3. PROJECT Overview
Project Name: Electric Excursion
Course: ELC 496
Program: Electrical and Computer Engineering
Project
Advisor:
Dr. Allen Katz
Description: Dr. Allen Katz is a professor in the Department of Electrical and Computer Engineering. He
earned his D.Sc. In Electrical Engineering from the New Jersey Institute of Technology and his
research interests are in communications, microwave, radio astronomy and distortion correction.
Start: 08/27/2020
Budget: ~$682
5. PROJECT BACKGROUND
General Overview
BACKGROUND
The use of small-scale transport is
increasing
Scooters, skateboards and
bicycles
Increase usability, consistency
and efficiency
Implement electric assistive
design
PROJECT ADVISOR:
Dr. Allen Katz
PROGRAM:
E.C.E
START:
08/27/2020
BUDGET:
$682
7. GOALS/DETAILED SPECIFICATIONS
Goals Overview
Goals & Detailed Specifications
Test prototype Electric Excursion board
Incorporate and test safety features
Verify system integrity after each addition
9. DESIGN SPECIFICATIONS
Parameterized Specifications
Parameter Requirement Actual performance Verification COMPLETE
Top Speed 12 Mph 12-21 Mph Test 100%
Battery Size 170 Watt-Hour 185 Watt-Hour Inspection 100%
Effective Range 10 miles ~10 miles Test 100%
Recharge Time < ~5 Hours ~3 Hours Test 100%
Ability to Climb
(Hill Gradient)
10% 10% Test 100%
Max Load 160 Pounds 200 Pounds Analysis 100%
Safety Features
At least one
(Excluding PPE)
3 Inspection/Test 100%
12. WORK PLAN
Task List
Project Tasks
Task 1: Determine the run time of the board (Controlled)
Task 2: Test controller connectivity and range limits (Controlled)
Task 3: Determine Max Speed Based on Parameters
Task 4: Determine the run time of the board (Field)
Task 5: Measure controller connectivity and range (Field)
Task 6: Speed Analysis
Task 7: Braking Analysis
Task 8: Safety Analysis
Task 9: Safety Documentation
Task 10: Documentation
18. PROJECT TASK OVERVIEW
Status of Tasks
Completed
Research
Obtain Materials
Construction
Modular Safety
NotYet Started
N/A
Paused
N/A
In Progress
Documentation
19. Road To Success
Moving Forward
Test Fixture
The initial design for testing
Stationary Board
Testing board and motor
assembly
Current Test Design
Electric Excursion Board
20. Snapshot of The Work Ahead
MAY
APR
MAR
FEB
JAN
Controlled Testing
Field Testing
Safety Testing
Phase
IV
Poster Construction
Part Sourcing
Board Construction
Phase
III
Documentation
System Refinement
Budget Analysis
Phase
V
Top-Down Tasking
81. MONETARY BUDGET
Budget Graph
Monetary Budget
0
100
200
300
400
500
600
700
800
August September October November December January February March April May
Dollars
(USD)
Month
Electric Excursion Budget
Projected Actual Approved
84. LABOR BUDGET
Budget Graph
Labor Budget
0
10
20
30
40
50
60
70
80
August September October November December January February March April May
Hours
Months
Labor Hours
Projected Actual (Nick) Actual (Keith)