5.2 BENCHMARK PROJECT ALLOCATION
Project: THE LOFT (2 tower blocks, 6 storey parking, 1 storey ameneties floor, 30 storey of 600 condominium units)
GFA: 119,210M2
*All quantities extrcted from Bills of Quantities and subject to change for project construction cost appraisal estimation
TOTAL
Total Cost Cost Ratio Total Cost Cost Ratio Total Cost Cost Ratio CONSTRUCTION
(Benchmark (Benchmark (Benchmark (Benchmark (Benchmark (Benchmark COST
Project) Project) Project) Project) Project) Project)
1.00 SUBSTRUCTURE
1.01 Site Preparation 672,718.42 0.51% - 0.00% - 0.00% 672,718.42
1.02 Piling 2,308,800.08 1.76% - 0.00% - 0.00% 2,308,800.08
1.03 Foundations 460,417.50 0.35% 804,770.97 0.61% - 0.00% 1,265,188.47
1.04 Basement Carcass 2,953,504.65 2.26% - 0.00% - 0.00% 2,953,504.65
Group Element Total 6,395,440.64 4.89% 804,770.97 0.61% - 0.00% 7,200,211.61
2.00 STRUCTURAL FRAME
2.01 Frame 3,732,914.96 2.85% 7,025,726.64 5.37% 16,595,967.23 12.68% 27,354,608.83
2.02 Transfer Structures - 0.00% 1,892,822.71 1.45% 554,327.62 0.42% 2,447,150.33
2.03 Staircase and Ramps 106,307.01 0.08% 372,074.54 0.28% 262,321.12 0.20% 740,702.67
Group Element Total 3,839,221.97 2.93% 9,290,623.89 7.10% 17,412,615.97 13.31% 30,542,461.83
3.00 EXTERNAL WALLING AND FINISHES
3.01 Walls 93,502.86 0.07% 327,260.00 0.25% 1,631,869.00 1.25% 2,052,631.86
3.02 External Finishes - 0.00% 115,223.23 0.09% 2,390,625.95 1.83% 2,505,849.18
3.03 Curtain Walling System - 0.00% 117,639.27 0.09% 207,491.06 0.16% 325,130.33
3.04 Doors 51,763.70 0.04% 181,172.95 0.14% - 0.00% 232,936.65
3.05 Windows 0.00% 513,778.00 0.39% 7,822,124.00 5.98% 8,335,902.00
Group Element Total 145,266.56 0.11% 1,255,073.45 0.96% 12,052,110.01 9.21% 13,452,450.02
4.00 ROOF COVERINGS, ETC
4.01 Roofing 0.00% - 0.00% 1,425,513.42 1.09% 1,425,513.42
4.02 Rainwater Goods - 0.00% - 0.00% 658,477.10 0.50% 658,477.10
Group Element Total - 0.00% - 0.00% 2,083,990.52 1.59% 2,083,990.52
-
5.00 INTERNAL WALLING -
-
5.01 Walls 52,321.65 0.04% 211,809.00 0.16% 2,234,705.00 1.71% 2,498,835.65
-
5.02 Doors 42,765.12 0.03% 77,645.55 0.06% 3,251,185.05 2.48% 3,371,595.72
-
-
Group Element Total 95,086.77 0.07% 289,454.55 0.22% 5,485,890.05 4.19% 5,870,431.37
6.00 INTERNAL FINISHES
6.01 Floors 158,168.37 0.12% 762,245.20 0.58% 9,575,920.90 7.32% 10,496,334.47
6.02 Walls 194,020.98 0.15% 716,116.01 0.55% 7,044,409.99 5.38% 7,954,546.98
6.03 Ceilings 11,186.02 0.01% 560,768.90 0.43% 2,759,524.20 2.11% 3,331,479.12
6.04 Staircases and Railings 36,922.86 0.03% 129,230.00 0.10% 592,679.79 0.45% 758,832.65
Group Element Total 400,298.23 0.31% 2,168,360.11 1.66% 19,972,534.88 15.26% 22,541,193.22
7.00 FITTINGS, ETC.
7.01 Sanitary Wares & Fittings 55,161.24 0.04% 77,176.70 0.06% 8,727,594.00 6.67% 8,859,931.94
7.02 Signages - 0.00% - 0.00% 28,828.05 0.02% 28,828.05
7.03 Mail Box - 0.00% 72,838.38 0.06% - 0.00% 72,838.38
7.04 Lift Car Finishes - 0.00% - 0.00% - 0.00% -
7.05 Counter top and cabinet 0.00% - 0.00% - 0.00% -
