More Related Content
Similar to Russia_automotive
Similar to Russia_automotive (20)
Russia_automotive
- 4. Copyright©SEGULATechnologies–Allrightsreserved–01/2014
Management team
4
Ilya BOGATYREV Head of
RAILWAY DEPARTMENT
Anatoliy SHINAKOV
GENERAL DIRECTOR
Philippe GONCALVES
COUNTRY MANAGER
Maxim RYAZANOFF
Quality Manager
in AEROSPACE
DEPARTMENT
Konstantin MEDVEDSKIY DIRECTOR
OF TECHNICAL DEVELOPMENT
Alexander FOMIN
Head of Engineering Center in
Ludinovo RAILWAY DEPARTMENT
Eduard MARKAROV
Head of Quality in
AUTOMOTIVE DEPARTMENT
Aleksey NEZHINSKIY
Project Manager in
AUTOMOTIVE DEPARTMENT
- 5. Copyright©SEGULATechnologies–Allrightsreserved–01/2014
5
© SEGULA Technologies - All rights reserved – January 2013
5
Competence transfer
Mechanical
Design
Integration
Power train
Design
Feasibility
Tooling
Tolerance analysis
Metrology
Global suppliers
Follow up
Preliminary design,
Architecture, Digital mock up
Design
Car body
Equipment
Electrical
Electronics
Tests, set up
Validation
Calculation
Simulation
Training/consulting
Performance improvement
Style, Design, Surface modeling
Technical publication
Diagrams
Prototyping
Assembly
Manufacturing
Tooling
Integration
Logistics
Supply chain
Project
Management
Range of Skills in Automotive Department
- 6. Copyright©SEGULATechnologies–Allrightsreserved–01/2014
Our Projects. Automotive
6
Renault Togliatti B0, X52
1)project management for following stamping shop preparation including building General Installation.
2)project management for following welding shop preparation including building General Installation.
3)project management for following paint shop preparation including building General Installation.
4)Project management of following engine’s shop industrialization
Renault Togliatti B0 industrialization.
1)project management of assembly shop.
2)specialists in welding – robots installation following and welding parameters
adjustment for BIW.
3)logistics (suppliers readiness with packaging) and purchasing (purchasing of
equipment and supplies) activity following.
People has previous experience in automotive, 80% fluent English speaking.
Previous experience at Renault and AvtoVAZ following customers standards.
Renault Togliatti X52, Izhevsk L52
1)Warehouse, logistics, packaging development for painting line X52;
2)Warehouse, logistics, packaging development for assembly line X52;
Renault Togliatti, Izhevsk
- 7. Copyright©SEGULATechnologies–Allrightsreserved–01/2014
Our Projects. Automotive
7
1) Segula Russian-French Front office for expertise and advice is located on site at
AvtoVAZ R&D Center, integrated within the Customer structure.
2) A Class Surfaces realization for a complete interior of a new car .
3) Engineering for Interior equipments and Bumpers.
Activities at «AVTOVAZ» Togliatti, project LADA «В»
Segula responsiveness to business needs, several turn key projects in the pipe
Segula propose turnkey projects with French/Russian mixed teams , the ratio evolving
over the project with the acquisition of skills, tasks delivered.
- 8. Copyright©SEGULATechnologies–Allrightsreserved–01/2014
Our Projects. Automotive
8
In the family of LADA «B»:
With Two teams :
The 1st based at AVTOVAZ site in Togliatti .
The 2nd
based in Trappes (R&D center, Segula Matra) in Paris,
near Renault Technical R&D centre
Segula is working in close collaboration with all the departments of AVTOVAZ to provide a
new derivative car:
from the styling department to the process mass production.
Segula takes on most of the responsibility by working in MOEX profile.
Through this development the Customer (AVTOVAZ )will have the benefit of having trained
teams, capable of using European Methodologies and European standards
Activities at «AVTOVAZ» Togliatti, project LADA «В»
- 11. Copyright©SEGULATechnologies–Allrightsreserved–01/2014
Development of specifications suppliers.
Validation proposals suppliers , quality , cost, deadline.
Insure:
– Technical agreement end of studies “ATFE”
– Technical agreement of delivery “ATL”
– Technical agreement of commissioning “ATFMR”
– Technical agreement of production “ATMP”
– Technical agreement of performance and quality
– Coordination of services (external and internal) warranty.
– Documentation
Synthetic Reporting to management.
11
Our Projects. Automotive
Welding Industrialization
Our services
- 12. Copyright©SEGULATechnologies–Allrightsreserved–01/2014
Our Projects. Automotive
12
LADA B/C painting
12
REAR AXLE
ЗАДНИЕ РЫЧАГИ
Mission
Construction of bodies painting line for 60 jph
Construction of new building for PT-ED process
Placement of the rest of equipment in existing
building 01/1
Organization & Technology
1 Project manager
PT-ED line
Mastic application line, TopCoat Line.
Wax application Line
Regenerative oxidizers for air purification
- 13. Copyright©SEGULATechnologies–Allrightsreserved–01/2014
Our Projects. Automotive
13
LADA B/C painting
13
REAR AXLE
ЗАДНИЕ РЫЧАГИ
Our services
Documentation preparation together with supplier company, Building Design Dept. and
Building Construction Dept. in order to protect the project in government agencies.
Coordination activities for customs clearance and supply of equipment for new paint shop.
Equipment installation activities coordination and schedule proceeding reporting.
Receiving all technical documentation from supplier during the project and to share it to all
envolved AVTOVAZ departments.
Receiving technical documentation issues from AVTOVAZ departments and to share it to
suppliers.
Project team activities for Master schedule actualization and proceeding.
To take part in Equipment acceptance
- 14. Copyright©SEGULATechnologies–Allrightsreserved–01/2014
Technical assistance for the project of the assembly shop 3rd line multipurpose
production capacity preparation
14
Our Projects. Automotive
CAMI
Mission
Equipment implemented by CAMI
Wheel alignment bench
Headlamp aiming bench
Roller bench
Brake tester bench
Glue installation
Manipulators for doors, dashboard and battery
A combined BK/CL/AC filling machine with 3 mobile units
A WW filling machine
A gearbox filling machine
An AC repair machine
A BK repair machine