SlideShare a Scribd company logo
1 of 6
Curriculum Vitae of RENALDO H. COLOMA Page 1 of 6
Personal Data:
Aramco SAP #.: 70002616
Date of birth : Sept.15, 1965
Age : 51
Gender : Male
Nationality : Filipino
Marital Status : Separated
Height : 5’4”
Weight : 78 Kg.
Religion : Catholic
Blood Type : O+
Contact Info:
Email address :
ronniecoloma@yahoo.com
Mobile No. : +63 9394301341
Permanent Address:
Block20 Lot 10 EliasSt.
VillaHermosaSubd.,BuhaynaTubig
Imus,Cavite City
Philippines
Passport Details:
Passport No : EC 3008070
Issuedon : December 17, 2014
Expire on : December 16, 2019
Issuedat : DFA NCR EAST, Manila
Languages:
1. English
2. Tagalog
RENALDOH. COLOMA
POSITION: QC Mechanical/Piping Inspector
A self-motivated QC Mechanical and Piping Inspector looking for a
challenging job in a large EPC organization implementing international
standards in Engineering and Oil and Gas sector. Where I can
implement my technical experience, enhance my knowledge and skills,
and build a long term successful career.
More than (16) sixteen years in Quality Assurance, Quality Control and
Inspection. Mostly in field of Petroleum Chemical, Sewage Treatment
Plant, Onshore as well as Offshore. Gain experience in variety of
services equipment and condition. High pressure, mechanical
equipment such as compressor and different kind of pumps and valves
including piping component and Tank fabrication.
Familiar with International codes and standards (API-570, API-650 &
API-598). Uniform Plumbing code etc. Monitor NDT Test.
Conduct quality control inspection activity during fabrication and
erection. This includes responsibility from start to turn over to clients,
all documentation of projects. Monitor pre-commissioning team with
regards to preparation of piping systemincluding its components.
Coordinate with clients inspector and review packages prior to
submission and approval.
COLLEGE:
School : Technological Institute of the Philippines
Address : Quiapo Manila, Philippines
Course : Bachelor of Science in Mechanical Engineering
Duration : 1982-1984
Educational Background
Qualifications Summary
Objective
Curriculum Vitae of RENALDO H. COLOMA Page 2 of 6
HIGH SCHOOL: (Secondary)
School : Mandaluyong High School
Address : Mandaluyong City, Philippines
Year : 1978-1982
Company : GS Construction Arabia Ltd.
Position : QC Piping Inspector
Client : Rabigh, Petro Chemical
Project : Petro Rabigh Phase @ (Package CP3&4)
Location : Rabigh, Kingdom of Saudi Arabia
Date : March 15, 2015 up to Present
Duties & Responsibilities:
 Provide technical guidance andinterpretationof specification asperproject
requirementstosub-contractors.
 Monitorfabrication,installationanderectionof fabricatedspool andprepare daily
inspection andaccomplishmentreport.
 Ensure that productionqualitybeingofferedforinspectionmeetsthe client
requirements.
 Coordinate withthe client representative toensure inspectioniscarriedexpediently.
 Maintaingoodrecord keepingof activitiescarriedoutandinspectionreports,
surveillance reportsetc…
 Ensure all qualityrecordsare maintained,uptodate,traceable andretrievable.
 Assistspre-commissioningteamandconductfinal inspectionpriortore-instatementof
completedpipingincludingitspipingcomponents.
 Checkconstructionactivitiespriortopre-commissioning.
 Reviewtestpackagespriorforsubmittal toclientsProjectInspectionDivisionandfinal
approval.
 Conductfinal walkthroughwithclientrepresentative forfinal mechanical completion
inspectionandapproval.
Company : GS Neotek LLC.
Position : QC Piping Inspector
Client : UZ-Kor
Project : Ethylene Plant Project
Location : Akchalak Karakalpak, Uzbekistan
Date : November 2013 up to November 2014
WORKING EXPERIENCES
Curriculum Vitae of RENALDO H. COLOMA Page 3 of 6
Duties & Responsibilities:
