1. CURRICULUM VITAE
Nawal kishore Prasad Email ID:-nawalkishoreprasad07@gmail.com
GSM: +91 8405001592
PROFESSIONAL OBJECTIVE
High-energy, results-oriented Telecom Professional 08 years of experience in Telecom Sectors. Presently
working as Project coordinator (Responsible for Roll out activates for Jharkhand Circle parts installation,
commissioning, commercially live up to AT Activity) Profile with Welkin Telecom Infar Pvt Ltd for RJIL Projects for 4G
Technology.
Proven success in multi-tasking, generating creative ideas, organizing, and finalizing projects with limited Resources.
Ability to work under pressure and meet impossible deadlines. Willing to travel and/or relocate.
KEY TECHINCAL SKILL SUMMARY
Hand On experience of three GSM Turn Key Projects ( AIRCEL 2G , STEL& RJIL 4G) & O&M of 03
operators (STEL, MTS & TATA DOCOMO).
SLA, reduction of MTTR of site outage, Infra Analysis & MSA Signoff:- Maintaining Network Uptime as per
SLA pertains to Active & Passive infrastructure of MTTR of site Outage, Follow up with IPs for Maintaining Uptime
as per the MSA, Analysis of Fuel Consumption, proper accounting of diesel. Maintain the MIS,EB &DG running
Analysis, restoration of Faulty EB supplies, Analysis of previous days faults and plans accordingly to reduce the
faults day by day. Coordinate/ Escalate if major issues to Energy Manager, MSA Signoff with IPs as per their SLA.
Hand- On Experiences on systems;- in ZTE Equipment (5.5 yrs_BSC ZXG10-iBSC, ZXWR RNC (V3.11.10),
nodeB SDR BTS 8900&8900E (V3.00.02), ZTE Mux S400, Tx Eqpt), Ericssion Equipment (1.8 Yrs_RBS
2202,2204,2206,2964, Ceragon SDH & PDH links).
Maintenance Management:-Co-ordination & performance monitoring of AMC Vendors (DGs,PIU,OFC,PAC), Plan
& execution of Preventive Maintenance & Breakdowns, KPI monitoring & analysis, Energy analysis & Optimization,
SLA monitoring, AT done project sites, RCA shared to customer for critical outages/breakdowns, Maximum
utilization Of EB Availability, Re-connection of all EB disconnection within SLA.
Resource & Asset Management:- Movement Plan/Guide to FLE & technicians for proper execution of O&M, Day
to day activities, Breakdowns rectification of Alarm, availability& Movement of Site Master, BER meter , OTDR,
Splicer & availability of vehicles. Master fault tracker, Site Infra Master Tracker, Up gradation Tracker, executed &
uncompleted plan activities details.
Spare Management:- Prepare/availability of spares & Consumables/ PM Materials as per Cluster/Circle Level for
Smooth operation & Breakdown, R&R report. & Share the RCA/ TTs against any critical hardware faulty.
PRESENT EXPERIANCE
Presentlyhandling Samsung Project as Project Coordinator with WelkinTelecom Infra Pvt Ltd from Jan-2014 to till now for
Jharkhand Circle responsible for Core Readiness.
PRESENT KEY RESPONSIBILITIES
Plan achieve the target provide by customer to launching RJIL 4 project within time limit.
Successfully completed 485 sites installation, integration & ATP.
Responsible for Project activities and rollout schedule for respective region.
Customer Orientation for complaint resolution through feedback and escalation with objective to derive
customer satisfaction
Responsible for Jharkhand circle team for I&C ,REF Survey plan & implementation & Collect report.
Responsible for Project activities and rollout schedule for respective region.
Planning & readiness for the proposed for RJIL 4G projects.
Installation & Commissioning of Enode B for proposed Samsung as per RJIL Quality Standard.
Completed supervision & better quality for project rollout Activity.
All type Quality checking.
Power ON & Hardware testing of Enode B Racks & provide support during ATP 11A & ATP 11B.
Planning of Site Works for RFI the sites.
To give suggestions to for Alarm Rectification.
To perform Quality check of newly installed sites for the purpose of Acceptance Test.
Strong co-ordination with Installation & Vendors.
Survey & raised requisition of Enode B equipment as per Planning.
Responsibility for managing the team of Engineers and Technicians.
2. Responsibility EMF Survey, SCFT & Cluster Drive Team line off and activity complete given time line.
PREVIOUS EXPERIENCE-VII
Handling TATA DOCOMO O&M as Cluster Lead with ZTE India Pvt Ltd from Feb-2011 to Oct-13 for BIHAR_ Gaya Cluster
responsible for Infra & BSS O&M.
KEY RESPONSIBILITIES
Operation & Maintenance of GSM Network in Gaya Cluster and Co-ordination with OMCR to ensure 99.99%
network availability and Q&S parameter monitoring Approx 287 Sites.
Quality of Service and Network Analysis and capacity augmentation of BSS Network with proper planning and
its' timely execution. Asset record updating is part of the function.
Scheduling & planning predictive, preventive & breakdown maintenance with key focus on resource/spare
availability with root Cause analysis.
Periodic Audit/PM of Critical Nodes BSC/Hub Sites BTS, Infra & takes corrective action for rectify identify
punch points.
PM Compliance:- Ensure proper PM compliance on sites after validated on sample basis, Ensure maximum PM
compliance as per targets within timelines
Analysis of R&M/AMC cost and implementing cost control measures at circle.
SITE INFRA MASTER & ALL IP INFRA ISSUE Tracker to maintain asset master of all sites & collects timeline to
rectify fault/Issue as per given SLA.