7.06 Niche 0.00% - 0.00% - 0.00% -
Group Element Total 55,161.24 0.04% 150,015.08 0.11% 8,756,422.05 6.69% 8,961,598.36
Alwin
8.00 SERVICES
8.01 Chiller Plant - 0.00% - 0.00% - 0.00% -
8.02 HVAC 1,947,500.00 1.49% 47,500.00 0.04% 3,040,000.00 2.32% 5,035,000.00
Michelle
Michelle
PIC
BENCHMARK PROJECT COST ALLOCATION (BREAKDOWN)
Michelle
PODIUM TOWER
Constituent
Functional Element
Jacquelyn
BASEMENT
Jacquelyn
Jacquelyn
Michelle
Project: THE LOFT (2 tower blocks, 6 storey parking, 1 storey ameneties floor, 30 storey of 600 condominium units)
GFA: 119,210M2
*All quantities extrcted from Bills of Quantities and subject to change for project construction cost appraisal estimation
TOTAL
Total Cost Cost Ratio Total Cost Cost Ratio Total Cost Cost Ratio CONSTRUCTION
(Benchmark (Benchmark (Benchmark (Benchmark (Benchmark (Benchmark COST
Project) Project) Project) Project) Project) Project)
PIC
BENCHMARK PROJECT COST ALLOCATION (BREAKDOWN)
PODIUM TOWER
Constituent
Functional Element
BASEMENT
8.03 Fire Protection 570,000.00 0.44% 855,000.00 0.65% 3,572,000.00 2.73% 4,997,000.00
8.04 Hot, Cold Water & Sanitary Plumbing 50,485.71 0.04% 176,700.00 0.14% 5,016,000.00 3.83% 5,243,185.71
8.05 Natural Gas - 0.00% - 0.00% - 0.00% -
8.06 BMS - 0.00% - 0.00% - 0.00% -
8.07 Pool Filtration System - 0.00% 161,500.00 0.12% - 0.00% 161,500.00
8.08 Electrical HV & Genset - 0.00% - 0.00% - 0.00% -
8.09 Electrical LV 324,425.00 0.25% 1,585,075.00 1.21% 13,832,000.00 10.57% 15,741,500.00
8.10 Telecom, telephone services - 0.00% - 0.00% - 0.00% -
8.11 Metering Utilities - 0.00% - 0.00% - 0.00% -
8.12 Vertical Transportation 271,428.57 0.21% 950,000.00 0.73% 4,636,000.00 3.54% 5,857,428.57
8.13 Security 46,585.71 0.04% 13,050.00 0.01% 35,421.43 0.03% 95,057.14
8.14 Building Maintenance Units - 0.00% - 0.00% - 0.00% -
8.15 Waste Collection System 647,348.13 0.49% - 0.00% 523,713.72 0.40% 1,171,061.85
8.16 Profits and Attendance 2% 77,155.46 0.06% 75776.5 0.06% 613,102.70 0.47% 766,034.67
8.17 BWICS 3% 115,733.19 0.09% 113664.75 0.09% 919,654.05 0.70% 1,149,052.00
-
Group Element Total 4,050,661.78 3.10% 3,978,266.25 3.04% 32,187,891.91 24.60% 40,216,819.94
9.00 Others 0.00%
9.01 Soft and Hard Scape - 0.00% 1,113,231.71 0.85% - 0.00% 1,113,231.71
9.02 Ancillary Works - 0.00% 47,500.00 0.04% - 0.00% 47,500.00
Group Element Total - 0.00% 1,160,731.71 0.89% 0.00% 1,160,731.71
TOTAL ESTIMATED CONSTRUCTION 14,981,137.20 11.45% 17,936,564.30 13.71% 97,951,455.38 74.85% 130,869,156.88
Total Estimated Building Cost from Benchmark Project
Basement 14,981,137.20 11.45%
Podium 17,936,564.30 13.71%
Tower 97,951,455.38 74.85%
130,869,156.88 100.00%
RM Percentage RM RM/m2 RM RM/m2
10,234,662.61 68.32% 10,095,394.86 56.28% 17,412,615.97 17.78%
695,812.80 4.64% 3,862,903.19 21.54% 48,350,947.50 49.36%
4,050,661.78 27.04% 3,978,266.25 22.18% 32,187,891.91 32.86%
14,981,137.20 100% 17,936,564.30 100% 97,951,455.38 100%
Structural
Architectural
M&E
TOTAL