 AssignedasQCTeam Leader.
 Technical guidance ininterpretationof specification.Review jobplans,method,
equipment,productivityanddefectspotential probleminconfirmingwithestablished
schedulesorspecsandadvice productionwhennotapplicableorif necessarycorrective
actionrequired.
 Ensure that all necessaryinspectionsare identifiedinthe approvedInspectionTestPlan
(ITP) attendedbya suitable QCInspectors.
 Identifyingandreportsondiscrepanciesinoriginal designorincontractdocumentsthat
necessitate contractmodificationsaccordinglyobtainengineeringreview andapproval.
 Ensure that productionqualitybeingofferedforinspectionmeetsthe client
requirements.
 Ensure that the inspectionsare carriesoutforthe closure of exceptionitemsas
documentedandsignedoff asclosedwhenactivityiscompleted.
 Ensure that surveillance inspectionsare continuallycarriedoutonthe projectrecording
and documentinganyandall deviationsfromthe ProjectQualityProgramandthe
CompanyIntegratedManagement System(IMS).
 Reviewthe calibrationstatusof anytestequipmentbeingutilizedonthe project.
 Coordinationandpreparationof qualitypolicyandreports.Organizedqualitycircle
meetingandpreparationodprocedure asperspecification.
 Coordinate with concerndepartmentsuchaspipingconstructiongroup.
 Coordinate withthe client representative toensure inspectionis carriedexpediently.
 Maintaingoodrecord keepingof activitiescarriedoutandinspectionreports,
surveillance reportsetc…
 Ensure all qualityrecordsare maintained,uptodate,traceable andretrievable.
 Auditare carriedout in accordance withthe project s schedule andisupto date.
Company : Nesma & Partners Cont. Co. Ltd.
Position : QC Mechanical/Piping Inspector
Client : Aramco
Project : Aramco Duba Bulk Plant
: Aramco Sullayil Bulk Plant
: Petro Rabigh Development Project
: Rahima Expanded Sewage Treatment Plant (Aramco)
: MA’ADEN Phosphate Granulation Plant
: SATORP (JERP Package #4- Delayed Coker Plant)
Location : Kingdom of Saudi Arabia
Date : December 2005 to MAY 2013
Curriculum Vitae of RENALDO H. COLOMA Page 4 of 6
Duties & Responsibilities:
 Conductdailyroutine inspection.
 Unsure that examinationandtestrequiredbythe InspectionTestPlan(ITP) hadbeen
performedwithsatisfactoryresult.
 Material ReceivingInspection(MRI) forfabricationaspersite specificationandreview
material testcertificate.
 Monitorsegregationof rejectedmaterials, issue andreview NCR/CARreportsandtrend
analysisandcompilingof reports.
 Receivinginspectionof centrifugal pumpsandpositive displacementpumpsandother
materialscheckapplicabledocumentandcoordinate withthe projectinspectiondivision
priorto release andinstallation.
 Performlevelingandalignmentinspectionof differentkind of pumps.
 Line checkof pipelines,whichcovercheck-upforproperinstallationandlocationof
standardpipe supportsandin accordance withisometricdrawing andotherrelated
components.
 Witnessvalve testingandreview necessarydocumentsandreviewhydrotestpackages.
 Inspectandwitnesshydro test,re-instatementandbolttorqueingof flange jointsprior
to final pipingcompletion.Evaluate of reportsandresultsetc..
 Implementandcomplete dailyinspectionactivities.
Company: Mega World Industrial Corp.
Position: QC Piping Inspector
Project: High Rise Residential and Commercial Building
Location: California Garden Square Manila, Philippines
Date: February 2002 to October 2005
Duties & Responsibilities:
 Visual anddimensional inspection of all mechanical andpipingmaterialsusedfor
the project.
 RaisedNCRfor non-conformingmaterialsandensure properhandling.
 Monitorfabrication,installationanderectionof fabricatedspool andprepare
dailyinspectionreport.
 Witnesshydro testandpneumatictestandconduct inspectionandprepare
packages.
 Monitorinstallationof pumps,alignment,dryruntest,loadtestand prepare
report.
