Business Systems Analyst
Presentation
Patrick McCarver
Contents
1. Project Background
2. Methodologies Utilized
3. Business Systems Analyst Role over the
Assignment/Project
4. Challenges
5. Outcomes
ASSIGNMENT
Assignment / Project
Background
In the 2nd quarter 2017, YP determined additional call centers would be
closed as they were no longer fiscally viable.
The Jacksonville, and eventually Madison Heights call centers needed to be
closed by September 29th 2017. They were notified of the closures on July
24th; impacted individuals would be allowed to stay until closure and
expected to handle as many customers as possible. Non-impacted centers
needed to be prepared to absorb the remaining workload.
Task:
• Forecast workforce needs in non-impacted centers.
• Calculate customers needed to keep impacted centers busy until
closure.
• Monitor activity and movement of customers during transition with
minimal impact to results and customer satisfaction.
• Communicate with all departments on project status.
Assignment / Project
Background
Jacksonville:
• Initial Headcount: 72
• Final Headcount: 53 (loss of 19 sales people)
• Number of customers transitioned or closed: 12,000
• Close announcement: 7/24
• Center close date: 9/29
Madison Heights:
• Initial Headcount: 42
• Final Headcount: 39 (loss of 3 sales people)
• Number of customers transitioned or closed: 8,000
• Close announcement: 7/24
• Center close date: 9/29
* Responsible for 40,000 total customers throughout the project.
Methodologies Utilized
While many of the non-functional requirements and business process
modeling were well defined and utilized, my focus was on two main areas.
Data modeling- collected large amounts of data to; forecast workforce
needs, track activity and monitor account transition. (Utilized from start to
finish of the project.)
• 40,000 customers would be impacted during the project.
• Over 220 sales people impacted by the project, 114 of which were part
of closing centers.
SWOT Analysis- assessed our project plan based on past experience and
current expectations.
• Strength- we have done this project before so there is a road map.
• Weakness- we are working under a tighter deadline and we have a new
corporate structure involved.
• Opportunities- Established methods and procedures I created allowed
for a nimble and scalable process.
• Threats- Disgruntled employees not effectively doing their job during
closure.
Methodologies Utilized
Tools:
• Access Database- Provided data for weekly view of all available and
assigned customer base.
• Excel- Used to create dashboard view of impacted customers and
forecast workforce needs. Shared with project team weekly.
Role players:
• Operations- Provide overall guidance throughout the project, track
progress and make recommendations based on outcomes.
• Human Resources- Managed the people portion of the project; closure
announcement, on-boarding and off-boarding of employees and
compensation.
• Real Estate- Assured that all assets and buildings were secured and
accounted for upon closure.
• Market Assignment- Once customer movement needs were identified,
they were responsible for moving those accounts quickly and
accurately.
• Sales- Impacted sales people were given incentive to stay until closure
and earn income. Non-impacted employees were prepped to begin
taking on more workload.
Business Systems Analyst Role
I was tasked with creating a calendar view for the number of customers in each
center to monitor activity and workforce needs along with identifying any
pinch points in the complete transition of those customers. Then make
recommendations based on my findings.
• The calendar identified by month how many customers we were required to
service.
• Based on historical trends the average closes expected were then calculated
and remaining business days identified.
• Formula: (Total number of customers/business days/avg. closes per
day)=workforce need
• Using that data, the workforce model forecasts how many accounts non-
impacted centers could handle based on their current headcount.
• I worked with our assignment department to assure identified clean
customers were moved to non-impacted centers while impacted
centers kept in-progress customers.
• If an overage was identified, those additional customers would be
considered for a postal mail campaign. (Ultimately not needed)
• I communicated weekly on the project status with the entire team.
• Throughout the process, I also monitored daily activity in all centers to
assure no customers would be orphaned upon center closure.
Business Systems Analyst Role
I was tasked with creating a calendar view for the number of customers in each
center to monitor activity and workforce needs along with identifying any
pinch points in the complete transition of those customers.
Row Labels Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17
Birmingham CC 738 2,236 2,182 2,342 2,903 2,152
Jacksonville CC 327 1,317 1,294 1,437 1,876 1,331
Telesales DQ 249 909 961 1,214 1,623 1,030
Grand Total 1,314 4,462 4,436 4,993 6,401 4,512
Closes Per Day Calculation 1.4 1.4 1.4 1.4 1.4 1.4
Closes Per Day Calculation DQ 1.6 1.6 1.6 1.6 1.6 1.6
Working Days 14 23 20 22 20 15
Workforce Need Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17
Birmingham CC 37.7 69.4 77.9 76.0 103.7 102.5
Jacksonville CC 16.7 40.9 46.2 46.7 67.0 63.4
Telesales DQ 11.1 24.7 30.0 34.5 50.7 42.9
Grand Total 67.0 138.6 158.4 162.1 228.6 214.9
Current
HC HC Overage Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17
102 Birmingham 54.3 110.3 124.1 122.7 170.7 165.9
Challenges
Challenge: One week prior to announcement of the closure of
Jacksonville and project start YP was bought by DEX Media.
Solution: While we were unsure of the future of the project,
much of the ground work was laid and we were prepared to
shift dates and implement contingency plans.
Challenge: The newly formed company quickly identified
Madison Heights as an additional center they wanted to close
in tandem with Jacksonville.
Solution: The dashboards, methods and calculations I created
were already scalable, so I was able to pivot quickly to show
the impact of closing an additional center.
Challenge: Upon merger of YP and DEX, many key role players
were immediately replaced and needed to be brought up to
speed.
Solution: I quickly summarized the data and project status to
assure we were still on task and included them on weekly
status updates.
Outcomes
On time:
100% movement within two months of 20,000 customer accounts from
impacted to non-impacted call centers.
• Jacksonville- monitored the closure and transition of 12,000
customers to Birmingham center in roughly 45 days. All while
forecasting workforce capacity as the Birmingham center
ramped up headcount and handled their already established
20,000 accounts.
• Madison Heights- Transitioned 8,000 customers to a newly
formed sales team in Missouri in roughly 45 days.
On budget:
No orphaned customers during the transition. Maintained a full
workload of accounts for impacted reps to work and maintain an income
during closure. Accurately forecasted workforce needs to handle
transition of accounts for the non-impacted centers. All while
maintaining acceptable revenue results.
At the completion of closures, I provided a summary and status outcome
to the project team.