More Related Content

What's hot

istatistik tablolar
istatistik tablolaristatistik tablolar
istatistik tablolarBurak Kocak
 
Weight count chart m.o.
Weight count chart  m.o.Weight count chart  m.o.
Weight count chart m.o.yogm2m
 
Statistics tables grubb's test
Statistics tables grubb's testStatistics tables grubb's test
Statistics tables grubb's testcamiloaquintero
 
93 crit valuetables_4th
93 crit valuetables_4th93 crit valuetables_4th
93 crit valuetables_4thasfawm
 
Anchor bolt load capacities F1554
Anchor bolt load capacities F1554Anchor bolt load capacities F1554
Anchor bolt load capacities F1554John Schuepbach
 
Sample Calculations for solar rooftop project in India
Sample Calculations for solar rooftop project in IndiaSample Calculations for solar rooftop project in India
Sample Calculations for solar rooftop project in Indiadisruptiveenergy
 
Thermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units TablesThermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units TablesKum Visal
 
Tabel Nilai Kritis Distribusi Chi-Square
Tabel Nilai Kritis Distribusi Chi-SquareTabel Nilai Kritis Distribusi Chi-Square
Tabel Nilai Kritis Distribusi Chi-SquareTrisnadi Wijaya
 
T distribution table
T distribution tableT distribution table
T distribution tableRaja Rosenani
 
Tablas Financieras de Factor Valor Actual y Valor Futuro Anualidades y Cantid...
Tablas Financieras de Factor Valor Actual y Valor Futuro Anualidades y Cantid...Tablas Financieras de Factor Valor Actual y Valor Futuro Anualidades y Cantid...
Tablas Financieras de Factor Valor Actual y Valor Futuro Anualidades y Cantid...emperatrizazul
 
Calculate the ROI of your SEO efforts
Calculate the ROI of your SEO effortsCalculate the ROI of your SEO efforts
Calculate the ROI of your SEO effortsBryan Olshock
 
P34 ex2 a01362061
P34 ex2 a01362061P34 ex2 a01362061
P34 ex2 a01362061Tzamn
 
Weight chart for_hexagon_bolts_&_nuts
Weight chart for_hexagon_bolts_&_nutsWeight chart for_hexagon_bolts_&_nuts
Weight chart for_hexagon_bolts_&_nutsManish Thakur
 
Laboratorio 5 ley de crecimiento de una gota de aceite
Laboratorio 5 ley de crecimiento de una gota de aceiteLaboratorio 5 ley de crecimiento de una gota de aceite
Laboratorio 5 ley de crecimiento de una gota de aceiteElsa Patricia
 

What's hot (20)

istatistik tablolar
istatistik tablolaristatistik tablolar
istatistik tablolar
 
Weight count chart m.o.
Weight count chart  m.o.Weight count chart  m.o.
Weight count chart m.o.
 
