REV. 0
12” LINE EXTENSION ENGINEERING DESIGN
CALCULATION REPORT OF CATHODIC
PROTECTION SYSTEM
11-04-2019 0 SENT FOR APPROVAL C. Vázquez
P. Márquez/
M. Guzmán
R. Balderaz
DATE REV. N° REASON FOR REVISION PREPARED CHECKED APPD. APPD.
DOCUMENT NUMBER : CMP-LE-001 JOB NUMBER:
CALCULATION REPORT OF
CATHODIC PROTECTION SYSTEM
Sideline Testing LCC
DATE: 11/04/2019
PAGE: 2 of 12
REV. 0
Disclaimer
While all efforts have been made to exercise due care and caution, Sideline Testing LLC cannot
assume any liability for damage, injury (personnel or plant), leakage, loss of containment,
environmental damage, remediation or the like associated with the subject pipeline. It is
understood by all parties that the measurement techniques used and discussed in this report are
non-invasive, and as such never made actual physical damage with the subject pipeline. As a
result, the data provided may not be indicative of actual pipeline condition and are deductive in
nature. All recommendations are based upon similar experience, standard industry methods
and best engineering practice.
CALCULATION REPORT OF
CATHODIC PROTECTION SYSTEM
Sideline Testing LCC
DATE: 11/04/2019
PAGE: 3 of 12
REV. 0
CONTENTS
LIST OF FIGURES.........................................................................................................4
LIST OF TABLES ..........................................................................................................4
1. OBJECTIVE............................................................................................................5
2. SCOPE OF WORK .................................................................................................5
3. ENGINEERING AND CONSTRUCTION PROJECT OF THE CATHODIC
PROTECTION SYSTEM ................................................................................................5
4. REFERENCE DOCUMENTS................................................................................10
5 CONCLUSIONS AND RECOMENDATIONS........................................................10
CALCULATION REPORT OF
CATHODIC PROTECTION SYSTEM
Sideline Testing LCC
DATE: 11/04/2019
PAGE: 4 of 12
REV. 0
LIST OF FIGURES
Figure 1. Location of anodic beds along the new and existing pipeline................ 11
Figure 2. Typical multiple galvanic anode installation........................................... 12
LIST OF TABLES
Table 1. General information of the pipeline. .......................................................... 6
Table 2. Soil resistivity vs. Degree of Corrosivity .................................................... 7
Table 3. Anode properties....................................................................................... 7
CALCULATION REPORT OF
CATHODIC PROTECTION SYSTEM
Sideline Testing LCC
DATE: 11/04/2019
PAGE: 5 of 12
REV. 0
1. OBJECTIVE
To develop a basic detailed engineering based on instructions and standards that
integrates the technical support for the design and installation of the cathodic
protection system for the project 12 "Line Extension Engineering Design.
2. SCOPE OF WORK
 Design a cathodic protection system by vertical magnesium galvanic
anodes.
 Sheet of calculations.
 Elaboration of drawing with specifications for the installation of the cathodic
protection system including Bill of Materials.
3. ENGINEERING AND CONSTRUCTION PROJECT OF THE CATHODIC
PROTECTION SYSTEM
3.1 GENERAL CONSIDERATIONS
 The type of cathodic protection system was considered by Galvanic
Anodes.
 Once the cathodic protection system was installed the minimum pipeline
potential shall be -0.85 volts with referenced to a saturated copper/copper
sulfate electrode.
 The cathodic protection system is designed for 30 years of life.
 A 0.9% coating damage was considered to determinate the total external
surface area of the pipeline to be protected. It was determined based on the
type of coating and the design life of the system.
 The soil resistivity considered was 500 ohm-cm, along the right of way of
the pipeline. The soil resistivity was considered very corrosive in order to
design in a conservatively way.
CALCULATION REPORT OF
CATHODIC PROTECTION SYSTEM
Sideline Testing LCC
DATE: 11/04/2019
PAGE: 6 of 12
REV. 0
Table 1. General information of the pipeline.
Pipeline ID: 12” LINE EXTENSION ENGINEERING DESIGN
Company: Laredo ENERGY
Diameter: 12 inches
Thickness: 0.375 inches
Length: 1.545 miles
Type of Coating: 3 layer polyethylene
3.2 OBJECTIVES
 Determine the total external surface area to protect.
 Determine the current requirement for an adequate cathodic protection.
 Select the type and size of the galvanic anodes.
 Calculate the quantity of galvanic anodes required.
 Calculate the anode bed to the earth resistance.
 Calculate the current output from the anode.
 Determinate the anode life.
 Distribute in a uniform way the anodes along the ROW of the pipeline.
3.3 DESIGN BASIS
Cathodic protection has been used for the effective control of external corrosion of
submerged or buried metallic structures. For galvanic anode CP systems, the
anode of the electrochemical cell is a casting of an electrochemically active alloy
(normally aluminum, zinc or magnesium based). This anode is also the current
source for the CP system and will be consumed. Accordingly, it is often referred to
as a “sacrificial anode”, as alternative to the term “galvanic anode”. The galvanic
anodes protection consists in electrically joining the metal structure that it is about
protecting with a more electronegative metal than the steel buried in the same
electrolyte. The existence of the electrolyte is completely essential, which
completes the system for the process.
CALCULATION REPORT OF
CATHODIC PROTECTION SYSTEM
Sideline Testing LCC
DATE: 11/04/2019
