Graduated 1987 with diploma specialized in the field of“Complex Instrumentation” with 26 years
experienced in supervision on construction, pre-commissioning,commissioning, start-up and
maintenance ofa high density production for both Industrial and Maritime industries (On/Off
Shore).
Responsible for the final Certification and Commissioning involving Chemical processing control,
Geothermal power plant, Air Separation unit, Carbon Monoxide and Hydrogen production,
Floating Production Storage and Offloading, Oil Production Platform, Oil Rigs, Oil and Gas, LNG
production process in compliance with the International Standard of Instrumentation Control and
Safety Standard.
Have certified the electrical and instrumentation process ofmajor projects for Floating Production
Storage and Offloading vessels (FPSO) and Petrochemical plant in the United States ofAmerica,
Gulf of Mexico,Philippines, Singapore, Brazil, Korea , Russia, Africa and Middle East.
WORK HISTORY
Company : ExxonMobil EMDC Arctic Projects
Project Address : Hebron UPMDrilling& Production Platform
HHI UlsanSouth Korea
Position : InstrumentCommissioningTechnician
Inclusive Dates : January 11, 2016 to Present
Company : ExxonMobil EMDC Arctic Projects
Project Address : Artukun Dagi Berkut Drillingand Production
Platform DSME-Geoje,Okpo,SouthKorea
Sakhalin, Russia (Offshore)
Position : InstrumentSpecialist
Inclusive dates : April 27, 2012 to April 21, 2015
2. Company : SBM Offshore
Project Address : Cidade de AnchietaFPSO, Keppel Shipyard
Tuas No.51 PioneerSector1 Singapore
Position : Lead Instrument CommissioningTechnician
Inclusive dates : February 08, 2012 to April 20, 2012
Company : BW Offshore
Project Address : FPSO PioneerChinookCascade Gulfof Mexico
USA
Position : InstrumentTechnician
Inclusive dates : January 29, 2011 to April 30, 2011
Company : SBM Offshore
Project Address : FPSO Okha Woodside Keppel ShipyardTuas
No.51 PioneerSector1 Singapore
Position : Lead Topside Fire&GasInstrumentTechnician
Inclusive dates : September17, 2010 to January 11, 2011
Company : ExxonMobil EMDC& Qatar GasJointProject
Project Address : QatarGas II PMT QGX ExpansionProject Train 4
& 5 LNG Ras Laffan, Industrial Site,Doha Qatar
Position : Lead E&I Completions/Commissioning
Technician
Inclusive dates : August 19, 2007 to October 9, 2009
Company : ExxonMobil NefteGasEMDC
Project Address : Orlan Platform Sakhalin Phase 1 HHI Ulsan
South Korea (onshore) SakhalinIsland Russian
Federation(offshore) andExxonMobil Dekastri
Oil Terminal Khabarovsk Mainland Russia
Position : Lead InstrumentTechnician
Inclusive dates : April 15, 2005 to May 18, 2007
Company : Total ElfFina E&PAngola
Project Address : FPSO Dalia, Samsung Shipyard Geoje,South
Korea
Position : Lead InstrumentCommissioningTechnician
Inclusive dates : December15,2004 to March 30,2005
Company : SBM Offshore
Project Address : FPSO MarlinSul Keppel ShipyardNo.51
PioneerSector1 Singapore (onshore),Campos
Basin FieldMaccae Brazil (offshore)
Position : Lead InstrumentCommissioningTechnician
Inclusive dates : October 2003 to September2004
3. Company : SBM Offshore
Project Address : FPSO SerpentinaKeppel ShipyardNo.51
PioneerSector1 Singapore (onshore),
Equatorial GuineaMalabo WestAfrica
Position : Lead InstrumentCommissioningTechnician
Inclusive dates : December2002 to August 2003
Company : Soxal/IslandPipelineGases/HycoPlant
Project Address : No. 76 Jurong Island Highway 111 Sakra Ave.
