PROFIBUS & PROFINET System Design, Andy Verwer, page 2MTC, Coventry, 25 February 2016
System costs
Most system designers and project managers look at the
project procurement, installation and deployment costs when
they price a project.
However, the costs of an automation system spread over the
life cycle of the plant and should include maintenance, fault-
finding and health-checking.
Perhaps most important is the cost in terms of loss of
production should faults develop during the lifetime of the
plant. Spending a little more at procurement time can repay
many times over.
Good fault tolerant design need not be more expensive.
Sometimes fault tolerance can be achieved with just a little
thought at no additional cost.
PROFIBUS & PROFINET System Design, Andy Verwer, page 3MTC, Coventry, 25 February 2016
Life cycle costs
The procurement,
installation and
commissioning
costs are only
incurred at the start
of the project.
Costs from device
failures increase as
equipment gets
older.
When system
overhaul is
undertaken this can
partially reset the
increasing cost of
failures.
System
overhaul
PROFIBUS & PROFINET System Design, Andy Verwer, page 4MTC, Coventry, 25 February 2016
Control system design
Control system design normally proceeds by building on the
experience obtained from previous designs.
But, designs which are based on badly designed systems will be
bad!
Only by using experience from operations and maintenance
staff can we develop good system designs.
In my experience it is rare for such feedback mechanisms to be
present. Particularly when design is carried out by sub-
contractors.
Designers need to know about mistakes that have been made
in the past.
Feedback from operations and maintenance is essential.
PROFIBUS & PROFINET System Design, Andy Verwer, page 5MTC, Coventry, 25 February 2016
System costs
Maximising plant availability is critical in reducing the total
costs of the system. It is essential that the System Designer
understands:
That minimising plant down time when faults inevitably
occur (i.e. maximising plant availability) is a key
requirement.
The impact of the network layout on plant reliability.
That the incorporation of network health checking and
fault finding facilities are essential.
How to appropriately use features such as redundancy and
network monitoring and rapid fault location and repair to
improve plant availability.
PROFIBUS & PROFINET System Design, Andy Verwer, page 6MTC, Coventry, 25 February 2016
The parts of a control system
will fail whilst in service.
The consequences of failures
are often predictable, but the
failures themselves are
unpredictable.
The design of a reliable
control system is not simple.
… and should be
accompanied by analysis of
how parts fail and of the
consequences of these
failures.
Cost of failures
PROFIBUS & PROFINET System Design, Andy Verwer, page 7MTC, Coventry, 25 February 2016
Minimising the failure footprint
There are three basic ways to minimise the impact of faults:
1. Make failures less likely – Minimise the Fault Frequency.
2. Restrict the Fault Effect when failures inevitably occur.
3. Minimise the Fault Duration – Provide for rapid fault location
and repair.
A good network design will minimise the effect on production
when inevitable failures occur.
We can speak of minimising the “failure footprint”.
Fault
frequency
Fault
effect
Fault
duration
PROFIBUS & PROFINET System Design, Andy Verwer, page 8MTC, Coventry, 25 February 2016
Minimising the failure footprint
Understand and implement the design and installation rules.
Improve reliability - use good quality well tested (certified) and
reliable devices, connectors and network components.
Use manufacturers who carry out burn-in testing on devices.
For PROFIBUS use the lowest possible bit rate that gives the
required performance.
1. How can we minimise Fault Frequency?
Fault Frequency
PROFIBUS & PROFINET System Design, Andy Verwer, page 9MTC, Coventry, 25 February 2016
Minimising the failure footprint
2. How can we minimise the Fault Effect?
Analyse the effects of failures on plant operation.
Use well thought out network layout and design.
Think about:
 Using separate networks or different masters (distributed
control),
 Using different segments for different parts of the process,
 Dealing with common cause failures.
Fault
Effect
PROFIBUS & PROFINET System Design, Andy Verwer, page 10MTC, Coventry, 25 February 2016
Minimising the failure footprint
3. How can we minimise the Fault Duration?
 Provide facilities in the design for rapid fault diagnosis and
fault location.
 Provide in the design for device hot swapping without
reconfiguration.
 Use designs that allow for a quick fix.
 Provide redundancy when appropriate. Needs to be well
thought out!
 Use standardised, vendor independent solutions rather
than being locked into manufacturer specific solutions.
Fault
Duration
PROFIBUS & PROFINET System Design, Andy Verwer, page 11MTC, Coventry, 25 February 2016
Minimising fault impact in design
Use pluggable devices that can be removed/replaced without
impinging on network operation.
Use appropriate network layout and segmentation so that
physical layer faults allow critical plant operation to continue
in the event of failure or device replacement.
Provide for rapid troubleshooting and simple fault isolation.
For PROFIBUS systems use:
Connector systems and layouts that do not break the bus
or loose termination when disconnected.
Termination solutions that allow devices to be removed or
replaced.
Use appropriate solutions for redundancy.
PROFIBUS & PROFINET System Design, Andy Verwer, page 12MTC, Coventry, 25 February 2016
Reliability and availability
Reliability is a measure of how a component, assembly or
system will perform its intended function, without failure, for
the required duration when installed and operated correctly in
a specified environment.
Availability is a measure of reliability indicating the fraction of
time in which a device or system is expected to operate
correctly.
It is important to remember that reliability and availability are
statistical measures: they will not predict when a particular
device will fail, only the expected rate based on average
performance of a batch of test devices or on past
performance.
PROFIBUS & PROFINET System Design, Andy Verwer, page 13MTC, Coventry, 25 February 2016
Some definitions
Mean Time Between Failures (MTBF) is the expected or
average time that a device will be free of failure.
Typical MTBF for a well designed and manufactured electronic
device might be 10 to 20 years.
Mean Time To Repair (MTTR), is the time taken to repair a
failed device.
In an operational system, MTTR generally means time to
detect the failure, diagnose and locate the problem and
replace the failed part.
PROFIBUS & PROFINET System Design, Andy Verwer, page 14MTC, Coventry, 25 February 2016
Availability
Availability can be calculated from MTBF and MTTR:
MTTRMTBF
MTBF
ty,Availabili