 Ensure that examinationandtestrequiredbythe ITPhas beenperformed
satisfactory.
 Conductline checkto verifythe overall completenessof installedpipingincluding
otherrelatedcomponents.
 MonitorNDT activities andcoordinate withthe thirdpartycontractor.Check
recordsalsopossible faultsinmaterial,whichare non-compliance withagreed
procedure.
Curriculum Vitae of RENALDO H. COLOMA Page 5 of 6
 Implementandcomplete dailyinspectionactivities.
 Conductfinal walkthroughinspectionpriortoacceptance oncompletedPotable
waterline andFire waterline.
 Compilingof all inspectionreportsandpackagesforfuture reference.
Company: DULSCO Marine and Engineering Services
Position: QC Piping Inspector
Project: Various / US Navy Ship and HMS Navy Ship
Location: Dubai U.A.E.
Date: February 1995 to October 2000
Duties & Responsibilities:
 Insuringbyinspectionandtestthatall services, supplies,workmanshipandover
all repairssubmittedtocustomersforacceptance whethermanufacturedor
processedbycontractorsor producedfromsub-contractorsor vendorsconform
to the requirementsinvokedbythe contractjoborder or individual workitem.
 Provide instructionandtestfromrequiredsubstantiate productconformance to
drawingspecificationandcontract.
 Visual anddimensional inspectionof incomingmaterialsandinitiationof
feedbackonnon-conformingmaterialsandcriteriaforrejection.
 Witnessandinspectionof loadtestingof differentliftingequipmentonboardUS
Navy shipand HMS Navy shipandprovide certificate.
 Conformance tospecial procedure forinspection,testandexaminationas
establishedbythe itemandapplicable referencesdrawing.
 Documentationof inspection,testandexaminationincludingcriteriafor
approval or rejectionasrequired.
 Verification,identificationandcontrol of materialsinspected.
 Monitornon-destructivetest.
Company: Pacific Seamen Services
Position: QC Piping Inspector
Project: Various Projects (Local and Abroad)
Location: Manila, Philippines
Date: June 1993 to January 1994
Duties & Responsibilities:
 Stateswhatto observe andmeasure inorderto meetthe quality
requirements.
 Prepare inspectiontestplanandparticipate inmonitoringcapacitytoensure
all applicable specification,workitemandinspectionplanrequirementsare
beingcompliedwiththroughall phases.
Curriculum Vitae of RENALDO H. COLOMA Page 6 of 6
 Ensure that the requiredtestreports,certificate requirements,material
conformto the requirementsof joborderorworkitem.
 Identification andsegregationof rejectedmaterials.
 Record documentsfiledforthe periodof time toQA Department.
 Dailymonitorandsurveillance of progressesinworkshopandonboardship.
 Assistsincoordinatingthe completionof relevantdocumentationand
determinationof actual eventsandsituationcausingcontractdelaysand/or
claimsand evaluatingvalidityof claims.
 Responsible forcoordinatingbetweenvariousdepartmentsmanagementof
the engineeringteams,designchanges,complyingwithspecificationsand
contract and communicatingwiththe projectengineer.
Company: Flour Arabia Ltd. / Rezayat Brown & Root
Position: QC Piping Inspector
Project: MARJAN GOSP 2&3 (Offshore)
Date: April 1992 to May 1993
Location: Kingdom of Saudi Arabia
Duties & Responsibilities
 Dailyroutine inspectionof fit-upandfabricatedspool asperisometric.
 Line checkof installedspoolsandverifycompletenessincludingother
components.
 Ensure that the examinationandtestrequiredbythe inspectiontestplanhas
beenperformedwithsatisfactoryresult.
 Inspectionandwitnesshydrotestingandprepare documents.
 Compilingof all reportincludingNDTresults.
 Initiationof feedbackonnon-conformingmaterialsandcriteriaforrejectionand
propertaggingof rejectedmaterials.
 Providingof technical datatoprepare weeklyandmonthlyreportsonproject
progressandqualitycontrol.
CHARACTER REFERENCES : Available upon request
RENALDO H. COLOMA