PAGE: 7 of 12
REV. 0
3.4 SOIL RESISTIVITY
The soil considered for the design of the cathodic protection system was 500 ohm-
cm, considering a very corrosive soil along the ROW of the pipeline, according the
Table 2.
Table 2. Soil resistivity vs. Degree of Corrosivity
Soil Resistivity Degree of corrosivity
0-500 Very Corrosive
500-1000 Corrosive
1,000-2,000 Moderately corrosive
2,000-10,000 Mildly corrosive
Above 10,000 Negligible
3.5 CALCULATIONS
- CURRENT OUTPUT FROM THE ANODE
Current Output for One Anode
I = Current output of one anode in amps 0.363
Ec = Cathode potential in volts (potential to which
the pipe is to be polarized)
-0.85
Ea = Anode potential in volts -1.55
Ra = Groundbed resistance in ohms 1.93
Table 3. Anode properties
H-1 Alloy Cast Magnesium Anode
Current density 3.25 mA/ft²
Dimension 5 x 5 x 21 inches
Theoretical Amp Year per Pound 0.116 Amp-yr/lb
Potential with ref to CuSO4 -1.55 volts
Electrochemical capacity of Anode 500 Amp-hour/lb
Current Efficiency (%) 50
Weight of anode 32 lbs
Utilization 0.85
CALCULATION REPORT OF
CATHODIC PROTECTION SYSTEM
Sideline Testing LCC
DATE: 11/04/2019
PAGE: 8 of 12
REV. 0
- ANODE LIFE
ANODE LIFE
V = Life in years. 4.34
C = Theoretical Amp Year per Pound 0.116
P = Anode weight in lbs 32
R = Efficiency 0.50
U = Utilization 0.85
I = Current output of the anode in amps 0.363
- SURFACE AREA TO PROTECT
TOTAL EXTERNAL SURFACE TO PROTECT
AB = surface area in sq. ft. 245.07
f = coating damage factor 0.009
π = 3.1416 3.1416
D = Diameter in ft. 1.0625
L = lenght in ft. 8157.6
- CURRENT REQUIREMENT
CURRENT REQUIREMENT
I = current requirement in amps 0.80
AB = surface area in sq.ft. 245.07
ID = current density in mA/sq.ft. 3.25
CALCULATION REPORT OF
CATHODIC PROTECTION SYSTEM
Sideline Testing LCC
DATE: 11/04/2019
PAGE: 9 of 12
REV. 0
- REQUIRED ANODIC MASS
MASA ANÓDICA REQUERIDA
W = total wegiht of required anodic mass in lbs 454
I = current requirement in amps 0.80
DR = Anode consumption lbs/yer 19
DL = CP system design life in years) 30
- NUMBER OF REQUIRED ANODES
NUMBER OF REQUIRED ANODES
N = Number of required anodes 14
W = total weight of required anodic mass in lbs 454
WA = weight of one anode in lbs 32
- GROUND BED RESISTANCE
Ground bed Resistance for Multiple Vertical Anodes in Parallel
(Sunde’sFormula)
R = resistance in ohms 1.93
ρ = soil resitivity in ohm-cm 500
L = anode lenght in feet 1.75
d = anode diameter in feet 0.417
S = anode spacing in feet 13
N = number of anodes 2
*ln is the natural logarithm function
CALCULATION REPORT OF
CATHODIC PROTECTION SYSTEM
Sideline Testing LCC
DATE: 11/04/2019
PAGE: 10 of 12
REV. 0
4. REFERENCE DOCUMENTS
The documents listed below are an integral part of the calculation report.
 Control of Pipeline Corrosion, A.W. Peabody Edited by R. L. Binchetti.
 Cathodic Protection Survey Procedures, Second Edition, W. Brian
Holtsbaum.
 CP-1 Cathodic Protection Tester Course manual, NACE International.
 CP-2 Cathodic Protection Technician Course manual, NACE International.
 CP-3 Cathodic Protection Technologist Course manual, NACE
International.
APPLICABLE CODES & STANDARDS
• NACE SP 0169 Control of External Corrosion on Underground or
Submerged Metallic Piping Systems
• ISO 15589-1:2015. Petroleum, petrochemical and natural gas industries –
Cathodic protection of pipeline systems - Part 1: On-land pipelines.
5. CONCLUSIONS AND RECOMENDATIONS
It is recommended to install seven anodic beds along the right of way uniformly
distributed, located as follows in progressive mileage, see Figure 1 for more
details:
- Bed 1, mile 0.85, two vertical galvanic anodes. The progressive mileage is
considered from the zero in the interconnection point with the new pipeline to
the end of the existing pipeline.
- Bed 2, mile 0.59, two vertical galvanic anodes. The progressive mileage is from
the zero in the interconnection point with the new pipeline to the end of the
existing pipeline.
- Bed 3, mile 0.33, two vertical galvanic anodes. The progressive mileage is from
the zero in the interconnection point with the new pipeline to the end of the
existing pipeline.
- Bed 4, mile 0.08, two vertical galvanic anodes. The progressive mileage is from
the zero in the interconnection point with the new pipeline to the end of the
existing pipeline.
CALCULATION REPORT OF
CATHODIC PROTECTION SYSTEM
Sideline Testing LCC
DATE: 11/04/2019
PAGE: 11 of 12
REV. 0
- Bed 5, mile 0.176, two vertical galvanic anodes. The progressive mileage is
from the zero in the interconnection point with the existing pipeline to the end of
the new pipeline.
- Bed 6, mile 0.43, two vertical galvanic anodes. The progressive mileage is from
the zero in the interconnection point with the existing pipeline to the end of the
new pipeline.
- Bed 7, mile 0.68, two vertical galvanic anodes. The progressive mileage is from
the zero in the interconnection point with the existing pipeline to the end of the
new pipeline.
Figure 1. Location of anodic beds along the new and existing pipeline.
The anodes should be H-1 Alloy Cast Magnesium Anodes, 32 lbs. in weight and
will be buried at a depth equal to or greater than the pipeline depth and should be
separated at a minimum distance of 10 feet from the axis of the pipeline, the
spacing between anodes should be 10 feet at least. The connection of the
HMWPE 12 AWG Cathodic protection cable from the anode to the pipeline must
be joined by exothermic welding and shall be properly insulated. A test station
should be placed in each anodic bed for potential reading in order to determine
effectiveness of the cathodic protection system.
CALCULATION REPORT OF
CATHODIC PROTECTION SYSTEM
Sideline Testing LCC
DATE: 11/04/2019
PAGE: 12 of 12
REV. 0
Figure 2. Typical multiple galvanic anode installation.