A
Remember that availability is a statistical measure and
represents an average probability of being in operation.
There is little point in trying to be accurate with these figures
since actual failures are unpredictable.
Availability is typically specified in “nines notation”. For
example 3-nines availability corresponds to 99.9%
availability. A 5-nines availability corresponds to 99.999%
availability.
PROFIBUS & PROFINET System Design, Andy Verwer, page 15MTC, Coventry, 25 February 2016
Availability, A D = (1-A) Downtime
0.9 = 90% (1-nine) 0.1 (10-1) 36.5 days/year
0.99 = 99% (2-nines) 0.01 (10-2) 3.7 days/year
99.9% (3-nines) 0.001 (10-3) 8.8 hours/year
99.99% (4-nines) 0.0001 (10-4) 53 minutes/year
99.999% (5-nines) 0.00001 (10-5) 5 minutes/year
99.9999% (6-nines) 0.000001 (10-6) 5 minutes/10years
99.99999% (7-nines) 0.0000001 (10-7) Not feasible!
99.999999% (8-nines) 0.00000001 (10-8) Impossible!
Downtime is an alternative way of understanding the
availability:
MTTRMTBF
MMTR
AD

 )1(Downtime,
Availability and downtime
Normalrange
forautomation
PROFIBUS & PROFINET System Design, Andy Verwer, page 16MTC, Coventry, 25 February 2016
Availability and downtime
Note that the availability of a device can be improved by
decreasing the MTTR.
This can be accomplished in several ways:
Faster detection and location of faults. (Accomplished by
diagnostic reporting facilities, availability of fault finding
tools and training of maintenance personnel).
Faster repair of the fault. (Accomplished by availability of
spares and all of the above).
Fault tolerant design.
PROFIBUS & PROFINET System Design, Andy Verwer, page 17MTC, Coventry, 25 February 2016
Example
Consider a remote IO unit with a MTBF of 10 years.
When the device fails, it could take several days to
recognise, diagnose and locate the fault. And then, if not
held as a spare, several more days to obtain a replacement.
The MTTR could be one week, giving an availability of:
998.0
73650
3650
736510
36510








MTTRMTBF
MTBF
A
That is approximately 3-nines availability, or a downtime of
about 16 hours/year.
Consider the availability when the MTTR is reduced to ½ day:
0.99986
5.036510
36510



A
The availability is now 4-nines and the downtime has reduced
to about 1hour/year.
PROFIBUS & PROFINET System Design, Andy Verwer, page 18MTC, Coventry, 25 February 2016
Reliability modelling
The system designer must understand the methods of
modelling and analysis of reliability and availability in systems.
In particular how system availability can be predicted from the
individual parts.
Also understand how standby systems, redundant solutions
and common cause failures impact the overall system
reliability.
We often find that redundancy is inappropriately used and
sometimes results in no real improvement in system
availability.
Careful network layout can have a major effect on the fault
footprint and significantly improve the overall availability of
the plant.
PROFIBUS & PROFINET System Design, Andy Verwer, page 19MTC, Coventry, 25 February 2016
Standby and redundant systems
We often see standby or redundant systems used to try to
improve plant availability.
Here we have two or more devices working in parallel.
Should a fault occur in the operational device then the standby
device can take over.
The switch over can be manually activated or can be
automatic. The switching time should be considered when
estimating the overall system availability.
This scheme achieves high availability because the system
function is maintained whilst repairing the failed device.
PROFIBUS & PROFINET System Design, Andy Verwer, page 20MTC, Coventry, 25 February 2016
Multiple controller systems
Multiple PROFIBUS masters or PROFINET controllers with
automatic duty-standby switching are available from a number
of suppliers.
These can drive different networks to provide redundancy
down to the field level. However, separate power supply and
network cable routing are advisable to minimise common-
cause failures.
Sometimes dual slaves can be used in the field with a simple
“wired-OR” voting system driving the final actuator or
connecting two redundant sensors.
However, more often we find such redundant controllers are
using the same field devices and actuators.
Such systems must be carefully designed, taking account of
the consequences of all possible failures.
PROFIBUS & PROFINET System Design, Andy Verwer, page 21MTC, Coventry, 25 February 2016
Redundancy solutions for PROFIBUS
Solutions for redundant PROFIBUS cabling are available from
many manufacturers:
Siemens Y-Link
PROCENTEC ProfiHubs
ABB Redundancy
Link Module
Moor-Hawke
Redundancy for PA
COMbricks modules
PROFIBUS & PROFINET System Design, Andy Verwer, page 22MTC, Coventry, 25 February 2016
Slave with
integrated
redundancy
Y
Slave 4
Slave
3A
Slave
3B
Mechanically
combined outputs
Redundant
slaves
Wired OR
outputs
Slave
2A
Slave
2B
Y
Redundant
masters
Master
B
Y
Redundancy solutions for PROFIBUS
Properly designed redundant
solutions can provide robustness
against a wide selection of faults
and conditions.
Master
A
Redundant cables
PSU A
PSU B
Redundant
power
supplies
Y
Slave
1
Redundant
links or hubs
Y
PROFIBUS & PROFINET System Design, Andy Verwer, page 23MTC, Coventry, 25 February 2016
PROFINET system layout
PROFINET systems can be laid out in a number of ways:
Star and tree topologies
using switches:
Line topology using two-port devices:
Or a combination of both.
Switches
PROFIBUS & PROFINET System Design, Andy Verwer, page 24MTC, Coventry, 25 February 2016
PROFINET system layout
There is a clear advantage of the star topology in terms of
system availability in that any device can be replaced without
affecting the other devices.
However, the system cost will be significantly greater because
of the number of switches required.
The line topology is much lower cost, because separate
switches are not required.
But removal or replacement of any device will cause all
downstream devices to fail.
PROFIBUS & PROFINET System Design, Andy Verwer, page 25MTC, Coventry, 25 February 2016
Redundancy solutions for PROFINET
One of the big advantages of PROFINET is that it incorporates
a specification for media redundancy.
The standardised Media Redundancy Protocol (MRP) provides
manufacturer independent redundancy which can be used
over copper or fibre cables.
PROFINET redundancy can provide:
• Controller redundancy.
• Transmission media and switch redundancy.
• IO device redundancy.
Redundant PROFINET systems are relatively easy to implement
and can be used across different manufacturers.
PROFIBUS & PROFINET System Design, Andy Verwer, page 26MTC, Coventry, 25 February 2016
PROFINET redundancy
Standardised Media Redundancy Protocol (MRP) can be used
on PROFINET systems to give media redundancy.
IO Controller
with MRP
IO Devices
with MRP
Switch
with
MRP
IO Device
without MRP
But the system must still be properly designed, considering
all possible failures and their likelihood. Common cause
failures must be properly dealt with.
PROFIBUS & PROFINET System Design, Andy Verwer, page 27MTC, Coventry, 25 February 2016
Other ways to improve availability
The careful design of networked systems can improve their
availability.
In particular by organising the system so that selected parts of
the system can be independently shut down for maintenance
without affecting the remaining production.
A simple example of this is seen with streamed production.
A stream can be taken out of service without affecting the
other stream.
But only if the system design allows this.
Process 1 Process 2 Process 3
Stream A
Process 1 Process 2 Process 3
Stream B
PROFIBUS & PROFINET System Design, Andy Verwer, page 28MTC, Coventry, 25 February 2016
Automation islands or units
The concept of dividing the plant into Automation Islands or
Automation Units is well established.
Each automation unit is considered as being functionally
separated from the rest of the plant so allowing it to operate
(and to be shut down) independently.
A good network design will facilitate the isolation of these
automation units using:
• Different controllers;
• Different networks or subnetworks;
• Segmentation.
Careful choice of various architectures for automation units is
a key stage in the design process which can impact on the
overall reliability and maintainability of the control system.
PROFIBUS & PROFINET System Design, Andy Verwer, page 29MTC, Coventry, 25 February 2016
Certified System Design course
A new Certified PROFIBUS System Design course was
developed last year and is fully accredited by PI.
This 3-day training course is suitable for managers, designers
and engineers who are involved in the planning, specification,
design and procurement of PROFIBUS systems.
The course covers the optimum design both DP and PA
systems for availability and maintenance.
The 1-day Certified PROFIBUS Installer course is an essential
pre-requisite which is normally run together with the design
course making 4-days of training.
The course is also available for cost-effective on-site delivery
for between 6 and 12 people.
PROFIBUS & PROFINET System Design, Andy Verwer, page 30MTC, Coventry, 25 February 2016
Training
Certified PROFIBUS and PROFINET training including the new
Certified PROFIBUS System Design course is available from the
UK’s accredited training centres:
PROFIBUS International Competence Centre
Manchester Metropolitan University.
in Manchester, or a location of your choice.
(www.sci-eng.mmu.ac.uk/ascent/).
PROFIBUS International Training Centre
Verwer Training & Consultancy Ltd
In Manchester or on-site.
(www.VerwerTraining.com)

