TANK BATTERY PROTECTION
optimizing and standardizing lightning and static protection
systems for production and saltwater disposal facilities
1
2
ABOUT PETRO GUARDIAN
Our team has been providing lightning and static protection to
the Oil & Gas industry for more than 20 years.
We are the industry leader in protecting Production and SWD
facilities from risk of fire and damage caused by lightning or
static discharge.
3
THE INDUSTRY CHALLENGE
>> Appropriate Lightning and Static Protection is often
overlooked in facility design.
>> Without a standardized practice, protection efforts are often
a knee jerk reaction to a recent loss.
4
A PROACTIVE APPROACH
>> Based on national and international standards
>> Provides a construction blueprint
>> Standardizes specifications for design, installation,
inspection, and maintenance
>> Applies to new or susceptible locations
>> Annual inspection & preventative maintenance program
5
THE RISKS
kk
>> Injury
>> Tank Battery Fire
>> Truck Fire
>> Equipment & Product Loss
>> Downtime
>> Automation Loss
>> Cleanup Expense
6
6 MAIN DAMAGES
OF A LIGHTNING OR STATIC DISCHARGE
Tank Battery Fire
Failure of Electrical,
Electronics &
Communication
Spill That Causes
Environmental Pollution
Thief Hatch Fire
Lined Steel, Fiberglass &
Poly Chemical Tank Fire
Truck Fire
7
6 CAUSES OF DAMAGE
FROM A LIGHTNING OR STATIC DISCHARGE
Direct Lightning Strike
to Tank Battery
Direct Lightning Strike
to Power Transmission
Line
Nearby Lightning Strike
to Tank Battery
Static Discharge at
Thief hatch
Static Discharge within
Lined Steel, Fiberglass &
Polychemical Tanks
Static Discharge from
Truck to Loadout
kk
8
PROBABILITY FOR
RISK PER EVENT
60%-70% Indirect Lightning
Strike
15%-25% Internal Static
Discharge
10%-20% Direct Lightning
Strike
9
SAMPLE STRIKE DATA PLOT
FOR 15 MILE RADIUS
10
SAMPLE STRIKE DATA PLOT
FOR 15 MILE RADIUS
11
There are standards, that when applied correctly,
will greatly reduce risk
>> API Standards for Protecting Tanks
>> IEEE Standards for Protecting Electronics
>> NFPA Standards for Lightning Protection and Static
Mitigation
MITIGATING RISKS
12
Do you have a combined lightning and static protection
standard for tank batteries?
If so, when was it last reviewed?
Have you assembled a team to maintain your standard?
Main Menu
ESTABLISHING A STANDARD
kk
14
>> Help create a Lightning
and Static Protection
Standard, engineer & inspect
>> Permian installation crews
are at the ready to help
protect your facilities
PETRO GUARDIAN
CAPABILITIES
15
Why should you do business with us?
Field experience – over 35,000 tanks protected
MSAs with most of the major shale operators
Proven effective protection
THE PETRO GUARDIAN DIFFERENCE
PETRO GUARDIAN PROTECTION PLAN
16
STATIC PROTECTION LIGHTNING STRIKE
PROTECTION
LIGHTNING SURGE
PROTECTION
TRUCK LOAD OUT STEEL TANK MAIN PANEL
THIEF HATCH FIBERGLASS TANK VFD PANEL
LINED STEEL & FRP TANK PROCESS VESSELS BRANCH PANEL
POLYCHEMICAL TANK SCADA TOWER BATTERY PANEL
GROUNDING & BONDING BACKBONE PLC PANEL
TURNKEY INSTALLATION TANK GAUGE
ANNUAL INSPECTION & PREVENTATIVE MAINTENANCE
PETRO GUARDIAN PROTECTION PLAN
FACILITY GROUNDING & BONDING
FIBERGLASS TANK STATIC PROTECTION
TRUCK LOAD OUT STATIC PROTECTION
THIEF HATCH STATIC PROTECTION
POLY CHEMICAL TANK STATIC PROTECTION
FIBERGLASS TANK LIGHTNING PROTECTION
STEEL TANK LIGHTNING PROTECTION
SCADA TOWER LIGHTNING PROTECTION
MAIN PANEL LIGHTNING PROTECTION
BRANCH PANEL LIGHTNING PROTECTION
VFD PANEL LIGHTNING PROTECTION
BATTERY PANEL LIGHTNING PROTECTION
CONTROL PANEL LIGHTNING PROTECTION
TANK GAUGE LIGHTNING PROTECTION
INSPECTIONS FOR
LIGHTNING & STATIC PROTECTION SYSTEM
33
CONTACT & QUESTIONS
985.882.2985
sales@petroguardian.com

More Related Content

Similar to Lightning & Static Tank Battery Protection

Key Features of MIR.1200 (AES-2006) design and current stage of Leningrad NP...
Key Features of MIR.1200 (AES-2006) design and current stage of  Leningrad NP...Key Features of MIR.1200 (AES-2006) design and current stage of  Leningrad NP...
Key Features of MIR.1200 (AES-2006) design and current stage of Leningrad NP...
myatom
 