More Related Content

What's hot (20)

Business Process Overview
Business Process OverviewBusiness Process Overview
Business Process Overview
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
CV_for Problem_Incident Manager
CV_for Problem_Incident ManagerCV_for Problem_Incident Manager
CV_for Problem_Incident Manager
 
One company’s experience
One company’s experienceOne company’s experience
One company’s experience
 
Nauk Yahoo Resume
Nauk Yahoo ResumeNauk Yahoo Resume
Nauk Yahoo Resume
 
Relocation Strategies Tampa Brochure
Relocation Strategies Tampa BrochureRelocation Strategies Tampa Brochure
Relocation Strategies Tampa Brochure
 
Ganesh ResumeN
Ganesh ResumeNGanesh ResumeN
Ganesh ResumeN
 
AHT action plan
AHT action planAHT action plan
AHT action plan
 
Hitesh Thakkar.resume
Hitesh Thakkar.resumeHitesh Thakkar.resume
Hitesh Thakkar.resume
 
Clarity Company Profile 2015
Clarity Company Profile 2015Clarity Company Profile 2015
Clarity Company Profile 2015
 
CV (3 October 2016)
CV (3 October 2016)CV (3 October 2016)
CV (3 October 2016)
 
Sachin_Kumar
Sachin_KumarSachin_Kumar
Sachin_Kumar
 
Using lean six sigma to improve call center operations
Using lean six sigma to improve call center operationsUsing lean six sigma to improve call center operations
Using lean six sigma to improve call center operations
 
Managing Property Performance
Managing Property PerformanceManaging Property Performance
Managing Property Performance
 
Vivek_Sharma_Profile_2016
Vivek_Sharma_Profile_2016Vivek_Sharma_Profile_2016
Vivek_Sharma_Profile_2016
 