Copy of z table
Copy of z tableCopy of z table
Copy of z table
 
Statistics tables grubb's test
Statistics tables grubb's testStatistics tables grubb's test
Statistics tables grubb's test
 
93 crit valuetables_4th
93 crit valuetables_4th93 crit valuetables_4th
93 crit valuetables_4th
 
T table
T tableT table
T table
 
Anchor bolt load capacities F1554
Anchor bolt load capacities F1554Anchor bolt load capacities F1554
Anchor bolt load capacities F1554
 
Sample Calculations for solar rooftop project in India
Sample Calculations for solar rooftop project in IndiaSample Calculations for solar rooftop project in India
Sample Calculations for solar rooftop project in India
 
Thermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units TablesThermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units Tables
 
JTP - EV Presentation
JTP - EV PresentationJTP - EV Presentation
JTP - EV Presentation
 
Tabel Nilai Kritis Distribusi Chi-Square
Tabel Nilai Kritis Distribusi Chi-SquareTabel Nilai Kritis Distribusi Chi-Square
Tabel Nilai Kritis Distribusi Chi-Square
 
T distribution table
T distribution tableT distribution table
T distribution table
 
Creativity journey
Creativity journeyCreativity journey
Creativity journey
 
Tablaf
TablafTablaf
Tablaf
 
Tablas Financieras de Factor Valor Actual y Valor Futuro Anualidades y Cantid...
Tablas Financieras de Factor Valor Actual y Valor Futuro Anualidades y Cantid...Tablas Financieras de Factor Valor Actual y Valor Futuro Anualidades y Cantid...
Tablas Financieras de Factor Valor Actual y Valor Futuro Anualidades y Cantid...
 
Tablaschi
TablaschiTablaschi
Tablaschi
 
Calculate the ROI of your SEO efforts
Calculate the ROI of your SEO effortsCalculate the ROI of your SEO efforts
Calculate the ROI of your SEO efforts
 
P34 ex2 a01362061
P34 ex2 a01362061P34 ex2 a01362061
P34 ex2 a01362061
 
Weight chart for_hexagon_bolts_&_nuts
Weight chart for_hexagon_bolts_&_nutsWeight chart for_hexagon_bolts_&_nuts
Weight chart for_hexagon_bolts_&_nuts
 
Laboratorio 5 ley de crecimiento de una gota de aceite
Laboratorio 5 ley de crecimiento de una gota de aceiteLaboratorio 5 ley de crecimiento de una gota de aceite
Laboratorio 5 ley de crecimiento de una gota de aceite
 

Similar to Benchmark Project Cost Allocation Breakdown

cost appraisal
cost appraisalcost appraisal
cost appraisalahmong4
 
111647298 heritage-dolls-case-study-analysis-calc
111647298 heritage-dolls-case-study-analysis-calc111647298 heritage-dolls-case-study-analysis-calc
111647298 heritage-dolls-case-study-analysis-calcFaheem Mukhtar
 
Realisasi dipa mar jun 2011
Realisasi dipa mar jun 2011Realisasi dipa mar jun 2011
Realisasi dipa mar jun 2011pamedan
 
Second edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promoSecond edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promoignitetribes
 
Rehoboth Beach, DE - Funding the Ocean Outfall Project
Rehoboth Beach, DE - Funding the Ocean Outfall ProjectRehoboth Beach, DE - Funding the Ocean Outfall Project
Rehoboth Beach, DE - Funding the Ocean Outfall Projectrehobothbeachde
 
PLD-FINAL-REPORT
PLD-FINAL-REPORTPLD-FINAL-REPORT
PLD-FINAL-REPORTadnan malak
 
dgr4-2022-02-04.pdf
dgr4-2022-02-04.pdfdgr4-2022-02-04.pdf
dgr4-2022-02-04.pdfDataCentrum1
 
Financial Model Sample Format - Cement Company
Financial Model Sample Format - Cement CompanyFinancial Model Sample Format - Cement Company
Financial Model Sample Format - Cement CompanyPranav Pareek
 
J J FOAM MODERANISATION
J J FOAM MODERANISATIONJ J FOAM MODERANISATION
J J FOAM MODERANISATIONPawan Gupta
 
TECHPRE_BusinessPlan_Presentation-AICA.pptx
TECHPRE_BusinessPlan_Presentation-AICA.pptxTECHPRE_BusinessPlan_Presentation-AICA.pptx
TECHPRE_BusinessPlan_Presentation-AICA.pptxoykems
 
Calendario valorizado sistema de recreacion amotape
Calendario valorizado  sistema de recreacion amotapeCalendario valorizado  sistema de recreacion amotape
Calendario valorizado sistema de recreacion amotapeEdikson Soto
 