More Related Content

What's hot

PROFIBUS maintenance & monitoring in Factory Automation - Andy Verwer and Dal...
PROFIBUS maintenance & monitoring in Factory Automation - Andy Verwer and Dal...PROFIBUS maintenance & monitoring in Factory Automation - Andy Verwer and Dal...
PROFIBUS maintenance & monitoring in Factory Automation - Andy Verwer and Dal...PROFIBUS and PROFINET InternationaI - PI UK
 

What's hot (20)

Safety for Automation and Control Networks - Peter Brown
Safety for Automation and Control Networks - Peter BrownSafety for Automation and Control Networks - Peter Brown
Safety for Automation and Control Networks - Peter Brown
 
PROFIBUS maintenance & monitoring in Process Automation - Andy Verwer and Da...
PROFIBUS maintenance & monitoring in Process Automation -  Andy Verwer and Da...PROFIBUS maintenance & monitoring in Process Automation -  Andy Verwer and Da...
PROFIBUS maintenance & monitoring in Process Automation - Andy Verwer and Da...
 
Introduction to PROFIBUS for process automation Andy Verwer
Introduction to PROFIBUS for process automation   Andy VerwerIntroduction to PROFIBUS for process automation   Andy Verwer
Introduction to PROFIBUS for process automation Andy Verwer
 
PROFIBUS and PROFINET system design for the process industry - Andy Verwer
PROFIBUS and PROFINET system design for the process industry - Andy VerwerPROFIBUS and PROFINET system design for the process industry - Andy Verwer
PROFIBUS and PROFINET system design for the process industry - Andy Verwer
 
Profibus PA device commissioning and maintenance - Andy Verwer
Profibus PA device commissioning and maintenance - Andy VerwerProfibus PA device commissioning and maintenance - Andy Verwer
Profibus PA device commissioning and maintenance - Andy Verwer
 
PROFIBUS maintenance & monitoring in Factory Automation - Andy Verwer and Dal...
PROFIBUS maintenance & monitoring in Factory Automation - Andy Verwer and Dal...PROFIBUS maintenance & monitoring in Factory Automation - Andy Verwer and Dal...
PROFIBUS maintenance & monitoring in Factory Automation - Andy Verwer and Dal...
 
C13 – Profibus and Profinet network design - Andy Verwer, VTC
C13 – Profibus and Profinet network design -  Andy Verwer, VTCC13 – Profibus and Profinet network design -  Andy Verwer, VTC
C13 – Profibus and Profinet network design - Andy Verwer, VTC
 
W03 Profibus diagnostics & monitoring - Andy Verwer, VTC and Dave Tomlin, H...
W03   Profibus diagnostics & monitoring - Andy Verwer, VTC and Dave Tomlin, H...W03   Profibus diagnostics & monitoring - Andy Verwer, VTC and Dave Tomlin, H...
W03 Profibus diagnostics & monitoring - Andy Verwer, VTC and Dave Tomlin, H...
 
PROFINET in process - Peter Brown
PROFINET in process - Peter BrownPROFINET in process - Peter Brown
PROFINET in process - Peter Brown
 
Introduction to PROFINET - Derek Lane of Wago
Introduction to PROFINET -  Derek Lane of WagoIntroduction to PROFINET -  Derek Lane of Wago
Introduction to PROFINET - Derek Lane of Wago
 
Profibus maintenance & monitoring andy verwer
Profibus maintenance & monitoring  andy verwerProfibus maintenance & monitoring  andy verwer
Profibus maintenance & monitoring andy verwer
 
PROFIBUS and PROFINET system design for the process industry - Andy Verwer
PROFIBUS and PROFINET system design for the process industry - Andy VerwerPROFIBUS and PROFINET system design for the process industry - Andy Verwer
PROFIBUS and PROFINET system design for the process industry - Andy Verwer
 
Introduction to profibus for process automation andy verwer
Introduction to profibus for process automation   andy verwerIntroduction to profibus for process automation   andy verwer
Introduction to profibus for process automation andy verwer
 