Enabling the Shift-left Service Strategy
Enabling the Shift-left Service StrategyEnabling the Shift-left Service Strategy
Enabling the Shift-left Service Strategy
 
Abhishek Kumar
Abhishek KumarAbhishek Kumar
Abhishek Kumar
 
Are industry best practices getting you the results you expected
Are industry best practices getting you the results you expectedAre industry best practices getting you the results you expected
Are industry best practices getting you the results you expected
 
Resume
ResumeResume
Resume
 

Similar to Business systems analyst project

2016 Michael Wilson Resume
2016 Michael Wilson Resume2016 Michael Wilson Resume
2016 Michael Wilson ResumeMichael Wilson
 
Konas Mark 20160527
Konas Mark 20160527Konas Mark 20160527
Konas Mark 20160527Mark Konas
 
MMS Managed Projects - Presentation
MMS Managed Projects - PresentationMMS Managed Projects - Presentation
MMS Managed Projects - PresentationBrian Kuramoto
 
Managed Services Capability_V0.1_SMpdfpdf.pdf
Managed Services Capability_V0.1_SMpdfpdf.pdfManaged Services Capability_V0.1_SMpdfpdf.pdf
Managed Services Capability_V0.1_SMpdfpdf.pdfgemba560102
 
Developing project based Cash Forecasts
Developing project based Cash ForecastsDeveloping project based Cash Forecasts
Developing project based Cash ForecastsFrank Owen
 
Robert pearce cv v3.5
Robert pearce cv v3.5Robert pearce cv v3.5
Robert pearce cv v3.5Robert Pearce
 
Debasish Sen - Resume
Debasish Sen - ResumeDebasish Sen - Resume
Debasish Sen - ResumeDebasish Sen
 
Srinithya_Software Testing resume
Srinithya_Software Testing resumeSrinithya_Software Testing resume
Srinithya_Software Testing resumeSrinithya Kumar
 
RHulick Resume
RHulick ResumeRHulick Resume
RHulick Resumerchulick
 
MacKenzie_JamesResume
MacKenzie_JamesResumeMacKenzie_JamesResume
MacKenzie_JamesResumeJim MacKenzie
 
RESUME-MICHAELNISENSON_PMP -As of October 2015
RESUME-MICHAELNISENSON_PMP -As of October 2015RESUME-MICHAELNISENSON_PMP -As of October 2015
RESUME-MICHAELNISENSON_PMP -As of October 2015Michael Nisenson, PMP
 
Pravallika_Reddy_profile.V1
Pravallika_Reddy_profile.V1Pravallika_Reddy_profile.V1
Pravallika_Reddy_profile.V1Pravallika Reddy
 
Keep calm and carry on – How to run a data migration in the middle of lockdow...
Keep calm and carry on – How to run a data migration in the middle of lockdow...Keep calm and carry on – How to run a data migration in the middle of lockdow...
Keep calm and carry on – How to run a data migration in the middle of lockdow...Association for Project Management
 
Drupal Camp Wroclaw 2015 Measure everything nps
Drupal Camp Wroclaw 2015 Measure everything npsDrupal Camp Wroclaw 2015 Measure everything nps
Drupal Camp Wroclaw 2015 Measure everything npsAndy Kucharski
 

Similar to Business systems analyst project (20)

2016 Michael Wilson Resume
2016 Michael Wilson Resume2016 Michael Wilson Resume
2016 Michael Wilson Resume
 
Konas Mark 20160527
Konas Mark 20160527Konas Mark 20160527
Konas Mark 20160527
 
MMS Managed Projects - Presentation
MMS Managed Projects - PresentationMMS Managed Projects - Presentation
MMS Managed Projects - Presentation
 
Managed Services Capability_V0.1_SMpdfpdf.pdf
Managed Services Capability_V0.1_SMpdfpdf.pdfManaged Services Capability_V0.1_SMpdfpdf.pdf
Managed Services Capability_V0.1_SMpdfpdf.pdf
 
Developing project based Cash Forecasts
Developing project based Cash ForecastsDeveloping project based Cash Forecasts
Developing project based Cash Forecasts
 
Robert pearce cv v3.5
Robert pearce cv v3.5Robert pearce cv v3.5
Robert pearce cv v3.5
 
