SANKARA SAI KANDRAKOTA
Contact No’s: +919885325448/+91866-2535448/+97430588254
E-Mail:sankarsai.k@gmail.com
Aiming for assignments as Production Engineer/Manager/QC Engineer & Welding Inspectorin
Production, Quality Control &Manufacturing Operations with an organization of high repute,
preferably in the Oil & Gas, Erection, Steel-Structure and Fabrication industries
PROFILE SNAPSHOT
 A dynamic professional with above 5 years of experience in Production Operations, Erection and Quality Control
 Currently associated withHydrotech Energy WLL,Umm Salal, Qatar as a Operations Engineer
 Expertise in rendering technical guidance to the clients & communicating with clients for schedules
 Gained exposure in adopting quality control techniques to achieve product excellence at the lowest overall costs;
possess clear understanding of industry & technology trends
 Proficient in analyzing processes, identifying improvement areas and implementing techniques for reducing rejection level,
rework and consumption of resources
 Well versed with welding technology like SMAW, GTAW, GMAW, SAW, etc.
 Innovative and exceptionally creative to foster ideas that impel the organization towards a result-oriented direction
 Experience in delegating work schedules &managing work force of multilingual and different nationalities
 Impeccable management and leadership skills with abilities to work independently as well as a team
 Driven by new challenges and adept at adapting to any cultural and business environments
 Skilled in project planning, cost estimation as per clients drawings& preparing costing reports on the basis of work orders
 An effective communicator with proven abilities in leading teams and resolving complex technical issues
ORGANIZATIONAL EXPERIENCE
Apr’10~ Feb’14 Yongnam Engineering Sdn. Bhd., Johor Bahru, Malaysia as Production Engineer
Joined as Assistant Engineer; promoted asProduction Engineer in Feb’13
May’14~ Feb’15 NDTCTC , Vizag India as Welding & field Engineer
Joined as Welding Inspector; promoted as field Engineer in sep’14
Since Feb’15 Hydrotech Energy WLL as Operations Engineer
Key Result Areas:
 Formulating production plans and accomplishing daily/monthly targets with man and cost parameters
 Communicating regularly to follow up with project teams and clients regarding the schedule and timely dispatch of
fabricated items to the sites; documenting costing reports on work order basis
 Ensuring complete in-process quality control and continuous improvement in process capabilities
 Monitoring & supporting the shop drawings upon receiving for any kind issues before proceeding to fabrication
 Organizing & managing required manpowerof multilingual and different nationalities along with machinery &subcontractors
 Attending technical discussions with various fabricators and clients on daily and weekly basis
 Devising significant solutions &following up technical and supervision teams for making qualitative &effective utilization
of man, machine, method & materials
 Monitoring and arranging man power for various projects .
 Executing QC works like PWPS & PQR qualification for steel structure works , structure work and NDT activities
 Liaising with QS for any of the additional tasks that are to be performed which are not mentioned in contract
 Producing & submitting various reports on manpower availability, utilization, maintenance on tools & machinery
available, fabrication progress reports, and final costing & logistics reports for finance
 Preparing FieldQualityPlanforrelativejobaccordingto technicalspecification ; preparing WPS & PQR for Structural & other jobs
 Witnessing& supervising in Welding, Heat treatment of Structural & Piping Works
