PROFESSIONAL EXPERIENCE
Organization: M/S. Ashoka Distillers & Chemical Pvt. Ltd. Hathin, Palwal (HR)
Sr. InstrumentationEngg April 2013-Till date
Field: Project Execution
 To handle Total Green belt Project activities and Erection & commissioning of
Honeywell HC 900 Hybrid control based fully automated 80 KLPD MPR Distilleries
plant.
 To handle Project activities an Erection & commissioning of 25 TPH Boiler 67 Kg/cm2
workings Pressure make Cogent with PLC PM583 Make ABB.
 To handle Project activities an Erection & commissioning of 3 MW Turbine makes
Triveni Turbine Ltd.
 Handlingall pre-commissioningactivitiesaswell ascommissioningactivities,review of P&
ID, Instrumentdatasheetandspecificationsheetdevelopedbyengineeringconsultancy.
 To supervise jobs of contractor for successful implementation of commissioning
activities.
 Handled material procurement and maintaining spare for regular plant operation and
modification project activities.
 Troubleshooting/Modification of HC 900 Hybrid control Honeywell PLC & PM583
Make ABB.
 Handling Electrical activities related to VFD drive & control circuit for different section.
 Troubleshooting/ModificationrelatedtoInstrument& Electrical activitiesthat are required.
 Checking of All interlocks, no load & full load trails, Parameters settings of Panel feeders.
 Handling Operation /Maintenance and Modification projects in 1000 I/O’s Rockwell’s
Allen Bradley PLC based fully automated 45 KLPD distillery plant.
 Implementation, Planning and Execution of Project, in Plant modification jobs in co-
ordination with Technical Cell, Instrumentation Department and respective plant
engineer.
 Handling all Modification jobs Electrical & Instrumentation related to Ring Dryer Plant.
 Logic implementation & modification in Honeywell HC900 & ABB PM 583 PLC System.
 To codify all engineering items and prepare database required for implementation.
 Managing resources to perform activities in cost effective manner.
 Calibration of all type of instrument which are used in Agro Chemical plant, With
reference to master instrument.
 Instrument Air Compressor Preventive maintenance & servicing make ELGI & Chicago
Pneumatic.
ROLE AND KEY RESPONSIBILITIES
 Understandthe Processandreview of P&IDdevelopedbyEngg.Consultancy.
 Preparationof Instrumentindex sheet,JunctionBox Schedule,Erectionhook-updiagrams,BOQ
for instrumentationwork,Traylayouts,Interconnectiondetailsetc.
 Revisionof all instrumentationdocumentsissuedbythe EngineeringServicesContractors(e.g.
technical reports,specifications,procedures,drawings,etc.)
 To reviewTechnical Purchase SpecificationforFieldTransmittersuchasFlow,Pressure,
Temperature,LevelandalsoforControl Valves,On/Off Valve.
 PlanningandImplementationof developingcontrol on HC 900 hybrid& PM583 PLC Control
System.
 Finalizationof primary&secondarycable tray routine,Junctionbox,instrumentlocationetc.
 Weeklyreportssubmitforpresentweekandnextweekplanningsubmits.
 Attendingdailyjobsallottedbythe maintenance teamlike PMCheck,AlarmandTrip Checks
and otherinstrumentrelatedjobscomingupeverynow andthencalledforbythe Operations.
 Involvedinday-to-daycorrective,preventiveandshutdownmaintenanceof all
electronic/pneumaticscontrol instruments,individuallyandensure thatall maintenance works
are carriedout as standardmaintenance procedure
 Handlingtroubleshootingof control relatedproblems.
 Calibration,LoopTesting,Installationof Rosemount,Yokogawa,E&H,Siemens, Honeywell,ABB
make SMART familyFlow,Pressure,Level Transmitter, pH,Conductivitytransmitters Make
Eureka,Aster.
 Calibration&strokingof control valve & On – OFFvalve make
Forbsmarshal,Dembla,Samson,Pneucon,Chemtrol.
 Servicing&maintenance of ACVFDdrive make ABB, AllenBradley,Schneider,Siemens,Delta.
 Servicing&maintenance of SoftStartermake ABB.
 Preparing Preventive maintenance schedule of various machineries and equipments to
increase machine uptime and equipment reliability