Resume
ResumeResume
Resume
 
Debasish Sen - Resume
Debasish Sen - ResumeDebasish Sen - Resume
Debasish Sen - Resume
 
Srinithya_Software Testing resume
Srinithya_Software Testing resumeSrinithya_Software Testing resume
Srinithya_Software Testing resume
 
RHulick Resume
RHulick ResumeRHulick Resume
RHulick Resume
 
MacKenzie_JamesResume
MacKenzie_JamesResumeMacKenzie_JamesResume
MacKenzie_JamesResume
 
RESUME-MICHAELNISENSON_PMP -As of October 2015
RESUME-MICHAELNISENSON_PMP -As of October 2015RESUME-MICHAELNISENSON_PMP -As of October 2015
RESUME-MICHAELNISENSON_PMP -As of October 2015
 
Vaibhav_Keshari 12
Vaibhav_Keshari 12Vaibhav_Keshari 12
Vaibhav_Keshari 12
 
Pravallika_Reddy_profile.V1
Pravallika_Reddy_profile.V1Pravallika_Reddy_profile.V1
Pravallika_Reddy_profile.V1
 
jstrugala resume2016
jstrugala resume2016jstrugala resume2016
jstrugala resume2016
 
Keep calm and carry on – How to run a data migration in the middle of lockdow...
Keep calm and carry on – How to run a data migration in the middle of lockdow...Keep calm and carry on – How to run a data migration in the middle of lockdow...
Keep calm and carry on – How to run a data migration in the middle of lockdow...
 
Anuraag-Resume
Anuraag-ResumeAnuraag-Resume
Anuraag-Resume
 
Resume
Resume Resume
Resume
 
Drupal Camp Wroclaw 2015 Measure everything nps
Drupal Camp Wroclaw 2015 Measure everything npsDrupal Camp Wroclaw 2015 Measure everything nps
Drupal Camp Wroclaw 2015 Measure everything nps
 
Anita_Fernando
Anita_FernandoAnita_Fernando
Anita_Fernando
 

Recently uploaded

Sensing the Future: Anomaly Detection and Event Prediction in Sensor Networks
Sensing the Future: Anomaly Detection and Event Prediction in Sensor NetworksSensing the Future: Anomaly Detection and Event Prediction in Sensor Networks
Sensing the Future: Anomaly Detection and Event Prediction in Sensor NetworksBoston Institute of Analytics
 
如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证
如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证
如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证ju0dztxtn
 
What is Insertion Sort. Its basic information
What is Insertion Sort. Its basic informationWhat is Insertion Sort. Its basic information
What is Insertion Sort. Its basic informationmuqadasqasim10
 
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证acoha1
 
The Significance of Transliteration Enhancing
The Significance of Transliteration EnhancingThe Significance of Transliteration Enhancing
The Significance of Transliteration Enhancingmohamed Elzalabany
 
Abortion Clinic in Randfontein +27791653574 Randfontein WhatsApp Abortion Cli...
Abortion Clinic in Randfontein +27791653574 Randfontein WhatsApp Abortion Cli...Abortion Clinic in Randfontein +27791653574 Randfontein WhatsApp Abortion Cli...
Abortion Clinic in Randfontein +27791653574 Randfontein WhatsApp Abortion Cli...mikehavy0
 
Formulas dax para power bI de microsoft.pdf
Formulas dax para power bI de microsoft.pdfFormulas dax para power bI de microsoft.pdf
Formulas dax para power bI de microsoft.pdfRobertoOcampo24
 
MATERI MANAJEMEN OF PENYAKIT TETANUS.ppt
MATERI  MANAJEMEN OF PENYAKIT TETANUS.pptMATERI  MANAJEMEN OF PENYAKIT TETANUS.ppt
MATERI MANAJEMEN OF PENYAKIT TETANUS.pptRachmaGhifari
 
原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证
原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证
原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证pwgnohujw
 
社内勉強会資料  Mamba - A new era or ephemeral
社内勉強会資料   Mamba - A new era or ephemeral社内勉強会資料   Mamba - A new era or ephemeral
社内勉強会資料  Mamba - A new era or ephemeralNABLAS株式会社
 