More Related Content

Similar to 12” Pipeline Cathodic Protection Design

Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Audubon Engineering Company
 
Corrosion Assessment – Half-Cell Potential Method for reinforced concrete
Corrosion Assessment – Half-Cell Potential Method for reinforced concreteCorrosion Assessment – Half-Cell Potential Method for reinforced concrete
Corrosion Assessment – Half-Cell Potential Method for reinforced concreteYash Shah
 
Presentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsPresentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsMahesh Chandra Manav
 
Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Mahesh Chandra Manav
 
cathodic protection SYSTEME -190126162306.pdf
cathodic protection SYSTEME -190126162306.pdfcathodic protection SYSTEME -190126162306.pdf
cathodic protection SYSTEME -190126162306.pdfBadi36
 
(cathodic protection)
(cathodic protection) (cathodic protection)
(cathodic protection) Mohamed Safwat
 
Corrosion control
Corrosion controlCorrosion control
Corrosion controlDuy Vu
 
Impact of economical cable conductor sizing
Impact of economical cable conductor sizingImpact of economical cable conductor sizing
Impact of economical cable conductor sizingLeonardo ENERGY
 
Marine cathodic protection.
Marine cathodic protection.Marine cathodic protection.
Marine cathodic protection.Muzzamil Eatoo
 
MEMS Chip for capturing single cells and recording ion channel currents
MEMS Chip for capturing single cells and recording ion channel currentsMEMS Chip for capturing single cells and recording ion channel currents
MEMS Chip for capturing single cells and recording ion channel currentsIowa State University
 