Work Experience (8 Year)
 Ashoka Distillers& ChemicalsPvt. Ltd. Hathin , Palwal (HR).
Duration April 2013 to till date.
 Nuway Organics Natural (I) Ltd, Rajpura (Punjab) Ayur groups Distillery.
Duration Feb. 2011 –March 2013.
 RAJ IndustriesPvt. Ltd. Belydeor(Nalagarh) H.P. , Manufactures of Fatty Acid, Glycerine,Soap
Noodles’& Soap.
Duration Oct. 2008 –Feb.2011.
 PiccadillySugar & AlliedInd.Ltd. Patran Distt. Patiala (Punjab)
Duration May 2008 –Oct. 2008.
IT SKILL
 Basic knowledgeof Computer&Internetusing.
 Good knowledgeof MicrosoftExcel,MSWord. WindowsXP,Vista,XP7.
 ComputerHardwiring.
 Comfortable usingWindowsOperatingSystem
 SCADA Software Honeywell HC 900 & ABB XA- 800.
EDUCATION
Examination Institution
Marks
Obtained
BE Electrical JRN University Rajasthan 65%
Diploma (ETE) GTB Khalsa Polytechnic College,Malout (PB) 65%
10th Govt. Sr. Sec. School Khanouri, Sangrur (PB) 80%
PERSONAL DETALS
 Name: Pargat SinghNahar
 Date of Birth: 20/10/1986
 Gender: Male
 Marital Status: Married
 LanguagesKnown: Punjabi,English,Hindi.
 Nationality: Indian
 Email ID ps.nonil@yahoo.com
 Mobile No. 9467000238,8699770065
If I am fortunate enoughtofulfill yourrequirements,asbyfittingmyQualifications and
experience ,Iassure you,I am dedicatedtowork& whetmy skillsforyourEsteemedConcern.
(PargatSinghNahar)

More Related Content

What's hot

Nitin_Patil_Resume
Nitin_Patil_ResumeNitin_Patil_Resume
Nitin_Patil_Resume
Nitin Patil
 
RyanMoyer_FinalResume
RyanMoyer_FinalResumeRyanMoyer_FinalResume
RyanMoyer_FinalResume
Ryan Moyer PE
 
Rizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_CvRizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_Cv
Rizwan Javed
 
amir akhtar cv engineer - Copy
amir akhtar cv engineer - Copyamir akhtar cv engineer - Copy
amir akhtar cv engineer - Copy
amir akhtar
 
Vinod Kumar__Process_Engineer-11+ years_Exp
Vinod Kumar__Process_Engineer-11+ years_ExpVinod Kumar__Process_Engineer-11+ years_Exp
Vinod Kumar__Process_Engineer-11+ years_Exp
patelvr05
 
Instrument & Control Engineer
Instrument & Control Engineer Instrument & Control Engineer
Instrument & Control Engineer
Mahmoud Mohamed
 
Ahmad Ali Khan AGP EXP Final
Ahmad Ali Khan AGP EXP FinalAhmad Ali Khan AGP EXP Final
Ahmad Ali Khan AGP EXP Final
Ahmad Ali Khan
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
SANJAY SHARAN
 

What's hot (20)

SANDEEP (4)
SANDEEP (4)SANDEEP (4)
SANDEEP (4)
 
Nitin_Patil_Resume
Nitin_Patil_ResumeNitin_Patil_Resume
Nitin_Patil_Resume
 
RyanMoyer_FinalResume
RyanMoyer_FinalResumeRyanMoyer_FinalResume
RyanMoyer_FinalResume
 
Rizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_CvRizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_Cv
 
amir akhtar cv engineer - Copy
amir akhtar cv engineer - Copyamir akhtar cv engineer - Copy
amir akhtar cv engineer - Copy
 
Sasikumar A
Sasikumar ASasikumar A
Sasikumar A
 
Vinod Kumar__Process_Engineer-11+ years_Exp
Vinod Kumar__Process_Engineer-11+ years_ExpVinod Kumar__Process_Engineer-11+ years_Exp
Vinod Kumar__Process_Engineer-11+ years_Exp
 
afzal c.v
afzal c.vafzal c.v
afzal c.v
 
Fasil ck resume
Fasil ck resumeFasil ck resume
Fasil ck resume
 
Instrument & Control Engineer
Instrument & Control Engineer Instrument & Control Engineer
Instrument & Control Engineer
 
Dhanaji suravase resume
Dhanaji suravase resumeDhanaji suravase resume
Dhanaji suravase resume
 
Prashant pal cv
Prashant pal cvPrashant pal cv
Prashant pal cv
 
Ahmad Ali Khan AGP EXP Final
Ahmad Ali Khan AGP EXP FinalAhmad Ali Khan AGP EXP Final
Ahmad Ali Khan AGP EXP Final
 
