Rev Description Prep ChkdAppdDate
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0601 A
JAN '15PHW.FN.C
NTS 10001
SHEET 1 OF 8
INDEX PLAN OF ASSET 11
FOUL SEWER
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
A Draft Issue for Review N.C W.F W.F JAN '15
ASSET 12A
ASSET 25
ASSET 12B
ASSET 22B
ASSET 22A
ASSET 13A
ASSET 13B
ASSET 24B
ASSET 26 ASSET 15
ASSET 16C
ASSET 14B
ASSET 14A
10001-JB-11-PRE-0610 10001-JB-11-PRE-0612
10001-JB-11-PRE-0608
10001-JB-11-PRE-0609
10001-JB-11-PRE-0611
10001-JB-11-PRE-0602
10001-JB-11-PRE-0603
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED DEEP GRAVITY SEWER
(ASSET 11)shown thus
SECTION No. & DIRECTION shown thus
FUTURE CONNECTIONS constructed
under seperate contract's
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. All materials to be approved by EWA/SEPPD prior to installation.
6. Installation to be in accordance with SEPPD standards and best
practices and in accordance with the utility cross sections.
7. All works to be carried out by a SEPPD approved contractor.
8. Pipe diameters up to 450mm, shall be of uPVC.
9. Pipe diameters above 450mm, shall be of GRP material.
10. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
No.1
??mm@
??mm@
10001-JB-11-PRE-0604 10001-JB-11-PRE-0605
10001-JB-11-PRE-060710001-JB-11-PRE-0606
SARAT
ASSET 23A
ASSET 23B
ASSET 27
ASSET 16A
ASSET 16B
BRIDGE
Rev Description Prep ChkdAppdDate
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0602 A
JAN '15PHW.FN.C
1:2000@A1 10001
SHEET 1 OF 12
LAYOUT PLAN OF ASSET 11
FOUL SEWER
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
A Draft Issue for Review N.C W.F W.F JAN '15
ASSET 27
ASSET 17
ASSET 23B
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED DEEP GRAVITY SEWER
(ASSET 11)shown thus
SECTION No. & DIRECTION shown thus
FUTURE CONNECTIONS constructed
under seperate contract's
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. All materials to be approved by EWA/SEPPD prior to installation.
6. Installation to be in accordance with SEPPD standards and best
practices and in accordance with the utility cross sections.
7. All works to be carried out by a SEPPD approved contractor.
8. Pipe diameters up to 450mm, shall be of uPVC.
9. Pipe diameters above 450mm, shall be of GRP material.
10. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
No.1
??mm@
??mm@
No. 2 - ASSET 11
DEEP GRAVITY
SEWER
No. 1 - ASSET 11 & ASSET 27 DEEP GRAVITY SEWER
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 27 I.L= -5.781m
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 27 I.L = =I.L -4.885
No. 3 - DEEP GRAVITY SEWER
Rev Description Prep ChkdAppdDate
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0603 A
JAN '15PHW.FN.C
1:2000@A1 10001
SHEET 2 OF 12
LAYOUT PLAN OF ASSET 11
FOUL SEWER
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
A Draft Issue for Review N.C W.F W.F JAN '15
ASSET 15
ASSET 18
ASSET 17
ASSET 16B
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED DEEP GRAVITY SEWER
(ASSET 11)shown thus
SECTION No. & DIRECTION shown thus
FUTURE CONNECTIONS constructed
under seperate contract's
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. All materials to be approved by EWA/SEPPD prior to installation.
6. Installation to be in accordance with SEPPD standards and best
practices and in accordance with the utility cross sections.
7. All works to be carried out by a SEPPD approved contractor.
8. Pipe diameters up to 450mm, shall be of uPVC.
9. Pipe diameters above 450mm, shall be of GRP material.
10. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
No.1
??mm@
??mm@
No.2 - ASSET 11, ASSET 18 & ASSET 17
DEEP GRAVITY SEWER
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 17 I.L = =I.L -4.660
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 17 I.L = -2.398m
No.12 - ASSET 11 DEEP GRAVITY SEWER
ASSET 16AASSET 15
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 18 = -2.398m
BRI
Rev Description Prep ChkdAppdDate
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0604 A
JAN '15PHW.FN.C
1:2000@A1 10001
SHEET 3 OF 12
LAYOUT PLAN OF ASSET 11
FOUL SEWER
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
A Draft Issue for Review N.C W.F W.F JAN '15
ASSET 25
ASSET 15
ASSET 26
ASSET 27
ASSET 23B
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED DEEP GRAVITY SEWER
(ASSET 11)shown thus
SECTION No. & DIRECTION shown thus
FUTURE CONNECTIONS constructed
under seperate contract's
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. All materials to be approved by EWA/SEPPD prior to installation.
6. Installation to be in accordance with SEPPD standards and best
practices and in accordance with the utility cross sections.
7. All works to be carried out by a SEPPD approved contractor.
8. Pipe diameters up to 450mm, shall be of uPVC.
9. Pipe diameters above 450mm, shall be of GRP material.
10. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
No.1
??mm@
??mm@
No.5- ASSET 11 DEEP GRAVITY SEWER
No.5- ASSET 11
DEEP GRAVITY SEWER
No.3- ASSET 11
DEEP GRAVITY SEWER
No.1 - ASSET 11
DEEP GRAVITY SEWER
No.2 - ASSET 11 DEEP GRAVITY SEWER
No.12 - ASSET 11
DEEP GRAVITY SEWER
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 15 I.L = =I.L -2.131
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 25 I.L = 0.125m
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 15 I.L = -1.600m
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 25 I.L = -5.152m
FUTURE 200mm TRUNK
FOUL SEWER
FROM ASSET 26
I.L = =I.L -4.271m
No.28 - ASSET 11
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 25 I.L = =I.L -0.119
Rev Description Prep ChkdAppdDate
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0605 A
JAN '15PHW.FN.C
1:2000@A1 10001
SHEET 4 OF 12
LAYOUT PLAN OF ASSET 11
FOUL SEWER
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
A Draft Issue for Review N.C W.F W.F JAN '15
ASSET 15 ASSET 16A
ASSET 16B
ASSET 13B
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED DEEP GRAVITY SEWER
(ASSET 11)shown thus
SECTION No. & DIRECTION shown thus
FUTURE CONNECTIONS constructed
under seperate contract's
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. All materials to be approved by EWA/SEPPD prior to installation.
6. Installation to be in accordance with SEPPD standards and best
practices and in accordance with the utility cross sections.
7. All works to be carried out by a SEPPD approved contractor.
8. Pipe diameters up to 450mm, shall be of uPVC.
9. Pipe diameters above 450mm, shall be of GRP material.
10. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
No.1
??mm@
??mm@
No.6- ASSET 11 DEEP GRAVITY SEWER
No.13 - ASSET 11 DEEP GRAVITY SEWER
No. 2 - ASSET 11 DEEP GRAVITY SEWER
No.23 - ASSET 11 FOUL SEWER
No. 3 - ASSET 11 DEEP GRAVITY SEWER
FUTURE 200mm TRUNK
FOUL SEWER
FROM ASSET 16C I.L =-4.782m
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 15 = -2.131m
FUTURE 200mm TRUNK
FOUL SEWER
FROM ASSET 15
FUTURE 200mm TRUNK
FOUL SEWER
FROM ASSET 15 = I.L -1.600m
FUTURE 200mm
TRUNK FOUL SEWER
FROM ASSET 16A = I.L -0.996m
FUTURE 200mm
TRUNK FOUL SEWER
FROM ASSET 16A = I.L -1.909m
15.00
Rev Description Prep ChkdAppdDate
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0606 A
JAN '15PHW.FN.C
1:2000@A1 10001
SHEET 5 OF 12
LAYOUT PLAN OF ASSET 11