Jurong Island Singapore
Position : Instrument Technician
Inclusive dates : September2000 to July2002
Company : SBM Offshore
Project Address : FPSO Kuito 1 SBM/Chevron SanAngol
Angola WestAfrica (offshore)
Position : Instrument CommissioningTechnician
Inclusive dates : September1999 to August 2000
Company : Petrobras Offshore
Project Address : Petrobras P-37 Jurong Shipyard Singapore
Position : Instrument CommissioningTechnician
Inclusive dates : April 1999 to August 1999
Company : Mitsubishi Japan
Project Address : PNOCGeothermal PowerPlant Kidapawan
North Cotabato Mindanao Philippines
Position : Instrument CommissioningTechnician
Inclusive dates : January 1999 to April 1999
Company : Keppel Fels
Project Address : Petrobras P-27 FPSO No. 50 Gul Road Jurong
Singapore,Campos Basin Offshore Brazil
Position : Instrument CommissioningTechnician
Inclusive dates : April 1998 to August 1998
Company : Keppel Fels
Project Address : B-241 SAGA VARG No. 50 Gul Road Jurong
Singapore
Position : Instrument CommissioningTechnician
Inclusive dates : December1997 to March 1998 1998
Company : San Miguel Brewing Group
Project Address : Canlubang BottlingPlant Industrial site
Canlubang Laguna Philippines
Position : InstrumentMaintenance Technician
Inclusive dates : April 1988 to December1996
4. JOB DESCRIPTION:
MC walkdownparticipation
SectionCPermitto workendorsementsignature
Provide Technical andProcedural Guidance
ConductsSafetyandPermitAudits
IdentifyandCommunicateprioritySub-Systems/activities
SupportsIGQ process
SIMOPSand Toolbox TalkParticipation
WitnessLoopcheckand Functioncheck
Coordinate withVendorControl Engineer
“ApprovedBy”InstrumentBchecksheetssignature
Interface withDSME andI&C Managers
Toolsand Testequipment’scoordinationforENLTechnicians
Performlastminute riskassessmentLMRA withtechnicians
Loop folder/projectdocumentationsupport
SupportWINPCSpunchitemprocess.
Lead othersite teammemberstomeetcommonprojectobjectives
Overall supervision,constructionandinspectionof Topside Fire andGas
Pre-commissioningworksfunctionandcause andeffecttesting
Loop checkof all Topside Fire andGas devices
Preparationof Loopcheck workpack
As-Builtof InstrumentLoopDiagram
PreparationIITRB for the completedLoops
Assure thatproperdocumentationsuchasI/O List,Cable BlockDiagram
TerminationDrawingsare maintainedwithinthe site team
ImplementLogictestingforSiemensPCS7
Site Co-ordination
AttendsSafetyandToolbox meeting
PreparesworkpermitforFire andGas Hot LoopCheck
Supervise Teamof Technicianforthe Commissioningof TopsideFire andGas
Pre-commissioning works and logic, function and cause and effect testing:
Loop check, function test, logic check on Emerson Delta V DCS Arrangement
Loop check, function test, logic check on Triconex Emergency Shut-down System
‘ESD’. High Integrity Pressure Protection System ‘HIPPS’
Implementing Compressor Startup Sequence, graphic
Loop check on Various Vendor Supplied System
Emergency Shut-Down Logic Testing (Triconex) Cause & Effect Testing
DCS Sequence Function Testing
Lead other site team members to meet common project objectives.
Assure that proper documentation and as-built drawings are maintained by the
CONTRACTOR and within the site team and Give Progress Report
Support the Site Instrument & Controls team members in resolving design problems
SAT (Site Acceptance Test) package preparation & to Conduct SAT for Hardware, Graphics and
control logics by Emerson DeltaV DCS System.
5. Instrument Protective System by Triconex, Invensys Process System
Logic verification with respect to design of Fractionation and LPG treating
C&E matrix reviewing and verifying with Process. Verification of graphics as per
P&IDs and PFDs
Site co-ordination for SAT modifications.
Review and implement the modifications including graphics, configuration and hardware
installation.
Work in a cross functional team environment (instrument, electrical, mechanical, operation)
integrated systems.
Supportthe commissioning/startupoperationstoensure thatall equipmenton site is integrated
into the current systems / procedures
Assist in troubleshooting hardware and configuration problems and failures.
Review interlocks and alarm protocols.
Optimize equipment, system performance through improving efficiency, reducing faults and
reducing downtime.
Participate in HAZOPS and give input from control perspective.