10. EJECUCIÓN PRESUPUESTAL 2014
10. EJECUCIÓN PRESUPUESTAL 201410. EJECUCIÓN PRESUPUESTAL 2014
10. EJECUCIÓN PRESUPUESTAL 2014Rene Cardenas
 
Ejecución presupuesto 2014
Ejecución presupuesto 2014Ejecución presupuesto 2014
Ejecución presupuesto 2014Rene Cardenas
 
Westheimer mobil station
Westheimer mobil stationWestheimer mobil station
Westheimer mobil stationrobertday
 
Westheimer mobil station
Westheimer mobil stationWestheimer mobil station
Westheimer mobil stationnateshow
 
Payment Method for Work item Studies and Design November 26, 2010.
Payment Method for Work item Studies and Design November 26, 2010.Payment Method for Work item Studies and Design November 26, 2010.
Payment Method for Work item Studies and Design November 26, 2010.Mourad Iskandar
 

Similar to Benchmark Project Cost Allocation Breakdown (20)

cost appraisal
cost appraisalcost appraisal
cost appraisal
 
De assignment
De assignmentDe assignment
De assignment
 
111647298 heritage-dolls-case-study-analysis-calc
111647298 heritage-dolls-case-study-analysis-calc111647298 heritage-dolls-case-study-analysis-calc
111647298 heritage-dolls-case-study-analysis-calc
 
Realisasi dipa mar jun 2011
Realisasi dipa mar jun 2011Realisasi dipa mar jun 2011
Realisasi dipa mar jun 2011
 
Second edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promoSecond edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promo
 
Rehoboth Beach, DE - Funding the Ocean Outfall Project
Rehoboth Beach, DE - Funding the Ocean Outfall ProjectRehoboth Beach, DE - Funding the Ocean Outfall Project
Rehoboth Beach, DE - Funding the Ocean Outfall Project
 
PLD-FINAL-REPORT
PLD-FINAL-REPORTPLD-FINAL-REPORT
PLD-FINAL-REPORT
 
dgr4-2022-02-04.pdf
dgr4-2022-02-04.pdfdgr4-2022-02-04.pdf
dgr4-2022-02-04.pdf
 
Financial Model Sample Format - Cement Company
Financial Model Sample Format - Cement CompanyFinancial Model Sample Format - Cement Company
Financial Model Sample Format - Cement Company
 
Cp 24062018 2241
Cp 24062018 2241Cp 24062018 2241
Cp 24062018 2241
 
J J FOAM MODERANISATION
J J FOAM MODERANISATIONJ J FOAM MODERANISATION
J J FOAM MODERANISATION
 
TECHPRE_BusinessPlan_Presentation-AICA.pptx
TECHPRE_BusinessPlan_Presentation-AICA.pptxTECHPRE_BusinessPlan_Presentation-AICA.pptx
TECHPRE_BusinessPlan_Presentation-AICA.pptx
 
Calendario valorizado sistema de recreacion amotape
Calendario valorizado  sistema de recreacion amotapeCalendario valorizado  sistema de recreacion amotape
Calendario valorizado sistema de recreacion amotape
 
10. EJECUCIÓN PRESUPUESTAL 2014
10. EJECUCIÓN PRESUPUESTAL 201410. EJECUCIÓN PRESUPUESTAL 2014
10. EJECUCIÓN PRESUPUESTAL 2014
 
Ejecución presupuesto 2014
Ejecución presupuesto 2014Ejecución presupuesto 2014
Ejecución presupuesto 2014
 
Excel Model for Banking
Excel Model for Banking Excel Model for Banking
Excel Model for Banking
 
Overall of 2012
Overall of 2012Overall of 2012
Overall of 2012
 
Westheimer mobil station
Westheimer mobil stationWestheimer mobil station
Westheimer mobil station
 
Westheimer mobil station
Westheimer mobil stationWestheimer mobil station
Westheimer mobil station
 
Payment Method for Work item Studies and Design November 26, 2010.
Payment Method for Work item Studies and Design November 26, 2010.Payment Method for Work item Studies and Design November 26, 2010.
Payment Method for Work item Studies and Design November 26, 2010.
 