 Evaluating radiographic films acceptance according to AWS
 Executing Ultrasonic Testing Acceptance according to jobs applicable code (UT procedure AWS)
 Documenting daily, weekly & monthly inspection / testing reports and managing all the documents related to the contract
 Painting DFT Inspection, Weld Visual Inspection of Pressure Parts & others jobs and surface checking before painting
 Carrying out alignment inspection of structure & equipment
 Conducting audit on welder performance and project quality audit
 Adhering to the implementation of all Industrial and safety rule & regulation
Highlights:
 Created a new of format to monitor daily work monitoring / discussion sheet for supervisors &workshop/factory heads
for resolving problems in a fast and efficient manner
 Appreciated by the General Manager(Yongnam Engineering Sdn. Bhd., Johor Bahru, Malaysia) for good control over
fabrication status according to client’s schedule and for planning of fabrication in a smooth and fast manner without
disturbing other projects/departments and for good communication with clients & QC Departments
 Displayed exceptional working skills and received appreciations from the managers for weekly and monthly basis reviews
 Recognized for outstanding commitment of schedules provided by clients
 Achieving difficult schedules in proper time by communicating with clients time to time.
 Prepared costing calming report for additional work projects which was around 1,000,000 S$ for the Sentosa Project
 Received an increment in Feb’11 and have continued to receive the same twice every year since then
 Sound knowledge of Welder Qualification as per AWS D1.1.
ACADEMIC QUALIFICATIONS
 B.Tech. inMechanicalEngineeringfromNimraCollegeof Engineering& Technology,JNT University, Kakinada in 2009 with 60%
 12th(Intermediate)from Geetanjali Jr. College (SVSR&MM), BIE Andhra Pradesh, Vijayawada in 2005 with 76%
 10th from Gowtham EM High School, SSC Board,Vijayawada in 2003 with 65%
CERTIFICATIONS
 Cswip 3.1 Certified Welding Inspector from TWI in 2014
 Successfully completed certification courses in:
o AutoCAD
o Pro/E
o Ansys
o Safety Awareness
o First-Aid
TRAININGS ATTENDED
 VTPS for over planning, working & maintaining the Thermal Power Plant
 At Machlipatam Diesel Power Plant
 On New metals for Impeller at HAL Bangalore –Engine Division in graduation 4th Year
OTHER ACCOLADES
 Acknowledged with the President Award for Boy Scouting from SCR –Railways
 Served as the leader for all events organized in college like annual functions & technical meets in the years of 2007 &2008
IT SKILLS
 Well versed with:
o MS Office, Word and Excel
o Lean Process Development
o Pro/E
o AutoCAD
o Microsoft Access
o Uni Graphics (NX5)
o Ansys
PERSONAL DETAILS
Date of Birth: 6th August, 1988
Languages Known: English, Hindi, Telugu, Tamil and Bhasha Malayu
Present Address: D.No.18-8-39, 5thLine,KedareswaraRaoPeta, Vijayawada-520003, Andhra Pradesh
Permanent Address: D.No.18-8-39, 5thLine,KedareswaraRaoPeta, Vijayawada-520003, Andhra Pradesh
Passport Details: Passport No. Z2430727 valid till 22/04/2023
Religion: Hindu
Marital Status: Unmarried
Current CTC/&/Expected CTC 5500 Qatari Riyals /month/&/8000QR/month
No. of Dependents: 4
Notice period 0 to 10 days
(Refer to the annexure for project details)
ANNEXURE
Title: Crane Mat Decking- Marina Bay Crossing -395 MT
Period: Apr’10 -May’10
Location: Singapore
Description: Fabrication of temporary flat form for crane mat decking (Vehicle Access Control System on Marina Coastal
Expressway)
Role: Asst. Engineer (Work Shop)
Title: Crystal Pavilion- South and North Crystal Pavilion of Marina Bay Sands, Singapore 2100 MT
