKALVIN
  • 46. SARANA DEPARTEMEN HRM SM SHE 01 INF68 MRJ 01 INI01 BMS 1 INJ01 TRC 02 INP02 TRC 02 INI02 BMS 2 INJ02 TTP 03 INP03 MAP 03 INI03 BMS 3 INJ04 BMS 04 INP04 MRJ 04 INI04 MAP 4 INJ05 TTP 05 INP05 MRJ 5 INJ06 TRC 06 INP06 TRC 6 INJ08 DIKALVIN
  • 47. BUS & ELF 01 INF04 BAGONG 12 INF22 BAGONG 23 INF71 BAGONG 02 INF05 BAGONG 13 INF25 BAGONG 24 INF72 BAGONG 03 INF09 BAGONG 14 INF37 BAGONG 25 INF08 RODA 04 INF10 BAGONG 15 INF38 BAGONG 26 INF18 RODA 05 INF11 BAGONG 16 INF40 BAGONG 27 INF19 RODA 06 INF12 BAGONG 17 INF42 BAGONG 28 INF24 RODA 07 INF13 BAGONG 18 INF43 BAGONG 29 INF26 RODA 08 INF14 BAGONG 19 INF49 BAGONG 30 INF27 RODA 09 INF15 BAGONG 20 INF52 BAGONG 31 INF28 RODA 10 INF20 BAGONG 21 INF56 BAGONG 32 INF30 RODA 11 INF21 BAGONG 22 INF70 BAGONG 33 INF32 RODA
  • 48. BUS & ELF 34 INF33 RODA 45 INF77 RODA 35 INF34 RODA 46 INF78 RODA 36 INF39 RODA 47 INF07 AJM 37 INF41 RODA 48 INF31 AJM 38 INF45 RODA 49 INF75 AJM 39 INF46 RODA 50 INF16 DIKALVIN 40 INF47 RODA 51 41 INF51 RODA 52 42 INF62 RODA 53 43 INF63 RODA 54 44 INF76 RODA 55
  • 49. SARANA PER VENDOR AGUNG JAYA MAKMUR BORNEO MALOY SEJAHTERA DIKALVIN NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK 01 INF07 31/05/2022 01 INI01 30/11/2021 01 IN01 02 INF31 30/09/2021 (WAITING NEW UNIT) 02 INI02 30/11/2022 02 IN02 30/11/2021 03 INF75 08/08/2023 03 INI03 31/07/2022 03 INF67 31/12/2022 04 INB01 30/11/2022 04 INA05 31/10/2021 05 INA02 30/11/2022 05 INJ08 31/01/2022 06 INA03 31/03/2022 06 INF16 31/10/2021 07 INF50 30/11/2022 08 INJ04 30/11/2022 09 INF53 (INBS01) 30/11/2022
  • 50. SARANA PER VENDOR MARITIM ASIA PASIFIK NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK 01 INF03 31/05/2022 10 INB06 11/07/2023 19 INI04 09/09/2023 02 IND02 30/11/2021 11 INB07 30/06/2023 20 INA06 28/02/2022 03 INA01 31/05/2022 12 INB08 31/05/2023 04 INF79 30/11/2021 13 INB09 30/07/2023 05 INP03 31/05/2022 14 INB10 24/05/2023 06 INB02 31/03/2022 15 INB12 31/07/2023 07 INB03 31/05/2023 16 INB13 31/05/2023 08 INB04 31/05/2023 17 INF35 30/11/2021 09 INB05 31/05/2023 18 INA07 30/08/2023
  • 51. SARANA PER VENDOR MITRA RAMAYANA JAYA TEKNO PUTRA PERKASA TRAC NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK 01 INF68 31/12/2021 01 INJ06 31/10/2021 01 INF69 31/07/2022 02 INP04 05/10/2023 02 INP06 31/10/2021 02 INF80 31/03/2022 03 INP05 05/10/2023 03 INC01 02/09/2023 03 IND09 31/03/2022 04 IND01 02/09/2023 04 IND05 31/07/2022 05 IN03 31/12/2023 05 IND07 31/03/2022 06 INP02 22/08/2023 06 IND08 31/07/2022 07 INJ01 05/09/2023 07 INF54 31/03/2022 08 INF74 24/11/2023 08 IND06 31/07/2022 09 09 IND03 31/07/2022 10 IND10 31/07/2022
  • 52. SARANA PER VENDOR TURANGGA TRIDITYA PERKASA BAGONG DEKAKA MAKMUR NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK 01 ING01 30/11/2021 01 INF04 08/03/2022 11 INF37 18/12/2021 02 INF01 31/12/2022 02 INF05 30/04/2022 12 INF38 18/12/2021 03 INJ05 30/11/2021 03 INF09 11/12/2022 13 INF52 11/12/2022 04 INB11 31/12/2022 04 INF11 11/12/2022 14 INF10 11/12/2022 05 INJ02 31/12/2022 05 INF12 08/03/2022 15 INF40 15/06/2024 06 INF13 30/04/2022 16 INF48 15/06/2024 07 INF20 07/01/2024 17 INF49 15/06/2024 08 INF21 07/01/2024 18 INF56 23/06/2024 09 INF22 07/01/2024 19 INF70 23/06/2024 10 INF25 07/01/2024 20 INF14 30/06/2024
  • 53. SARANA PER VENDOR BAGONG DEKAKA MAKMUR RODA PRATAMA JAYA NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK NO NO. LAMBUNG HABIS KONTRAK 21 INF71 11/07/2024 01 IND04 30/09/2022 11 INF33 30/09/2021 22 INF42 04/07/2024 02 INF08 31/10/2021 12 INF34 28/02/2023 23 INF43 22/03/2023 03 INF18 28/02/2023 13 INF39 31/08/2022 24 INF15 30/06/2024 04 INF19 28/02/2023 14 INF41 18/09/2022 25 INF72 30/06/2024 05 INF24 31/10/2021 15 INF45 30/09/2021 06 INF26 31/10/2021 16 INF46 30/09/2021 07 INF27 30/09/2021 17 INF47 30/09/2021 08 INF28 28/02/2023 18 INF51 30/10/2021 09 INF30 03/09/2024 19 INF62 31/08/2022 10 INF32 30/09/21 20 INF63 01/10/2022
  • 54. SARANA PER VENDOR RODA PRATAMA JAYA NO NO. LAMBUNG HABIS KONTRAK 21 INF76 03/09/2024 22 INF77 03/09/2024 23 INF78 03/09/2024 24 INB15 04/08/2023 25 INB16 12/08/2024
  • 58. SAFETY TALK & INSIDEN ALLERT 06 – 07 – 2021 18 – 07 – 2021 05 – 09 – 2021 11 – 07 – 2021 15 – 08 - 2021 10 – 10 – 2021
  • 59. DESIGN FACILITY MESS MINING RUMAH LAUNDRY CAMP OFFICE & GUDANG GS
  • 60. DESIGN BUILDING SUPPORT WORKSHOP SARANA T2 POS SECURITY KHVR TPS B3 MUSHOLA PIT STOP T6
  • 61. IBS PLAN X IBS ACTUAL 94% 96% 98% 100% SEPTEMBER AGUSTUS JULI PLAN ACTUAL PLAN ACTUAL SELISIH SEPTEMBER 4.161.600.000,00 Rp 4.003.490.000,00 Rp 158.110.000,00 Rp AGUSTUS 4.089.600.000,00 Rp 4.051.490.000,00 Rp 38.110.000,00 Rp JULI 3.915.600.000,00 Rp 3.848.090.000,00 Rp 67.510.000,00 Rp