SlideShare a Scribd company logo
1 of 2
Download to read offline
MUHAMMAD KASHIF JAMIL 
Permanent Address: 
House No 284/285 , street water tank Labour Colony Sahiwal Pakistan. 
Mobile Number: 00923146260564 
CNIC No: 36502-1930571-5 
Date Of Birth 10 Jan 1988 
Email Address:kashif.jamil@yahoo.com 
Nationality: Pakistani OBJECTIVE 
Seeking a challenging, development-oriented career within a dynamic and progressive organization where enthusiasm, dedication and the ability to manage tasks effectively are the pre-requisite in driving the organization forward. EDUCATION 
 B.Sc. Mechanical Engineering (2014) 
UET Lahore 3.523 /4.0 CGPA 
 B.TECH (Pass) Mechanical (2010) 
BZU Multan 82.2% 
 DAE Mechanical (2007) 
Govt. Collage of Technology Sahiwal 75.6% 
 Matric (science ) (2004) 
Govt. High School Sahiwal 64.588% 
EXPERIENCE 
SAIF COMBINE CYCLE POWER PLANT. Operation Supervisor 
225MWe ( G.E 6FA G.T & SST900 STG) May 2009 to 14TH Oct 2010 
Worked on commissioning of GE Gas turbines and Siemens Steam Turbine of Combine Cycle Power Plant. Project is commissioned successfully, later on activities along with G.E energy O&M team 
 Control room operations i.e. switching, controlling, operation. 
 Maintaining shift Log, reading sheets, local control room operations and field operations. 
 Use of Computer based maintenance management system i.e. 
1- Maximo version 6.0 
 Supervised Startup and shut down of complex. 
 Operate complex under technical limits. 
 Heat recovery steam generator Nooter Ericson (125*2 T/H) 
 Mark-VI control system for Gas Turbines.  Siematic PCS-7 DCS control of Siemens steam turbine. 
 PACiS HMI for power distribution control make AREVA. 
 DCS control Baily infi 90 system for HRSGs and Balance of plant make ABB. 
 BOP system i.e. Water bath heater for gas heating, Deep well turbine pumps network, Air compressor, auxiliary Boiler, De-mineralized Water Treatment Plant (RO type), 
 Switching of 132kv Gas Insulated Switchgear (GIS). 
 Carried out all plant capacity test i.e. initial capacity test, reliability test, performance test, etc 
 Fully involves in the plant startup, plant normal power operation, power reduction and handling all types of transients in all phases of plant. 
 System Line up, Isolation, normalization & Priming Of systems 
CENTURY PAPER & BOARD MILLS. Trainee Technician 
Power Plant Department Oct 2007 to March 2008 
 Maintenance all types of valve , replacing gaskit , Lube oil and inspection. 
 All type strainer checking and replacing 
 Vibration analysis measurement and condoning monitoring 
 Use of Computer based maintenance management system 
TELE TOWER –PROJECTED BY IKAN Supervisor 
Manufacturing Department July 2007 to Oct 2007 
 Arc and gas welding inspection and Legs Operation Limit checking 
 Ladder galvanizing , Modification of components in CAD
 Mechanical workshop under all the mechanical operation related to tower . INTERNSHIP 
Dawood Hercules fertilizers(1 month) 
Departments: (Planning section, Equipment section, Machinery section, Workshop section) 
 Valves (NRV’S, PRV,S, PSV’S, Gate, plug, globe etc),gaskets and their function, 
 Maintenance planning, knowledge about MWR and work permit 
 Balancing of parts(dynamic balancing, rotors of turbines and any other parts 
 presentation on understanding of valves (at DH plant) & presenting to incharges and respective Engineers. 
Qadirpur Gas Field OGDCL ( One Week ) 
 Gained a lot of practical knowledge about valves (NRV’S, PRV,S, PSV’S, Gate, plug, globe etc),gaskets and their function, maintenance planning, knowledge 
 Vibration analysis techniques and special working on taking vibrations of cooling tower , compressors , motors, and boroscopy of gas turbine . PROJECTS 
FINAL YEAR PROJECT 
Working on Reliability Centered Maintenance (RCM ) Implementation on feed water pump at Baloki 225 MW, in UET LHR. ( BSc Engineering ) 
 Maintenance and its technique 
 RCM and its criticality on bases of RPN No 
 FMECA 
 Cost Evaluation 
ACADMIC PROJECTS 
 Design and manufacturing the heat exchanger (ASME Technical Project Competition) TECHNICAL AND EHS Training 
MARK V1 
 Certificate of MARK V1 control system for 6FA G.E gas turbine. 
SISMENS SST 900 
 Certificate OF Operation and control of SISMENS SST 900 steam turbine. 
CMEC 
SGS 
 PLANT system training from china machinery export company CMEC. 
 Inspection ,measurement and testing 
Maximo version 6.0 
EHS 
 Responsible for authorization of work permit 
 One Month on EHS Procedure of GE 
 Firefighting, LOTO, First aid, PPE awareness, chemical spill etc. 
 Three days First Aid Training by Red Crescent Society of Pakistan. 
GE on line training 
 32 On line Technical and EHS training through GE online learning program 
E-learning essential for every employee, also attend refresher courses. 
COMPUTER SKILLS 
1-Auto CAD 2- Solid Edge 3- Microsoft office 4- CNC Lathe 
5-MAT Lab 6-Primavera 7- ANSYS 8-FPWIN Pro 5 SHORT COURSES 
1- Safety/Risk Management 2- Auto Cad 3- CNC Lathe 4- AHM( Assets Health Management ) DISTINCTIONS 
1- I got 2nd position in B.Tech (pass) Mechanical Technology ,securing 1195/1450. 
2- I was the group leader of my final year project. PERSONAL SKILLS 
 Working as a leader in Final Year Project in B.Tech (pass) 
 Creative, self-motivated with strong interpersonal skills, always ready to tackle the problems 
 Excellent communication skills and leadership qualities, team man 
 Swiftto adapt changes according to the working conditions. EXTRACURRICULAR ACTIVITIES 
 I was the captain of my hostel cricket team so it added to my leadership qualities. 
 Reading, cooking, playing games on PC 
 Running, jogging, swimming