More from ahmong4

Be slides
Be slidesBe slides
Be slidesahmong4
 
Final csi slides
Final csi slidesFinal csi slides
Final csi slidesahmong4
 
Final submission be 2.0
Final submission be 2.0Final submission be 2.0
Final submission be 2.0ahmong4
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2ahmong4
 
Fm assignment
Fm assignmentFm assignment
Fm assignmentahmong4
 
Assignmenr for pp2 final account
Assignmenr for pp2 final accountAssignmenr for pp2 final account
Assignmenr for pp2 final accountahmong4
 
Csi journal
Csi journalCsi journal
Csi journalahmong4
 
Measurement 4
Measurement 4Measurement 4
Measurement 4ahmong4
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)ahmong4
 
Final es4 sorry boss pdf
Final es4 sorry boss pdf Final es4 sorry boss pdf
Final es4 sorry boss pdf ahmong4
 
Pp1 report
Pp1 reportPp1 report
Pp1 reportahmong4
 
Pp1 group presentation
Pp1 group presentation Pp1 group presentation
Pp1 group presentation ahmong4
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slidesahmong4
 
Eca forms final
Eca forms final Eca forms final
Eca forms final ahmong4
 
Estimating presentation 1
Estimating presentation 1Estimating presentation 1
Estimating presentation 1ahmong4
 
Software app slides
Software app slidesSoftware app slides
Software app slidesahmong4
 
Software full
Software fullSoftware full
Software fullahmong4
 
Mong construction techonology 3 report
Mong construction techonology 3 reportMong construction techonology 3 report
Mong construction techonology 3 reportahmong4
 
Mong ms report
Mong ms reportMong ms report
Mong ms reportahmong4
 
Curtain wall%2 f facade system
Curtain wall%2 f facade systemCurtain wall%2 f facade system
Curtain wall%2 f facade systemahmong4
 

More from ahmong4 (20)

Be slides
Be slidesBe slides
Be slides
 
Final csi slides
Final csi slidesFinal csi slides
Final csi slides
 
Final submission be 2.0
Final submission be 2.0Final submission be 2.0
Final submission be 2.0
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
Fm assignment
Fm assignmentFm assignment
Fm assignment
 
Assignmenr for pp2 final account
Assignmenr for pp2 final accountAssignmenr for pp2 final account
Assignmenr for pp2 final account
 
Csi journal
Csi journalCsi journal
Csi journal
 
Measurement 4
Measurement 4Measurement 4
Measurement 4
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
 
Final es4 sorry boss pdf
Final es4 sorry boss pdf Final es4 sorry boss pdf
Final es4 sorry boss pdf
 
Pp1 report
Pp1 reportPp1 report
Pp1 report
 
Pp1 group presentation
Pp1 group presentation Pp1 group presentation
Pp1 group presentation
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slides
 
Eca forms final
Eca forms final Eca forms final
Eca forms final
 
Estimating presentation 1
Estimating presentation 1Estimating presentation 1
Estimating presentation 1
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Software full
Software fullSoftware full
Software full
 
Mong construction techonology 3 report
Mong construction techonology 3 reportMong construction techonology 3 report
Mong construction techonology 3 report
 
Mong ms report
Mong ms reportMong ms report
Mong ms report
 
Curtain wall%2 f facade system
Curtain wall%2 f facade systemCurtain wall%2 f facade system
Curtain wall%2 f facade system
 

Recently uploaded

Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 

Recently uploaded (20)

Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 

Benchmark Project Cost Allocation Breakdown

  • 2. Project: THE LOFT (2 tower blocks, 6 storey parking, 1 storey ameneties floor, 30 storey of 600 condominium units) GFA: 119,210M2 *All quantities extrcted from Bills of Quantities and subject to change for project construction cost appraisal estimation TOTAL Total Cost Cost Ratio Total Cost Cost Ratio Total Cost Cost Ratio CONSTRUCTION (Benchmark (Benchmark (Benchmark (Benchmark (Benchmark (Benchmark COST Project) Project) Project) Project) Project) Project) 1.00 SUBSTRUCTURE 1.01 Site Preparation 672,718.42 0.51% - 0.00% - 0.00% 672,718.42 1.02 Piling 2,308,800.08 1.76% - 0.00% - 0.00% 2,308,800.08 1.03 Foundations 460,417.50 0.35% 804,770.97 0.61% - 0.00% 1,265,188.47 1.04 Basement Carcass 2,953,504.65 2.26% - 0.00% - 0.00% 2,953,504.65 Group Element Total 6,395,440.64 4.89% 804,770.97 0.61% - 0.00% 7,200,211.61 2.00 STRUCTURAL FRAME 2.01 Frame 3,732,914.96 2.85% 7,025,726.64 5.37% 16,595,967.23 12.68% 27,354,608.83 2.02 Transfer Structures - 0.00% 1,892,822.71 1.45% 554,327.62 0.42% 2,447,150.33 2.03 Staircase and Ramps 106,307.01 0.08% 372,074.54 0.28% 262,321.12 0.20% 740,702.67 Group Element Total 3,839,221.97 2.93% 9,290,623.89 7.10% 17,412,615.97 13.31% 30,542,461.83 3.00 EXTERNAL WALLING AND FINISHES 3.01 Walls 93,502.86 0.07% 327,260.00 0.25% 1,631,869.00 1.25% 2,052,631.86 3.02 External Finishes - 0.00% 115,223.23 0.09% 2,390,625.95 1.83% 2,505,849.18 3.03 Curtain Walling System - 0.00% 117,639.27 0.09% 207,491.06 0.16% 325,130.33 3.04 Doors 51,763.70 0.04% 181,172.95 0.14% - 0.00% 232,936.65 3.05 Windows 0.00% 513,778.00 0.39% 7,822,124.00 5.98% 8,335,902.00 Group Element Total 145,266.56 0.11% 1,255,073.45 0.96% 12,052,110.01 9.21% 13,452,450.02 4.00 ROOF COVERINGS, ETC 4.01 Roofing 0.00% - 0.00% 1,425,513.42 1.09% 1,425,513.42 4.02 Rainwater Goods - 0.00% - 0.00% 658,477.10 0.50% 658,477.10 Group Element Total - 0.00% - 0.00% 2,083,990.52 1.59% 2,083,990.52 - 5.00 INTERNAL WALLING - - 5.01 Walls 52,321.65 0.04% 211,809.00 0.16% 2,234,705.00 1.71% 2,498,835.65 - 5.02 Doors 42,765.12 0.03% 77,645.55 0.06% 3,251,185.05 2.48% 3,371,595.72 - - Group Element Total 95,086.77 0.07% 289,454.55 0.22% 5,485,890.05 4.19% 5,870,431.37 6.00 INTERNAL FINISHES 6.01 Floors 158,168.37 0.12% 762,245.20 0.58% 9,575,920.90 7.32% 10,496,334.47 6.02 Walls 194,020.98 0.15% 716,116.01 0.55% 7,044,409.99 5.38% 7,954,546.98 6.03 Ceilings 11,186.02 0.01% 560,768.90 0.43% 2,759,524.20 2.11% 3,331,479.12 6.04 Staircases and Railings 36,922.86 0.03% 129,230.00 0.10% 592,679.79 0.45% 758,832.65 Group Element Total 400,298.23 0.31% 2,168,360.11 1.66% 19,972,534.88 15.26% 22,541,193.22 7.00 FITTINGS, ETC. 7.01 Sanitary Wares & Fittings 55,161.24 0.04% 77,176.70 0.06% 8,727,594.00 6.67% 8,859,931.94 7.02 Signages - 0.00% - 0.00% 28,828.05 0.02% 28,828.05 7.03 Mail Box - 0.00% 72,838.38 0.06% - 0.00% 72,838.38 7.04 Lift Car Finishes - 0.00% - 0.00% - 0.00% - 7.05 Counter