Period: Apr’10 –Oct’10
Location: Singapore
Description: Fabrication of crystal pavilion structure which included roof beams, columns, and bracings. North & South
pavilionconsisted of complete built –up box structures for trusses.
Role: Asst. Engineer (Work Shop)
Title: International Cruise Terminal-ICT Ship Terminal, Singapore -2300 MT
Period: Oct’10 -Jun’11
Location: Singapore
Description: Fabrication of Trusses for Car Parks, Roof Screens, Main Terminal, Walk Ways and Purlins
Role: Asst. Engineer (Work Shop)
Title: GorgonProject- Barrow Island LNG Plant Safety Ladders – 500 MT
Period: Oct’11-Feb’11
Location: Indonesia
Description: Fabrication of staircase (52 sets), Plat Forms, Ladders, Hand rails &Gratings for Barrow Island
Role: Asst. Engineer (Work Shop)
Title: Mumbai Airport- ChatrapathiShivaji International Airport (MAIL), Mumbai – 4000 MT
Period: Oct’10 –Jul’11
Location: India
Description: Fabrication of steel structures like mega columns, wing truss and peripheral truss for the new extension
terminal, which is an ongoing major project.
Role: Asst. Engineer (Work Shop)
Title: Sentosa IR- Resorts World Sentosa, Singapore–500 MT
Period: Dec’10-Jan’11
Location: Singapore
Description: Fabrication of roof structures, canopy, columns, Purlins Layouts, Foot bridges, Mullion Tanks, Trek Pavilions,
Tree Top Walks, Posts, walkways, Eco ponds and all other steel structures
Role: Asst. Engineer (Production)
Title: Jurong Island (Rotary)-Jurong Island Structures for Chemical Plant 4000 MT
Period: Feb’11- Oct’12
Location: Singapore
Description: Fabrication of Columns, Purlins Layouts, Foot Bridges, Cable Tray supports &all Support Structures for
Chemical Storage Tanks
Role: Asst. Engineer(Production)
Title: Jurong Island(Haileck)-Jurong Island Structures for Chemical Plant 2400 MT
Period: Apr’11- Aug’12
Location: Singapore
Description: Fabrication of Columns, Purlins Layouts, Foot Bridges, Cable Tray Supports and all support structures for
Chemical Storage Tanks
Role: Asst. Engineer (Production)
Title: Victoria Project- Additions &Alternations at Victoria Concert Hall & Theater Singapore 2400 MT
Period: Aug’12- Sep’13
Location: Singapore
Description: Fabrication of roof structures, Columns, Purlins, Roof Truss, Balcony Hanging Platforms, Seating Platforms
Glass Lifts & Architectural Spiral Stairs cases & Clock Tower
Role: Production Engineer
Title: National Art Gallery-National Art Gallery 3000 MT
Period: Jan’11- Feb’14
Location: Singapore
Description: Fabrication of Columns, King Post, Trusses, Floor by Floor Supports, Staircases &Hand Rails
Role: Production Engineer
Title: Changi Hospital- Additions & Alternation forChangi Hospital 400 MT
Period: Dec’13- Feb’14
Location: Singapore
Description: Fabrication of Roof structures, Columns, Link Bridges, Tank &Solar Panel Structures
Role: Production Engineer
Title: Singapore Sports Hub-Moving Tier for Singapore National Stadium 3000 MT
Period: Aug’13- Feb’14
Location: Singapore
Description: Fabrication of Moving Tier Trusses with Special Parts & Damper Legs and Movable Platform with Mechanical
parts for its movement, Cricket Tier Structural Beams and Infill Panels with different shapes
Role: Production Engineer
Title: SentosaProject-2- Sentosa Island’s New Cable Car Station 400 MT
Period: Dec’13- Feb’14
Location: Singapore
Description: Fabrication of Station Roof and tower for cable car station and link ways with few new resort hotels
Role: Production Engineer
Title: SKY Wall Ware Houses , 300MT
Period: May’15- till today
Location: Qatar, New
Description: Fabrication of Roof trusses, columns, support beams, braces and handrails and cable trays
Role: Operation Engineer