How to Transform Clinical Trial Management with Advanced Data Analytics
How to Transform Clinical Trial Management with Advanced Data AnalyticsHow to Transform Clinical Trial Management with Advanced Data Analytics
How to Transform Clinical Trial Management with Advanced Data AnalyticsBrainSell Technologies
 
edited gordis ebook sixth edition david d.pdf
edited gordis ebook sixth edition david d.pdfedited gordis ebook sixth edition david d.pdf
edited gordis ebook sixth edition david d.pdfgreat91
 
一比一原版麦考瑞大学毕业证成绩单如何办理
一比一原版麦考瑞大学毕业证成绩单如何办理一比一原版麦考瑞大学毕业证成绩单如何办理
一比一原版麦考瑞大学毕业证成绩单如何办理cyebo
 
Aggregations - The Elasticsearch "GROUP BY"
Aggregations - The Elasticsearch "GROUP BY"Aggregations - The Elasticsearch "GROUP BY"
Aggregations - The Elasticsearch "GROUP BY"John Sobanski
 
一比一原版阿德莱德大学毕业证成绩单如何办理
一比一原版阿德莱德大学毕业证成绩单如何办理一比一原版阿德莱德大学毕业证成绩单如何办理
一比一原版阿德莱德大学毕业证成绩单如何办理pyhepag
 
Identify Rules that Predict Patient’s Heart Disease - An Application of Decis...
Identify Rules that Predict Patient’s Heart Disease - An Application of Decis...Identify Rules that Predict Patient’s Heart Disease - An Application of Decis...
Identify Rules that Predict Patient’s Heart Disease - An Application of Decis...ThinkInnovation
 
Northern New England Tableau User Group (TUG) May 2024
Northern New England Tableau User Group (TUG) May 2024Northern New England Tableau User Group (TUG) May 2024
Northern New England Tableau User Group (TUG) May 2024patrickdtherriault
 
如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一
如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一
如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一fztigerwe
 

Recently uploaded (20)

123.docx. .
123.docx.                                 .123.docx.                                 .
123.docx. .
 
Sensing the Future: Anomaly Detection and Event Prediction in Sensor Networks
Sensing the Future: Anomaly Detection and Event Prediction in Sensor NetworksSensing the Future: Anomaly Detection and Event Prediction in Sensor Networks
Sensing the Future: Anomaly Detection and Event Prediction in Sensor Networks
 
如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证
如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证
如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证
 
What is Insertion Sort. Its basic information
What is Insertion Sort. Its basic informationWhat is Insertion Sort. Its basic information
What is Insertion Sort. Its basic information
 
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
 
The Significance of Transliteration Enhancing
The Significance of Transliteration EnhancingThe Significance of Transliteration Enhancing
The Significance of Transliteration Enhancing
 
Abortion Clinic in Randfontein +27791653574 Randfontein WhatsApp Abortion Cli...
Abortion Clinic in Randfontein +27791653574 Randfontein WhatsApp Abortion Cli...Abortion Clinic in Randfontein +27791653574 Randfontein WhatsApp Abortion Cli...
Abortion Clinic in Randfontein +27791653574 Randfontein WhatsApp Abortion Cli...
 
Formulas dax para power bI de microsoft.pdf
Formulas dax para power bI de microsoft.pdfFormulas dax para power bI de microsoft.pdf
Formulas dax para power bI de microsoft.pdf
 
MATERI MANAJEMEN OF PENYAKIT TETANUS.ppt
MATERI  MANAJEMEN OF PENYAKIT TETANUS.pptMATERI  MANAJEMEN OF PENYAKIT TETANUS.ppt
MATERI MANAJEMEN OF PENYAKIT TETANUS.ppt
 
原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证
原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证
原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证
 
社内勉強会資料  Mamba - A new era or ephemeral
社内勉強会資料   Mamba - A new era or ephemeral社内勉強会資料   Mamba - A new era or ephemeral
社内勉強会資料  Mamba - A new era or ephemeral
 