FOUL SEWER
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
A Draft Issue for Review N.C W.F W.F JAN '15
ASSET 23A
ASSET 24A
ASSET 22B
ASSET 23B
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED DEEP GRAVITY SEWER
(ASSET 11)shown thus
SECTION No. & DIRECTION shown thus
FUTURE CONNECTIONS constructed
under seperate contract's
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. All materials to be approved by EWA/SEPPD prior to installation.
6. Installation to be in accordance with SEPPD standards and best
practices and in accordance with the utility cross sections.
7. All works to be carried out by a SEPPD approved contractor.
8. Pipe diameters up to 450mm, shall be of uPVC.
9. Pipe diameters above 450mm, shall be of GRP material.
10. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
No.1
??mm@
??mm@
No.5- ASSET 11 DEEP GRAVITY SEWER
No.11- ASSET 11 DEEP GRAVITY SEWER
No.6- ASSET 11 DEEP GRAVITY SEWER
No.6 - ASSET 11 DEEP
GRAVITY SEWER
ASSET 24B No.21 - ASSET 11 FOUL SEWER
No.22-- ASSET 11 FOUL SEWER
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 23A I.L = -2.405
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 23A I.L = -1.909m
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 24A I.L = --1.829m
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 23B I.L = -1.568m
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 23A I.L = -1.402m
FUTURE 200mm
TRUNK FOUL
SEWER FROM
ASSET 23B I.L = -2.826m
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 24B I.L = -2.915m
Rev Description Prep ChkdAppdDate
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0607 A
JAN '15PHW.FN.C
1:2000@A1 10001
SHEET 6 OF 12
LAYOUT PLAN OF ASSET 11
FOUL SEWER
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
A Draft Issue for Review N.C W.F W.F JAN '15
ASSET 13A
ASSET 14A
ASSET 13B
ASSET 23A
ASSET 23B
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED DEEP GRAVITY SEWER
(ASSET 11)shown thus
SECTION No. & DIRECTION shown thus
FUTURE CONNECTIONS constructed
under seperate contract's
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. All materials to be approved by EWA/SEPPD prior to installation.
6. Installation to be in accordance with SEPPD standards and best
practices and in accordance with the utility cross sections.
7. All works to be carried out by a SEPPD approved contractor.
8. Pipe diameters up to 450mm, shall be of uPVC.
9. Pipe diameters above 450mm, shall be of GRP material.
10. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
No.1
??mm@
??mm@
No.5- ASSET 11 DEEP GRAVITY SEWER
No.5- ASSET 11 DEEP GRAVITY SEWER
No.24 - ASSET 11 FOUL SEWER
No.26-- ASSET 11 FOUL SEWER
No.25 - ASSET 11 FOUL SEWER
No.4 ASSET 11 DEEP GRAVITY SEWER
No.6- ASSET 11 DEEP GRAVITY SEWER
No.11- ASSET 11 DEEP GRAVITY SEWER
FUTURE 200mm TRUNK
FOUL SEWER
FROM ASSET 13A I.L = -1.318
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 13A I.L = -2.546
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 23B I.L = -0.4088
FUTURE 200mm TRUNK
FOUL SEWER
FROM ASSET 13B I.L = -0.332
FUTURE 200mm TRUNK
FOUL SEWER
FROM ASSET
13B I.L = -0.555
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 13B I.L = -1.788
FUTURE 200mm
TRUNK FOUL SEWER
FROM ASSET 14A I.L = -0.729
Sub Station
Rev Description Prep ChkdAppdDate
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0608 A
JAN '15PHW.FN.C
1:2000@A1 10001
SHEET 8 OF 12
LAYOUT PLAN OF ASSET 11
FOUL SEWER
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
A Draft Issue for Review N.C W.F W.F JAN '15
No.21 - ASSET 11 FOUL SEWER
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED DEEP GRAVITY SEWER
(ASSET 11)shown thus
SECTION No. & DIRECTION shown thus
FUTURE CONNECTIONS constructed
under seperate contract's
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. All materials to be approved by EWA/SEPPD prior to installation.
6. Installation to be in accordance with SEPPD standards and best
practices and in accordance with the utility cross sections.
7. All works to be carried out by a SEPPD approved contractor.
8. Pipe diameters up to 450mm, shall be of uPVC.
9. Pipe diameters above 450mm, shall be of GRP material.
10. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
No.1
??mm@
??mm@
No.6- ASSET 11 DEEP GRAVITY SEWER
No.8- ASSET 11 DEEP GRAVITY SEWER
No.12- ASSET 11 DEEP GRAVITY SEWER
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 22B I.L = -2.282m
No.20 - ASSET 11 FOUL SEWER
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 23A I.L = -2.05
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 23A I.L = -i.909m
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 23A I.L = -1.402m
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 22B I.L = -3.021
No.11- ASSET 11 DEEP GRAVITY SEWER
Rev Description Prep ChkdAppdDate
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0609 -
JAN '15PHW.FN.C
1:2000@A1 10001
SHEET 8 OF 12
LAYOUT PLAN OF ASSET 11
FOUL SEWER
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
A Draft Issue for Review N.C W.F W.F JAN '15
No.25 - ASSET 11 FOUL SEWER
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED DEEP GRAVITY SEWER
(ASSET 11)shown thus
SECTION No. & DIRECTION shown thus
FUTURE CONNECTIONS constructed
under seperate contract's
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. All materials to be approved by EWA/SEPPD prior to installation.
6. Installation to be in accordance with SEPPD standards and best
practices and in accordance with the utility cross sections.
7. All works to be carried out by a SEPPD approved contractor.
8. Pipe diameters up to 450mm, shall be of uPVC.
9. Pipe diameters above 450mm, shall be of GRP material.
10. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
No.1
??mm@
??mm@
No.6- ASSET 11 DEEP GRAVITY SEWER
No.8- ASSET 11 DEEP GRAVITY SEWER
No.6- ASSET 11 DEEP GRAVITY SEWER
No.26 - ASSET 11 FOUL SEWER
No.8- ASSET 11 DEEP GRAVITY SEWER
No.11- ASSET 11 DEEP GRAVITY SEWER
No.12- ASSET 11 DEEP GRAVITY SEWER
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 13A I.L = -2.546
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 13A I.L = -1.318
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 22B
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 14A I.L = -0.729
FUTURE 200mm TRUNK
FOUL SEWER
FROM ASSET 12B I.L = -1.953
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 12B I.L = -2.212
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 12B I.L = -1.680
Sub Station
Rev Description Prep ChkdAppdDate
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0610 A
JAN '15PHW.FN.C
1:2000@A1 10001
SHEET 10 OF 12
LAYOUT PLAN OF ASSET 11
FOUL SEWER
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
No.20 - ASSET 11 FOUL SEWER
A Draft Issue for Review N.C W.F W.F JAN '15
ASSET 22A
ASSET 22B
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED DEEP GRAVITY SEWER
(ASSET 11)shown thus
SECTION No. & DIRECTION shown thus
FUTURE CONNECTIONS constructed
under seperate contract's
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. All materials to be approved by EWA/SEPPD prior to installation.
6. Installation to be in accordance with SEPPD standards and best
practices and in accordance with the utility cross sections.
7. All works to be carried out by a SEPPD approved contractor.