More Related Content

What's hot

CV_PROCUREMENT ENGINEER_VISHAL
CV_PROCUREMENT ENGINEER_VISHALCV_PROCUREMENT ENGINEER_VISHAL
CV_PROCUREMENT ENGINEER_VISHALVishal Gajare
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMANSaif kharal
 
JEFFREY UBALDO CV
JEFFREY UBALDO CVJEFFREY UBALDO CV
JEFFREY UBALDO CVjeff_badz23
 
CV- Sr. Procurement Engineer
CV- Sr. Procurement Engineer CV- Sr. Procurement Engineer
CV- Sr. Procurement Engineer Shafeek Nazar
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.prabu s
 
LAL Rajashekharan Mahendar p6
LAL Rajashekharan  Mahendar p6LAL Rajashekharan  Mahendar p6
LAL Rajashekharan Mahendar p6Rajshekharan M
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERShafeek Nazar
 
Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016Bupathy Vidyapathy
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_ResumeJit Roy
 
CV Engr Imran Brkat
CV Engr Imran BrkatCV Engr Imran Brkat
CV Engr Imran Brkatimran barkat
 

What's hot (20)

CV_PROCUREMENT ENGINEER_VISHAL
CV_PROCUREMENT ENGINEER_VISHALCV_PROCUREMENT ENGINEER_VISHAL
CV_PROCUREMENT ENGINEER_VISHAL
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 
JEFFREY UBALDO CV
JEFFREY UBALDO CVJEFFREY UBALDO CV
JEFFREY UBALDO CV
 
CV- Sr. Procurement Engineer
CV- Sr. Procurement Engineer CV- Sr. Procurement Engineer
CV- Sr. Procurement Engineer
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.
 
peercv- 1
peercv- 1peercv- 1
peercv- 1
 
LAL Rajashekharan Mahendar p6
LAL Rajashekharan  Mahendar p6LAL Rajashekharan  Mahendar p6
LAL Rajashekharan Mahendar p6
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
 
Mohammed Yousuf cv
Mohammed Yousuf cvMohammed Yousuf cv
Mohammed Yousuf cv
 
CV_ABDU RASHEED U
CV_ABDU RASHEED UCV_ABDU RASHEED U
CV_ABDU RASHEED U
 
Jestin - Resume
Jestin - ResumeJestin - Resume
Jestin - Resume
 
RAMESH_Resume
RAMESH_ResumeRAMESH_Resume
RAMESH_Resume
 
CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.
 
Certified QA QC Manager
Certified QA QC ManagerCertified QA QC Manager
Certified QA QC Manager
 
Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016Resume_Bupathy Vidyapathy_15-Sep-2016
Resume_Bupathy Vidyapathy_15-Sep-2016
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_Resume
 
CV Engr Imran Brkat
CV Engr Imran BrkatCV Engr Imran Brkat
CV Engr Imran Brkat
 
Imran barkat.
Imran barkat.Imran barkat.
Imran barkat.
 
Ashok Kumar Das-Biodata
Ashok Kumar Das-BiodataAshok Kumar Das-Biodata
Ashok Kumar Das-Biodata
 

Similar to my resume sankar 3

Similar to my resume sankar 3 (20)

CV-CE-0516
CV-CE-0516CV-CE-0516
CV-CE-0516
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
Venkatesh- planning CV
Venkatesh- planning CVVenkatesh- planning CV
Venkatesh- planning CV
 
Resume New
Resume NewResume New
Resume New
 
BBA resume_2017
BBA resume_2017BBA resume_2017
BBA resume_2017
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
QA QC Engineer CV
QA QC Engineer CVQA QC Engineer CV
QA QC Engineer CV
 
Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)
 
CV Raza_Ali_Saleem
CV Raza_Ali_SaleemCV Raza_Ali_Saleem
CV Raza_Ali_Saleem
 
balaji cv
balaji cvbalaji cv
balaji cv
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)
 
Krishna Updated Resume
Krishna Updated ResumeKrishna Updated Resume
Krishna Updated Resume
 
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
 
CV..Bassam Abdul Gafoor
CV..Bassam Abdul GafoorCV..Bassam Abdul Gafoor
CV..Bassam Abdul Gafoor
 
CustomerCopy raghu
CustomerCopy raghuCustomerCopy raghu
CustomerCopy raghu
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 