Ac corrosion-booklet-44-pagg
Ac corrosion-booklet-44-paggAc corrosion-booklet-44-pagg
Ac corrosion-booklet-44-paggHarry Mg
 
Corrosion Control Project
Corrosion Control ProjectCorrosion Control Project
Corrosion Control ProjectDil Nawaz
 
M 503 cathodic protection
M 503 cathodic protectionM 503 cathodic protection
M 503 cathodic protectionHedi Mohamed
 
Axios bridge final-english
Axios bridge  final-englishAxios bridge  final-english
Axios bridge final-englishChris Rodopoulos
 
64132673-Cathodic-Protection- diseños-Design.ppt
64132673-Cathodic-Protection- diseños-Design.ppt64132673-Cathodic-Protection- diseños-Design.ppt
64132673-Cathodic-Protection- diseños-Design.pptomar681193
 
Revernsi ke 14 b.ingrs edit
Revernsi ke 14   b.ingrs editRevernsi ke 14   b.ingrs edit
Revernsi ke 14 b.ingrs editAchmad Zaim
 
Building lightning protection for Metro Railway
Building lightning protection for Metro RailwayBuilding lightning protection for Metro Railway
Building lightning protection for Metro RailwaySubhendu Bikash Santra
 

Similar to 12” Pipeline Cathodic Protection Design (20)

Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
 
Kaizenreport
KaizenreportKaizenreport
Kaizenreport
 
Corrosion Assessment – Half-Cell Potential Method for reinforced concrete
Corrosion Assessment – Half-Cell Potential Method for reinforced concreteCorrosion Assessment – Half-Cell Potential Method for reinforced concrete
Corrosion Assessment – Half-Cell Potential Method for reinforced concrete
 
Presentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsPresentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lps
 
Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)
 
Cathodic protection
Cathodic protectionCathodic protection
Cathodic protection
 
cathodic protection SYSTEME -190126162306.pdf
cathodic protection SYSTEME -190126162306.pdfcathodic protection SYSTEME -190126162306.pdf
cathodic protection SYSTEME -190126162306.pdf
 
(cathodic protection)
(cathodic protection) (cathodic protection)
(cathodic protection)
 
Corrosion control
Corrosion controlCorrosion control
Corrosion control
 
Galvanic cp design
Galvanic cp designGalvanic cp design
Galvanic cp design
 
Impact of economical cable conductor sizing
Impact of economical cable conductor sizingImpact of economical cable conductor sizing
Impact of economical cable conductor sizing
 
Marine cathodic protection.
Marine cathodic protection.Marine cathodic protection.
Marine cathodic protection.
 
MEMS Chip for capturing single cells and recording ion channel currents
MEMS Chip for capturing single cells and recording ion channel currentsMEMS Chip for capturing single cells and recording ion channel currents
MEMS Chip for capturing single cells and recording ion channel currents
 
Ac corrosion-booklet-44-pagg
Ac corrosion-booklet-44-paggAc corrosion-booklet-44-pagg
Ac corrosion-booklet-44-pagg
 
Corrosion Control Project
Corrosion Control ProjectCorrosion Control Project
Corrosion Control Project
 
M 503 cathodic protection
M 503 cathodic protectionM 503 cathodic protection
M 503 cathodic protection
 
Axios bridge final-english
Axios bridge  final-englishAxios bridge  final-english
Axios bridge final-english
 
64132673-Cathodic-Protection- diseños-Design.ppt
64132673-Cathodic-Protection- diseños-Design.ppt64132673-Cathodic-Protection- diseños-Design.ppt
64132673-Cathodic-Protection- diseños-Design.ppt
 
Revernsi ke 14 b.ingrs edit
Revernsi ke 14   b.ingrs editRevernsi ke 14   b.ingrs edit
Revernsi ke 14 b.ingrs edit
 
Building lightning protection for Metro Railway
Building lightning protection for Metro RailwayBuilding lightning protection for Metro Railway
Building lightning protection for Metro Railway
 

More from Pedro Marquez

DSP-LE-001 Datasheet PSV.pdf
DSP-LE-001 Datasheet PSV.pdfDSP-LE-001 Datasheet PSV.pdf
DSP-LE-001 Datasheet PSV.pdfPedro Marquez
 
CP 200 Drawing Rev.0 Model (1).pdf
CP 200 Drawing Rev.0 Model (1).pdfCP 200 Drawing Rev.0 Model (1).pdf
CP 200 Drawing Rev.0 Model (1).pdfPedro Marquez
 