Merix Def Aero Oct08 A
Merix Def Aero Oct08 AMerix Def Aero Oct08 A
Merix Def Aero Oct08 A
Rich Suriani
 
Merix Def Aero Oct08 A
Merix Def Aero Oct08 AMerix Def Aero Oct08 A
Merix Def Aero Oct08 A
guest41dd72
 
Оverview АР1000 reduced
Оverview АР1000 reducedОverview АР1000 reduced
Оverview АР1000 reduced
Ilona Zayets
 
Field Services overview for Marine applications
Field Services overview for Marine applicationsField Services overview for Marine applications
Field Services overview for Marine applications
Anton Svinenkov
 

Similar to Lightning & Static Tank Battery Protection (20)

Guest speaker presentation at 'Seminar Offshore Wind Energy' UGent – June 201...
Guest speaker presentation at 'Seminar Offshore Wind Energy' UGent – June 201...Guest speaker presentation at 'Seminar Offshore Wind Energy' UGent – June 201...
Guest speaker presentation at 'Seminar Offshore Wind Energy' UGent – June 201...
 
6 choices 2015 BDC only
6 choices 2015 BDC only6 choices 2015 BDC only
6 choices 2015 BDC only
 
Onr nr-ar-17-021
Onr nr-ar-17-021Onr nr-ar-17-021
Onr nr-ar-17-021
 
ABB Contact 3/13 - Southern Gulf and Pakistan
ABB Contact 3/13 - Southern Gulf and PakistanABB Contact 3/13 - Southern Gulf and Pakistan
ABB Contact 3/13 - Southern Gulf and Pakistan
 
Arc flash analysis and electrical hazards
Arc flash analysis and electrical hazardsArc flash analysis and electrical hazards
Arc flash analysis and electrical hazards
 
Ex Products - nuovo
Ex Products - nuovoEx Products - nuovo
Ex Products - nuovo
 
Key Features of MIR.1200 (AES-2006) design and current stage of Leningrad NP...
Key Features of MIR.1200 (AES-2006) design and current stage of  Leningrad NP...Key Features of MIR.1200 (AES-2006) design and current stage of  Leningrad NP...
Key Features of MIR.1200 (AES-2006) design and current stage of Leningrad NP...
 
Newson Gale Bond Rite Clamp
Newson Gale Bond Rite ClampNewson Gale Bond Rite Clamp
Newson Gale Bond Rite Clamp
 
KPX Promotionnal Catalogue
KPX Promotionnal CatalogueKPX Promotionnal Catalogue
KPX Promotionnal Catalogue
 
Cable Assembly Capabilities
Cable Assembly CapabilitiesCable Assembly Capabilities
Cable Assembly Capabilities
 
LFUS_AEB_Battery_Protection_Disconnect_Spotlight.pdf
LFUS_AEB_Battery_Protection_Disconnect_Spotlight.pdfLFUS_AEB_Battery_Protection_Disconnect_Spotlight.pdf
LFUS_AEB_Battery_Protection_Disconnect_Spotlight.pdf
 
Design Considerations for Lithium Batteries Used in Portable Devices
Design Considerations for Lithium Batteries Used in Portable DevicesDesign Considerations for Lithium Batteries Used in Portable Devices
Design Considerations for Lithium Batteries Used in Portable Devices
 
Suraksha Jagriti.pptx
Suraksha Jagriti.pptxSuraksha Jagriti.pptx
Suraksha Jagriti.pptx
 
GeoThermLtd-The_Report_Magazine_article_Rig_IR_Window_retrofit_June2020.pdf
GeoThermLtd-The_Report_Magazine_article_Rig_IR_Window_retrofit_June2020.pdfGeoThermLtd-The_Report_Magazine_article_Rig_IR_Window_retrofit_June2020.pdf
GeoThermLtd-The_Report_Magazine_article_Rig_IR_Window_retrofit_June2020.pdf
 
MC _ CP Rev.0.pdf
MC _ CP Rev.0.pdfMC _ CP Rev.0.pdf
MC _ CP Rev.0.pdf
 
h&k ventures llc silicon valley wac 2021 - sept 22 2021 - ver 1.2
h&k ventures llc silicon valley   wac 2021 - sept 22 2021 - ver 1.2h&k ventures llc silicon valley   wac 2021 - sept 22 2021 - ver 1.2
h&k ventures llc silicon valley wac 2021 - sept 22 2021 - ver 1.2
 
Merix Def Aero Oct08 A
Merix Def Aero Oct08 AMerix Def Aero Oct08 A
Merix Def Aero Oct08 A
 
Merix Def Aero Oct08 A
Merix Def Aero Oct08 AMerix Def Aero Oct08 A
Merix Def Aero Oct08 A
 
Оverview АР1000 reduced
Оverview АР1000 reducedОverview АР1000 reduced
Оverview АР1000 reduced
 
Field Services overview for Marine applications
Field Services overview for Marine applicationsField Services overview for Marine applications
Field Services overview for Marine applications
 

Recently uploaded

Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
Kira Dess
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
IJECEIAES
 

Recently uploaded (20)

analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 

Lightning & Static Tank Battery Protection