How to Transform Clinical Trial Management with Advanced Data Analytics
How to Transform Clinical Trial Management with Advanced Data AnalyticsHow to Transform Clinical Trial Management with Advanced Data Analytics
How to Transform Clinical Trial Management with Advanced Data Analytics
 
edited gordis ebook sixth edition david d.pdf
edited gordis ebook sixth edition david d.pdfedited gordis ebook sixth edition david d.pdf
edited gordis ebook sixth edition david d.pdf
 
一比一原版麦考瑞大学毕业证成绩单如何办理
一比一原版麦考瑞大学毕业证成绩单如何办理一比一原版麦考瑞大学毕业证成绩单如何办理
一比一原版麦考瑞大学毕业证成绩单如何办理
 
Aggregations - The Elasticsearch "GROUP BY"
Aggregations - The Elasticsearch "GROUP BY"Aggregations - The Elasticsearch "GROUP BY"
Aggregations - The Elasticsearch "GROUP BY"
 
一比一原版阿德莱德大学毕业证成绩单如何办理
一比一原版阿德莱德大学毕业证成绩单如何办理一比一原版阿德莱德大学毕业证成绩单如何办理
一比一原版阿德莱德大学毕业证成绩单如何办理
 
Identify Rules that Predict Patient’s Heart Disease - An Application of Decis...
Identify Rules that Predict Patient’s Heart Disease - An Application of Decis...Identify Rules that Predict Patient’s Heart Disease - An Application of Decis...
Identify Rules that Predict Patient’s Heart Disease - An Application of Decis...
 
Abortion pills in Riyadh Saudi Arabia (+966572737505 buy cytotec
Abortion pills in Riyadh Saudi Arabia (+966572737505 buy cytotecAbortion pills in Riyadh Saudi Arabia (+966572737505 buy cytotec
Abortion pills in Riyadh Saudi Arabia (+966572737505 buy cytotec
 
Northern New England Tableau User Group (TUG) May 2024
Northern New England Tableau User Group (TUG) May 2024Northern New England Tableau User Group (TUG) May 2024
Northern New England Tableau User Group (TUG) May 2024
 
如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一
如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一
如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一
 