Pirolisis continua opcion 1
Pirolisis continua opcion 1Pirolisis continua opcion 1
Pirolisis continua opcion 1Pedro Marquez
 
Evaluation of gas handling capacity of the ellen east gas gathering system (5)
Evaluation of gas handling capacity of the ellen east gas gathering system (5)Evaluation of gas handling capacity of the ellen east gas gathering system (5)
Evaluation of gas handling capacity of the ellen east gas gathering system (5)Pedro Marquez
 
Plant view pig launcher trap_pll-le-001_rev 00 (1)
Plant view pig launcher trap_pll-le-001_rev 00 (1)Plant view pig launcher trap_pll-le-001_rev 00 (1)
Plant view pig launcher trap_pll-le-001_rev 00 (1)Pedro Marquez
 
Icda mx line mrpl_multiphase flow modeling report draft 1.0
Icda mx line mrpl_multiphase flow modeling report draft 1.0Icda mx line mrpl_multiphase flow modeling report draft 1.0
Icda mx line mrpl_multiphase flow modeling report draft 1.0Pedro Marquez
 
Id88 okereke nu_updated_211014
Id88 okereke nu_updated_211014Id88 okereke nu_updated_211014
Id88 okereke nu_updated_211014Pedro Marquez
 
Dti a-502-pb-2-rev-a
Dti a-502-pb-2-rev-aDti a-502-pb-2-rev-a
Dti a-502-pb-2-rev-aPedro Marquez
 
22425400 maggiolo-r-1-optimizacion-de-la-produccion-mediante-analisis-nodal
22425400 maggiolo-r-1-optimizacion-de-la-produccion-mediante-analisis-nodal22425400 maggiolo-r-1-optimizacion-de-la-produccion-mediante-analisis-nodal
22425400 maggiolo-r-1-optimizacion-de-la-produccion-mediante-analisis-nodalPedro Marquez
 

More from Pedro Marquez (11)

DSP-LE-001 Datasheet PSV.pdf
DSP-LE-001 Datasheet PSV.pdfDSP-LE-001 Datasheet PSV.pdf
DSP-LE-001 Datasheet PSV.pdf
 
CP 200 Drawing Rev.0 Model (1).pdf
CP 200 Drawing Rev.0 Model (1).pdfCP 200 Drawing Rev.0 Model (1).pdf
CP 200 Drawing Rev.0 Model (1).pdf
 
Pirolisis continua opcion 1
Pirolisis continua opcion 1Pirolisis continua opcion 1
Pirolisis continua opcion 1
 
A100 rev.0 model
A100 rev.0 modelA100 rev.0 model
A100 rev.0 model
 
Evaluation of gas handling capacity of the ellen east gas gathering system (5)
Evaluation of gas handling capacity of the ellen east gas gathering system (5)Evaluation of gas handling capacity of the ellen east gas gathering system (5)
Evaluation of gas handling capacity of the ellen east gas gathering system (5)
 
Plant view pig launcher trap_pll-le-001_rev 00 (1)
Plant view pig launcher trap_pll-le-001_rev 00 (1)Plant view pig launcher trap_pll-le-001_rev 00 (1)
Plant view pig launcher trap_pll-le-001_rev 00 (1)
 
Icda mx line mrpl_multiphase flow modeling report draft 1.0
Icda mx line mrpl_multiphase flow modeling report draft 1.0Icda mx line mrpl_multiphase flow modeling report draft 1.0
Icda mx line mrpl_multiphase flow modeling report draft 1.0
 
Dibujo
DibujoDibujo
Dibujo
 
Id88 okereke nu_updated_211014
Id88 okereke nu_updated_211014Id88 okereke nu_updated_211014
Id88 okereke nu_updated_211014
 
Dti a-502-pb-2-rev-a
Dti a-502-pb-2-rev-aDti a-502-pb-2-rev-a
Dti a-502-pb-2-rev-a
 
22425400 maggiolo-r-1-optimizacion-de-la-produccion-mediante-analisis-nodal
22425400 maggiolo-r-1-optimizacion-de-la-produccion-mediante-analisis-nodal22425400 maggiolo-r-1-optimizacion-de-la-produccion-mediante-analisis-nodal
22425400 maggiolo-r-1-optimizacion-de-la-produccion-mediante-analisis-nodal
 

Recently uploaded

ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
A level Digipak development Presentation
A level Digipak development PresentationA level Digipak development Presentation
A level Digipak development Presentationamedia6
 