More Related Content

What's hot

RESUME of Sid_Hebron_NEW
RESUME of Sid_Hebron_NEWRESUME of Sid_Hebron_NEW
RESUME of Sid_Hebron_NEWSid de Leon II
 
Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017Slamet Nurhadi
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCkhursheed aiam
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.Vijay Sekaran
 
Allan g hardy cv feb 2020_master
Allan g hardy cv feb 2020_masterAllan g hardy cv feb 2020_master
Allan g hardy cv feb 2020_masterAllan Hardy
 
ColinHunt.CV.May.16
ColinHunt.CV.May.16ColinHunt.CV.May.16
ColinHunt.CV.May.16Colin Hunt
 
Lenny Lanhart Resume
Lenny Lanhart ResumeLenny Lanhart Resume
Lenny Lanhart ResumeLenny Lanhart
 
3Q INSPECTION PROFILE
3Q INSPECTION PROFILE3Q INSPECTION PROFILE
3Q INSPECTION PROFILEBENNY JACK
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016Kirana Devasya
 

What's hot (18)

CV QC
CV QCCV QC
CV QC
 
Precast Concrete QA/QC CV
Precast Concrete QA/QC CVPrecast Concrete QA/QC CV
Precast Concrete QA/QC CV
 
RESUME of Sid_Hebron_NEW
RESUME of Sid_Hebron_NEWRESUME of Sid_Hebron_NEW
RESUME of Sid_Hebron_NEW
 
Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017
 
RESUME QA QC ENGG
RESUME  QA  QC ENGGRESUME  QA  QC ENGG
RESUME QA QC ENGG
 
QC. CV
QC. CVQC. CV
QC. CV
 
Lester_Coleman_Resume
Lester_Coleman_ResumeLester_Coleman_Resume
Lester_Coleman_Resume
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.
 
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
 
JIMJITH QC INSPECTOR
JIMJITH QC INSPECTORJIMJITH QC INSPECTOR
JIMJITH QC INSPECTOR
 
Allan g hardy cv feb 2020_master
Allan g hardy cv feb 2020_masterAllan g hardy cv feb 2020_master
Allan g hardy cv feb 2020_master
 
ColinHunt.CV.May.16
ColinHunt.CV.May.16ColinHunt.CV.May.16
ColinHunt.CV.May.16
 
Lenny Lanhart Resume
Lenny Lanhart ResumeLenny Lanhart Resume
Lenny Lanhart Resume
 
3Q INSPECTION PROFILE
3Q INSPECTION PROFILE3Q INSPECTION PROFILE
3Q INSPECTION PROFILE
 
Jiju new cv
Jiju new cvJiju new cv
Jiju new cv
 
SABRI CV
SABRI CVSABRI CV
SABRI CV
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
 

Viewers also liked

Himpervinculo 1im
Himpervinculo 1imHimpervinculo 1im
Himpervinculo 1imKateRamos5
 
Configuracion de excel 1 hm
Configuracion de excel 1 hmConfiguracion de excel 1 hm
Configuracion de excel 1 hmEmanuel Mata
 
Updated CV 20160915
Updated CV 20160915Updated CV 20160915
Updated CV 20160915Louw Riekert
 
George de loache-portfolio-02
George de loache-portfolio-02George de loache-portfolio-02
George de loache-portfolio-02georgedeloache
 
Film Poster Conventions
Film Poster ConventionsFilm Poster Conventions
Film Poster Conventionsnazhasultana
 
completed-transcript-9007731
completed-transcript-9007731completed-transcript-9007731
completed-transcript-9007731Sabrina Stearns
 
Cultural Control of Pest
Cultural Control of PestCultural Control of Pest
Cultural Control of PestKarl Obispo
 
Ecological Concepts of Integrated Pest Management
Ecological Concepts of Integrated Pest ManagementEcological Concepts of Integrated Pest Management
Ecological Concepts of Integrated Pest ManagementKarl Obispo
 
Thermoelectric materials & Applications
Thermoelectric materials & ApplicationsThermoelectric materials & Applications
Thermoelectric materials & Applicationsut09
 

Viewers also liked (12)

Himpervinculo 1im
Himpervinculo 1imHimpervinculo 1im
Himpervinculo 1im
 
Configuracion de excel 1 hm
Configuracion de excel 1 hmConfiguracion de excel 1 hm
Configuracion de excel 1 hm
 