Profibus network health checking and monitoring andy verwer
Profibus network health checking and monitoring   andy verwerProfibus network health checking and monitoring   andy verwer
Profibus network health checking and monitoring andy verwer
 
PROFIBUS commissioning and maintenance - Richard Needham
PROFIBUS commissioning and maintenance - Richard NeedhamPROFIBUS commissioning and maintenance - Richard Needham
PROFIBUS commissioning and maintenance - Richard Needham
 
Introduction to PROFINET - Derek Lane
Introduction to PROFINET - Derek LaneIntroduction to PROFINET - Derek Lane
Introduction to PROFINET - Derek Lane
 
PI UK Seminar (Nov 2021) - Online Certified Training Courses
PI UK Seminar (Nov 2021) - Online Certified Training CoursesPI UK Seminar (Nov 2021) - Online Certified Training Courses
PI UK Seminar (Nov 2021) - Online Certified Training Courses
 
System design for the water industry - Andy Verwer
System design for the water industry -  Andy VerwerSystem design for the water industry -  Andy Verwer
System design for the water industry - Andy Verwer
 
Maintaining pa networks dave tomlin
Maintaining pa networks   dave tomlinMaintaining pa networks   dave tomlin
Maintaining pa networks dave tomlin
 
PI Technologies for Process Automation
PI Technologies for Process AutomationPI Technologies for Process Automation
PI Technologies for Process Automation
 

Viewers also liked

Viewers also liked (20)

Introduction to Profibus and Profinet for Process Industry - Mark Freeman
Introduction to Profibus and Profinet for Process Industry - Mark FreemanIntroduction to Profibus and Profinet for Process Industry - Mark Freeman
Introduction to Profibus and Profinet for Process Industry - Mark Freeman
 
C6 profibus system design, andy verwer
C6 profibus system design, andy verwerC6 profibus system design, andy verwer
C6 profibus system design, andy verwer
 
PROFIBUS and PROFINET update - Mark Freeman of Siemens A&D
PROFIBUS and PROFINET update -  Mark Freeman of Siemens A&DPROFIBUS and PROFINET update -  Mark Freeman of Siemens A&D
PROFIBUS and PROFINET update - Mark Freeman of Siemens A&D
 
Introduction to PROFIBUS and PROFINET - andy verwer
Introduction to PROFIBUS and PROFINET -  andy verwerIntroduction to PROFIBUS and PROFINET -  andy verwer
Introduction to PROFIBUS and PROFINET - andy verwer
 
Introduction to Profibus & Profinet - Mark Freeman
Introduction to Profibus & Profinet - Mark FreemanIntroduction to Profibus & Profinet - Mark Freeman
Introduction to Profibus & Profinet - Mark Freeman
 
State of the nation keynote address by brian holliday
State of the nation keynote address by brian hollidayState of the nation keynote address by brian holliday
State of the nation keynote address by brian holliday
 
C4 small scale pa application, james powell
C4 small scale pa application, james powellC4 small scale pa application, james powell
C4 small scale pa application, james powell
 
C5 wimes and spd, david bray
C5 wimes and spd, david brayC5 wimes and spd, david bray
C5 wimes and spd, david bray
 
Updates on Profibus and Profinet technology karsten schneider
Updates on Profibus and Profinet technology   karsten schneiderUpdates on Profibus and Profinet technology   karsten schneider
Updates on Profibus and Profinet technology karsten schneider
 
W5a profibus pa device configuration using fdt, andy smith
W5a profibus pa device configuration using fdt, andy smithW5a profibus pa device configuration using fdt, andy smith
W5a profibus pa device configuration using fdt, andy smith
 
C3 profibus profiles, steffen ochsenreither
C3 profibus profiles, steffen ochsenreitherC3 profibus profiles, steffen ochsenreither
C3 profibus profiles, steffen ochsenreither
 
W2 profibus health monitoring dale fittes, hitex
W2 profibus health monitoring   dale fittes, hitexW2 profibus health monitoring   dale fittes, hitex
W2 profibus health monitoring dale fittes, hitex
 
Profibus device configuration and commissioning using fdtdtm and eddl tools ...
Profibus device configuration and commissioning using fdtdtm and eddl tools  ...Profibus device configuration and commissioning using fdtdtm and eddl tools  ...
Profibus device configuration and commissioning using fdtdtm and eddl tools ...
 
PROFIsafe and IT security - Peter Brown of Siemens A&D
PROFIsafe and IT security  - Peter Brown of Siemens A&DPROFIsafe and IT security  - Peter Brown of Siemens A&D
PROFIsafe and IT security - Peter Brown of Siemens A&D
 
W1 profibus configuration, andy verwer
W1 profibus configuration, andy verwerW1 profibus configuration, andy verwer
W1 profibus configuration, andy verwer
 
Profibus project management, design and component selection andy smith
Profibus project management, design and component selection   andy smithProfibus project management, design and component selection   andy smith
Profibus project management, design and component selection andy smith
 
PROFIBUS frame analysis - Peter Thomas of Control Specialists
PROFIBUS frame analysis - Peter Thomas of Control SpecialistsPROFIBUS frame analysis - Peter Thomas of Control Specialists
PROFIBUS frame analysis - Peter Thomas of Control Specialists
 
C1 profinet design, pete brown
C1 profinet design, pete brownC1 profinet design, pete brown
C1 profinet design, pete brown
 
Engineering with PROFIsafe - Peter Brown
Engineering with PROFIsafe - Peter BrownEngineering with PROFIsafe - Peter Brown
Engineering with PROFIsafe - Peter Brown
 
W4 profinet frame analysis, peter thomas
W4 profinet frame analysis, peter thomasW4 profinet frame analysis, peter thomas
W4 profinet frame analysis, peter thomas
 

Similar to Profibus and Profinet system design - Andy Verwer

reliability.pdf
reliability.pdfreliability.pdf
reliability.pdftinymoley
 
Best Practices for Microsoft-Based Plant Software Address Reliability, Cost, ...
Best Practices for Microsoft-Based Plant Software Address Reliability, Cost, ...Best Practices for Microsoft-Based Plant Software Address Reliability, Cost, ...
Best Practices for Microsoft-Based Plant Software Address Reliability, Cost, ...ARC Advisory Group
 
Guidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFGuidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFijsrd.com
 
