4. /2015-04-08
We specialise in providing customers with complete solutions
for the processing, packaging and distribution of food products
Focused on our customers
5. /2015-04-08
Present in more than 175 countries
and operations in all continents
82 sales offices
32 market companies
6 R&D units
13 Technical Training
Centres
48 manufacturing sites
6. Tetra Pak in summary, January 2015
► Employees: 23,460
► Net sales mio €: 10,900
► Countries where Tetra Pak
packages are available: >175
► Packaging material and closure plants: 37
► Filling machine assembly plants: 5
► R&D units: 6
► Technical training centres: 13
/2015-04-08
8. Lund Site Future Desired State
Security Level
Initials/YYYY-MM-DD / 9
9. 2010
► Change of behaviour the past 20 years
Development of the virtual workplace creates new
opportunities…
1950
Security Level
Initials/YYYY-MM-DD / 10
10. The physical environment develops and support our
behaviour
Security Level
Initials/YYYY-MM-DD / 11
15. Urgency and Vision
Activity Based Working
Attract and retain
talented people
Enhance a sharing
and collaboration
mindset
Optimise the use of
space
Security Level
Initials/YYYY-MM-DD / 16
17. What is it?
► A shared and engaging way of working that
− Supports our activities
− Lives up to our different personal focus needs
− Supports the collaboration we need for a successful future
− Aligned with our core values and our leadership elements
► A variety of areas and work settings will support the activities
Activity Base Working
Security Level
Initials/YYYY-MM-DD / 18
18. Areas supporting different activities
Activity Based Working
Quiet Area
Open Work Area
Collaboration Area
Square
Anchoring Points (home base)
High focus
Low focus
Individual
Group
Security Level
Initials/YYYY-MM-DD / 19
19. A community layout based on activities done
Anchoring Points
Collaboration Areas
Quiet Areas
Square
Open Work Areas
LL/2015-12-10
Internal
Dimensioning of the areas done through
Activity analysis
Occupancy study
Input from organisation
Community
20. BR/ 4 April 2016
Internal
In summary
Activity Based Working
The concept
► Office divided in different
work areas supporting
different needs
− Team work or individual work, high focus
or low focus
► No assigned desks or offices
− People can choose the area based on
actual need
► An ”anchoring point” is the
home base
Key areas of focus
21. Why is it so difficult?
Change Management
It involves people
People are unpredictable
Often prefer status quo
It takes time...
Security Level
Initials/YYYY-MM-DD / 22
23. ABW supporting the objectives
How could ABW support the achievements of your Must Do´s or strategic objectives?
What will be the main challenges in your organisation to implement ABW?
Security Level
Initials/YYYY-MM-DD / 24
24. ► “It is not the strongest of the
species that survives, nor the
most intelligent; it is the one that
is most adaptable to change”
Why is Change important?
Security Level
Initials/YYYY-MM-DD / 25
25. Key success factors
► Strong top management commitment
► Create sense of urgency
− Communicate Why and What
► Start with the leaders
− Workshops with leaders
− Readiness evaluation
► Acknowledge the change effort
− Managers leading the change
► Involve the employees
− Identify ambassadors
− Involve to the right level through workshops and trainings (i.e 5S)
Security Level
Initials/YYYY-MM-DD / 26
27. Collaboration within own team
- Leaders to focus on how to meet and keep the team spirit
- Share best practices
Need to change behaviour ( meetings, finding people…)
- Changes takes time
- Challenge old habits, daily routines and ways of doing things
- Utilise IT tools
Positive but some challenges has to be focussed on
LL/2017-02-07
Internal
ABW experiences so far
• Attractive workplace appreciated
• Increased collaboration between departments as well as more
spontaneous meetings two and three
• Increased transparency
• The relevant type of workarea is available
!
28. Challenges during the journey
► Changes in activity pattern, i:e:
− Less travelling
− Promoting net-meetings
− New project models, i:e agile / scrum
► Wide spread of employee categories
− Administration, HR, Finance, Legal
− R&D engineers
− Construction engineers
− Production
− Market, Communication, Governance
− Managers abroad
► Change in local business environments
− Closing down a factory
− Consolidating all business to one site
− More people than predicted
One size doesn´t fit
all
Continuous
improvements
Plan with
uncertainties.
Flexible solutions
Security Level
Initials/YYYY-MM-DD / 29
29. OFFICES RÅBYHOLM , LUND 2016
ABW Transformation
People working ABW:
Q2 2016 1600
Q2 2017 2100
Q1 2018 3400
Security Level
Initials/YYYY-MM-DD / 30
2016
On going or initiated projects
30. Implementation projects beyond Lund
LL/20116-04-19
Internal
ABW in Tetra Pak
Shanghai
Jakarta
Lund
Moscow
Budaörs
Zagreb
Modena
Lausanne
Paris
Ongoing / Planned projects
Inquiries
Singapore
Warzaw
Zofingen
Oslo
Kuala
LumpurImplemented
Bogota
► Modena
Rubiera
[TP306]
A local partner
With our 32 market companies and 82 sales offices we work locally on a global basis. Tetra Pak packages can be bought in more than 170 countries throughout the world.
Manufacturing sitesA global in-house manufacturing cover:
PM factory (Pink colour) (24)
PM + Straw factory (Brown colour) (9)
Straw factory (Dark green colour) (2)
Closure factory (Blue colour) (4)
Strip + film factory (Yellow colour) (2)
Capital equipment factory (Light green colour) (2)
Strip + PM factory (Dark red colour) (1)
PM + CE factory (Grey colour) (1)
Strip + film + straw factory (Purple colour) (1)
[TP317]
Popular consumer packaging 2013
The total world production of Tetra Pak packages in 2013 amounted to 178,412 mio packages.
[TP327]
Tetra Pak in summary
Within the entire Tetra Pak Group, there were 6 filling machine assembly plants and 40 plants .
In 2013, Tetra Pak packages were sold in more than 170 markets.
There were activities in 11 R&D centres in nine countries around the world and 16 Technical training centres.
The number of employees was 23,540 and total net sales were Euro 11,075 million.
Attract and retain talented people: Workshop with Young Talents, when they designed, an ABW envrionment was created. Managers responsible.
Enhance a sharing and collaboration mindset: What does this means for DSO? Managers responsible.
Optimise the use of space: According to Business case 5 million Euro/year. ABW project to fix.
The future is bright, but different, that means a lot of changes, ABW is just one part of it. Examples within DSO.
Find the solutions, not the problems.
Title, subtitle and text slide with a heading to introduce the bullet section.
Title, subtitle and text slide with a heading to introduce the bullet section.