8. Pipe diameters up to 450mm, shall be of uPVC.
9. Pipe diameters above 450mm, shall be of GRP material.
10. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
No.1
??mm@
??mm@
No.12- ASSET 11 DEEP GRAVITY SEWER
No.11- ASSET 11 DEEP GRAVITY SEWER
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 22B
FUTURE 200mm TRUNK
FOUL SEWER
FROM ASSET 22A I.L = -2.283
FUTURE 200mm TRUNK
FOUL SEWER
FROM ASSET 22B
I.L = -3.021
Rev Description Prep ChkdAppdDate
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0611 A
JAN '15PHW.FN.C
1:2000@A1 10001
SHEET 11 OF 12
LAYOUT PLAN OF ASSET 11
FOUL SEWER
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
A Draft Issue for Review N.C W.F W.F JAN '15
ASSET 12A
ASSET 12B
No.4
No.18
No.27 - ASSET 11 FOUL SEWER
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED DEEP GRAVITY SEWER
(ASSET 11)shown thus
SECTION No. & DIRECTION shown thus
FUTURE CONNECTIONS constructed
under seperate contract's
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. All materials to be approved by EWA/SEPPD prior to installation.
6. Installation to be in accordance with SEPPD standards and best
practices and in accordance with the utility cross sections.
7. All works to be carried out by a SEPPD approved contractor.
8. Pipe diameters up to 450mm, shall be of uPVC.
9. Pipe diameters above 450mm, shall be of GRP material.
10. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
No.1
??mm@
??mm@
No.8- ASSET 11 DEEP GRAVITY SEWER
No.9- ASSET 11 DEEP GRAVITY SEWER
No.6- ASSET 11 DEEP GRAVITY SEWER
No.25 - ASSET 11 FOUL SEWER
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 12B I.L = -1.953
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 12B I.L = -2.212
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 12B I.L = -1.680
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 12A I.L = -6.853
FUTURE 200mm
TRUNK FOUL SEWER
FROM ASSET 12A I.L = -4.689
IN
OUT
Rev Description Prep ChkdAppdDate
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0612 A
JAN '15PHW.FN.C
1:2000@A1 10001
SHEET 12 OF 12
LAYOUT PLAN OF ASSET 11
FOUL SEWER
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
A Draft Issue for Review N.C W.F W.F JAN '15
ASSET 12A
ASSET 12B
ASSET 14A
SARAT
No.26 - ASSET 11 FOUL SEWER
No.8- ASSET 11 DEEP GRAVITY SEWER
No.9- ASSET 11 DEEP GRAVITY SEWER No.10- ASSET 11 DEEP GRAVITY SEWER
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 12B I.L = -2.912
TRUNK FOUL SEWER
FROM ASSET SARAT I.L = -3.881
TRUNK FOUL SEWER
FROM ASSET SARAT I.L = -4.689
FUTURE 200mm TRUNK FOUL SEWER
FROM ASSET 14A I.L = -2.925
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED DEEP GRAVITY SEWER
(ASSET 11)shown thus
SECTION No. & DIRECTION shown thus
FUTURE CONNECTIONS constructed
under seperate contract's
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. All materials to be approved by EWA/SEPPD prior to installation.
6. Installation to be in accordance with SEPPD standards and best
practices and in accordance with the utility cross sections.
7. All works to be carried out by a SEPPD approved contractor.
8. Pipe diameters up to 450mm, shall be of uPVC.
9. Pipe diameters above 450mm, shall be of GRP material.
10. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
No.1
??mm@
??mm@
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0613 A
JAN '15PHW.FN.C
As Shown@A1 10001
SHEET 1 OF 6
SECTIONS
FOUL SEWER ASSET 11
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
Rev Description Prep ChkdAppdDate
SCALE = 1:2000 HORIZONTAL
1:200 VERTICAL
A Draft Issue for Review N.C W.F W.F JAN '15
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED GROUND LEVEL shown thus
EXISTING GROUND LEVEL Shown thus
22A-F-No.
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. All materials to be approved by EWA/SEPPD prior to installation.
6. Installation to be in accordance with SEPPD standards and best
practices and in accordance with the utility cross sections.
7. All works to be carried out by a SEPPD approved contractor.
8. Pipe diameters up to 450mm, shall be of uPVC.
9. Pipe diameters above 450mm, shall be of GRP material.
10. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0613 A
JAN '15PHW.FN.C
As Shown@A1 10001
SHEET 2 OF 6
SECTIONS
FOUL SEWER ASSET 11
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
Rev Description Prep ChkdAppdDate
SCALE = 1:2000 HORIZONTAL
1:200 VERTICAL
A Draft Issue for Review N.C W.F W.F JAN '15
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED GROUND LEVEL shown thus
EXISTING GROUND LEVEL Shown thus
22A-F-No.
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. All materials to be approved by EWA/SEPPD prior to installation.
6. Installation to be in accordance with SEPPD standards and best
practices and in accordance with the utility cross sections.
7. All works to be carried out by a SEPPD approved contractor.
8. Pipe diameters up to 450mm, shall be of uPVC.
9. Pipe diameters above 450mm, shall be of GRP material.
10. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0615 A
JAN '15PHW.FN.C
As Shown@A1 10001
SHEET 3 OF 6
SECTIONS
FOUL SEWER ASSET 11
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
Rev Description Prep ChkdAppdDate
SCALE = 1:2000 HORIZONTAL
1:200 VERTICAL
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED GROUND LEVEL shown thus
EXISTING GROUND LEVEL Shown thus
11-F-No.
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. Pipe diameters up to 450mm, shall be of uPVC.
6. Pipe diameters above 450mm, shall be of GRP material.
7. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
A Draft Issue for Review N.C W.F W.F JAN '15
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0616 A
JAN '15PHW.FN.C
As Shown@A1 10001
SHEET 4 OF 6
SECTIONS
FOUL SEWER ASSET 11
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
Rev Description Prep ChkdAppdDate
SCALE = 1:2000 HORIZONTAL
1:200 VERTICAL
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED GROUND LEVEL shown thus
EXISTING GROUND LEVEL Shown thus
11-F-No.
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. Pipe diameters up to 450mm, shall be of uPVC.
6. Pipe diameters above 450mm, shall be of GRP material.
7. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
A Draft Issue for Review N.C W.F W.F JAN '15
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0617 A
JAN '15PHW.FN.C
As Shown@A1 10001
SHEET 5 OF 6
SECTIONS
FOUL SEWER ASSET 11
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
Rev Description Prep ChkdAppdDate
SCALE = 1:2000 HORIZONTAL
1:200 VERTICAL
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED GROUND LEVEL shown thus
EXISTING GROUND LEVEL Shown thus
11-F-No.
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. Pipe diameters up to 450mm, shall be of uPVC.
6. Pipe diameters above 450mm, shall be of GRP material.
7. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
A Draft Issue for Review N.C W.F W.F JAN '15
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0618 A
JAN '15PHW.FN.C
As Shown@A1 10001
SHEET 6 OF 7
SECTIONS
FOUL SEWER ASSET 11
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
Rev Description Prep ChkdAppdDate
SCALE = 1:2000 HORIZONTAL
1:200 VERTICAL
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED GROUND LEVEL shown thus