More Related Content

What's hot

Ahmad Ali Khan AGP EXP Final
Ahmad Ali Khan AGP EXP FinalAhmad Ali Khan AGP EXP Final
Ahmad Ali Khan AGP EXP Final
Ahmad Ali Khan
 
Resume_vishwesh_April 16
Resume_vishwesh_April 16Resume_vishwesh_April 16
Resume_vishwesh_April 16
Vishwesh Patel
 
amir akhtar cv engineer - Copy
amir akhtar cv engineer - Copyamir akhtar cv engineer - Copy
amir akhtar cv engineer - Copy
amir akhtar
 
ALBARICK POWER PLANT NEW CV
ALBARICK POWER PLANT NEW CVALBARICK POWER PLANT NEW CV
ALBARICK POWER PLANT NEW CV
al barick
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
SANJAY SHARAN
 
Bilal.cv
Bilal.cvBilal.cv
Bilal.cv
Mohammad Bilal
 
SuryaMohan_Resume_2016
SuryaMohan_Resume_2016SuryaMohan_Resume_2016
SuryaMohan_Resume_2016
Surya Mohan
 
CV RIZWAN (Instrumentation)
CV RIZWAN (Instrumentation)CV RIZWAN (Instrumentation)
CV RIZWAN (Instrumentation)
Rizwan Ullah
 

What's hot (19)

Ahmad Ali Khan AGP EXP Final
Ahmad Ali Khan AGP EXP FinalAhmad Ali Khan AGP EXP Final
Ahmad Ali Khan AGP EXP Final
 
Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
 
Resume_vishwesh_April 16
Resume_vishwesh_April 16Resume_vishwesh_April 16
Resume_vishwesh_April 16
 
amir akhtar cv engineer - Copy
amir akhtar cv engineer - Copyamir akhtar cv engineer - Copy
amir akhtar cv engineer - Copy
 
SANDEEP (4)
SANDEEP (4)SANDEEP (4)
SANDEEP (4)
 
khizar hayat cv.
khizar hayat cv.khizar hayat cv.
khizar hayat cv.
 