Kieran Salaria Graphic Design PDF Portfolio
Kieran Salaria Graphic Design PDF PortfolioKieran Salaria Graphic Design PDF Portfolio
Kieran Salaria Graphic Design PDF Portfolioktksalaria
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...Suhani Kapoor
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CANestorGamez6
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptxVanshNarang19
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
Cheap Rate Call girls Malviya Nagar 9205541914 shot 1500 night
Cheap Rate Call girls Malviya Nagar 9205541914 shot 1500 nightCheap Rate Call girls Malviya Nagar 9205541914 shot 1500 night
Cheap Rate Call girls Malviya Nagar 9205541914 shot 1500 nightDelhi Call girls
 
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...ankitnayak356677
 
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,bhuyansuprit
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)jennyeacort
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfAmirYakdi
 
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...Suhani Kapoor
 

Recently uploaded (20)

ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
A level Digipak development Presentation
A level Digipak development PresentationA level Digipak development Presentation
A level Digipak development Presentation
 
Kieran Salaria Graphic Design PDF Portfolio
Kieran Salaria Graphic Design PDF PortfolioKieran Salaria Graphic Design PDF Portfolio
Kieran Salaria Graphic Design PDF Portfolio
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptx
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
Cheap Rate Call girls Malviya Nagar 9205541914 shot 1500 night
Cheap Rate Call girls Malviya Nagar 9205541914 shot 1500 nightCheap Rate Call girls Malviya Nagar 9205541914 shot 1500 night
Cheap Rate Call girls Malviya Nagar 9205541914 shot 1500 night
 