EXISTING GROUND LEVEL Shown thus
11-F-No.
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. Pipe diameters up to 450mm, shall be of uPVC.
6. Pipe diameters above 450mm, shall be of GRP material.
7. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
A Draft Issue for Review N.C W.F W.F JAN '15
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0619 A
JAN '15PHW.FN.C
As Shown@A1 10001
SHEET 7 OF 7
SECTIONS
FOUL SEWER ASSET 11
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
Rev Description Prep ChkdAppdDate
SCALE = 1:2000 HORIZONTAL
1:200 VERTICAL
LEGEND:
PROPOSED MANHOLE shown thus
PROPOSED PIPELINE shown thus
PROPOSED GROUND LEVEL shown thus
EXISTING GROUND LEVEL Shown thus
11-F-No.
Notes
1. This Drawing is to be read in conjunction with all other relevant
documentation.
2. Do not scale from this drawing, use only printed dimensions.
3. All dimensions in millimetres, all chainages, levels and coordinates
are in metres unless defined otherwise.
4. This drawing is to be read in conjunction with the project Health and
Safety File for any identified potential risks.
5. Pipe diameters up to 450mm, shall be of uPVC.
6. Pipe diameters above 450mm, shall be of GRP material.
7. Minimum clear cover from finish grade level to the top of pipe shall
be minimum 1200mm.
A Draft Issue for Review N.C W.F W.F JAN '15
1:30 CROSSFALL
1200
100 100
10mm THICK
EPOXY MORTAR
200mm THICK
CONCRETE WALL (C45/20)
HALF ROUND CHANNEL
1000 G POLYTHENE SHEET
CONCRETE BLINDING 50mm THICK
PAINT PROTECTION IN
ACCORDANCE WITH SECTION G
OF THESPECIFICATION (TABLE G1)
200 800 200
250
BENCHING TO BE C45/20
CONCRETE FINISHED WITH
10mm THICK EPOXY MORTAR
MASTIC SEALANT 50x25 THICK WITH
BOND BREAKER MEMBRANE TO
UNDERSIDE ONLY
RTR LINER IN ACCORDANCE WITH
SECTION 'F' OF THE SPECIFICATION
200
MEDIUM OR HEAVY DUTY CAST IRON
COVER AND FRAME WITH RTR SEALING PLATE
ROAD LEVEL (PAVED AREAS)
COVER LEVEL -5
ROAD LEVEL (UNPAVED AREAS)
COVER LEVEL -50
GROUND LEVEL (OPEN AREAS)
COVER LEVEL -150
CONCRETE HAUNCH
GRADE C 45/20
PRECAST COVER SUPPORT PAINTED
INTERNALLY WITH EPOXY MORTAR
2000Max.
1:30 CROSSFALL
1001000100 250250
50
POSITION OF
ACCESS HOLE
10mm THICK
EPOXY MORTAR
250mm THICK
CONCRETE WALL (C45/20)
HALF ROUND CHANNEL
1000 G POLYTHENE SHEET
CONCRETE BLINDING 50mm THICK
PAINT PROTECTION IN
ACCORDANCE WITH SECTION G
OF THE SPECIFICATION (TABLE G1)
250 1200 250
3000Max.300
BENCHING TO BE C45/20
CONCRETE FINISHED WITH
10mm THICK EPOXY MORTAR
MASTIC SEALANT 50x25 THICK WITH
BOND BREAKER MEMBRANE TO
UNDRESIDE ONLY
RTR LINER IN ACCORDANCE WITH
SECTION 'F' OF THE SPECIFICATION
200
REINFORCEMENT BAR
MEDIUM OR HEAVY DUTY CAST IRON
COVER AND FRAME WITH RTR SEALING PLATE
ROAD LEVEL (PAVED AREAS)
COVER LEVEL -5
ROAD LEVEL (UNPAVED AREAS)
COVER LEVEL -50
GROUND LEVEL (OPEN AREAS)
COVER LEVEL -150
CONCRETE HAUNCH
GRADE C 45/20
PRECAST COVER SUPPORT
PAINTED INTERNALLY WITH
EPOXY MORTAR
800
3-3 T20-100 B
4 T20-200 B
4 T20-200 B
4 T20-200 B
1+5 T20-100 B
4 T20 TRIMMER BARS
300800600
450 450
1700
CHAMBER TYPE - E
(SCALE 1:20)
(SCALE 1:20)
(SCALE-1:20)
(SCALE-1:20)
(SCALE-1:20)
CHAMBER TYPE - F
Xref P:10001-Diyar al Muharraq Primary Infrastructure10001-106 Drawings000 XREF Files10001-JB-000-M2-0001_DRBD_WA1.dwg
Rev Description Prep ChkdAppdDate
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0620 A
Jan '15PHW.FN.C
1:2000@A1 10001
OF ASSET 11
TYPE E&F AND COVER TYPES
MH SCHEDULE & CHAMBER DETAILS
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
A Draft Issue for Review N.C W.F W.F JAN '15
Notes
1. This Drawing is to be read in conjunction with all
other relevant documentation.
2. Do not scale from this drawing, use only
printed dimensions.
3. All dimensions in millimetres, all chainages,
levels and coordinates are in metres unless
defined otherwise.
4. This drawing is to be read in conjunction with the
project Health and Safety File for any identified
potential risks.
5. All materials to be approved by EWA/SEPPD
prior to installation.
6. Installation to be in accordance with SEPPD
standards and best practices and in accordance
with the utility cross sections.
7. All works to be carried out by a SEPPD
approved contractor.
1:30 CROSSFALL
2001000200 250250
50
POSITION OF
ACCESS HOLE
HALF ROUND CHANNEL
1000 G POLYTHENE SHEET
250 1400 250
3000Max.300
MASTIC SEALANT 50x25mm THICK
WITH BOND BREAKER
MEMBRANE TOUNDRESIDE ONLY
RTR LINER IN ACCORDANCE WITH
SECTION 'F' OF THE SPECIFICATION
200
REINFORCEMENT BAR
MEDIUM OR HEAVY DUTY CAST IRON
COVER AND FRAME WITH RTR SEALING PLATE
ROAD LEVEL (PAVED AREAS)
COVER LEVEL -5
ROAD LEVEL (UNPAVED AREAS)
COVER LEVEL -50
GROUND LEVEL (OPEN AREAS)
COVER LEVEL -150
CONCRETE HAUNCH
GRADE C 45/20
PRECAST COVER SUPPORT PAINTED
INTERNALLY WITH EPOXY MORTAR
800
10mm THICK
EPOXY MORTAR
250mm THICK
CONCRETE WALL (C45/20)
CONCRETE BLINDING 50mm THICK
PAINT PROTECTION IN
ACCORDANCE WITH SECTION G
OF THE SPECIFICATION (TABLE G1)
BENCHING TO BE C45/20
CONCRETE FINISHED WITH
10mm THICK EPOXY MORTAR
3-3 T16-180 B
5 T16 145 B
5 T16 145 B
5 T16-145 B
1+4 T16-145 B
4 T16 TRIMMER BARS
310800790
550
1900
550 800
1:30 CROSSFALL
2001000200
250250
50
POSITION OF
ACCESS HOLE
1400
10mm THICK
EPOXY MORTAR
250mm THICK
CONCRETE WALL (C45/20)
HALF ROUND CHANNEL
1000 G POLYTHENE SHEET
CONCRETE BLINDING 50mm THICK
PAINT PROTECTION IN ACCORDANCE
WITH SECTION G OF THE
SPECIFICATION (TABLE G1)
250 1400 250
2000Max.350
BENCHING TO BE C45/20
CONCRETE FINISHED WITH
10mm THICK EPOXY MORTAR
MASTIC SEALANT 50x25mm THICK
WITH BOND BREAKER
MEMBRANE TO UNDRESIDE ONLY
RTR LINER IN ACCORDANCE WITH
SECTION 'F' OF THE SPECIFICATION
200
REINFORCEMENT BAR
MEDIUM OR HEAVY DUTY CAST IRON
COVER AND FRAME WITH RTR SEALING PLATE
ROAD LEVEL (PAVED AREAS)
COVER LEVEL -5
ROAD LEVEL (UNPAVED AREAS)
COVER LEVEL -50
GROUND LEVEL (OPEN AREAS)
COVER LEVEL -150
CONCRETE HAUNCH
GRADE C 45/20
PRECAST COVER SUPPORT PAINTED
INTERNALLY WITH EPOXY MORTAR
250
800 200200
3-3 T16-180 B
5 T16 145 B
5 T16 145 B
5 T16-145 B
1+4 T16-145 B
4 T16 TRIMMER BARS
310800790
550
1900
550 800
FO
U
L
SEW
ER
FO
U
L
SEW
ER
FO
U
L
SEW
ER
FO
U
L
SEW
ER
FOUL
SEWER
CHAMBER TYPE - G
(SCALE 1:20)
(SCALE 1:20)
CHAMBER TYPE - H
(SCALE-1:20)
(SCALE 1:20)
(SCALE 1:20)
(SCALE-1:20)
Rev Description Prep ChkdAppdDate
Client
Design Consultant
Project
Stage
Title
Scale
Checked Approved Date
Drawing No. Rev
Prepared
Job No.
10001-JB-11-PRE-0621 A
JAN '15PHW.FN.C
1:2000@A1 10001
OF ASSET 11
TYPE G&H
CHAMBER DETAILS
PRELIMINARY DESIGN
DIYAR AL MUHARRAQ
PRIORITY WORKS
PRIMARY INFRASTRUCTURE
A Draft Issue for Review N.C W.F W.F JAN '15
Notes
1. This Drawing is to be read in conjunction with all
other relevant documentation.
2. Do not scale from this drawing, use only
printed dimensions.
3. All dimensions in millimetres, all chainages,
levels and coordinates are in metres unless
defined otherwise.
4. This drawing is to be read in conjunction with the
project Health and Safety File for any identified
potential risks.
5. All materials to be approved by EWA/SEPPD
prior to installation.
6. Installation to be in accordance with SEPPD
standards and best practices and in accordance
with the utility cross sections.
7. All works to be carried out by a SEPPD
approved contractor.
CHAMBER COVER TYPE

