KASHAGAN / KAZAKHSTAN
frame agreement
mv/lv packaged substations
Local equipment rooms
process and utilities buildings
Kashagan / Kazakhstan
Kashagan Field Development Experimental Programme
>>>
•	 190 km2
total area of onshore operations = the size of Amsterdam
•	 120,000 tonstotal weight of steel items and structures used =
	 1.5 times the weight of the Golden Gate Bridge in San Francisco
•	 	510 km total length of pipelines = almost the distance between New
York and Montreal
•	 5,000 kmtotal length of electric and instrumentation cables =
	 about the distance between Almaty and Rome
•	 50,000 m3
volume of concrete structures used = the size of the landmark
88-floor building of Petronas Towers in Kuala Lumpur, Malaysia
Kashagan, 80km south-east of Atyrau, in the North Caspian Sea, is
the largest oil field discovered over the last thirty years worldwide
and extends over a surface area of approximately 75km by 45km.
Its development represents one of the greatest challenges faced by
the petroleum industry, given the deep, high-pressure reservoir, the
high sulphur content, the shallow waters that freeze in winter and
the marked shifts in temperature (from -30°C to +40°C).
The potential daily average production amounts to 1.2 million bar-
rels, with estimated reserves of 38 billion barrels.
The Kashagan Project consists of two developments: Offshore
Complex (artificial islands in the Caspian Sea) and Onshore Com-
plex (Bolashak onshore processing facility).
Skema supplied Local Equipment Rooms, MV/LV complete Pack-
aged Substations, all LV Switchgears/Intelligent Power Motor Con-
trol Centers, RTUs, LMS/DMS (onshore) and the IPCS System.
Skema, through its in-country subsidiary Skema LLP, is also work-
ing in joint-venture with one of the major local industrial group,
Isker Consortium, on the epc contract for the fabrication of 20 proc-
ess and utilities buildings.
The fabrication yard is located on the Ural River in Atyrau.
End user
Agip KCO
A consortium of
ConocoPhillips - ENI - ExxonMobil - Inpex
KazMunaIGaS - Shell - Total
The giant KASHAGAN
>>>
Frame Agreement
Onshore / Offshore
Skema was awarded the frame agreement for the provision of all intel-
ligent LV Switchgear / Intelligent Power Motor Control Centers, RTus,
the Integrated Protection and Control System for both offshore and on-
shore facilities and LMS / DMS (onshore).
EPC contractors
ABBPs&s-AkerKvaerner-Bateman-Consafe-Fores-GEoil&gasnp
GustoMSC - Kazstroyservice - Litwin - Mss - Punji Lloyd - Saipem
SBM - Siemens turbomachinery - Rosetti Marino - Renco - Tekfen
- Zafer
5.1 km =the total length of columns supplied by Skema
( the length of 340 trailer trucks )
Project Electrical and Instrumentation Engineer
Skema was in charge of the engineering, manufacturing, testing
and commissioning of 6 MV/LV Packaged Substations. The Substa-
tions feed the infrastructure utilities for the Kashagan field and are
part of the Early Works of the Kashagan Experimental Programme.
Each Substation was equipped with:
•	 10 kV Switchboards
• 	 PMCC LV Switchboards
• 	 Distribution boards
• 	 Distribution transformers
• 	 AC and DC UPS batteries
• 	 Alarm and communication RTUs
• 	 HVAC system
• 	 Electrical Control System
MV/LV Packaged Substations
Onshore
“The products supplied by Skema were able to meet the strict
technical standards of the job. Skema’s project team showed
competent technical skills and the ability to work and support us
at all stages of the project from engineering to commissioning”.
( )
Skema was awarded in joint venture the EPC Contract for the provision
of 20 Local Equipment Rooms (LERs).
The scope of work includes the coordination and monitoring of every
aspect of the project, from feasibility studies and cost/performance
optimization to the design of structural, electrical, HVAC and safety
systems, procurement, construction, assembly, commissioning, final
inspection and supervision of on-site installation.
The LERs are pre-fabricated steel-structure modules (measur-
ing on average 8.3m in height, 15.3m in width and 44m in length),
which have the following systems installed: medium and low voltage
switchboards, transformers, distribution switchboards, UPSs and rel-
evant batteries, supervision and control equipment, HVAC with pro-
visions for explosive/dangerous gas injections, electrical networks,
fire-detection and fire-fighting systems and telecoms equipment.
Each LER has an average length of 50 m and weight of 1000 tonnes.
The LERs are being built in Ravenna, are shipped to the Caspian Sea on
barges and will be located on artificial islands in the Caspian Sea.
Local Equipment Rooms
Offshore
Skema has been highly committed to developing the local content
of its operations in Kazakhstan since the early stages of its pres-
ence in the country. Having already founded Skema LLP in Atyrau,
Kazakhstan, a year earlier, in 2009, Skema and Isker Consortium
established a 100% Local Joint Venture Company called Ozen Port
Production Base LLP (OPPB LLP) with the intention of becoming
one of the major EPC Contractors in the Oil & Gas Industry in the
Republic of Kazakhstan.
The OPPB LLP’s operations can leverage major pre-fabrication fa-
cilities, including: the AZTU workshop, with a total area of 22,500
m2
; and the Ozen Port Yard, located in Atyrau on the Ural River and
covering a total surface area of 100,000 m2
, which plays host to a
workshop for sub-assembly, an indoor assembly area of 40,000
m2
, a quay measuring 215 m in length (including the 110 m Ro-Ro
quay), controlled-atmosphere storage warehouses and a series of
offices that are fully equipped for use by managers and supervi-
sors.
procurement and fabrication of offshore buIldings - in couNtry
By making the most of the perfect mix of skilled local personnel and
expatriates to ensure local development and top-quality solutions,
OPPB LLP handles the design, engineering, construction, pre-com-
missioning, commissioning, installation, start-up and maintenance
of modules, local equipment rooms, process and utilities buildings,
temporary refuges, manifolds and piping fabrication for both off-
shore and onshore applications.
FIRST MILESTONE ACHIEVED BY OPPB LLP
Winning an EPC Contract for 13 Offshore Utilities Buildings for
the Kashagan Experimental Programme, Island D.
KEY SUCCESS FACTORS
- Maximum local content achievable for modules, temporary refuges,
local equipment rooms, process and utilities buildings
- First local Contractor to be awarded a multidisciplinary EPC Contract
for offshore applications (highest quality standard required in the Oil
& Gas Industry)
- Project delivered on time and without any punch list
- The complete project cycle is managed by internal resources (from
feasibility studies and cost/performance optimization to the design of
structures, electrical HVAC and safety systems, procurement, con-
struction, assembly pre-commissioning, start-up, commissioning,
load out activities and on site supervision/installation)
- Facilities located in a strategic position (Atyrau) and designed for all
modular solutions
“Company congratulates Contractor with the big achievement
of meeting the requested delivery date, and thanks for its good
work and cooperation, and wishes to Contractor to maintain its
place for the future achievements”.
AKCO Contract Holder( )