my resume sankar 3

  • 1. SANKARA SAI KANDRAKOTA Contact No’s: +919885325448/+91866-2535448/+97430588254 E-Mail:sankarsai.k@gmail.com Aiming for assignments as Production Engineer/Manager/QC Engineer & Welding Inspectorin Production, Quality Control &Manufacturing Operations with an organization of high repute, preferably in the Oil & Gas, Erection, Steel-Structure and Fabrication industries PROFILE SNAPSHOT  A dynamic professional with above 5 years of experience in Production Operations, Erection and Quality Control  Currently associated withHydrotech Energy WLL,Umm Salal, Qatar as a Operations Engineer  Expertise in rendering technical guidance to the clients & communicating with clients for schedules  Gained exposure in adopting quality control techniques to achieve product excellence at the lowest overall costs; possess clear understanding of industry & technology trends  Proficient in analyzing processes, identifying improvement areas and implementing techniques for reducing rejection level, rework and consumption of resources  Well versed with welding technology like SMAW, GTAW, GMAW, SAW, etc.  Innovative and exceptionally creative to foster ideas that impel the organization towards a result-oriented direction  Experience in delegating work schedules &managing work force of multilingual and different nationalities  Impeccable management and leadership skills with abilities to work independently as well as a team  Driven by new challenges and adept at adapting to any cultural and business environments  Skilled in project planning, cost estimation as per clients drawings& preparing costing reports on the basis of work orders  An effective communicator with proven abilities in leading teams and resolving complex technical issues ORGANIZATIONAL EXPERIENCE Apr’10~ Feb’14 Yongnam Engineering Sdn. Bhd., Johor Bahru, Malaysia as Production Engineer Joined as Assistant Engineer; promoted asProduction Engineer in Feb’13 May’14~ Feb’15 NDTCTC , Vizag India as Welding & field Engineer Joined as Welding Inspector; promoted as field Engineer in sep’14 Since Feb’15 Hydrotech Energy WLL as Operations Engineer Key Result Areas:  Formulating production plans and accomplishing daily/monthly targets with man and cost parameters  Communicating regularly to follow up with project teams and clients regarding the schedule and timely dispatch of fabricated items to the sites; documenting costing reports on work order basis  Ensuring complete in-process quality control and continuous improvement in process capabilities  Monitoring & supporting the shop drawings upon receiving for any kind issues before proceeding to fabrication  Organizing & managing required manpowerof multilingual and different nationalities along with machinery &subcontractors  Attending technical discussions with various fabricators and clients on daily and weekly basis  Devising significant solutions &following up technical and supervision teams for making qualitative &effective utilization of man, machine, method & materials  Monitoring and arranging man power for various projects .  Executing QC works like PWPS & PQR qualification for steel structure works , structure work and NDT activities  Liaising with QS for any of the additional tasks that are to be performed which are not mentioned in contract  Producing & submitting various reports on manpower availability, utilization, maintenance on tools & machinery available, fabrication progress reports, and final costing & logistics reports for finance  Preparing FieldQualityPlanforrelativejobaccordingto technicalspecification ; preparing WPS & PQR for Structural & other jobs  Witnessing& supervising in Welding, Heat treatment of Structural & Piping Works  Evaluating radiographic films acceptance according to AWS  Executing Ultrasonic Testing Acceptance according to jobs applicable code (UT procedure AWS)  Documenting daily, weekly & monthly inspection / testing reports and managing all the documents related to the contract  Painting DFT Inspection, Weld Visual Inspection of Pressure Parts & others jobs and surface checking before painting  Carrying out alignment inspection of structure & equipment  Conducting audit on welder performance and project quality audit  Adhering to the implementation of all Industrial and safety rule & regulation