Resume- Ram Raj Yadav
Resume- Ram Raj YadavResume- Ram Raj Yadav
Resume- Ram Raj Yadav
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
 
ALBARICK POWER PLANT NEW CV
ALBARICK POWER PLANT NEW CVALBARICK POWER PLANT NEW CV
ALBARICK POWER PLANT NEW CV
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
 
Kanika Chadha
Kanika ChadhaKanika Chadha
Kanika Chadha
 
Waqar zeb cv
Waqar zeb cvWaqar zeb cv
Waqar zeb cv
 
Bilal.cv
Bilal.cvBilal.cv
Bilal.cv
 
Sarvesh_CV (2)
Sarvesh_CV (2)Sarvesh_CV (2)
Sarvesh_CV (2)
 
Site Visits 6.5
Site Visits 6.5Site Visits 6.5
Site Visits 6.5
 
CV Agha Shuaib August 16
CV Agha Shuaib August 16CV Agha Shuaib August 16
CV Agha Shuaib August 16
 
Yadav Manojkumar Indrapalbhai
Yadav  Manojkumar  IndrapalbhaiYadav  Manojkumar  Indrapalbhai
Yadav Manojkumar Indrapalbhai
 
SuryaMohan_Resume_2016
SuryaMohan_Resume_2016SuryaMohan_Resume_2016
SuryaMohan_Resume_2016
 
CV RIZWAN (Instrumentation)
CV RIZWAN (Instrumentation)CV RIZWAN (Instrumentation)
CV RIZWAN (Instrumentation)
 

Similar to cv

RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATEL
Rakesh patel
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15
Mahboob Iqbal
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
Zaheer Ahmed
 
khaled ramdan osman -kiln coach
khaled ramdan osman -kiln coachkhaled ramdan osman -kiln coach
khaled ramdan osman -kiln coach
Khalid RamDAn
 

Similar to cv (20)

RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATEL
 
Chaithanya Potluri
Chaithanya PotluriChaithanya Potluri
Chaithanya Potluri
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15
 
M.Yesrub Iqbal
M.Yesrub IqbalM.Yesrub Iqbal
M.Yesrub Iqbal
 
Cv tapan kumar prusty updated
Cv tapan kumar prusty updatedCv tapan kumar prusty updated
Cv tapan kumar prusty updated
 
Nizami cv
Nizami cvNizami cv
Nizami cv
 
RESUME
RESUMERESUME
RESUME
 
RABIGH II Resume ksa
RABIGH II Resume ksaRABIGH II Resume ksa
RABIGH II Resume ksa
 
CV-VP-KEMYA
CV-VP-KEMYACV-VP-KEMYA
CV-VP-KEMYA
 
Nizami_CV
Nizami_CVNizami_CV
Nizami_CV
 
Reneesh@brahamOffshore
Reneesh@brahamOffshoreReneesh@brahamOffshore
Reneesh@brahamOffshore
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
viklesh essar
viklesh essarviklesh essar
viklesh essar
 
Pramod cv 04 feb2016
Pramod cv 04 feb2016Pramod cv 04 feb2016
Pramod cv 04 feb2016
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Turbine and Auxillaries
Turbine and AuxillariesTurbine and Auxillaries
Turbine and Auxillaries
 
Vel Linked In CV
Vel Linked In CVVel Linked In CV
Vel Linked In CV
 
khaled ramdan osman -kiln coach
khaled ramdan osman -kiln coachkhaled ramdan osman -kiln coach
khaled ramdan osman -kiln coach
 
mohamed moustafa resume
mohamed moustafa resumemohamed moustafa resume
mohamed moustafa resume
 