More Related Content

What's hot

GM-casestudy-uninett
GM-casestudy-uninettGM-casestudy-uninett
GM-casestudy-uninettScott Miller
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray FirstsMyLast1
 
MCS Presentation
MCS PresentationMCS Presentation
MCS PresentationArranEwan
 
ICPC Presentation April 2016 Hamburg Rev 3
ICPC Presentation April 2016 Hamburg Rev 3ICPC Presentation April 2016 Hamburg Rev 3
ICPC Presentation April 2016 Hamburg Rev 3Jerry Brown
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Edward Byrne
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & ToubroJAIPRAKASH PATIL
 
CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016Skare Sigbjørn
 
Global Perspective on the Future of Subsea Technology
Global Perspective on the Future of Subsea TechnologyGlobal Perspective on the Future of Subsea Technology
Global Perspective on the Future of Subsea TechnologyConference_Presentations
 
2012 Network design
2012 Network design2012 Network design
2012 Network designJohn Snoxell
 
Eia lucky electric power company 660 mw coal power project
Eia  lucky electric power company  660 mw coal power projectEia  lucky electric power company  660 mw coal power project
Eia lucky electric power company 660 mw coal power projectzubeditufail
 
Curriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebCurriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebMario Rey Rguieb_68
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newvasanth morais
 

What's hot (19)

GM-casestudy-uninett
GM-casestudy-uninettGM-casestudy-uninett
GM-casestudy-uninett
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray Firsts
 