More Related Content

What's hot

Newsco International Energy Services Inc -Services
Newsco International Energy Services Inc  -ServicesNewsco International Energy Services Inc  -Services
Newsco International Energy Services Inc -Services
amar65gupta
 
Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)
Sean Roper
 
BR07 Proposed Section A - A
BR07 Proposed Section A - ABR07 Proposed Section A - A
BR07 Proposed Section A - A
sarah ralphs
 
Inspector ,ElectroMechanical engineer resume rev.01
Inspector ,ElectroMechanical  engineer resume rev.01Inspector ,ElectroMechanical  engineer resume rev.01
Inspector ,ElectroMechanical engineer resume rev.01
yousef amrou
 
JPT_DynaStage_TechUpdateApril 2016
JPT_DynaStage_TechUpdateApril 2016JPT_DynaStage_TechUpdateApril 2016
JPT_DynaStage_TechUpdateApril 2016
Sandra Denson
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.
Vijay Sekaran
 

What's hot (20)

Seaward PowerCheck 1557 PAT And Installation Verification Unit
Seaward PowerCheck 1557 PAT And Installation Verification UnitSeaward PowerCheck 1557 PAT And Installation Verification Unit
Seaward PowerCheck 1557 PAT And Installation Verification Unit
 
Giuliano david catalogo seco gear_17-5kv
Giuliano david catalogo seco gear_17-5kvGiuliano david catalogo seco gear_17-5kv
Giuliano david catalogo seco gear_17-5kv
 
Newsco International Energy Services Inc -Services
Newsco International Energy Services Inc  -ServicesNewsco International Energy Services Inc  -Services
Newsco International Energy Services Inc -Services
 
TEST1
TEST1TEST1
TEST1
 
Janet Coppola
Janet CoppolaJanet Coppola
Janet Coppola
 
Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)
 
CVbillyno3-
CVbillyno3-CVbillyno3-
CVbillyno3-
 
BR07 Proposed Section A - A
BR07 Proposed Section A - ABR07 Proposed Section A - A
BR07 Proposed Section A - A
 
Vijay cv
Vijay cvVijay cv
Vijay cv
 
Inspector ,ElectroMechanical engineer resume rev.01
Inspector ,ElectroMechanical  engineer resume rev.01Inspector ,ElectroMechanical  engineer resume rev.01
Inspector ,ElectroMechanical engineer resume rev.01
 
JPT_DynaStage_TechUpdateApril 2016
JPT_DynaStage_TechUpdateApril 2016JPT_DynaStage_TechUpdateApril 2016
JPT_DynaStage_TechUpdateApril 2016
 
WILLIAMS IDORO CV 2.2
WILLIAMS IDORO CV 2.2WILLIAMS IDORO CV 2.2
WILLIAMS IDORO CV 2.2
 
Vibration Monitoring
Vibration MonitoringVibration Monitoring
Vibration Monitoring
 
KOLECTRIC MC8020 MICROCOVERMETER
KOLECTRIC MC8020 MICROCOVERMETER KOLECTRIC MC8020 MICROCOVERMETER
KOLECTRIC MC8020 MICROCOVERMETER
 
sr.in tech
sr.in techsr.in tech
sr.in tech
 
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
 
Raja CV Instrument
Raja CV InstrumentRaja CV Instrument
Raja CV Instrument
 
7 - Encardio Rite ONLINE WATER QUANTITY AND QUALITY MONITORING-Sep-15
7 - Encardio Rite ONLINE WATER QUANTITY AND QUALITY MONITORING-Sep-157 - Encardio Rite ONLINE WATER QUANTITY AND QUALITY MONITORING-Sep-15
7 - Encardio Rite ONLINE WATER QUANTITY AND QUALITY MONITORING-Sep-15
 
Quick Acting Couplers - Legris Parker นิวเมติก.com
Quick Acting Couplers - Legris Parker นิวเมติก.comQuick Acting Couplers - Legris Parker นิวเมติก.com
Quick Acting Couplers - Legris Parker นิวเมติก.com
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.
 

Similar to ASSET 11 FOUL NETWORK Jan '15 REV B

Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
Surya Kant
 
2 cm-ms-bld-012 - roof fan & natural ventilator
2   cm-ms-bld-012 - roof fan & natural ventilator2   cm-ms-bld-012 - roof fan & natural ventilator
2 cm-ms-bld-012 - roof fan & natural ventilator
Minh Bui Si
 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------
Pratap Biswas
 
Stephen Jones October 2016
Stephen Jones October 2016Stephen Jones October 2016
Stephen Jones October 2016
Stephen Jones
 
AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD
 
BR08 Proposed Section B - B
BR08 Proposed Section B - BBR08 Proposed Section B - B
BR08 Proposed Section B - B
sarah ralphs
 
Acsr moose conductor
Acsr moose conductorAcsr moose conductor
Acsr moose conductor
Dineshsenthil
 
269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf
moumo1
 

Similar to ASSET 11 FOUL NETWORK Jan '15 REV B (20)

Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00
Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00
Ohl transmission lines opgw instalation procedure for fiber optic cables rev.00
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
 
Method of statement piping works
Method of statement piping works Method of statement piping works
Method of statement piping works
 
61131730 transmission-line-case-study
61131730 transmission-line-case-study61131730 transmission-line-case-study
61131730 transmission-line-case-study
 
2 cm-ms-bld-012 - roof fan & natural ventilator
2   cm-ms-bld-012 - roof fan & natural ventilator2   cm-ms-bld-012 - roof fan & natural ventilator
2 cm-ms-bld-012 - roof fan & natural ventilator
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019
 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------
 
Stephen Jones October 2016
Stephen Jones October 2016Stephen Jones October 2016
Stephen Jones October 2016
 
AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15
 
03 Mohamed_fathi
03 Mohamed_fathi03 Mohamed_fathi
03 Mohamed_fathi
 
BR08 Proposed Section B - B
BR08 Proposed Section B - BBR08 Proposed Section B - B
BR08 Proposed Section B - B
 
Sixpack company profile
Sixpack  company profileSixpack  company profile
Sixpack company profile
 
Acsr moose conductor
Acsr moose conductorAcsr moose conductor
Acsr moose conductor
 
Profi bus DATA SHEET
Profi  bus  DATA  SHEETProfi  bus  DATA  SHEET
Profi bus DATA SHEET
 
2376 robor ductile_iron_brochure5
2376 robor ductile_iron_brochure52376 robor ductile_iron_brochure5
2376 robor ductile_iron_brochure5
 
15-0478_WD_B
15-0478_WD_B15-0478_WD_B
15-0478_WD_B
 
269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf
 
Telescopic poles nea
Telescopic poles  neaTelescopic poles  nea
Telescopic poles nea
 
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized PartnerTrust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
 
80G FM Radar Level Meter Product Manual
80G FM Radar Level Meter Product Manual80G FM Radar Level Meter Product Manual
80G FM Radar Level Meter Product Manual
 