Updated CV 20160915
Updated CV 20160915Updated CV 20160915
Updated CV 20160915
 
George de loache-portfolio-02
George de loache-portfolio-02George de loache-portfolio-02
George de loache-portfolio-02
 
Film Poster Conventions
Film Poster ConventionsFilm Poster Conventions
Film Poster Conventions
 
Balancim
BalancimBalancim
Balancim
 
NCGB PROFILE
NCGB PROFILENCGB PROFILE
NCGB PROFILE
 
completed-transcript-9007731
completed-transcript-9007731completed-transcript-9007731
completed-transcript-9007731
 
Voice of Customer Program Design
Voice of Customer Program Design Voice of Customer Program Design
Voice of Customer Program Design
 
Cultural Control of Pest
Cultural Control of PestCultural Control of Pest
Cultural Control of Pest
 
Ecological Concepts of Integrated Pest Management
Ecological Concepts of Integrated Pest ManagementEcological Concepts of Integrated Pest Management
Ecological Concepts of Integrated Pest Management
 
Thermoelectric materials & Applications
Thermoelectric materials & ApplicationsThermoelectric materials & Applications
Thermoelectric materials & Applications
 

Similar to R. Coloma CV

Updated CV MValenzuela (latest)
Updated CV MValenzuela (latest)Updated CV MValenzuela (latest)
Updated CV MValenzuela (latest)Michael Valenzuela
 
Julius Sanorjo CV Rev B
Julius Sanorjo CV Rev BJulius Sanorjo CV Rev B
Julius Sanorjo CV Rev BJulius Sanorjo
 
Alexander Richardson CSWIP Welding Inspector lvl 2
Alexander Richardson CSWIP Welding Inspector lvl 2Alexander Richardson CSWIP Welding Inspector lvl 2
Alexander Richardson CSWIP Welding Inspector lvl 2Alexander Richardson
 
Resume 2015updated doc
Resume 2015updated docResume 2015updated doc
Resume 2015updated docMark Ikonen
 
Saddam A. Abas -PDF
Saddam A. Abas -PDFSaddam A. Abas -PDF
Saddam A. Abas -PDFsaddam abas
 
1.andre resume full rev1
1.andre resume  full rev11.andre resume  full rev1
1.andre resume full rev1Andre Sookool
 
ROBABEL V TEJOSO - UPDATED RESUME
ROBABEL V TEJOSO - UPDATED RESUMEROBABEL V TEJOSO - UPDATED RESUME
ROBABEL V TEJOSO - UPDATED RESUMEBobby Tejoso
 
Melanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CVMelanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CVMelanie Manalo
 
REVISED CV SEPTEMBER 03 2016
REVISED CV SEPTEMBER 03 2016REVISED CV SEPTEMBER 03 2016
REVISED CV SEPTEMBER 03 2016amiel barcelon
 
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
 

Similar to R. Coloma CV (20)

FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 
RhoveeFider-CV
RhoveeFider-CVRhoveeFider-CV
RhoveeFider-CV
 
Engg.Muhammad-ali
Engg.Muhammad-aliEngg.Muhammad-ali
Engg.Muhammad-ali
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
Vinay CV
Vinay CVVinay CV
Vinay CV
 
Updated CV MValenzuela (latest)
Updated CV MValenzuela (latest)Updated CV MValenzuela (latest)
Updated CV MValenzuela (latest)
 
Julius Sanorjo CV Rev B
Julius Sanorjo CV Rev BJulius Sanorjo CV Rev B
Julius Sanorjo CV Rev B
 
Alexander Richardson CSWIP Welding Inspector lvl 2
Alexander Richardson CSWIP Welding Inspector lvl 2Alexander Richardson CSWIP Welding Inspector lvl 2
Alexander Richardson CSWIP Welding Inspector lvl 2
 
CV-FRANCISCO L. ABOR
CV-FRANCISCO L. ABORCV-FRANCISCO L. ABOR
CV-FRANCISCO L. ABOR
 
Resume 2015updated doc
Resume 2015updated docResume 2015updated doc
Resume 2015updated doc
 