MCS Presentation
MCS PresentationMCS Presentation
MCS Presentation
 
ICPC Presentation April 2016 Hamburg Rev 3
ICPC Presentation April 2016 Hamburg Rev 3ICPC Presentation April 2016 Hamburg Rev 3
ICPC Presentation April 2016 Hamburg Rev 3
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
 
ANSYS oil&gas seminar 2013
ANSYS oil&gas seminar 2013ANSYS oil&gas seminar 2013
ANSYS oil&gas seminar 2013
 
Nazh cv rev.2
Nazh cv  rev.2Nazh cv  rev.2
Nazh cv rev.2
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & Toubro
 
CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016
 
Global Perspective on the Future of Subsea Technology
Global Perspective on the Future of Subsea TechnologyGlobal Perspective on the Future of Subsea Technology
Global Perspective on the Future of Subsea Technology
 
63089_SEKAR_01_12_14
63089_SEKAR_01_12_1463089_SEKAR_01_12_14
63089_SEKAR_01_12_14
 
Subsea Separation presentation
Subsea Separation presentationSubsea Separation presentation
Subsea Separation presentation
 
2012 Network design
2012 Network design2012 Network design
2012 Network design
 
Eia lucky electric power company 660 mw coal power project
Eia  lucky electric power company  660 mw coal power projectEia  lucky electric power company  660 mw coal power project
Eia lucky electric power company 660 mw coal power project
 
Trdrag 04 13 16
Trdrag 04 13 16Trdrag 04 13 16
Trdrag 04 13 16
 
Curriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebCurriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey Guieb
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
 
DR.VAN
DR.VANDR.VAN
DR.VAN
 

Viewers also liked

One Is Too Many
One Is Too ManyOne Is Too Many
One Is Too Manysufizu
 
RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016Jashim Pd-2
 
月刊事業構想2_Feb2014
月刊事業構想2_Feb2014月刊事業構想2_Feb2014
月刊事業構想2_Feb2014Reini Mizushima
 
7 claves para refinar la mirada
7 claves para refinar la mirada7 claves para refinar la mirada
7 claves para refinar la miradameadows42
 
Computação em Nuvem
Computação em Nuvem  Computação em Nuvem
Computação em Nuvem Toivo Gomes
 
EduKit School Brochure_v4 compressed
EduKit School Brochure_v4 compressedEduKit School Brochure_v4 compressed
EduKit School Brochure_v4 compressedZhendan (Max) Wang
 
การศึกษาของบุคลากรสุขภาพ 590727
การศึกษาของบุคลากรสุขภาพ 590727การศึกษาของบุคลากรสุขภาพ 590727
การศึกษาของบุคลากรสุขภาพ 590727Pattie Pattie
 
การศึกษาไทยในศตวรรษที่ ๒๑ ม. เซนต์จอห์น 590731_n-last
การศึกษาไทยในศตวรรษที่ ๒๑ ม. เซนต์จอห์น 590731_n-lastการศึกษาไทยในศตวรรษที่ ๒๑ ม. เซนต์จอห์น 590731_n-last
การศึกษาไทยในศตวรรษที่ ๒๑ ม. เซนต์จอห์น 590731_n-lastPattie Pattie
 
Roushan Kumar Presentation
Roushan Kumar PresentationRoushan Kumar Presentation
Roushan Kumar PresentationRoushan Kumar
 
Text Analytics Presentation LinkedIn
Text Analytics Presentation LinkedInText Analytics Presentation LinkedIn
Text Analytics Presentation LinkedInStacy Faught
 
Summary The PMAC 2017
Summary The PMAC 2017Summary The PMAC 2017
Summary The PMAC 2017Pattie Pattie
 
Washroom Optimised Brochure
Washroom Optimised BrochureWashroom Optimised Brochure
Washroom Optimised BrochureMegan Murphy
 
Psicopatología: Trastornos de evitación y anorexia nerviosa
Psicopatología: Trastornos de  evitación y  anorexia nerviosaPsicopatología: Trastornos de  evitación y  anorexia nerviosa
Psicopatología: Trastornos de evitación y anorexia nerviosaM Sc. Marta LiCY - Marta Cuyuch
 
Introducció a la metodologia BIM, by DDV Arquitectura ©
Introducció a la metodologia BIM, by DDV Arquitectura ©Introducció a la metodologia BIM, by DDV Arquitectura ©
Introducció a la metodologia BIM, by DDV Arquitectura ©David Delgado Vendrell
 