(Modifid)condition m0nitoring of longwall face supportd
(Modifid)condition m0nitoring of longwall face supportd(Modifid)condition m0nitoring of longwall face supportd
(Modifid)condition m0nitoring of longwall face supportdrockyraj19
 
IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET Journal
 
Top-Down Network DesignAnalyzing Technical Goals.docx
Top-Down Network DesignAnalyzing Technical Goals.docxTop-Down Network DesignAnalyzing Technical Goals.docx
Top-Down Network DesignAnalyzing Technical Goals.docxjuliennehar
 
Lenovo High Availability Solutions Brief
Lenovo High Availability Solutions BriefLenovo High Availability Solutions Brief
Lenovo High Availability Solutions BriefDataCore Software
 
Ch11 - Reliability Engineering
Ch11 - Reliability EngineeringCh11 - Reliability Engineering
Ch11 - Reliability EngineeringHarsh Verdhan Raj
 
Ch13-Software Engineering 9
Ch13-Software Engineering 9Ch13-Software Engineering 9
Ch13-Software Engineering 9Ian Sommerville
 
CS672 – System Engineering and Analysis Discussion 6 - 1192018.docx
CS672 – System Engineering and Analysis Discussion 6 - 1192018.docxCS672 – System Engineering and Analysis Discussion 6 - 1192018.docx
CS672 – System Engineering and Analysis Discussion 6 - 1192018.docxmydrynan
 
IRJET- Analysis of Micro Inversion to Improve Fault Tolerance in High Spe...
IRJET-  	  Analysis of Micro Inversion to Improve Fault Tolerance in High Spe...IRJET-  	  Analysis of Micro Inversion to Improve Fault Tolerance in High Spe...
IRJET- Analysis of Micro Inversion to Improve Fault Tolerance in High Spe...IRJET Journal
 
A Tale of CI Build Failures: an Open Source and a Financial Organization Pers...
A Tale of CI Build Failures: an Open Source and a Financial Organization Pers...A Tale of CI Build Failures: an Open Source and a Financial Organization Pers...
A Tale of CI Build Failures: an Open Source and a Financial Organization Pers...Sebastiano Panichella
 
Advanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesAdvanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesalmassa group
 

Similar to Profibus and Profinet system design - Andy Verwer (20)

PROFINET system design - Andy Verwer
PROFINET system design - Andy VerwerPROFINET system design - Andy Verwer
PROFINET system design - Andy Verwer
 
reliability.pdf
reliability.pdfreliability.pdf
reliability.pdf
 
Best Practices for Microsoft-Based Plant Software Address Reliability, Cost, ...
Best Practices for Microsoft-Based Plant Software Address Reliability, Cost, ...Best Practices for Microsoft-Based Plant Software Address Reliability, Cost, ...
Best Practices for Microsoft-Based Plant Software Address Reliability, Cost, ...
 
Reliability
ReliabilityReliability
Reliability
 
Ch11 reliability engineering
Ch11 reliability engineeringCh11 reliability engineering
Ch11 reliability engineering
 
Guidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFGuidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBF
 
(Modifid)condition m0nitoring of longwall face supportd
(Modifid)condition m0nitoring of longwall face supportd(Modifid)condition m0nitoring of longwall face supportd
(Modifid)condition m0nitoring of longwall face supportd
 
IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...
 
Top-Down Network DesignAnalyzing Technical Goals.docx
Top-Down Network DesignAnalyzing Technical Goals.docxTop-Down Network DesignAnalyzing Technical Goals.docx
Top-Down Network DesignAnalyzing Technical Goals.docx
 
Ch13
Ch13Ch13
Ch13
 
Lenovo High Availability Solutions Brief
Lenovo High Availability Solutions BriefLenovo High Availability Solutions Brief
Lenovo High Availability Solutions Brief
 
Ch11 - Reliability Engineering
Ch11 - Reliability EngineeringCh11 - Reliability Engineering
Ch11 - Reliability Engineering
 
Ch13-Software Engineering 9
Ch13-Software Engineering 9Ch13-Software Engineering 9
Ch13-Software Engineering 9
 
CS672 – System Engineering and Analysis Discussion 6 - 1192018.docx
CS672 – System Engineering and Analysis Discussion 6 - 1192018.docxCS672 – System Engineering and Analysis Discussion 6 - 1192018.docx
CS672 – System Engineering and Analysis Discussion 6 - 1192018.docx
 
Ch13.pptx
Ch13.pptxCh13.pptx
Ch13.pptx
 
Profibus and Profinet system design - Andy Verwer
Profibus and Profinet system design  - Andy VerwerProfibus and Profinet system design  - Andy Verwer
Profibus and Profinet system design - Andy Verwer
 
IRJET- Analysis of Micro Inversion to Improve Fault Tolerance in High Spe...
IRJET-  	  Analysis of Micro Inversion to Improve Fault Tolerance in High Spe...IRJET-  	  Analysis of Micro Inversion to Improve Fault Tolerance in High Spe...
IRJET- Analysis of Micro Inversion to Improve Fault Tolerance in High Spe...
 
A Tale of CI Build Failures: an Open Source and a Financial Organization Pers...
A Tale of CI Build Failures: an Open Source and a Financial Organization Pers...A Tale of CI Build Failures: an Open Source and a Financial Organization Pers...
A Tale of CI Build Failures: an Open Source and a Financial Organization Pers...
 
Advanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesAdvanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machines
 
Advanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesAdvanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machines
 

More from PROFIBUS and PROFINET InternationaI - PI UK

More from PROFIBUS and PROFINET InternationaI - PI UK (20)

11. PI_Ford_Dunton_IOLINK_Safety.pdf
11. PI_Ford_Dunton_IOLINK_Safety.pdf11. PI_Ford_Dunton_IOLINK_Safety.pdf
11. PI_Ford_Dunton_IOLINK_Safety.pdf
 
7. Ford_Dunton_TSN_CRM.pdf
7. Ford_Dunton_TSN_CRM.pdf7. Ford_Dunton_TSN_CRM.pdf
7. Ford_Dunton_TSN_CRM.pdf
 
6. SRCI Profibus International v2.pdf
6. SRCI Profibus International v2.pdf6. SRCI Profibus International v2.pdf
6. SRCI Profibus International v2.pdf
 