Business systems analyst project

  • 2. Contents 1. Project Background 2. Methodologies Utilized 3. Business Systems Analyst Role over the Assignment/Project 4. Challenges 5. Outcomes ASSIGNMENT
  • 3. Assignment / Project Background In the 2nd quarter 2017, YP determined additional call centers would be closed as they were no longer fiscally viable. The Jacksonville, and eventually Madison Heights call centers needed to be closed by September 29th 2017. They were notified of the closures on July 24th; impacted individuals would be allowed to stay until closure and expected to handle as many customers as possible. Non-impacted centers needed to be prepared to absorb the remaining workload. Task: • Forecast workforce needs in non-impacted centers. • Calculate customers needed to keep impacted centers busy until closure. • Monitor activity and movement of customers during transition with minimal impact to results and customer satisfaction. • Communicate with all departments on project status.
  • 4. Assignment / Project Background Jacksonville: • Initial Headcount: 72 • Final Headcount: 53 (loss of 19 sales people) • Number of customers transitioned or closed: 12,000 • Close announcement: 7/24 • Center close date: 9/29 Madison Heights: • Initial Headcount: 42 • Final Headcount: 39 (loss of 3 sales people) • Number of customers transitioned or closed: 8,000 • Close announcement: 7/24 • Center close date: 9/29 * Responsible for 40,000 total customers throughout the project.
  • 5. Methodologies Utilized While many of the non-functional requirements and business process modeling were well defined and utilized, my focus was on two main areas. Data modeling- collected large amounts of data to; forecast workforce needs, track activity and monitor account transition. (Utilized from start to finish of the project.) • 40,000 customers would be impacted during the project. • Over 220 sales people impacted by the project, 114 of which were part of closing centers. SWOT Analysis- assessed our project plan based on past experience and current expectations. • Strength- we have done this project before so there is a road map. • Weakness- we are working under a tighter deadline and we have a new corporate structure involved. • Opportunities- Established methods and procedures I created allowed for a nimble and scalable process. • Threats- Disgruntled employees not effectively doing their job during closure.
  • 6. Methodologies Utilized Tools: • Access Database- Provided data for weekly view of all available and assigned customer base. • Excel- Used to create dashboard view of impacted customers and forecast workforce needs. Shared with project team weekly. Role players: • Operations- Provide overall guidance throughout the project, track progress and make recommendations based on outcomes. • Human Resources- Managed the people portion of the project; closure announcement, on-boarding and off-boarding of employees and compensation. • Real Estate- Assured that all assets and buildings were secured and accounted for upon closure. • Market Assignment- Once customer movement needs were identified, they were responsible for moving those accounts quickly and accurately. • Sales- Impacted sales people were given incentive to stay until closure and earn income. Non-impacted employees were prepped to begin taking on more workload.
  • 7. Business Systems Analyst Role I was tasked with creating a calendar view for the number of customers in each center to monitor activity and workforce needs along with identifying any pinch points in the complete transition of those customers. Then make recommendations based on my findings. • The calendar identified by month how many customers we were required to service. • Based on historical trends the average closes expected were then calculated and remaining business days identified. • Formula: (Total number of customers/business days/avg. closes per day)=workforce need • Using that data, the workforce model forecasts how many accounts non- impacted centers could handle based on their current headcount. • I worked with our assignment department to assure identified clean customers were moved to non-impacted centers while impacted centers kept in-progress customers. • If an overage was identified, those additional customers would be considered for a postal mail campaign. (Ultimately not needed) • I communicated weekly on the project status with the entire team. • Throughout the process, I also monitored daily activity in all centers to assure no customers would be orphaned upon center closure.
  • 8. Business Systems Analyst Role I was tasked with creating a calendar view for the number of customers in each center to monitor activity and workforce needs along with identifying any pinch points in the complete transition of those customers. Row Labels Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Birmingham CC 738 2,236 2,182 2,342 2,903 2,152 Jacksonville CC 327 1,317 1,294 1,437 1,876 1,331 Telesales DQ 249 909 961 1,214 1,623 1,030 Grand Total 1,314 4,462 4,436 4,993 6,401 4,512 Closes Per Day Calculation 1.4 1.4 1.4 1.4 1.4 1.4 Closes Per Day Calculation DQ 1.6 1.6 1.6 1.6 1.6 1.6 Working Days 14 23 20 22 20 15 Workforce Need Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Birmingham CC 37.7 69.4 77.9 76.0 103.7 102.5 Jacksonville CC 16.7 40.9 46.2 46.7 67.0 63.4 Telesales DQ 11.1 24.7 30.0 34.5 50.7 42.9 Grand Total 67.0 138.6 158.4 162.1 228.6 214.9 Current HC HC Overage Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 102 Birmingham 54.3 110.3 124.1 122.7 170.7 165.9
  • 9. Challenges Challenge: One week prior to announcement of the closure of Jacksonville and project start YP was bought by DEX Media. Solution: While we were unsure of the future of the project, much of the ground work was laid and we were prepared to shift dates and implement contingency plans. Challenge: The newly formed company quickly identified Madison Heights as an additional center they wanted to close in tandem with Jacksonville. Solution: The dashboards, methods and calculations I created were already scalable, so I was able to pivot quickly to show the impact of closing an additional center. Challenge: Upon merger of YP and DEX, many key role players were immediately replaced and needed to be brought up to speed. Solution: I quickly summarized the data and project status to assure we were still on task and included them on weekly status updates.
  • 10. Outcomes On time: 100% movement within two months of 20,000 customer accounts from impacted to non-impacted call centers. • Jacksonville- monitored the closure and transition of 12,000 customers to Birmingham center in roughly 45 days. All while forecasting workforce capacity as the Birmingham center ramped up headcount and handled their already established 20,000 accounts. • Madison Heights- Transitioned 8,000 customers to a newly formed sales team in Missouri in roughly 45 days. On budget: No orphaned customers during the transition. Maintained a full workload of accounts for impacted reps to work and maintain an income during closure. Accurately forecasted workforce needs to handle transition of accounts for the non-impacted centers. All while maintaining acceptable revenue results. At the completion of closures, I provided a summary and status outcome to the project team.