Viewers also liked (18)

One Is Too Many
One Is Too ManyOne Is Too Many
One Is Too Many
 
RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016
 
Ahmad-cv-NEW
Ahmad-cv-NEWAhmad-cv-NEW
Ahmad-cv-NEW
 
月刊事業構想2_Feb2014
月刊事業構想2_Feb2014月刊事業構想2_Feb2014
月刊事業構想2_Feb2014
 
7 claves para refinar la mirada
7 claves para refinar la mirada7 claves para refinar la mirada
7 claves para refinar la mirada
 
Computação em Nuvem
Computação em Nuvem  Computação em Nuvem
Computação em Nuvem
 
EduKit School Brochure_v4 compressed
EduKit School Brochure_v4 compressedEduKit School Brochure_v4 compressed
EduKit School Brochure_v4 compressed
 
การศึกษาของบุคลากรสุขภาพ 590727
การศึกษาของบุคลากรสุขภาพ 590727การศึกษาของบุคลากรสุขภาพ 590727
การศึกษาของบุคลากรสุขภาพ 590727
 
Taj mahal
Taj mahalTaj mahal
Taj mahal
 
Agrupaciones instrumentales1 eso
Agrupaciones instrumentales1 esoAgrupaciones instrumentales1 eso
Agrupaciones instrumentales1 eso
 
การศึกษาไทยในศตวรรษที่ ๒๑ ม. เซนต์จอห์น 590731_n-last
การศึกษาไทยในศตวรรษที่ ๒๑ ม. เซนต์จอห์น 590731_n-lastการศึกษาไทยในศตวรรษที่ ๒๑ ม. เซนต์จอห์น 590731_n-last
การศึกษาไทยในศตวรรษที่ ๒๑ ม. เซนต์จอห์น 590731_n-last
 
Roushan Kumar Presentation
Roushan Kumar PresentationRoushan Kumar Presentation
Roushan Kumar Presentation
 
Text Analytics Presentation LinkedIn
Text Analytics Presentation LinkedInText Analytics Presentation LinkedIn
Text Analytics Presentation LinkedIn
 
Summary The PMAC 2017
Summary The PMAC 2017Summary The PMAC 2017
Summary The PMAC 2017
 
Maturitate 8
Maturitate 8Maturitate 8
Maturitate 8
 
Washroom Optimised Brochure
Washroom Optimised BrochureWashroom Optimised Brochure
Washroom Optimised Brochure
 
Psicopatología: Trastornos de evitación y anorexia nerviosa
Psicopatología: Trastornos de  evitación y  anorexia nerviosaPsicopatología: Trastornos de  evitación y  anorexia nerviosa
Psicopatología: Trastornos de evitación y anorexia nerviosa
 
Introducció a la metodologia BIM, by DDV Arquitectura ©
Introducció a la metodologia BIM, by DDV Arquitectura ©Introducció a la metodologia BIM, by DDV Arquitectura ©
Introducció a la metodologia BIM, by DDV Arquitectura ©
 

Similar to Skema LER

Safety Management of Deep Mechanised Longwall Mine
Safety Management of Deep Mechanised Longwall MineSafety Management of Deep Mechanised Longwall Mine
Safety Management of Deep Mechanised Longwall MineUlimella Siva Sankar
 
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Javier Cantera
 
Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015Jailton Rodrigues
 
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...DEGIMA SA
 
Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018SanjuBK
 
KHAN Brochure_150414 (8P)
KHAN Brochure_150414 (8P)KHAN Brochure_150414 (8P)
KHAN Brochure_150414 (8P)KHAN Offshore
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan David H Moloney
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Pratap Bhunia
 
Zinfra Renewables Capability Statement
Zinfra Renewables Capability StatementZinfra Renewables Capability Statement
Zinfra Renewables Capability StatementZinfra Group
 
EPIC Engineering/Valero Case Study
EPIC Engineering/Valero Case StudyEPIC Engineering/Valero Case Study
EPIC Engineering/Valero Case StudyMichael Gauthier
 
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...Roxtec UK & Ireland
 
CV Mr Michael Marley-Savage
CV Mr Michael Marley-SavageCV Mr Michael Marley-Savage
CV Mr Michael Marley-Savagemichael savage
 
Alewijnse Retec Romania company presentation
Alewijnse Retec Romania company presentationAlewijnse Retec Romania company presentation
Alewijnse Retec Romania company presentationLaura Negoi
 