ASSET 11 FOUL NETWORK Jan '15 REV B

  • 1. Rev Description Prep ChkdAppdDate Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0601 A JAN '15PHW.FN.C NTS 10001 SHEET 1 OF 8 INDEX PLAN OF ASSET 11 FOUL SEWER PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE A Draft Issue for Review N.C W.F W.F JAN '15 ASSET 12A ASSET 25 ASSET 12B ASSET 22B ASSET 22A ASSET 13A ASSET 13B ASSET 24B ASSET 26 ASSET 15 ASSET 16C ASSET 14B ASSET 14A 10001-JB-11-PRE-0610 10001-JB-11-PRE-0612 10001-JB-11-PRE-0608 10001-JB-11-PRE-0609 10001-JB-11-PRE-0611 10001-JB-11-PRE-0602 10001-JB-11-PRE-0603 LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED DEEP GRAVITY SEWER (ASSET 11)shown thus SECTION No. & DIRECTION shown thus FUTURE CONNECTIONS constructed under seperate contract's Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. No.1 ??mm@ ??mm@ 10001-JB-11-PRE-0604 10001-JB-11-PRE-0605 10001-JB-11-PRE-060710001-JB-11-PRE-0606 SARAT ASSET 23A ASSET 23B ASSET 27 ASSET 16A ASSET 16B
  • 2. BRIDGE Rev Description Prep ChkdAppdDate Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0602 A JAN '15PHW.FN.C 1:2000@A1 10001 SHEET 1 OF 12 LAYOUT PLAN OF ASSET 11 FOUL SEWER PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE A Draft Issue for Review N.C W.F W.F JAN '15 ASSET 27 ASSET 17 ASSET 23B LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED DEEP GRAVITY SEWER (ASSET 11)shown thus SECTION No. & DIRECTION shown thus FUTURE CONNECTIONS constructed under seperate contract's Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. No.1 ??mm@ ??mm@ No. 2 - ASSET 11 DEEP GRAVITY SEWER No. 1 - ASSET 11 & ASSET 27 DEEP GRAVITY SEWER FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 27 I.L= -5.781m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 27 I.L = =I.L -4.885 No. 3 - DEEP GRAVITY SEWER
  • 3. Rev Description Prep ChkdAppdDate Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0603 A JAN '15PHW.FN.C 1:2000@A1 10001 SHEET 2 OF 12 LAYOUT PLAN OF ASSET 11 FOUL SEWER PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE A Draft Issue for Review N.C W.F W.F JAN '15 ASSET 15 ASSET 18 ASSET 17 ASSET 16B LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED DEEP GRAVITY SEWER (ASSET 11)shown thus SECTION No. & DIRECTION shown thus FUTURE CONNECTIONS constructed under seperate contract's Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. No.1 ??mm@ ??mm@ No.2 - ASSET 11, ASSET 18 & ASSET 17 DEEP GRAVITY SEWER FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 17 I.L = =I.L -4.660 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 17 I.L = -2.398m No.12 - ASSET 11 DEEP GRAVITY SEWER ASSET 16AASSET 15 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 18 = -2.398m
  • 4. BRI Rev Description Prep ChkdAppdDate Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0604 A JAN '15PHW.FN.C 1:2000@A1 10001 SHEET 3 OF 12 LAYOUT PLAN OF ASSET 11 FOUL SEWER PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE A Draft Issue for Review N.C W.F W.F JAN '15 ASSET 25 ASSET 15 ASSET 26 ASSET 27 ASSET 23B LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED DEEP GRAVITY SEWER (ASSET 11)shown thus SECTION No. & DIRECTION shown thus FUTURE CONNECTIONS constructed under seperate contract's Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. No.1 ??mm@ ??mm@ No.5- ASSET 11 DEEP GRAVITY SEWER No.5- ASSET 11 DEEP GRAVITY SEWER No.3- ASSET 11 DEEP GRAVITY SEWER No.1 - ASSET 11 DEEP GRAVITY SEWER No.2 - ASSET 11 DEEP GRAVITY SEWER No.12 - ASSET 11 DEEP GRAVITY SEWER FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 15 I.L = =I.L -2.131 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 25 I.L = 0.125m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 15 I.L = -1.600m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 25 I.L = -5.152m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 26 I.L = =I.L -4.271m No.28 - ASSET 11 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 25 I.L = =I.L -0.119
  • 5. Rev Description Prep ChkdAppdDate Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0605 A JAN '15PHW.FN.C 1:2000@A1 10001 SHEET 4 OF 12 LAYOUT PLAN OF ASSET 11 FOUL SEWER PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE A Draft Issue for Review N.C W.F W.F JAN '15 ASSET 15 ASSET 16A ASSET 16B ASSET 13B LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED DEEP GRAVITY SEWER (ASSET 11)shown thus SECTION No. & DIRECTION shown thus FUTURE CONNECTIONS constructed under seperate contract's Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. No.1 ??mm@ ??mm@ No.6- ASSET 11 DEEP GRAVITY SEWER No.13 - ASSET 11 DEEP GRAVITY SEWER No. 2 - ASSET 11 DEEP GRAVITY SEWER No.23 - ASSET 11 FOUL SEWER No. 3 - ASSET 11 DEEP GRAVITY SEWER FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 16C I.L =-4.782m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 15 = -2.131m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 15 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 15 = I.L -1.600m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 16A = I.L -0.996m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 16A = I.L -1.909m
  • 6. 15.00 Rev Description Prep ChkdAppdDate Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0606 A JAN '15PHW.FN.C 1:2000@A1 10001 SHEET 5 OF 12 LAYOUT PLAN OF ASSET 11 FOUL SEWER PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE A Draft Issue for Review N.C W.F W.F JAN '15 ASSET 23A ASSET 24A ASSET 22B ASSET 23B LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED DEEP GRAVITY SEWER (ASSET 11)shown thus SECTION No. & DIRECTION shown thus FUTURE CONNECTIONS constructed under seperate contract's Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. No.1 ??mm@ ??mm@ No.5- ASSET 11 DEEP GRAVITY SEWER No.11- ASSET 11 DEEP GRAVITY SEWER No.6- ASSET 11 DEEP GRAVITY SEWER No.6 - ASSET 11 DEEP GRAVITY SEWER ASSET 24B No.21 - ASSET 11 FOUL SEWER No.22-- ASSET 11 FOUL SEWER FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 23A I.L = -2.405 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 23A I.L = -1.909m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 24A I.L = --1.829m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 23B I.L = -1.568m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 23A I.L = -1.402m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 23B I.L = -2.826m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 24B I.L = -2.915m
  • 7. Rev Description Prep ChkdAppdDate Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0607 A JAN '15PHW.FN.C 1:2000@A1 10001 SHEET 6 OF 12 LAYOUT PLAN OF ASSET 11 FOUL SEWER PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE A Draft Issue for Review N.C W.F W.F JAN '15 ASSET 13A ASSET 14A ASSET 13B ASSET 23A ASSET 23B LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED DEEP GRAVITY SEWER (ASSET 11)shown thus SECTION No. & DIRECTION shown thus FUTURE CONNECTIONS constructed under seperate contract's Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. No.1 ??mm@ ??mm@ No.5- ASSET 11 DEEP GRAVITY SEWER No.5- ASSET 11 DEEP GRAVITY SEWER No.24 - ASSET 11 FOUL SEWER No.26-- ASSET 11 FOUL SEWER No.25 - ASSET 11 FOUL SEWER No.4 ASSET 11 DEEP GRAVITY SEWER No.6- ASSET 11 DEEP GRAVITY SEWER No.11- ASSET 11 DEEP GRAVITY SEWER FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 13A I.L = -1.318 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 13A I.L = -2.546 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 23B I.L = -0.4088 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 13B I.L = -0.332 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 13B I.L = -0.555 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 13B I.L = -1.788 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 14A I.L = -0.729
