1. CURRICULUM VITAE
Merajuddin sheikh persent address
Mail ID : merajs08@gmail.com mumbai
Mobile no 8651473900
Phone No: 8651473900
+919934437973 (India)
Skype id,merajuddin.shaikh
Pipeline foreman (12 Years Experienced)
Objective
To obtain a position in which dedication and a high degree of enthusiasm can be fully utilized and
drive for satisfaction with a positive attitude. To excel professionally gaining, experience in a
growth oriented Organization where I can enhance my knowledge base and contribute towards
the success of the Organization.
Summary of Work Experience
1. 10+ Years of experience in Oil & Gas offshore projects in UAE as a pipeline foreman with
M/s PILCO Pipe Line Construction Co. WLL. (20,8,2005 to 28,1,2016
2 Years of experience in Refineries/petrochemical/Power plant projects in
india,saudi,bahrain. as a F (Previous)
Experience Profile:
Experienced in Fabrication of Piping, Mechanical Structures, Pressure vessel, Mooring
buoy, Anchor blocks, Drain traps, Air receiver, Vacuum tower, swirl separator, Heli Deck, and Boat
fenders, Stack, etc.
I. Organization: M/s PILCO Pipe Line Construction Co. WLL.
PILCO is one of the leading mechanical construction company in Abu Dhabi-UAE and
successfully completed various offshore projects in ZADCO (all sites), ADMA –OPCO, CCC,
TOTAL ABK and BUNDUQ.
PROJECTS
1. Replacement of 18” WOTL Topside Facilities at CC, ACPT –Client ZADCO
2. 2. Installations of water injection pump and related piping -W 15 PL at ZADCO- UMMUL
DALAK -CPC working with UTS Kent – client ZADCO
3. Installation of Multiphase flow meter and related piping at PW 109 WHPT- UZ field of
ZADCO. – Client ZADCO
4. Replacement of existing SDVS at various Wellheads and 4” GRE Free issue pipe spools
installation at BUNDUQ Complex – client BUNDUQ
5. Installation of Instrument air back up piping from Air receiver of turbine Generator at UZ
field of ZADCO Central complex - Client ZADCO.
6. Conversion of Water line to Oil Line WHPT PN-27 & PN-35 (Fabrication and erection of
pipe spools and support) at UZ field of ZADCO. – Client ZADCO
7. Installation of new Pig receiver at PS77 WHPT UZ field of ZADCO. – Client ZADCO
8. MRC-5 WELL Pre final Hookup at PW 38 WHPT at UZ field of ZADCO. – Client ZADCO
9. REPLACEMENT OF SHOT stem valves corroded piping and small bore tapping of gtp at UZ
field of ZADCO. – Client ZADCO
10. Installation of sources cooler On GSP and replacement of existing chemical dosing
package on Wipand Replacement Electro chlorination package at BUNDUQ Complex –
client BUNDUQ
11. Replacement of closure X-mass Tree wings ABD master valves on 44 WHPTs & installation
of Coriolis meters @ 39 WHPTs at UZ Field of ZADCO – Client ZADCO
12. Dry Deluge Renovation works Deck A at UZ Field of ZADCO – Client ZADCO
13. Replacement of Corroded pipe fittings and valves at GTP Platform for shutdown works at
BUNDUQ Complex – client BUNDUQ
14. Replacement of Corroded Fender at Zakum West Platform - client ADMA
15. Pre& Final Hookup H36, 37, 12 WHPTS & Fabrication and erection of pipe spools and
replacement of corroded lines at CC in UZ field of ZADCO. – Client ZADCO
16. Replacement of Deluge lines by Cu-Ni at Loading pumps area, Metering station, Gas
turbines, Glycol unit, Gas plant, H2S flare unit and Gas sweetening unit in ZIRKU Island
(ZADCO) - Client ZADCO
17. Fabrication of USSC – instrument airlines at Zakum West Platform - client ADMA.
18. Replacement of WHPL -07 UZ field of ZADCO. – Client ZADCO
3. Client zadco
Duration 2005-2016
II. Organization : M/s pilco pipeline contruction company wll abudhabi
Designation : pipeline foreman
Project : Fabrication and erection of GTP loading pump area piping.