Similar to Skema LER (20)

WQ-2
WQ-2WQ-2
WQ-2
 
Safety Management of Deep Mechanised Longwall Mine
Safety Management of Deep Mechanised Longwall MineSafety Management of Deep Mechanised Longwall Mine
Safety Management of Deep Mechanised Longwall Mine
 
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
 
Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015
 
Nexans LV-HV Wind Farm Cables Catalogue
Nexans LV-HV Wind Farm Cables CatalogueNexans LV-HV Wind Farm Cables Catalogue
Nexans LV-HV Wind Farm Cables Catalogue
 
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
 
Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018
 
Haris.CV15
Haris.CV15Haris.CV15
Haris.CV15
 
Ww cv 2016
Ww cv 2016Ww cv 2016
Ww cv 2016
 
Abou el azm CV
Abou el azm CVAbou el azm CV
Abou el azm CV
 
Ww CV 2016
Ww CV 2016Ww CV 2016
Ww CV 2016
 
KHAN Brochure_150414 (8P)
KHAN Brochure_150414 (8P)KHAN Brochure_150414 (8P)
KHAN Brochure_150414 (8P)
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...
 
Zinfra Renewables Capability Statement
Zinfra Renewables Capability StatementZinfra Renewables Capability Statement
Zinfra Renewables Capability Statement
 
Report
ReportReport
Report
 
EPIC Engineering/Valero Case Study
EPIC Engineering/Valero Case StudyEPIC Engineering/Valero Case Study
EPIC Engineering/Valero Case Study
 
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
 
CV Mr Michael Marley-Savage
CV Mr Michael Marley-SavageCV Mr Michael Marley-Savage
CV Mr Michael Marley-Savage
 
Alewijnse Retec Romania company presentation
Alewijnse Retec Romania company presentationAlewijnse Retec Romania company presentation
Alewijnse Retec Romania company presentation
 