Saddam A. Abas -PDF
Saddam A. Abas -PDFSaddam A. Abas -PDF
Saddam A. Abas -PDF
 
2015 CV
2015 CV 2015 CV
2015 CV
 
1.andre resume full rev1
1.andre resume  full rev11.andre resume  full rev1
1.andre resume full rev1
 
MWI CV3
MWI CV3MWI CV3
MWI CV3
 
ROBABEL V TEJOSO - UPDATED RESUME
ROBABEL V TEJOSO - UPDATED RESUMEROBABEL V TEJOSO - UPDATED RESUME
ROBABEL V TEJOSO - UPDATED RESUME
 
Melanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CVMelanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CV
 
REVISED CV SEPTEMBER 03 2016
REVISED CV SEPTEMBER 03 2016REVISED CV SEPTEMBER 03 2016
REVISED CV SEPTEMBER 03 2016
 
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)
 
cv
cvcv
cv
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 

R. Coloma CV

  • 1. Curriculum Vitae of RENALDO H. COLOMA Page 1 of 6 Personal Data: Aramco SAP #.: 70002616 Date of birth : Sept.15, 1965 Age : 51 Gender : Male Nationality : Filipino Marital Status : Separated Height : 5’4” Weight : 78 Kg. Religion : Catholic Blood Type : O+ Contact Info: Email address : ronniecoloma@yahoo.com Mobile No. : +63 9394301341 Permanent Address: Block20 Lot 10 EliasSt. VillaHermosaSubd.,BuhaynaTubig Imus,Cavite City Philippines Passport Details: Passport No : EC 3008070 Issuedon : December 17, 2014 Expire on : December 16, 2019 Issuedat : DFA NCR EAST, Manila Languages: 1. English 2. Tagalog RENALDOH. COLOMA POSITION: QC Mechanical/Piping Inspector A self-motivated QC Mechanical and Piping Inspector looking for a challenging job in a large EPC organization implementing international standards in Engineering and Oil and Gas sector. Where I can implement my technical experience, enhance my knowledge and skills, and build a long term successful career. More than (16) sixteen years in Quality Assurance, Quality Control and Inspection. Mostly in field of Petroleum Chemical, Sewage Treatment Plant, Onshore as well as Offshore. Gain experience in variety of services equipment and condition. High pressure, mechanical equipment such as compressor and different kind of pumps and valves including piping component and Tank fabrication. Familiar with International codes and standards (API-570, API-650 & API-598). Uniform Plumbing code etc. Monitor NDT Test. Conduct quality control inspection activity during fabrication and erection. This includes responsibility from start to turn over to clients, all documentation of projects. Monitor pre-commissioning team with regards to preparation of piping systemincluding its components. Coordinate with clients inspector and review packages prior to submission and approval. COLLEGE: School : Technological Institute of the Philippines Address : Quiapo Manila, Philippines Course : Bachelor of Science in Mechanical Engineering Duration : 1982-1984 Educational Background Qualifications Summary Objective
  • 2. Curriculum Vitae of RENALDO H. COLOMA Page 2 of 6 HIGH SCHOOL: (Secondary) School : Mandaluyong High School Address : Mandaluyong City, Philippines Year : 1978-1982 Company : GS Construction Arabia Ltd. Position : QC Piping Inspector Client : Rabigh, Petro Chemical Project : Petro Rabigh Phase @ (Package CP3&4) Location : Rabigh, Kingdom of Saudi Arabia Date : March 15, 2015 up to Present Duties & Responsibilities:  Provide technical guidance andinterpretationof specification asperproject requirementstosub-contractors.  Monitorfabrication,installationanderectionof fabricatedspool andprepare daily inspection andaccomplishmentreport.  Ensure that productionqualitybeingofferedforinspectionmeetsthe client requirements.  Coordinate withthe client representative toensure inspectioniscarriedexpediently.  Maintaingoodrecord keepingof activitiescarriedoutandinspectionreports, surveillance reportsetc…  Ensure all qualityrecordsare maintained,uptodate,traceable andretrievable.  Assistspre-commissioningteamandconductfinal inspectionpriortore-instatementof completedpipingincludingitspipingcomponents.  Checkconstructionactivitiespriortopre-commissioning.  Reviewtestpackagespriorforsubmittal toclientsProjectInspectionDivisionandfinal approval.  Conductfinal walkthroughwithclientrepresentative forfinal mechanical completion inspectionandapproval. Company : GS Neotek LLC. Position : QC Piping Inspector Client : UZ-Kor Project : Ethylene Plant Project Location : Akchalak Karakalpak, Uzbekistan Date : November 2013 up to November 2014 WORKING EXPERIENCES