Daily tracking with IP for their Infra fault / service tickets and closure on time.
Pushing IP/collect timeline & chasing for 100% Site Automation/ External Alarm.
OPEX MANAGERMENT Minimum breakdown delivery for cluster to optimize OPEX.
Guide Engineer/technician during critical Faults/Alarm integration/Service affecting Alarm Clearance.
Co-ordination responsibility for upgrade/planned event/other OPCO- installation and operational supports.
Responsible for day to day MS activity of Network at Cluster level.
Collection and monitoring of Energy Related parameters on daily/monthly basis.
Site wise analysis of DG/EB/BB running and energy cost and cost reductions plan.
Resolution of Landlord issues within timelines, Ensure good relationship with Landlords.
Quality of service and network analysis and capacity augmentation of BSS network with proper planning and
its timely execution. Asset record updating is the part of the function
Responsible for managing the team of Engineers and Technicians for O&M / project and support for TTSL
Network
Maintaining KPI targets required by customer.
Attending customer complain and resolved the issue if found network related issue.
Identify low utilization area and optimized our network through field team & vender team.
Provide 24x7 1st level service supports to Field as well as OMCR Team.
Support to field engineers for optimization of existing network.
Also completed the Competitive Exam of Level iii in ZTE V3 Product.
PREVIOUS EXPERIENCE - IV
Handling STEL O&M/Project as Cluster Lead with ZTE India Pvt Ltd for STEL MS/Project- Bihar Telecom Circle
from June-2009 to Dec-2011 for Jharkhand_ RollOut_BSC/BTS Installation Commissioning, O&M.
KEY RESPONSIBILITIES
Responsible for managing the team of Engineers and Technicians for O&M / proje ct and support for STEL
Network.
Successfully Maintaining a New Operator STEL in Jharkhand Circle .
Responsible for of more than 500 sites in different parts of Jharkhand and having very good interaction with
My Engineers.
Responsible for whole network quality and Alarm free sites.
Being a very Self motivated person I Always Motivate My colleagues and My Engineers ,to work well and
concentrate on the given task professionally as well personally and interact with them in order to know about
the problems they are facing in the field and try to resolve them at the same time.
Rehoming for sites from one BSC to another BSC.E1 connectivity between BSC & BTS sites through different
media Microwave (PDH & SDH), Leased line (optical fiber & copper cable).
3. Also actively involved in activities like Traffic shifting from one link to another ,TRX addition Segmentation,
Segmentation revert back, Link up gradation.
Operation & Maintenance of GSM Network in DHANBD Cluster and Co-ordination with OMCR to ensure
99.99% network availability and Q&S parameter monitoring Approx 218 Sites
Preventive Maintenance & Corrective Maintenance of infra & Power equipment of BSC Location Sites.
Handle the troubleshooting of BTS,BSC,SDH,PDH Link.
Monthly & quarterly health checkup & troubleshooting issue SMPS & Battery Bank at BSC Location.
Planning for the power expansion & swapping case without Network affected.
Track & ensure quality of Network Availability by effective monitoring and NW.
Drive the MS team_ Sub-contractors & Cluster Leads for better smooth operation & better NW.
Completed terminate & verification of all external Alarms for BSCs & cells sites.
Escalate & resolved the Infra Issue- Power issue & owner issue.
Coordinating with RF team to ensure network availability & clearing various alarms.
Drive the MS team_ Sub-contractors & Cluster Leads for better smooth operation & better NW
Completed terminate & verification of all external Alarms for BSCs & cells sites.
Escalate & resolved the Infra Issue- Power issue & owner issue.
Control no. of faults and MTTR within targets & thus ensure maintenance of SLA for Network availability by
mobilizing own FRT team.
PREVIOUS EXPERIENCE - III
Previously handling BTS Engineer with Ericcsion India Pvt Ltd Aircel PROJECT from NOV 2007 to June 2009 in
Meghalaya (Shillong) rollout/O&M_ around 120 Sites .
KEY RESPONSIBILITIES
Installation and commissioning of the Ericsson make BTS.
Work on RBS 2202.2204,2206,2964 Ericssion BTS.
MAN MANAGEMENT Technician performance evaluations and required action for maintaining proper quality of
manpower. Worked on Mini link,Trafic node E, Mini link service manager,mini link Hi cap.
Familiar on E1 dropping , Bypass, loop testing & Basic mechanism of Mux.
Did BSC STM Patching with Mux with optical protection defining at Mux end.
Site preparation, Microwave alignment and fine tuning.
Alarm termination of various RBS site.
Call testing and site acceptance.
Responsible for site integration & Commissioning of 2204 & 2964 of erission BTS.
Measuring VSWR with site master.
Drive the MS team_ Sub-contractors & Cluster Leads for better smooth operation & better NW.
.
TECHNICAL QULIFICATION
Completed Bachelor of Engineering, as a student of Computer science from CIT, Ranchi Jharkhand in 2007 with 67%.
PERSONAL ATTRIBUTES
Date of birth: 01 March 1979.
Marital status: Married.
Hobbies: Playingfootball, Visitnew locations & making friends.
Interests: Drivingdifferent vehicle& watching cricket.
STRENGTH
Good communication and inter personal skills, Willing to relocate anywhere in India
Capability of executing challenging assignments with right blend of intelligence, diligence and patience.
Team Player & Driven for success , Comprehensive problem solving abilities.
DECLARATION
Are that the particularsfurnished aboveare complete and correct to the best of my knowledge and belief.