Overall supervision of control systems during commissioning
Investigate and determine root cause of equipment underperformances
Carry out Site Acceptance TestforGE Mark VI SpeedtronicsTurbine Control SystemPanel,
BentleyNevadaPanelandCompressorControl Corporation(CCC) Panel.
Performedloopcheckingandfunctional testactivitiesof all instrumentson
Turbine andcompressorareaand otherassociatedinstrumentationthruHuman
Machine Interface andGE Mark VI SpeedtronicsTurbine Control SystemPanel.
Supervising20 Techniciansforthe Mechanical CompletionsandCommissioning.
To work withthe CompaniesElectrical/InstrumentationSite Engineertoensure thatthe
electrical andinstrumentationconstructionworkiscarriedoutinaccordance withthe contract
requirementsandthatthe standardof workmanshipandthe qualityof the productisto the
company and code requirements.
Monitorthe implementationof the approvedqualityplan.
Ensure that the work iscarriedout inaccordance withthe requirementsof the subcontractors
approvedqualitymanual.
Verifythatall inspectionsare carriedoutby qualified personnel andthatrecordsare
maintained.
Verifythe suitabilityandacceptance of all electrical andinstrumentationmaterials.
Ensure that competentandcertifiedtradesmenare usedtocarry out the electrical and
instrumentationwork.
Inspectthe electrical andinstrumentationworkduringcable andtrayinstallation,cable pulling,
gladding,andterminating,toensure compliance withcontractandcode requirements.
Monitorthe subcontractorduringtestingactivitiestoensure compliance withthe agreed testing
procedures.
Ensure the productionof and the acceptance of the necessaryelectrical andinstrumentation
documentationforinclusionin the final documentationpackage.
6. Installation,commissioning,repairandcalibrationof instrumentsforsequencingcontrol and
protectionof Gas Turbine Generators (JohnBrownEngineeringMarkI,II and IV),utility
equipmentincludingR.O.PlantandFire ProtectionSystem.
AttendTBT & JSA
Verifydeviceconfiguration(Tag#,calibratedrange,engineeringunits,LCDconfiguration,and
failure mode)
Performdevice loopcheck
Identifyfieldpunchitemsandcommunicate toleadtechnician(photo,description,detail,
model/part/serial numberetc.)
PerformC&E Testing
Fill outB Sheetevidence of testing& SUB-CONTRACTORBsheetsignature
Maintain/ensure safeinterface withconstructioninthe field
Reportinterface issues,safetyissues,problems,challenges,discrepancies,common/reoccurring
faultsto leadtechnicians&specialistinatimelymanner –share lessonslearnedbetweenthe
teams.
SecondaryPermitApplicantandPermitHoldersignature &responsibilities(selectedindividuals)
DevelopPTWPacks,obtainareaauthoritysignatures,andsubmitpermits
PrimaryPermitApplicantandPermitHoldersignature &responsibilities
PerformDailyTBT & JSA
ISCT B Sheetwitness/reviewsignature
SubmitcompletedBsheettoMC+ team (same day)
DynamicCommissioning&MethodStatementSupport
Raise & verifyMC+ commissioningpunchitems
EDUCATIONAL ATTAINMENT
Don Bosco Technical College – MandaluyongCity, Philippines
InstrumentationTechnology-Majorin: Machine Automation
Graduate withDiploma -September1987 with S.O. (D) No.9-15:0143s.1991 (4/11/91)
Loyalty Awardees
Member of PhilippineInstrumentationand Control Society-August14, 1995
SEMINARS AND TRAINING
COENSBasic Offshore SafetyInduction&EmergencyTrainingincluding
EBS / OPITOApprovedCourse Course Code: 5700; HELLY HANSEN SeaAirwithCA HUEBA
Training;26 April 2013
Basic Offshore Safety InductionandEmergencyTraining(BOSIET)
(Accredited byoffshorepetroleumindustrytraining organization(OPITO)
Singapore TrainingCentre 24Jan. 2011
IntroductiontoPLC andElectro PneumaticControl
Singapore Polytechnic-November02 to 19 2001
FirefightingCourse (Basic)
Sakra EmergencyResponse Brigade
JurongIslandSingapore-November4to 5 2001