  • 3. Curriculum Vitae of RENALDO H. COLOMA Page 3 of 6 Duties & Responsibilities:  AssignedasQCTeam Leader.  Technical guidance ininterpretationof specification.Review jobplans,method, equipment,productivityanddefectspotential probleminconfirmingwithestablished schedulesorspecsandadvice productionwhennotapplicableorif necessarycorrective actionrequired.  Ensure that all necessaryinspectionsare identifiedinthe approvedInspectionTestPlan (ITP) attendedbya suitable QCInspectors.  Identifyingandreportsondiscrepanciesinoriginal designorincontractdocumentsthat necessitate contractmodificationsaccordinglyobtainengineeringreview andapproval.  Ensure that productionqualitybeingofferedforinspectionmeetsthe client requirements.  Ensure that the inspectionsare carriesoutforthe closure of exceptionitemsas documentedandsignedoff asclosedwhenactivityiscompleted.  Ensure that surveillance inspectionsare continuallycarriedoutonthe projectrecording and documentinganyandall deviationsfromthe ProjectQualityProgramandthe CompanyIntegratedManagement System(IMS).  Reviewthe calibrationstatusof anytestequipmentbeingutilizedonthe project.  Coordinationandpreparationof qualitypolicyandreports.Organizedqualitycircle meetingandpreparationodprocedure asperspecification.  Coordinate with concerndepartmentsuchaspipingconstructiongroup.  Coordinate withthe client representative toensure inspectionis carriedexpediently.  Maintaingoodrecord keepingof activitiescarriedoutandinspectionreports, surveillance reportsetc…  Ensure all qualityrecordsare maintained,uptodate,traceable andretrievable.  Auditare carriedout in accordance withthe project s schedule andisupto date. Company : Nesma & Partners Cont. Co. Ltd. Position : QC Mechanical/Piping Inspector Client : Aramco Project : Aramco Duba Bulk Plant : Aramco Sullayil Bulk Plant : Petro Rabigh Development Project : Rahima Expanded Sewage Treatment Plant (Aramco) : MA’ADEN Phosphate Granulation Plant : SATORP (JERP Package #4- Delayed Coker Plant) Location : Kingdom of Saudi Arabia Date : December 2005 to MAY 2013
  • 4. Curriculum Vitae of RENALDO H. COLOMA Page 4 of 6 Duties & Responsibilities:  Conductdailyroutine inspection.  Unsure that examinationandtestrequiredbythe InspectionTestPlan(ITP) hadbeen performedwithsatisfactoryresult.  Material ReceivingInspection(MRI) forfabricationaspersite specificationandreview material testcertificate.  Monitorsegregationof rejectedmaterials, issue andreview NCR/CARreportsandtrend analysisandcompilingof reports.  Receivinginspectionof centrifugal pumpsandpositive displacementpumpsandother materialscheckapplicabledocumentandcoordinate withthe projectinspectiondivision priorto release andinstallation.  Performlevelingandalignmentinspectionof differentkind of pumps.  Line checkof pipelines,whichcovercheck-upforproperinstallationandlocationof standardpipe supportsandin accordance withisometricdrawing andotherrelated components.  Witnessvalve testingandreview necessarydocumentsandreviewhydrotestpackages.  Inspectandwitnesshydro test,re-instatementandbolttorqueingof flange jointsprior to final pipingcompletion.Evaluate of reportsandresultsetc..  Implementandcomplete dailyinspectionactivities. Company: Mega World Industrial Corp. Position: QC Piping Inspector Project: High Rise Residential and Commercial Building Location: California Garden Square Manila, Philippines Date: February 2002 to October 2005 Duties & Responsibilities:  Visual anddimensional inspection of all mechanical andpipingmaterialsusedfor the project.  RaisedNCRfor non-conformingmaterialsandensure properhandling.  Monitorfabrication,installationanderectionof fabricatedspool andprepare dailyinspectionreport.  Witnesshydro testandpneumatictestandconduct inspectionandprepare packages.  Monitorinstallationof pumps,alignment,dryruntest,loadtestand prepare report.  Ensure that examinationandtestrequiredbythe ITPhas beenperformed satisfactory.  Conductline checkto verifythe overall completenessof installedpipingincluding otherrelatedcomponents.  MonitorNDT activities andcoordinate withthe thirdpartycontractor.Check recordsalsopossible faultsinmaterial,whichare non-compliance withagreed procedure.