top and cabinet 0.00% - 0.00% - 0.00% - 7.06 Niche 0.00% - 0.00% - 0.00% - Group Element Total 55,161.24 0.04% 150,015.08 0.11% 8,756,422.05 6.69% 8,961,598.36 Alwin 8.00 SERVICES 8.01 Chiller Plant - 0.00% - 0.00% - 0.00% - 8.02 HVAC 1,947,500.00 1.49% 47,500.00 0.04% 3,040,000.00 2.32% 5,035,000.00 Michelle Michelle PIC BENCHMARK PROJECT COST ALLOCATION (BREAKDOWN) Michelle PODIUM TOWER Constituent Functional Element Jacquelyn BASEMENT Jacquelyn Jacquelyn Michelle
  • 3. Project: THE LOFT (2 tower blocks, 6 storey parking, 1 storey ameneties floor, 30 storey of 600 condominium units) GFA: 119,210M2 *All quantities extrcted from Bills of Quantities and subject to change for project construction cost appraisal estimation TOTAL Total Cost Cost Ratio Total Cost Cost Ratio Total Cost Cost Ratio CONSTRUCTION (Benchmark (Benchmark (Benchmark (Benchmark (Benchmark (Benchmark COST Project) Project) Project) Project) Project) Project) PIC BENCHMARK PROJECT COST ALLOCATION (BREAKDOWN) PODIUM TOWER Constituent Functional Element BASEMENT 8.03 Fire Protection 570,000.00 0.44% 855,000.00 0.65% 3,572,000.00 2.73% 4,997,000.00 8.04 Hot, Cold Water & Sanitary Plumbing 50,485.71 0.04% 176,700.00 0.14% 5,016,000.00 3.83% 5,243,185.71 8.05 Natural Gas - 0.00% - 0.00% - 0.00% - 8.06 BMS - 0.00% - 0.00% - 0.00% - 8.07 Pool Filtration System - 0.00% 161,500.00 0.12% - 0.00% 161,500.00 8.08 Electrical HV & Genset - 0.00% - 0.00% - 0.00% - 8.09 Electrical LV 324,425.00 0.25% 1,585,075.00 1.21% 13,832,000.00 10.57% 15,741,500.00 8.10 Telecom, telephone services - 0.00% - 0.00% - 0.00% - 8.11 Metering Utilities - 0.00% - 0.00% - 0.00% - 8.12 Vertical Transportation 271,428.57 0.21% 950,000.00 0.73% 4,636,000.00 3.54% 5,857,428.57 8.13 Security 46,585.71 0.04% 13,050.00 0.01% 35,421.43 0.03% 95,057.14 8.14 Building Maintenance Units - 0.00% - 0.00% - 0.00% - 8.15 Waste Collection System 647,348.13 0.49% - 0.00% 523,713.72 0.40% 1,171,061.85 8.16 Profits and Attendance 2% 77,155.46 0.06% 75776.5 0.06% 613,102.70 0.47% 766,034.67 8.17 BWICS 3% 115,733.19 0.09% 113664.75 0.09% 919,654.05 0.70% 1,149,052.00 - Group Element Total 4,050,661.78 3.10% 3,978,266.25 3.04% 32,187,891.91 24.60% 40,216,819.94 9.00 Others 0.00% 9.01 Soft and Hard Scape - 0.00% 1,113,231.71 0.85% - 0.00% 1,113,231.71 9.02 Ancillary Works - 0.00% 47,500.00 0.04% - 0.00% 47,500.00 Group Element Total - 0.00% 1,160,731.71 0.89% 0.00% 1,160,731.71 TOTAL ESTIMATED CONSTRUCTION 14,981,137.20 11.45% 17,936,564.30 13.71% 97,951,455.38 74.85% 130,869,156.88 Total Estimated Building Cost from Benchmark Project Basement 14,981,137.20 11.45% Podium 17,936,564.30 13.71% Tower 97,951,455.38 74.85% 130,869,156.88 100.00% RM Percentage RM RM/m2 RM RM/m2 10,234,662.61 68.32% 10,095,394.86 56.28% 17,412,615.97 17.78% 695,812.80 4.64% 3,862,903.19 21.54% 48,350,947.50 49.36% 4,050,661.78 27.04% 3,978,266.25 22.18% 32,187,891.91 32.86% 14,981,137.20 100% 17,936,564.30 100% 97,951,455.38 100% Structural Architectural M&E TOTAL