  • 8. Sub Station Rev Description Prep ChkdAppdDate Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0608 A JAN '15PHW.FN.C 1:2000@A1 10001 SHEET 8 OF 12 LAYOUT PLAN OF ASSET 11 FOUL SEWER PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE A Draft Issue for Review N.C W.F W.F JAN '15 No.21 - ASSET 11 FOUL SEWER LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED DEEP GRAVITY SEWER (ASSET 11)shown thus SECTION No. & DIRECTION shown thus FUTURE CONNECTIONS constructed under seperate contract's Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. No.1 ??mm@ ??mm@ No.6- ASSET 11 DEEP GRAVITY SEWER No.8- ASSET 11 DEEP GRAVITY SEWER No.12- ASSET 11 DEEP GRAVITY SEWER FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 22B I.L = -2.282m No.20 - ASSET 11 FOUL SEWER FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 23A I.L = -2.05 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 23A I.L = -i.909m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 23A I.L = -1.402m FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 22B I.L = -3.021 No.11- ASSET 11 DEEP GRAVITY SEWER
  • 9. Rev Description Prep ChkdAppdDate Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0609 - JAN '15PHW.FN.C 1:2000@A1 10001 SHEET 8 OF 12 LAYOUT PLAN OF ASSET 11 FOUL SEWER PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE A Draft Issue for Review N.C W.F W.F JAN '15 No.25 - ASSET 11 FOUL SEWER LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED DEEP GRAVITY SEWER (ASSET 11)shown thus SECTION No. & DIRECTION shown thus FUTURE CONNECTIONS constructed under seperate contract's Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. No.1 ??mm@ ??mm@ No.6- ASSET 11 DEEP GRAVITY SEWER No.8- ASSET 11 DEEP GRAVITY SEWER No.6- ASSET 11 DEEP GRAVITY SEWER No.26 - ASSET 11 FOUL SEWER No.8- ASSET 11 DEEP GRAVITY SEWER No.11- ASSET 11 DEEP GRAVITY SEWER No.12- ASSET 11 DEEP GRAVITY SEWER FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 13A I.L = -2.546 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 13A I.L = -1.318 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 22B FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 14A I.L = -0.729 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 12B I.L = -1.953 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 12B I.L = -2.212 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 12B I.L = -1.680
  • 10. Sub Station Rev Description Prep ChkdAppdDate Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0610 A JAN '15PHW.FN.C 1:2000@A1 10001 SHEET 10 OF 12 LAYOUT PLAN OF ASSET 11 FOUL SEWER PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE No.20 - ASSET 11 FOUL SEWER A Draft Issue for Review N.C W.F W.F JAN '15 ASSET 22A ASSET 22B LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED DEEP GRAVITY SEWER (ASSET 11)shown thus SECTION No. & DIRECTION shown thus FUTURE CONNECTIONS constructed under seperate contract's Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. No.1 ??mm@ ??mm@ No.12- ASSET 11 DEEP GRAVITY SEWER No.11- ASSET 11 DEEP GRAVITY SEWER FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 22B FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 22A I.L = -2.283 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 22B I.L = -3.021
  • 11. Rev Description Prep ChkdAppdDate Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0611 A JAN '15PHW.FN.C 1:2000@A1 10001 SHEET 11 OF 12 LAYOUT PLAN OF ASSET 11 FOUL SEWER PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE A Draft Issue for Review N.C W.F W.F JAN '15 ASSET 12A ASSET 12B No.4 No.18 No.27 - ASSET 11 FOUL SEWER LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED DEEP GRAVITY SEWER (ASSET 11)shown thus SECTION No. & DIRECTION shown thus FUTURE CONNECTIONS constructed under seperate contract's Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. No.1 ??mm@ ??mm@ No.8- ASSET 11 DEEP GRAVITY SEWER No.9- ASSET 11 DEEP GRAVITY SEWER No.6- ASSET 11 DEEP GRAVITY SEWER No.25 - ASSET 11 FOUL SEWER FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 12B I.L = -1.953 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 12B I.L = -2.212 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 12B I.L = -1.680 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 12A I.L = -6.853 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 12A I.L = -4.689
  • 12. IN OUT Rev Description Prep ChkdAppdDate Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0612 A JAN '15PHW.FN.C 1:2000@A1 10001 SHEET 12 OF 12 LAYOUT PLAN OF ASSET 11 FOUL SEWER PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE A Draft Issue for Review N.C W.F W.F JAN '15 ASSET 12A ASSET 12B ASSET 14A SARAT No.26 - ASSET 11 FOUL SEWER No.8- ASSET 11 DEEP GRAVITY SEWER No.9- ASSET 11 DEEP GRAVITY SEWER No.10- ASSET 11 DEEP GRAVITY SEWER FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 12B I.L = -2.912 TRUNK FOUL SEWER FROM ASSET SARAT I.L = -3.881 TRUNK FOUL SEWER FROM ASSET SARAT I.L = -4.689 FUTURE 200mm TRUNK FOUL SEWER FROM ASSET 14A I.L = -2.925 LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED DEEP GRAVITY SEWER (ASSET 11)shown thus SECTION No. & DIRECTION shown thus FUTURE CONNECTIONS constructed under seperate contract's Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. No.1 ??mm@ ??mm@
  • 13. Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0613 A JAN '15PHW.FN.C As Shown@A1 10001 SHEET 1 OF 6 SECTIONS FOUL SEWER ASSET 11 PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE Rev Description Prep ChkdAppdDate SCALE = 1:2000 HORIZONTAL 1:200 VERTICAL A Draft Issue for Review N.C W.F W.F JAN '15 LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED GROUND LEVEL shown thus EXISTING GROUND LEVEL Shown thus 22A-F-No. Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm.
  • 14. Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0613 A JAN '15PHW.FN.C As Shown@A1 10001 SHEET 2 OF 6 SECTIONS FOUL SEWER ASSET 11 PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE Rev Description Prep ChkdAppdDate SCALE = 1:2000 HORIZONTAL 1:200 VERTICAL A Draft Issue for Review N.C W.F W.F JAN '15 LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED GROUND LEVEL shown thus EXISTING GROUND LEVEL Shown thus 22A-F-No. Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. 8. Pipe diameters up to 450mm, shall be of uPVC. 9. Pipe diameters above 450mm, shall be of GRP material. 10. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm.
  • 15. Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0615 A JAN '15PHW.FN.C As Shown@A1 10001 SHEET 3 OF 6 SECTIONS FOUL SEWER ASSET 11 PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE Rev Description Prep ChkdAppdDate SCALE = 1:2000 HORIZONTAL 1:200 VERTICAL LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED GROUND LEVEL shown thus EXISTING GROUND LEVEL Shown thus 11-F-No. Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. Pipe diameters up to 450mm, shall be of uPVC. 6. Pipe diameters above 450mm, shall be of GRP material. 7. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. A Draft Issue for Review N.C W.F W.F JAN '15
  • 16. Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0616 A JAN '15PHW.FN.C As Shown@A1 10001 SHEET 4 OF 6 SECTIONS FOUL SEWER ASSET 11 PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE Rev Description Prep ChkdAppdDate SCALE = 1:2000 HORIZONTAL 1:200 VERTICAL LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED GROUND LEVEL shown thus EXISTING GROUND LEVEL Shown thus 11-F-No. Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. Pipe diameters up to 450mm, shall be of uPVC. 6. Pipe diameters above 450mm, shall be of GRP material. 7. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. A Draft Issue for Review N.C W.F W.F JAN '15