cv

  • 1. MUHAMMAD KASHIF JAMIL Permanent Address: House No 284/285 , street water tank Labour Colony Sahiwal Pakistan. Mobile Number: 00923146260564 CNIC No: 36502-1930571-5 Date Of Birth 10 Jan 1988 Email Address:kashif.jamil@yahoo.com Nationality: Pakistani OBJECTIVE Seeking a challenging, development-oriented career within a dynamic and progressive organization where enthusiasm, dedication and the ability to manage tasks effectively are the pre-requisite in driving the organization forward. EDUCATION  B.Sc. Mechanical Engineering (2014) UET Lahore 3.523 /4.0 CGPA  B.TECH (Pass) Mechanical (2010) BZU Multan 82.2%  DAE Mechanical (2007) Govt. Collage of Technology Sahiwal 75.6%  Matric (science ) (2004) Govt. High School Sahiwal 64.588% EXPERIENCE SAIF COMBINE CYCLE POWER PLANT. Operation Supervisor 225MWe ( G.E 6FA G.T & SST900 STG) May 2009 to 14TH Oct 2010 Worked on commissioning of GE Gas turbines and Siemens Steam Turbine of Combine Cycle Power Plant. Project is commissioned successfully, later on activities along with G.E energy O&M team  Control room operations i.e. switching, controlling, operation.  Maintaining shift Log, reading sheets, local control room operations and field operations.  Use of Computer based maintenance management system i.e. 1- Maximo version 6.0  Supervised Startup and shut down of complex.  Operate complex under technical limits.  Heat recovery steam generator Nooter Ericson (125*2 T/H)  Mark-VI control system for Gas Turbines.  Siematic PCS-7 DCS control of Siemens steam turbine.  PACiS HMI for power distribution control make AREVA.  DCS control Baily infi 90 system for HRSGs and Balance of plant make ABB.  BOP system i.e. Water bath heater for gas heating, Deep well turbine pumps network, Air compressor, auxiliary Boiler, De-mineralized Water Treatment Plant (RO type),  Switching of 132kv Gas Insulated Switchgear (GIS).  Carried out all plant capacity test i.e. initial capacity test, reliability test, performance test, etc  Fully involves in the plant startup, plant normal power operation, power reduction and handling all types of transients in all phases of plant.  System Line up, Isolation, normalization & Priming Of systems CENTURY PAPER & BOARD MILLS. Trainee Technician Power Plant Department Oct 2007 to March 2008  Maintenance all types of valve , replacing gaskit , Lube oil and inspection.  All type strainer checking and replacing  Vibration analysis measurement and condoning monitoring  Use of Computer based maintenance management system TELE TOWER –PROJECTED BY IKAN Supervisor Manufacturing Department July 2007 to Oct 2007  Arc and gas welding inspection and Legs Operation Limit checking  Ladder galvanizing , Modification of components in CAD
  • 2.  Mechanical workshop under all the mechanical operation related to tower . INTERNSHIP Dawood Hercules fertilizers(1 month) Departments: (Planning section, Equipment section, Machinery section, Workshop section)  Valves (NRV’S, PRV,S, PSV’S, Gate, plug, globe etc),gaskets and their function,  Maintenance planning, knowledge about MWR and work permit  Balancing of parts(dynamic balancing, rotors of turbines and any other parts  presentation on understanding of valves (at DH plant) & presenting to incharges and respective Engineers. Qadirpur Gas Field OGDCL ( One Week )  Gained a lot of practical knowledge about valves (NRV’S, PRV,S, PSV’S, Gate, plug, globe etc),gaskets and their function, maintenance planning, knowledge  Vibration analysis techniques and special working on taking vibrations of cooling tower , compressors , motors, and boroscopy of gas turbine . PROJECTS FINAL YEAR PROJECT Working on Reliability Centered Maintenance (RCM ) Implementation on feed water pump at Baloki 225 MW, in UET LHR. ( BSc Engineering )  Maintenance and its technique  RCM and its criticality on bases of RPN No  FMECA  Cost Evaluation ACADMIC PROJECTS  Design and manufacturing the heat exchanger (ASME Technical Project Competition) TECHNICAL AND EHS Training MARK V1  Certificate of MARK V1 control system for 6FA G.E gas turbine. SISMENS SST 900  Certificate OF Operation and control of SISMENS SST 900 steam turbine. CMEC SGS  PLANT system training from china machinery export company CMEC.  Inspection ,measurement and testing Maximo version 6.0 EHS  Responsible for authorization of work permit  One Month on EHS Procedure of GE  Firefighting, LOTO, First aid, PPE awareness, chemical spill etc.  Three days First Aid Training by Red Crescent Society of Pakistan. GE on line training  32 On line Technical and EHS training through GE online learning program E-learning essential for every employee, also attend refresher courses. COMPUTER SKILLS 1-Auto CAD 2- Solid Edge 3- Microsoft office 4- CNC Lathe 5-MAT Lab 6-Primavera 7- ANSYS 8-FPWIN Pro 5 SHORT COURSES 1- Safety/Risk Management 2- Auto Cad 3- CNC Lathe 4- AHM( Assets Health Management ) DISTINCTIONS 1- I got 2nd position in B.Tech (pass) Mechanical Technology ,securing 1195/1450. 2- I was the group leader of my final year project. PERSONAL SKILLS  Working as a leader in Final Year Project in B.Tech (pass)  Creative, self-motivated with strong interpersonal skills, always ready to tackle the problems  Excellent communication skills and leadership qualities, team man  Swiftto adapt changes according to the working conditions. EXTRACURRICULAR ACTIVITIES  I was the captain of my hostel cricket team so it added to my leadership qualities.  Reading, cooking, playing games on PC  Running, jogging, swimming