Skema LER

  • 2. frame agreement mv/lv packaged substations Local equipment rooms process and utilities buildings Kashagan / Kazakhstan Kashagan Field Development Experimental Programme >>>
  • 3. • 190 km2 total area of onshore operations = the size of Amsterdam • 120,000 tonstotal weight of steel items and structures used = 1.5 times the weight of the Golden Gate Bridge in San Francisco • 510 km total length of pipelines = almost the distance between New York and Montreal • 5,000 kmtotal length of electric and instrumentation cables = about the distance between Almaty and Rome • 50,000 m3 volume of concrete structures used = the size of the landmark 88-floor building of Petronas Towers in Kuala Lumpur, Malaysia Kashagan, 80km south-east of Atyrau, in the North Caspian Sea, is the largest oil field discovered over the last thirty years worldwide and extends over a surface area of approximately 75km by 45km. Its development represents one of the greatest challenges faced by the petroleum industry, given the deep, high-pressure reservoir, the high sulphur content, the shallow waters that freeze in winter and the marked shifts in temperature (from -30°C to +40°C). The potential daily average production amounts to 1.2 million bar- rels, with estimated reserves of 38 billion barrels. The Kashagan Project consists of two developments: Offshore Complex (artificial islands in the Caspian Sea) and Onshore Com- plex (Bolashak onshore processing facility). Skema supplied Local Equipment Rooms, MV/LV complete Pack- aged Substations, all LV Switchgears/Intelligent Power Motor Con- trol Centers, RTUs, LMS/DMS (onshore) and the IPCS System. Skema, through its in-country subsidiary Skema LLP, is also work- ing in joint-venture with one of the major local industrial group, Isker Consortium, on the epc contract for the fabrication of 20 proc- ess and utilities buildings. The fabrication yard is located on the Ural River in Atyrau. End user Agip KCO A consortium of ConocoPhillips - ENI - ExxonMobil - Inpex KazMunaIGaS - Shell - Total The giant KASHAGAN >>>
  • 4. Frame Agreement Onshore / Offshore Skema was awarded the frame agreement for the provision of all intel- ligent LV Switchgear / Intelligent Power Motor Control Centers, RTus, the Integrated Protection and Control System for both offshore and on- shore facilities and LMS / DMS (onshore). EPC contractors ABBPs&s-AkerKvaerner-Bateman-Consafe-Fores-GEoil&gasnp GustoMSC - Kazstroyservice - Litwin - Mss - Punji Lloyd - Saipem SBM - Siemens turbomachinery - Rosetti Marino - Renco - Tekfen - Zafer 5.1 km =the total length of columns supplied by Skema ( the length of 340 trailer trucks )
  • 5. Project Electrical and Instrumentation Engineer Skema was in charge of the engineering, manufacturing, testing and commissioning of 6 MV/LV Packaged Substations. The Substa- tions feed the infrastructure utilities for the Kashagan field and are part of the Early Works of the Kashagan Experimental Programme. Each Substation was equipped with: • 10 kV Switchboards • PMCC LV Switchboards • Distribution boards • Distribution transformers • AC and DC UPS batteries • Alarm and communication RTUs • HVAC system • Electrical Control System MV/LV Packaged Substations Onshore “The products supplied by Skema were able to meet the strict technical standards of the job. Skema’s project team showed competent technical skills and the ability to work and support us at all stages of the project from engineering to commissioning”. ( )
  • 6. Skema was awarded in joint venture the EPC Contract for the provision of 20 Local Equipment Rooms (LERs). The scope of work includes the coordination and monitoring of every aspect of the project, from feasibility studies and cost/performance optimization to the design of structural, electrical, HVAC and safety systems, procurement, construction, assembly, commissioning, final inspection and supervision of on-site installation. The LERs are pre-fabricated steel-structure modules (measur- ing on average 8.3m in height, 15.3m in width and 44m in length), which have the following systems installed: medium and low voltage switchboards, transformers, distribution switchboards, UPSs and rel- evant batteries, supervision and control equipment, HVAC with pro- visions for explosive/dangerous gas injections, electrical networks, fire-detection and fire-fighting systems and telecoms equipment. Each LER has an average length of 50 m and weight of 1000 tonnes. The LERs are being built in Ravenna, are shipped to the Caspian Sea on barges and will be located on artificial islands in the Caspian Sea. Local Equipment Rooms Offshore
  • 7. Skema has been highly committed to developing the local content of its operations in Kazakhstan since the early stages of its pres- ence in the country. Having already founded Skema LLP in Atyrau, Kazakhstan, a year earlier, in 2009, Skema and Isker Consortium established a 100% Local Joint Venture Company called Ozen Port Production Base LLP (OPPB LLP) with the intention of becoming one of the major EPC Contractors in the Oil & Gas Industry in the Republic of Kazakhstan. The OPPB LLP’s operations can leverage major pre-fabrication fa- cilities, including: the AZTU workshop, with a total area of 22,500 m2 ; and the Ozen Port Yard, located in Atyrau on the Ural River and covering a total surface area of 100,000 m2 , which plays host to a workshop for sub-assembly, an indoor assembly area of 40,000 m2 , a quay measuring 215 m in length (including the 110 m Ro-Ro quay), controlled-atmosphere storage warehouses and a series of offices that are fully equipped for use by managers and supervi- sors. procurement and fabrication of offshore buIldings - in couNtry By making the most of the perfect mix of skilled local personnel and expatriates to ensure local development and top-quality solutions, OPPB LLP handles the design, engineering, construction, pre-com- missioning, commissioning, installation, start-up and maintenance of modules, local equipment rooms, process and utilities buildings, temporary refuges, manifolds and piping fabrication for both off- shore and onshore applications. FIRST MILESTONE ACHIEVED BY OPPB LLP Winning an EPC Contract for 13 Offshore Utilities Buildings for the Kashagan Experimental Programme, Island D.
  • 8. KEY SUCCESS FACTORS - Maximum local content achievable for modules, temporary refuges, local equipment rooms, process and utilities buildings - First local Contractor to be awarded a multidisciplinary EPC Contract for offshore applications (highest quality standard required in the Oil & Gas Industry) - Project delivered on time and without any punch list - The complete project cycle is managed by internal resources (from feasibility studies and cost/performance optimization to the design of structures, electrical HVAC and safety systems, procurement, con- struction, assembly pre-commissioning, start-up, commissioning, load out activities and on site supervision/installation) - Facilities located in a strategic position (Atyrau) and designed for all modular solutions “Company congratulates Contractor with the big achievement of meeting the requested delivery date, and thanks for its good work and cooperation, and wishes to Contractor to maintain its place for the future achievements”. AKCO Contract Holder( )