Site Visits 6.5
Site Visits 6.5Site Visits 6.5
Site Visits 6.5
 
Sheik Nizamuddin CV
Sheik Nizamuddin CV Sheik Nizamuddin CV
Sheik Nizamuddin CV
 
Ashutosh CV
Ashutosh CVAshutosh CV
Ashutosh CV
 
Yadav Manojkumar Indrapalbhai
Yadav  Manojkumar  IndrapalbhaiYadav  Manojkumar  Indrapalbhai
Yadav Manojkumar Indrapalbhai
 
SOURAV LAHA
SOURAV LAHASOURAV LAHA
SOURAV LAHA
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
 
Rahulvikram2016
Rahulvikram2016Rahulvikram2016
Rahulvikram2016
 

Similar to Pargat Singh Nahar (20)

Nizami cv
Nizami cvNizami cv
Nizami cv
 
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
 
Kanika Chadha
Kanika ChadhaKanika Chadha
Kanika Chadha
 
RESUME
RESUMERESUME
RESUME
 
Avtar_singh CV 2016
Avtar_singh  CV 2016Avtar_singh  CV 2016
Avtar_singh CV 2016
 
SahilResume
SahilResumeSahilResume
SahilResume
 
CV PMF - L1
CV PMF - L1CV PMF - L1
CV PMF - L1
 
afri-cv
afri-cvafri-cv
afri-cv
 
Babban_Pandey-3
Babban_Pandey-3Babban_Pandey-3
Babban_Pandey-3
 
kshitij_resume_R&D
kshitij_resume_R&Dkshitij_resume_R&D
kshitij_resume_R&D
 
pavan_DCS
pavan_DCSpavan_DCS
pavan_DCS
 
Resume dt 14.12.16
Resume dt 14.12.16Resume dt 14.12.16
Resume dt 14.12.16
 
senthilkumar resume 2016
senthilkumar resume 2016senthilkumar resume 2016
senthilkumar resume 2016
 
M.Anwar C.V
M.Anwar C.VM.Anwar C.V
M.Anwar C.V
 
Automation professional
Automation professionalAutomation professional
Automation professional
 
Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa New Complete CV (1)Alfred Chikunichawa New Complete CV (1)
Alfred Chikunichawa New Complete CV (1)
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
cv Instrument Commissioning Engineer
cv Instrument Commissioning Engineercv Instrument Commissioning Engineer
cv Instrument Commissioning Engineer
 
ROSHAN-1 (1)
ROSHAN-1 (1)ROSHAN-1 (1)
ROSHAN-1 (1)
 
Profile Susheel 2016
Profile Susheel 2016Profile Susheel 2016
Profile Susheel 2016
 