13. CEMA - AUTOMOTIVE.pdf
13. CEMA - AUTOMOTIVE.pdf13. CEMA - AUTOMOTIVE.pdf
13. CEMA - AUTOMOTIVE.pdf
 
12. PI_OPC_UK.pdf
12. PI_OPC_UK.pdf12. PI_OPC_UK.pdf
12. PI_OPC_UK.pdf
 
4. APL PI Presentation 2023.pdf
4. APL PI Presentation 2023.pdf4. APL PI Presentation 2023.pdf
4. APL PI Presentation 2023.pdf
 
10. PI_Dunton - OT Security.pdf
10. PI_Dunton - OT Security.pdf10. PI_Dunton - OT Security.pdf
10. PI_Dunton - OT Security.pdf
 
9. PA DIM presentation.pdf
9. PA DIM presentation.pdf9. PA DIM presentation.pdf
9. PA DIM presentation.pdf
 
3. Ford Dunton Mark Freeman.pdf
3. Ford Dunton Mark Freeman.pdf3. Ford Dunton Mark Freeman.pdf
3. Ford Dunton Mark Freeman.pdf
 
2. Ford_Dunton_Introductions_CRM.pdf
2. Ford_Dunton_Introductions_CRM.pdf2. Ford_Dunton_Introductions_CRM.pdf
2. Ford_Dunton_Introductions_CRM.pdf
 
PI UK Seminar (Nov 2021) - PROFINET Implementation and Testing
PI UK Seminar (Nov 2021) - PROFINET Implementation and TestingPI UK Seminar (Nov 2021) - PROFINET Implementation and Testing
PI UK Seminar (Nov 2021) - PROFINET Implementation and Testing
 
PI UK Seminar (Nov 2021) - PROFINET Design Basics
PI UK Seminar (Nov 2021) - PROFINET Design BasicsPI UK Seminar (Nov 2021) - PROFINET Design Basics
PI UK Seminar (Nov 2021) - PROFINET Design Basics
 
PI UK Seminar (Nov 2021) - PROFINET Gateways
PI UK Seminar (Nov 2021) - PROFINET GatewaysPI UK Seminar (Nov 2021) - PROFINET Gateways
PI UK Seminar (Nov 2021) - PROFINET Gateways
 
PI UK Seminar (Nov 2021) - PROFIBUS and PROFINET Device Configuration
PI UK Seminar (Nov 2021) - PROFIBUS and PROFINET Device ConfigurationPI UK Seminar (Nov 2021) - PROFIBUS and PROFINET Device Configuration
PI UK Seminar (Nov 2021) - PROFIBUS and PROFINET Device Configuration
 
PI UK Seminar (Nov 2021) - PROFINET of Things
PI UK Seminar (Nov 2021) - PROFINET of ThingsPI UK Seminar (Nov 2021) - PROFINET of Things
PI UK Seminar (Nov 2021) - PROFINET of Things
 
PI UK Seminar (Nov 2021) - Update on APL
PI UK Seminar (Nov 2021) - Update on APLPI UK Seminar (Nov 2021) - Update on APL
PI UK Seminar (Nov 2021) - Update on APL
 
PROFINET to PROFIBUS gateways - Peter Thomas - 03 june 2020
PROFINET to PROFIBUS gateways - Peter Thomas - 03 june 2020PROFINET to PROFIBUS gateways - Peter Thomas - 03 june 2020
PROFINET to PROFIBUS gateways - Peter Thomas - 03 june 2020
 
PROFIBUS lightning surge protection - Peter Thomas, CSL - 10 june 2020
PROFIBUS lightning surge protection -  Peter Thomas, CSL - 10 june 2020 PROFIBUS lightning surge protection -  Peter Thomas, CSL - 10 june 2020
PROFIBUS lightning surge protection - Peter Thomas, CSL - 10 june 2020
 
PROFINET network diagnostics and support - May 2020 - Peter Thomas
PROFINET network diagnostics and support - May 2020 - Peter ThomasPROFINET network diagnostics and support - May 2020 - Peter Thomas
PROFINET network diagnostics and support - May 2020 - Peter Thomas
 
Profinet network design webinar - Peter Thomas may 2020 - v1.0
Profinet network design webinar - Peter Thomas   may 2020 - v1.0Profinet network design webinar - Peter Thomas   may 2020 - v1.0
Profinet network design webinar - Peter Thomas may 2020 - v1.0
 

Recently uploaded

Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 

Recently uploaded (20)

Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 

Profibus and Profinet system design - Andy Verwer

  • 1. PROFIBUS and PROFINET System Design Andy Verwer, Verwer Training & Consultancy Ltd Accredited PI Training Centre PROFINET, PROFIBUS and IO-Link Seminar MTC, Coventry, 25 February 2016
  • 2. PROFIBUS & PROFINET System Design, Andy Verwer, page 2MTC, Coventry, 25 February 2016 System costs Most system designers and project managers look at the project procurement, installation and deployment costs when they price a project. However, the costs of an automation system spread over the life cycle of the plant and should include maintenance, fault- finding and health-checking. Perhaps most important is the cost in terms of loss of production should faults develop during the lifetime of the plant. Spending a little more at procurement time can repay many times over. Good fault tolerant design need not be more expensive. Sometimes fault tolerance can be achieved with just a little thought at no additional cost.
  • 3. PROFIBUS & PROFINET System Design, Andy Verwer, page 3MTC, Coventry, 25 February 2016 Life cycle costs The procurement, installation and commissioning costs are only incurred at the start of the project. Costs from device failures increase as equipment gets older. When system overhaul is undertaken this can partially reset the increasing cost of failures. System overhaul
  • 4. PROFIBUS & PROFINET System Design, Andy Verwer, page 4MTC, Coventry, 25 February 2016 Control system design Control system design normally proceeds by building on the experience obtained from previous designs. But, designs which are based on badly designed systems will be bad! Only by using experience from operations and maintenance staff can we develop good system designs. In my experience it is rare for such feedback mechanisms to be present. Particularly when design is carried out by sub- contractors. Designers need to know about mistakes that have been made in the past. Feedback from operations and maintenance is essential.
  • 5. PROFIBUS & PROFINET System Design, Andy Verwer, page 5MTC, Coventry, 25 February 2016 System costs Maximising plant availability is critical in reducing the total costs of the system. It is essential that the System Designer understands: That minimising plant down time when faults inevitably occur (i.e. maximising plant availability) is a key requirement. The impact of the network layout on plant reliability. That the incorporation of network health checking and fault finding facilities are essential. How to appropriately use features such as redundancy and network monitoring and rapid fault location and repair to improve plant availability.
  • 6. PROFIBUS & PROFINET System Design, Andy Verwer, page 6MTC, Coventry, 25 February 2016 The parts of a control system will fail whilst in service. The consequences of failures are often predictable, but the failures themselves are unpredictable. The design of a reliable control system is not simple. … and should be accompanied by analysis of how parts fail and of the consequences of these failures. Cost of failures
  • 7. PROFIBUS & PROFINET System Design, Andy Verwer, page 7MTC, Coventry, 25 February 2016 Minimising the failure footprint There are three basic ways to minimise the impact of faults: 1. Make failures less likely – Minimise the Fault Frequency. 2. Restrict the Fault Effect when failures inevitably occur. 3. Minimise the Fault Duration – Provide for rapid fault location and repair. A good network design will minimise the effect on production when inevitable failures occur. We can speak of minimising the “failure footprint”. Fault frequency Fault effect Fault duration
  • 8. PROFIBUS & PROFINET System Design, Andy Verwer, page 8MTC, Coventry, 25 February 2016 Minimising the failure footprint Understand and implement the design and installation rules. Improve reliability - use good quality well tested (certified) and reliable devices, connectors and network components. Use manufacturers who carry out burn-in testing on devices. For PROFIBUS use the lowest possible bit rate that gives the required performance. 1. How can we minimise Fault Frequency? Fault Frequency
  • 9. PROFIBUS & PROFINET System Design, Andy Verwer, page 9MTC, Coventry, 25 February 2016 Minimising the failure footprint 2. How can we minimise the Fault Effect? Analyse the effects of failures on plant operation. Use well thought out network layout and design. Think about:  Using separate networks or different masters (distributed control),  Using different segments for different parts of the process,  Dealing with common cause failures. Fault Effect
  • 10. PROFIBUS & PROFINET System Design, Andy Verwer, page 10MTC, Coventry, 25 February 2016 Minimising the failure footprint 3. How can we minimise the Fault Duration?  Provide facilities in the design for rapid fault diagnosis and fault location.  Provide in the design for device hot swapping without reconfiguration.  Use designs that allow for a quick fix.  Provide redundancy when appropriate. Needs to be well thought out!  Use standardised, vendor independent solutions rather than being locked into manufacturer specific solutions. Fault Duration
  • 11. PROFIBUS & PROFINET System Design, Andy Verwer, page 11MTC, Coventry, 25 February 2016 Minimising fault impact in design Use pluggable devices that can be removed/replaced without impinging on network operation. Use appropriate network layout and segmentation so that physical layer faults allow critical plant operation to continue in the event of failure or device replacement. Provide for rapid troubleshooting and simple fault isolation. For PROFIBUS systems use: Connector systems and layouts that do not break the bus or loose termination when disconnected. Termination solutions that allow devices to be removed or replaced. Use appropriate solutions for redundancy.
  • 12. PROFIBUS & PROFINET System Design, Andy Verwer, page 12MTC, Coventry, 25 February 2016 Reliability and availability Reliability is a measure of how a component, assembly or system will perform its intended function, without failure, for the required duration when installed and operated correctly in a specified environment. Availability is a measure of reliability indicating the fraction of time in which a device or system is expected to operate correctly. It is important to remember that reliability and availability are statistical measures: they will not predict when a particular device will fail, only the expected rate based on average performance of a batch of test devices or on past performance.
  • 13. PROFIBUS & PROFINET System Design, Andy Verwer, page 13MTC, Coventry, 25 February 2016 Some definitions Mean Time Between Failures (MTBF) is the expected or average time that a device will be free of failure. Typical MTBF for a well designed and manufactured electronic device might be 10 to 20 years. Mean Time To Repair (MTTR), is the time taken to repair a failed device. In an operational system, MTTR generally means time to detect the failure, diagnose and locate the problem and replace the failed part.
  • 14. PROFIBUS & PROFINET System Design, Andy Verwer, page 14MTC, Coventry, 25 February 2016 Availability Availability can be calculated from MTBF and MTTR: MTTRMTBF MTBF ty,Availabili  A Remember that availability is a statistical measure and represents an average probability of being in operation. There is little point in trying to be accurate with these figures since actual failures are unpredictable. Availability is typically specified in “nines notation”. For example 3-nines availability corresponds to 99.9% availability. A 5-nines availability corresponds to 99.999% availability.
  • 15. PROFIBUS & PROFINET System Design, Andy Verwer, page 15MTC, Coventry, 25 February 2016 Availability, A D = (1-A) Downtime 0.9 = 90% (1-nine) 0.1 (10-1) 36.5 days/year 0.99 = 99% (2-nines) 0.01 (10-2) 3.7 days/year 99.9% (3-nines) 0.001 (10-3) 8.8 hours/year 99.99% (4-nines) 0.0001 (10-4) 53 minutes/year 99.999% (5-nines) 0.00001 (10-5) 5 minutes/year 99.9999% (6-nines) 0.000001 (10-6) 5 minutes/10years 99.99999% (7-nines) 0.0000001 (10-7) Not feasible! 99.999999% (8-nines) 0.00000001 (10-8) Impossible! Downtime is an alternative way of understanding the availability: MTTRMTBF MMTR AD   )1(Downtime, Availability and downtime Normalrange forautomation