  • 17. Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0617 A JAN '15PHW.FN.C As Shown@A1 10001 SHEET 5 OF 6 SECTIONS FOUL SEWER ASSET 11 PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE Rev Description Prep ChkdAppdDate SCALE = 1:2000 HORIZONTAL 1:200 VERTICAL LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED GROUND LEVEL shown thus EXISTING GROUND LEVEL Shown thus 11-F-No. Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. Pipe diameters up to 450mm, shall be of uPVC. 6. Pipe diameters above 450mm, shall be of GRP material. 7. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. A Draft Issue for Review N.C W.F W.F JAN '15
  • 18. Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0618 A JAN '15PHW.FN.C As Shown@A1 10001 SHEET 6 OF 7 SECTIONS FOUL SEWER ASSET 11 PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE Rev Description Prep ChkdAppdDate SCALE = 1:2000 HORIZONTAL 1:200 VERTICAL LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED GROUND LEVEL shown thus EXISTING GROUND LEVEL Shown thus 11-F-No. Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. Pipe diameters up to 450mm, shall be of uPVC. 6. Pipe diameters above 450mm, shall be of GRP material. 7. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. A Draft Issue for Review N.C W.F W.F JAN '15
  • 19. Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0619 A JAN '15PHW.FN.C As Shown@A1 10001 SHEET 7 OF 7 SECTIONS FOUL SEWER ASSET 11 PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE Rev Description Prep ChkdAppdDate SCALE = 1:2000 HORIZONTAL 1:200 VERTICAL LEGEND: PROPOSED MANHOLE shown thus PROPOSED PIPELINE shown thus PROPOSED GROUND LEVEL shown thus EXISTING GROUND LEVEL Shown thus 11-F-No. Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. Pipe diameters up to 450mm, shall be of uPVC. 6. Pipe diameters above 450mm, shall be of GRP material. 7. Minimum clear cover from finish grade level to the top of pipe shall be minimum 1200mm. A Draft Issue for Review N.C W.F W.F JAN '15
  • 20. 1:30 CROSSFALL 1200 100 100 10mm THICK EPOXY MORTAR 200mm THICK CONCRETE WALL (C45/20) HALF ROUND CHANNEL 1000 G POLYTHENE SHEET CONCRETE BLINDING 50mm THICK PAINT PROTECTION IN ACCORDANCE WITH SECTION G OF THESPECIFICATION (TABLE G1) 200 800 200 250 BENCHING TO BE C45/20 CONCRETE FINISHED WITH 10mm THICK EPOXY MORTAR MASTIC SEALANT 50x25 THICK WITH BOND BREAKER MEMBRANE TO UNDERSIDE ONLY RTR LINER IN ACCORDANCE WITH SECTION 'F' OF THE SPECIFICATION 200 MEDIUM OR HEAVY DUTY CAST IRON COVER AND FRAME WITH RTR SEALING PLATE ROAD LEVEL (PAVED AREAS) COVER LEVEL -5 ROAD LEVEL (UNPAVED AREAS) COVER LEVEL -50 GROUND LEVEL (OPEN AREAS) COVER LEVEL -150 CONCRETE HAUNCH GRADE C 45/20 PRECAST COVER SUPPORT PAINTED INTERNALLY WITH EPOXY MORTAR 2000Max. 1:30 CROSSFALL 1001000100 250250 50 POSITION OF ACCESS HOLE 10mm THICK EPOXY MORTAR 250mm THICK CONCRETE WALL (C45/20) HALF ROUND CHANNEL 1000 G POLYTHENE SHEET CONCRETE BLINDING 50mm THICK PAINT PROTECTION IN ACCORDANCE WITH SECTION G OF THE SPECIFICATION (TABLE G1) 250 1200 250 3000Max.300 BENCHING TO BE C45/20 CONCRETE FINISHED WITH 10mm THICK EPOXY MORTAR MASTIC SEALANT 50x25 THICK WITH BOND BREAKER MEMBRANE TO UNDRESIDE ONLY RTR LINER IN ACCORDANCE WITH SECTION 'F' OF THE SPECIFICATION 200 REINFORCEMENT BAR MEDIUM OR HEAVY DUTY CAST IRON COVER AND FRAME WITH RTR SEALING PLATE ROAD LEVEL (PAVED AREAS) COVER LEVEL -5 ROAD LEVEL (UNPAVED AREAS) COVER LEVEL -50 GROUND LEVEL (OPEN AREAS) COVER LEVEL -150 CONCRETE HAUNCH GRADE C 45/20 PRECAST COVER SUPPORT PAINTED INTERNALLY WITH EPOXY MORTAR 800 3-3 T20-100 B 4 T20-200 B 4 T20-200 B 4 T20-200 B 1+5 T20-100 B 4 T20 TRIMMER BARS 300800600 450 450 1700 CHAMBER TYPE - E (SCALE 1:20) (SCALE 1:20) (SCALE-1:20) (SCALE-1:20) (SCALE-1:20) CHAMBER TYPE - F Xref P:10001-Diyar al Muharraq Primary Infrastructure10001-106 Drawings000 XREF Files10001-JB-000-M2-0001_DRBD_WA1.dwg Rev Description Prep ChkdAppdDate Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0620 A Jan '15PHW.FN.C 1:2000@A1 10001 OF ASSET 11 TYPE E&F AND COVER TYPES MH SCHEDULE & CHAMBER DETAILS PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE A Draft Issue for Review N.C W.F W.F JAN '15 Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor.
  • 21. 1:30 CROSSFALL 2001000200 250250 50 POSITION OF ACCESS HOLE HALF ROUND CHANNEL 1000 G POLYTHENE SHEET 250 1400 250 3000Max.300 MASTIC SEALANT 50x25mm THICK WITH BOND BREAKER MEMBRANE TOUNDRESIDE ONLY RTR LINER IN ACCORDANCE WITH SECTION 'F' OF THE SPECIFICATION 200 REINFORCEMENT BAR MEDIUM OR HEAVY DUTY CAST IRON COVER AND FRAME WITH RTR SEALING PLATE ROAD LEVEL (PAVED AREAS) COVER LEVEL -5 ROAD LEVEL (UNPAVED AREAS) COVER LEVEL -50 GROUND LEVEL (OPEN AREAS) COVER LEVEL -150 CONCRETE HAUNCH GRADE C 45/20 PRECAST COVER SUPPORT PAINTED INTERNALLY WITH EPOXY MORTAR 800 10mm THICK EPOXY MORTAR 250mm THICK CONCRETE WALL (C45/20) CONCRETE BLINDING 50mm THICK PAINT PROTECTION IN ACCORDANCE WITH SECTION G OF THE SPECIFICATION (TABLE G1) BENCHING TO BE C45/20 CONCRETE FINISHED WITH 10mm THICK EPOXY MORTAR 3-3 T16-180 B 5 T16 145 B 5 T16 145 B 5 T16-145 B 1+4 T16-145 B 4 T16 TRIMMER BARS 310800790 550 1900 550 800 1:30 CROSSFALL 2001000200 250250 50 POSITION OF ACCESS HOLE 1400 10mm THICK EPOXY MORTAR 250mm THICK CONCRETE WALL (C45/20) HALF ROUND CHANNEL 1000 G POLYTHENE SHEET CONCRETE BLINDING 50mm THICK PAINT PROTECTION IN ACCORDANCE WITH SECTION G OF THE SPECIFICATION (TABLE G1) 250 1400 250 2000Max.350 BENCHING TO BE C45/20 CONCRETE FINISHED WITH 10mm THICK EPOXY MORTAR MASTIC SEALANT 50x25mm THICK WITH BOND BREAKER MEMBRANE TO UNDRESIDE ONLY RTR LINER IN ACCORDANCE WITH SECTION 'F' OF THE SPECIFICATION 200 REINFORCEMENT BAR MEDIUM OR HEAVY DUTY CAST IRON COVER AND FRAME WITH RTR SEALING PLATE ROAD LEVEL (PAVED AREAS) COVER LEVEL -5 ROAD LEVEL (UNPAVED AREAS) COVER LEVEL -50 GROUND LEVEL (OPEN AREAS) COVER LEVEL -150 CONCRETE HAUNCH GRADE C 45/20 PRECAST COVER SUPPORT PAINTED INTERNALLY WITH EPOXY MORTAR 250 800 200200 3-3 T16-180 B 5 T16 145 B 5 T16 145 B 5 T16-145 B 1+4 T16-145 B 4 T16 TRIMMER BARS 310800790 550 1900 550 800 FO U L SEW ER FO U L SEW ER FO U L SEW ER FO U L SEW ER FOUL SEWER CHAMBER TYPE - G (SCALE 1:20) (SCALE 1:20) CHAMBER TYPE - H (SCALE-1:20) (SCALE 1:20) (SCALE 1:20) (SCALE-1:20) Rev Description Prep ChkdAppdDate Client Design Consultant Project Stage Title Scale Checked Approved Date Drawing No. Rev Prepared Job No. 10001-JB-11-PRE-0621 A JAN '15PHW.FN.C 1:2000@A1 10001 OF ASSET 11 TYPE G&H CHAMBER DETAILS PRELIMINARY DESIGN DIYAR AL MUHARRAQ PRIORITY WORKS PRIMARY INFRASTRUCTURE A Draft Issue for Review N.C W.F W.F JAN '15 Notes 1. This Drawing is to be read in conjunction with all other relevant documentation. 2. Do not scale from this drawing, use only printed dimensions. 3. All dimensions in millimetres, all chainages, levels and coordinates are in metres unless defined otherwise. 4. This drawing is to be read in conjunction with the project Health and Safety File for any identified potential risks. 5. All materials to be approved by EWA/SEPPD prior to installation. 6. Installation to be in accordance with SEPPD standards and best practices and in accordance with the utility cross sections. 7. All works to be carried out by a SEPPD approved contractor. CHAMBER COVER TYPE