Pargat Singh Nahar

  • 1. PARGAT SINGH NAHAR Contact No.9467000238,8699770065 E mail ID –ps.nonil@yahoo.com OBJECTIVE I aspire to be a part of team working on Instrumentation and Control projects where my knowledge, experience and skills can contribute significantly to the growth of the organization and myself. PROFESSIONAL EXPERIENCE Organization: M/S. Ashoka Distillers & Chemical Pvt. Ltd. Hathin, Palwal (HR) Sr. InstrumentationEngg April 2013-Till date Field: Project Execution  To handle Total Green belt Project activities and Erection & commissioning of Honeywell HC 900 Hybrid control based fully automated 80 KLPD MPR Distilleries plant.  To handle Project activities an Erection & commissioning of 25 TPH Boiler 67 Kg/cm2 workings Pressure make Cogent with PLC PM583 Make ABB.  To handle Project activities an Erection & commissioning of 3 MW Turbine makes Triveni Turbine Ltd.  Handlingall pre-commissioningactivitiesaswell ascommissioningactivities,review of P& ID, Instrumentdatasheetandspecificationsheetdevelopedbyengineeringconsultancy.  To supervise jobs of contractor for successful implementation of commissioning activities.  Handled material procurement and maintaining spare for regular plant operation and modification project activities.  Troubleshooting/Modification of HC 900 Hybrid control Honeywell PLC & PM583 Make ABB.  Handling Electrical activities related to VFD drive & control circuit for different section.  Troubleshooting/ModificationrelatedtoInstrument& Electrical activitiesthat are required.  Checking of All interlocks, no load & full load trails, Parameters settings of Panel feeders.  Handling Operation /Maintenance and Modification projects in 1000 I/O’s Rockwell’s Allen Bradley PLC based fully automated 45 KLPD distillery plant.  Implementation, Planning and Execution of Project, in Plant modification jobs in co- ordination with Technical Cell, Instrumentation Department and respective plant engineer.  Handling all Modification jobs Electrical & Instrumentation related to Ring Dryer Plant.  Logic implementation & modification in Honeywell HC900 & ABB PM 583 PLC System.  To codify all engineering items and prepare database required for implementation.  Managing resources to perform activities in cost effective manner.
  • 2.  Calibration of all type of instrument which are used in Agro Chemical plant, With reference to master instrument.  Instrument Air Compressor Preventive maintenance & servicing make ELGI & Chicago Pneumatic. ROLE AND KEY RESPONSIBILITIES  Understandthe Processandreview of P&IDdevelopedbyEngg.Consultancy.  Preparationof Instrumentindex sheet,JunctionBox Schedule,Erectionhook-updiagrams,BOQ for instrumentationwork,Traylayouts,Interconnectiondetailsetc.  Revisionof all instrumentationdocumentsissuedbythe EngineeringServicesContractors(e.g. technical reports,specifications,procedures,drawings,etc.)  To reviewTechnical Purchase SpecificationforFieldTransmittersuchasFlow,Pressure, Temperature,LevelandalsoforControl Valves,On/Off Valve.  PlanningandImplementationof developingcontrol on HC 900 hybrid& PM583 PLC Control System.  Finalizationof primary&secondarycable tray routine,Junctionbox,instrumentlocationetc.  Weeklyreportssubmitforpresentweekandnextweekplanningsubmits.  Attendingdailyjobsallottedbythe maintenance teamlike PMCheck,AlarmandTrip Checks and otherinstrumentrelatedjobscomingupeverynow andthencalledforbythe Operations.  Involvedinday-to-daycorrective,preventiveandshutdownmaintenanceof all electronic/pneumaticscontrol instruments,individuallyandensure thatall maintenance works are carriedout as standardmaintenance procedure  Handlingtroubleshootingof control relatedproblems.  Calibration,LoopTesting,Installationof Rosemount,Yokogawa,E&H,Siemens, Honeywell,ABB make SMART familyFlow,Pressure,Level Transmitter, pH,Conductivitytransmitters Make Eureka,Aster.  Calibration&strokingof control valve & On – OFFvalve make Forbsmarshal,Dembla,Samson,Pneucon,Chemtrol.  Servicing&maintenance of ACVFDdrive make ABB, AllenBradley,Schneider,Siemens,Delta.  Servicing&maintenance of SoftStartermake ABB.  Preparing Preventive maintenance schedule of various machineries and equipments to increase machine uptime and equipment reliability  Work Experience (8 Year)  Ashoka Distillers& ChemicalsPvt. Ltd. Hathin , Palwal (HR). Duration April 2013 to till date.  Nuway Organics Natural (I) Ltd, Rajpura (Punjab) Ayur groups Distillery. Duration Feb. 2011 –March 2013.
  • 3.  RAJ IndustriesPvt. Ltd. Belydeor(Nalagarh) H.P. , Manufactures of Fatty Acid, Glycerine,Soap Noodles’& Soap. Duration Oct. 2008 –Feb.2011.  PiccadillySugar & AlliedInd.Ltd. Patran Distt. Patiala (Punjab) Duration May 2008 –Oct. 2008. IT SKILL  Basic knowledgeof Computer&Internetusing.  Good knowledgeof MicrosoftExcel,MSWord. WindowsXP,Vista,XP7.  ComputerHardwiring.  Comfortable usingWindowsOperatingSystem  SCADA Software Honeywell HC 900 & ABB XA- 800. EDUCATION Examination Institution Marks Obtained BE Electrical JRN University Rajasthan 65% Diploma (ETE) GTB Khalsa Polytechnic College,Malout (PB) 65% 10th Govt. Sr. Sec. School Khanouri, Sangrur (PB) 80% PERSONAL DETALS  Name: Pargat SinghNahar  Date of Birth: 20/10/1986  Gender: Male  Marital Status: Married  LanguagesKnown: Punjabi,English,Hindi.  Nationality: Indian  Email ID ps.nonil@yahoo.com  Mobile No. 9467000238,8699770065 If I am fortunate enoughtofulfill yourrequirements,asbyfittingmyQualifications and experience ,Iassure you,I am dedicatedtowork& whetmy skillsforyourEsteemedConcern. (PargatSinghNahar)