Producing 220 MW
zakume field
Client : zadco
Duration : 2003-2004
III. Organization : C,C,I,C.GOSP1.project qatif .k.s.a
Designation : pipe fabricator
Project : Fabrication and erection of piping and structural works related to
Refinery plant owned Aramco, k.s.a,
Client : Technoment, Ltd.k.s.a,
Duration : 1999
IV. Organization : C,C,I,C.safco.2,amonia,urea,project,jubail.ksa
Designation : Pipe fitterProject : Fabrication and erection of piping and
structural works related to
Refinery plant owned b Safco, k.s.a,
Client : Buchtel, k.s.a,
Duration : 1997-1998
V. Organization : C.C.C,shaybah ,producing project .k.s.a
Designation : pipe fitter
Project : Fabrication and erection of piping and structural works related to
Refinery plant owned by ARAMCO, saudi arabia
Maintenance and Shut Down jobs of Refinery Plants
Duties and Responsibilities:
• Fabrication of Tanks, Pressure Vessels, heavy steel structure and Wellhead Skid with Piping.
Fabrication and erection of pipe spools Various materials such as CS, SS, CuNi, alloy steel from
2” to 48” Dia pipes .
• General maintenance of vessels, heat exchangers and other equipments, which includes
dismantling, over hauling and assembling etc.
• Generate Piping Drawings and Isometrics for Construction, Fabrication Drawings, Pipe
Spooling and Detailing and associated Pipe Supports; As-Built Drawings.
• Follows the work permit system and accepts the permits.
• Conducting and checking Hydro test & Box Up.
4. • Ensures all activities carried out by subordinates are performed in accordance with company
or client safety rules. Men working are wearing protective clothing and using required safety
equipment.
• Conducting site survey for drawing preparation
• Interpreting P & I Diagrams into piping drawings and further into material take-off.
• Ensure the correct elevation, orientation of the pipe spools, fittings & flanges as per project
specification/standard and approved drawings.
• Responsible for handling and manufacturing of alloy steel materials.
Educational Qualification
• Trade Certificate in DIPLOMA IN MECHANICAL ENGINEERING
• Secondary school leaving certification from Board of Education Bihar
Training course attended
• OPTIO BOSIET
• Offshore survival and Helicopter under water Escape Training, from Emirates Technical
& Safety Development Center, Abu Dhabi, UAE.
• Safety induction conducted by ADMA-OPCO, to work in Offshore and Das Island.
• Safety induction conducted by ZADCO, to work in Offshore.
• Safety induction conducted by BUNDUQ
• Breathing apparatus and hydrogen sulphide training from Emirates Technical & Safety
Development Center, Abu Dhabi, and UAE.
Personal Details
Fathers Name : Reyazuddin
Permanent Address : vill.musehari
Ps.jamoBazar Dist.siwan
Bihar, India.
Date of Birth : 3,5,1975
Religion : Muslim
Sex : Male
Marital Status : Married
Nationality : Indian
Languages : English, Hindi & urdu
Passport Details
Passport Number : k.4621036
Country Code : IND
Date of issue : 19,3,2012
5. Date of expiry : 18,3,2022
Place of issue : abudhabi
Declaration
I hereby declare that the above information furnished about me is true to my knowledge and
belief.
Date :10-feb-2017
Place : mumbai merajuddin shaikh
6. Date of expiry : 18,3,2022
Place of issue : abudhabi
Declaration
I hereby declare that the above information furnished about me is true to my knowledge and
belief.
Date :10-feb-2017
Place : mumbai merajuddin shaikh