  • 16. PROFIBUS & PROFINET System Design, Andy Verwer, page 16MTC, Coventry, 25 February 2016 Availability and downtime Note that the availability of a device can be improved by decreasing the MTTR. This can be accomplished in several ways: Faster detection and location of faults. (Accomplished by diagnostic reporting facilities, availability of fault finding tools and training of maintenance personnel). Faster repair of the fault. (Accomplished by availability of spares and all of the above). Fault tolerant design.
  • 17. PROFIBUS & PROFINET System Design, Andy Verwer, page 17MTC, Coventry, 25 February 2016 Example Consider a remote IO unit with a MTBF of 10 years. When the device fails, it could take several days to recognise, diagnose and locate the fault. And then, if not held as a spare, several more days to obtain a replacement. The MTTR could be one week, giving an availability of: 998.0 73650 3650 736510 36510         MTTRMTBF MTBF A That is approximately 3-nines availability, or a downtime of about 16 hours/year. Consider the availability when the MTTR is reduced to ½ day: 0.99986 5.036510 36510    A The availability is now 4-nines and the downtime has reduced to about 1hour/year.
  • 18. PROFIBUS & PROFINET System Design, Andy Verwer, page 18MTC, Coventry, 25 February 2016 Reliability modelling The system designer must understand the methods of modelling and analysis of reliability and availability in systems. In particular how system availability can be predicted from the individual parts. Also understand how standby systems, redundant solutions and common cause failures impact the overall system reliability. We often find that redundancy is inappropriately used and sometimes results in no real improvement in system availability. Careful network layout can have a major effect on the fault footprint and significantly improve the overall availability of the plant.
  • 19. PROFIBUS & PROFINET System Design, Andy Verwer, page 19MTC, Coventry, 25 February 2016 Standby and redundant systems We often see standby or redundant systems used to try to improve plant availability. Here we have two or more devices working in parallel. Should a fault occur in the operational device then the standby device can take over. The switch over can be manually activated or can be automatic. The switching time should be considered when estimating the overall system availability. This scheme achieves high availability because the system function is maintained whilst repairing the failed device.
  • 20. PROFIBUS & PROFINET System Design, Andy Verwer, page 20MTC, Coventry, 25 February 2016 Multiple controller systems Multiple PROFIBUS masters or PROFINET controllers with automatic duty-standby switching are available from a number of suppliers. These can drive different networks to provide redundancy down to the field level. However, separate power supply and network cable routing are advisable to minimise common- cause failures. Sometimes dual slaves can be used in the field with a simple “wired-OR” voting system driving the final actuator or connecting two redundant sensors. However, more often we find such redundant controllers are using the same field devices and actuators. Such systems must be carefully designed, taking account of the consequences of all possible failures.
  • 21. PROFIBUS & PROFINET System Design, Andy Verwer, page 21MTC, Coventry, 25 February 2016 Redundancy solutions for PROFIBUS Solutions for redundant PROFIBUS cabling are available from many manufacturers: Siemens Y-Link PROCENTEC ProfiHubs ABB Redundancy Link Module Moor-Hawke Redundancy for PA COMbricks modules
  • 22. PROFIBUS & PROFINET System Design, Andy Verwer, page 22MTC, Coventry, 25 February 2016 Slave with integrated redundancy Y Slave 4 Slave 3A Slave 3B Mechanically combined outputs Redundant slaves Wired OR outputs Slave 2A Slave 2B Y Redundant masters Master B Y Redundancy solutions for PROFIBUS Properly designed redundant solutions can provide robustness against a wide selection of faults and conditions. Master A Redundant cables PSU A PSU B Redundant power supplies Y Slave 1 Redundant links or hubs Y
  • 23. PROFIBUS & PROFINET System Design, Andy Verwer, page 23MTC, Coventry, 25 February 2016 PROFINET system layout PROFINET systems can be laid out in a number of ways: Star and tree topologies using switches: Line topology using two-port devices: Or a combination of both. Switches
  • 24. PROFIBUS & PROFINET System Design, Andy Verwer, page 24MTC, Coventry, 25 February 2016 PROFINET system layout There is a clear advantage of the star topology in terms of system availability in that any device can be replaced without affecting the other devices. However, the system cost will be significantly greater because of the number of switches required. The line topology is much lower cost, because separate switches are not required. But removal or replacement of any device will cause all downstream devices to fail.
  • 25. PROFIBUS & PROFINET System Design, Andy Verwer, page 25MTC, Coventry, 25 February 2016 Redundancy solutions for PROFINET One of the big advantages of PROFINET is that it incorporates a specification for media redundancy. The standardised Media Redundancy Protocol (MRP) provides manufacturer independent redundancy which can be used over copper or fibre cables. PROFINET redundancy can provide: • Controller redundancy. • Transmission media and switch redundancy. • IO device redundancy. Redundant PROFINET systems are relatively easy to implement and can be used across different manufacturers.
  • 26. PROFIBUS & PROFINET System Design, Andy Verwer, page 26MTC, Coventry, 25 February 2016 PROFINET redundancy Standardised Media Redundancy Protocol (MRP) can be used on PROFINET systems to give media redundancy. IO Controller with MRP IO Devices with MRP Switch with MRP IO Device without MRP But the system must still be properly designed, considering all possible failures and their likelihood. Common cause failures must be properly dealt with.
  • 27. PROFIBUS & PROFINET System Design, Andy Verwer, page 27MTC, Coventry, 25 February 2016 Other ways to improve availability The careful design of networked systems can improve their availability. In particular by organising the system so that selected parts of the system can be independently shut down for maintenance without affecting the remaining production. A simple example of this is seen with streamed production. A stream can be taken out of service without affecting the other stream. But only if the system design allows this. Process 1 Process 2 Process 3 Stream A Process 1 Process 2 Process 3 Stream B
  • 28. PROFIBUS & PROFINET System Design, Andy Verwer, page 28MTC, Coventry, 25 February 2016 Automation islands or units The concept of dividing the plant into Automation Islands or Automation Units is well established. Each automation unit is considered as being functionally separated from the rest of the plant so allowing it to operate (and to be shut down) independently. A good network design will facilitate the isolation of these automation units using: • Different controllers; • Different networks or subnetworks; • Segmentation. Careful choice of various architectures for automation units is a key stage in the design process which can impact on the overall reliability and maintainability of the control system.
  • 29. PROFIBUS & PROFINET System Design, Andy Verwer, page 29MTC, Coventry, 25 February 2016 Certified System Design course A new Certified PROFIBUS System Design course was developed last year and is fully accredited by PI. This 3-day training course is suitable for managers, designers and engineers who are involved in the planning, specification, design and procurement of PROFIBUS systems. The course covers the optimum design both DP and PA systems for availability and maintenance. The 1-day Certified PROFIBUS Installer course is an essential pre-requisite which is normally run together with the design course making 4-days of training. The course is also available for cost-effective on-site delivery for between 6 and 12 people.
  • 30. PROFIBUS & PROFINET System Design, Andy Verwer, page 30MTC, Coventry, 25 February 2016 Training Certified PROFIBUS and PROFINET training including the new Certified PROFIBUS System Design course is available from the UK’s accredited training centres: PROFIBUS International Competence Centre Manchester Metropolitan University. in Manchester, or a location of your choice. (www.sci-eng.mmu.ac.uk/ascent/). PROFIBUS International Training Centre Verwer Training & Consultancy Ltd In Manchester or on-site. (www.VerwerTraining.com)