  • 5. Curriculum Vitae of RENALDO H. COLOMA Page 5 of 6  Implementandcomplete dailyinspectionactivities.  Conductfinal walkthroughinspectionpriortoacceptance oncompletedPotable waterline andFire waterline.  Compilingof all inspectionreportsandpackagesforfuture reference. Company: DULSCO Marine and Engineering Services Position: QC Piping Inspector Project: Various / US Navy Ship and HMS Navy Ship Location: Dubai U.A.E. Date: February 1995 to October 2000 Duties & Responsibilities:  Insuringbyinspectionandtestthatall services, supplies,workmanshipandover all repairssubmittedtocustomersforacceptance whethermanufacturedor processedbycontractorsor producedfromsub-contractorsor vendorsconform to the requirementsinvokedbythe contractjoborder or individual workitem.  Provide instructionandtestfromrequiredsubstantiate productconformance to drawingspecificationandcontract.  Visual anddimensional inspectionof incomingmaterialsandinitiationof feedbackonnon-conformingmaterialsandcriteriaforrejection.  Witnessandinspectionof loadtestingof differentliftingequipmentonboardUS Navy shipand HMS Navy shipandprovide certificate.  Conformance tospecial procedure forinspection,testandexaminationas establishedbythe itemandapplicable referencesdrawing.  Documentationof inspection,testandexaminationincludingcriteriafor approval or rejectionasrequired.  Verification,identificationandcontrol of materialsinspected.  Monitornon-destructivetest. Company: Pacific Seamen Services Position: QC Piping Inspector Project: Various Projects (Local and Abroad) Location: Manila, Philippines Date: June 1993 to January 1994 Duties & Responsibilities:  Stateswhatto observe andmeasure inorderto meetthe quality requirements.  Prepare inspectiontestplanandparticipate inmonitoringcapacitytoensure all applicable specification,workitemandinspectionplanrequirementsare beingcompliedwiththroughall phases.
  • 6. Curriculum Vitae of RENALDO H. COLOMA Page 6 of 6  Ensure that the requiredtestreports,certificate requirements,material conformto the requirementsof joborderorworkitem.  Identification andsegregationof rejectedmaterials.  Record documentsfiledforthe periodof time toQA Department.  Dailymonitorandsurveillance of progressesinworkshopandonboardship.  Assistsincoordinatingthe completionof relevantdocumentationand determinationof actual eventsandsituationcausingcontractdelaysand/or claimsand evaluatingvalidityof claims.  Responsible forcoordinatingbetweenvariousdepartmentsmanagementof the engineeringteams,designchanges,complyingwithspecificationsand contract and communicatingwiththe projectengineer. Company: Flour Arabia Ltd. / Rezayat Brown & Root Position: QC Piping Inspector Project: MARJAN GOSP 2&3 (Offshore) Date: April 1992 to May 1993 Location: Kingdom of Saudi Arabia Duties & Responsibilities  Dailyroutine inspectionof fit-upandfabricatedspool asperisometric.  Line checkof installedspoolsandverifycompletenessincludingother components.  Ensure that the examinationandtestrequiredbythe inspectiontestplanhas beenperformedwithsatisfactoryresult.  Inspectionandwitnesshydrotestingandprepare documents.  Compilingof all reportincludingNDTresults.  Initiationof feedbackonnon-conformingmaterialsandcriteriaforrejectionand propertaggingof rejectedmaterials.  Providingof technical datatoprepare weeklyandmonthlyreportsonproject progressandqualitycontrol. CHARACTER REFERENCES : Available upon request RENALDO H. COLOMA