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
 
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
 
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
 

12” Pipeline Cathodic Protection Design

  • 1. REV. 0 12” LINE EXTENSION ENGINEERING DESIGN CALCULATION REPORT OF CATHODIC PROTECTION SYSTEM 11-04-2019 0 SENT FOR APPROVAL C. Vázquez P. Márquez/ M. Guzmán R. Balderaz DATE REV. N° REASON FOR REVISION PREPARED CHECKED APPD. APPD. DOCUMENT NUMBER : CMP-LE-001 JOB NUMBER:
  • 2. CALCULATION REPORT OF CATHODIC PROTECTION SYSTEM Sideline Testing LCC DATE: 11/04/2019 PAGE: 2 of 12 REV. 0 Disclaimer While all efforts have been made to exercise due care and caution, Sideline Testing LLC cannot assume any liability for damage, injury (personnel or plant), leakage, loss of containment, environmental damage, remediation or the like associated with the subject pipeline. It is understood by all parties that the measurement techniques used and discussed in this report are non-invasive, and as such never made actual physical damage with the subject pipeline. As a result, the data provided may not be indicative of actual pipeline condition and are deductive in nature. All recommendations are based upon similar experience, standard industry methods and best engineering practice.
  • 3. CALCULATION REPORT OF CATHODIC PROTECTION SYSTEM Sideline Testing LCC DATE: 11/04/2019 PAGE: 3 of 12 REV. 0 CONTENTS LIST OF FIGURES.........................................................................................................4 LIST OF TABLES ..........................................................................................................4 1. OBJECTIVE............................................................................................................5 2. SCOPE OF WORK .................................................................................................5 3. ENGINEERING AND CONSTRUCTION PROJECT OF THE CATHODIC PROTECTION SYSTEM ................................................................................................5 4. REFERENCE DOCUMENTS................................................................................10 5 CONCLUSIONS AND RECOMENDATIONS........................................................10
  • 4. CALCULATION REPORT OF CATHODIC PROTECTION SYSTEM Sideline Testing LCC DATE: 11/04/2019 PAGE: 4 of 12 REV. 0 LIST OF FIGURES Figure 1. Location of anodic beds along the new and existing pipeline................ 11 Figure 2. Typical multiple galvanic anode installation........................................... 12 LIST OF TABLES Table 1. General information of the pipeline. .......................................................... 6 Table 2. Soil resistivity vs. Degree of Corrosivity .................................................... 7 Table 3. Anode properties....................................................................................... 7
  • 5. CALCULATION REPORT OF CATHODIC PROTECTION SYSTEM Sideline Testing LCC DATE: 11/04/2019 PAGE: 5 of 12 REV. 0 1. OBJECTIVE To develop a basic detailed engineering based on instructions and standards that integrates the technical support for the design and installation of the cathodic protection system for the project 12 "Line Extension Engineering Design. 2. SCOPE OF WORK  Design a cathodic protection system by vertical magnesium galvanic anodes.  Sheet of calculations.  Elaboration of drawing with specifications for the installation of the cathodic protection system including Bill of Materials. 3. ENGINEERING AND CONSTRUCTION PROJECT OF THE CATHODIC PROTECTION SYSTEM 3.1 GENERAL CONSIDERATIONS  The type of cathodic protection system was considered by Galvanic Anodes.  Once the cathodic protection system was installed the minimum pipeline potential shall be -0.85 volts with referenced to a saturated copper/copper sulfate electrode.  The cathodic protection system is designed for 30 years of life.  A 0.9% coating damage was considered to determinate the total external surface area of the pipeline to be protected. It was determined based on the type of coating and the design life of the system.  The soil resistivity considered was 500 ohm-cm, along the right of way of the pipeline. The soil resistivity was considered very corrosive in order to design in a conservatively way.
  • 6. CALCULATION REPORT OF CATHODIC PROTECTION SYSTEM Sideline Testing LCC DATE: 11/04/2019 PAGE: 6 of 12 REV. 0 Table 1. General information of the pipeline. Pipeline ID: 12” LINE EXTENSION ENGINEERING DESIGN Company: Laredo ENERGY Diameter: 12 inches Thickness: 0.375 inches Length: 1.545 miles Type of Coating: 3 layer polyethylene 3.2 OBJECTIVES  Determine the total external surface area to protect.  Determine the current requirement for an adequate cathodic protection.  Select the type and size of the galvanic anodes.  Calculate the quantity of galvanic anodes required.  Calculate the anode bed to the earth resistance.  Calculate the current output from the anode.  Determinate the anode life.  Distribute in a uniform way the anodes along the ROW of the pipeline. 3.3 DESIGN BASIS Cathodic protection has been used for the effective control of external corrosion of submerged or buried metallic structures. For galvanic anode CP systems, the anode of the electrochemical cell is a casting of an electrochemically active alloy (normally aluminum, zinc or magnesium based). This anode is also the current source for the CP system and will be consumed. Accordingly, it is often referred to as a “sacrificial anode”, as alternative to the term “galvanic anode”. The galvanic anodes protection consists in electrically joining the metal structure that it is about protecting with a more electronegative metal than the steel buried in the same electrolyte. The existence of the electrolyte is completely essential, which completes the system for the process.
  • 7. CALCULATION REPORT OF CATHODIC PROTECTION SYSTEM Sideline Testing LCC DATE: 11/04/2019 PAGE: 7 of 12 REV. 0 3.4 SOIL RESISTIVITY The soil considered for the design of the cathodic protection system was 500 ohm- cm, considering a very corrosive soil along the ROW of the pipeline, according the Table 2. Table 2. Soil resistivity vs. Degree of Corrosivity Soil Resistivity Degree of corrosivity 0-500 Very Corrosive 500-1000 Corrosive 1,000-2,000 Moderately corrosive 2,000-10,000 Mildly corrosive Above 10,000 Negligible 3.5 CALCULATIONS - CURRENT OUTPUT FROM THE ANODE Current Output for One Anode I = Current output of one anode in amps 0.363 Ec = Cathode potential in volts (potential to which the pipe is to be polarized) -0.85 Ea = Anode potential in volts -1.55 Ra = Groundbed resistance in ohms 1.93 Table 3. Anode properties H-1 Alloy Cast Magnesium Anode Current density 3.25 mA/ft² Dimension 5 x 5 x 21 inches Theoretical Amp Year per Pound 0.116 Amp-yr/lb Potential with ref to CuSO4 -1.55 volts Electrochemical capacity of Anode 500 Amp-hour/lb Current Efficiency (%) 50 Weight of anode 32 lbs Utilization 0.85
  • 8. CALCULATION REPORT OF CATHODIC PROTECTION SYSTEM Sideline Testing LCC DATE: 11/04/2019 PAGE: 8 of 12 REV. 0 - ANODE LIFE ANODE LIFE V = Life in years. 4.34 C = Theoretical Amp Year per Pound 0.116 P = Anode weight in lbs 32 R = Efficiency 0.50 U = Utilization 0.85 I = Current output of the anode in amps 0.363 - SURFACE AREA TO PROTECT TOTAL EXTERNAL SURFACE TO PROTECT AB = surface area in sq. ft. 245.07 f = coating damage factor 0.009 π = 3.1416 3.1416 D = Diameter in ft. 1.0625 L = lenght in ft. 8157.6 - CURRENT REQUIREMENT CURRENT REQUIREMENT I = current requirement in amps 0.80 AB = surface area in sq.ft. 245.07 ID = current density in mA/sq.ft. 3.25
  • 9. CALCULATION REPORT OF CATHODIC PROTECTION SYSTEM Sideline Testing LCC DATE: 11/04/2019 PAGE: 9 of 12 REV. 0 - REQUIRED ANODIC MASS MASA ANÓDICA REQUERIDA W = total wegiht of required anodic mass in lbs 454 I = current requirement in amps 0.80 DR = Anode consumption lbs/yer 19 DL = CP system design life in years) 30 - NUMBER OF REQUIRED ANODES NUMBER OF REQUIRED ANODES N = Number of required anodes 14 W = total weight of required anodic mass in lbs 454 WA = weight of one anode in lbs 32 - GROUND BED RESISTANCE Ground bed Resistance for Multiple Vertical Anodes in Parallel (Sunde’sFormula) R = resistance in ohms 1.93 ρ = soil resitivity in ohm-cm 500 L = anode lenght in feet 1.75 d = anode diameter in feet 0.417 S = anode spacing in feet 13 N = number of anodes 2 *ln is the natural logarithm function
  • 10. CALCULATION REPORT OF CATHODIC PROTECTION SYSTEM Sideline Testing LCC DATE: 11/04/2019 PAGE: 10 of 12 REV. 0 4. REFERENCE DOCUMENTS The documents listed below are an integral part of the calculation report.  Control of Pipeline Corrosion, A.W. Peabody Edited by R. L. Binchetti.  Cathodic Protection Survey Procedures, Second Edition, W. Brian Holtsbaum.  CP-1 Cathodic Protection Tester Course manual, NACE International.  CP-2 Cathodic Protection Technician Course manual, NACE International.  CP-3 Cathodic Protection Technologist Course manual, NACE International. APPLICABLE CODES & STANDARDS • NACE SP 0169 Control of External Corrosion on Underground or Submerged Metallic Piping Systems • ISO 15589-1:2015. Petroleum, petrochemical and natural gas industries – Cathodic protection of pipeline systems - Part 1: On-land pipelines. 5. CONCLUSIONS AND RECOMENDATIONS It is recommended to install seven anodic beds along the right of way uniformly distributed, located as follows in progressive mileage, see Figure 1 for more details: - Bed 1, mile 0.85, two vertical galvanic anodes. The progressive mileage is considered from the zero in the interconnection point with the new pipeline to the end of the existing pipeline. - Bed 2, mile 0.59, two vertical galvanic anodes. The progressive mileage is from the zero in the interconnection point with the new pipeline to the end of the existing pipeline. - Bed 3, mile 0.33, two vertical galvanic anodes. The progressive mileage is from the zero in the interconnection point with the new pipeline to the end of the existing pipeline. - Bed 4, mile 0.08, two vertical galvanic anodes. The progressive mileage is from the zero in the interconnection point with the new pipeline to the end of the existing pipeline.
  • 11. CALCULATION REPORT OF CATHODIC PROTECTION SYSTEM Sideline Testing LCC DATE: 11/04/2019 PAGE: 11 of 12 REV. 0 - Bed 5, mile 0.176, two vertical galvanic anodes. The progressive mileage is from the zero in the interconnection point with the existing pipeline to the end of the new pipeline. - Bed 6, mile 0.43, two vertical galvanic anodes. The progressive mileage is from the zero in the interconnection point with the existing pipeline to the end of the new pipeline. - Bed 7, mile 0.68, two vertical galvanic anodes. The progressive mileage is from the zero in the interconnection point with the existing pipeline to the end of the new pipeline. Figure 1. Location of anodic beds along the new and existing pipeline. The anodes should be H-1 Alloy Cast Magnesium Anodes, 32 lbs. in weight and will be buried at a depth equal to or greater than the pipeline depth and should be separated at a minimum distance of 10 feet from the axis of the pipeline, the spacing between anodes should be 10 feet at least. The connection of the HMWPE 12 AWG Cathodic protection cable from the anode to the pipeline must be joined by exothermic welding and shall be properly insulated. A test station should be placed in each anodic bed for potential reading in order to determine effectiveness of the cathodic protection system.
  • 12. CALCULATION REPORT OF CATHODIC PROTECTION SYSTEM Sideline Testing LCC DATE: 11/04/2019 PAGE: 12 of 12 REV. 0 Figure 2. Typical multiple galvanic anode installation.