  • 2. Highlights:  Created a new of format to monitor daily work monitoring / discussion sheet for supervisors &workshop/factory heads for resolving problems in a fast and efficient manner  Appreciated by the General Manager(Yongnam Engineering Sdn. Bhd., Johor Bahru, Malaysia) for good control over fabrication status according to client’s schedule and for planning of fabrication in a smooth and fast manner without disturbing other projects/departments and for good communication with clients & QC Departments  Displayed exceptional working skills and received appreciations from the managers for weekly and monthly basis reviews  Recognized for outstanding commitment of schedules provided by clients  Achieving difficult schedules in proper time by communicating with clients time to time.  Prepared costing calming report for additional work projects which was around 1,000,000 S$ for the Sentosa Project  Received an increment in Feb’11 and have continued to receive the same twice every year since then  Sound knowledge of Welder Qualification as per AWS D1.1. ACADEMIC QUALIFICATIONS  B.Tech. inMechanicalEngineeringfromNimraCollegeof Engineering& Technology,JNT University, Kakinada in 2009 with 60%  12th(Intermediate)from Geetanjali Jr. College (SVSR&MM), BIE Andhra Pradesh, Vijayawada in 2005 with 76%  10th from Gowtham EM High School, SSC Board,Vijayawada in 2003 with 65% CERTIFICATIONS  Cswip 3.1 Certified Welding Inspector from TWI in 2014  Successfully completed certification courses in: o AutoCAD o Pro/E o Ansys o Safety Awareness o First-Aid TRAININGS ATTENDED  VTPS for over planning, working & maintaining the Thermal Power Plant  At Machlipatam Diesel Power Plant  On New metals for Impeller at HAL Bangalore –Engine Division in graduation 4th Year OTHER ACCOLADES  Acknowledged with the President Award for Boy Scouting from SCR –Railways  Served as the leader for all events organized in college like annual functions & technical meets in the years of 2007 &2008 IT SKILLS  Well versed with: o MS Office, Word and Excel o Lean Process Development o Pro/E o AutoCAD o Microsoft Access o Uni Graphics (NX5) o Ansys
  • 3. PERSONAL DETAILS Date of Birth: 6th August, 1988 Languages Known: English, Hindi, Telugu, Tamil and Bhasha Malayu Present Address: D.No.18-8-39, 5thLine,KedareswaraRaoPeta, Vijayawada-520003, Andhra Pradesh Permanent Address: D.No.18-8-39, 5thLine,KedareswaraRaoPeta, Vijayawada-520003, Andhra Pradesh Passport Details: Passport No. Z2430727 valid till 22/04/2023 Religion: Hindu Marital Status: Unmarried Current CTC/&/Expected CTC 5500 Qatari Riyals /month/&/8000QR/month No. of Dependents: 4 Notice period 0 to 10 days (Refer to the annexure for project details) ANNEXURE Title: Crane Mat Decking- Marina Bay Crossing -395 MT Period: Apr’10 -May’10 Location: Singapore Description: Fabrication of temporary flat form for crane mat decking (Vehicle Access Control System on Marina Coastal Expressway) Role: Asst. Engineer (Work Shop) Title: Crystal Pavilion- South and North Crystal Pavilion of Marina Bay Sands, Singapore 2100 MT Period: Apr’10 –Oct’10 Location: Singapore Description: Fabrication of crystal pavilion structure which included roof beams, columns, and bracings. North & South pavilionconsisted of complete built –up box structures for trusses. Role: Asst. Engineer (Work Shop) Title: International Cruise Terminal-ICT Ship Terminal, Singapore -2300 MT Period: Oct’10 -Jun’11 Location: Singapore Description: Fabrication of Trusses for Car Parks, Roof Screens, Main Terminal, Walk Ways and Purlins Role: Asst. Engineer (Work Shop) Title: GorgonProject- Barrow Island LNG Plant Safety Ladders – 500 MT Period: Oct’11-Feb’11 Location: Indonesia Description: Fabrication of staircase (52 sets), Plat Forms, Ladders, Hand rails &Gratings for Barrow Island Role: Asst. Engineer (Work Shop) Title: Mumbai Airport- ChatrapathiShivaji International Airport (MAIL), Mumbai – 4000 MT Period: Oct’10 –Jul’11 Location: India Description: Fabrication of steel structures like mega columns, wing truss and peripheral truss for the new extension terminal, which is an ongoing major project. Role: Asst. Engineer (Work Shop) Title: Sentosa IR- Resorts World Sentosa, Singapore–500 MT Period: Dec’10-Jan’11 Location: Singapore Description: Fabrication of roof structures, canopy, columns, Purlins Layouts, Foot bridges, Mullion Tanks, Trek Pavilions, Tree Top Walks, Posts, walkways, Eco ponds and all other steel structures Role: Asst. Engineer (Production) Title: Jurong Island (Rotary)-Jurong Island Structures for Chemical Plant 4000 MT
  • 4. Period: Feb’11- Oct’12 Location: Singapore Description: Fabrication of Columns, Purlins Layouts, Foot Bridges, Cable Tray supports &all Support Structures for Chemical Storage Tanks Role: Asst. Engineer(Production) Title: Jurong Island(Haileck)-Jurong Island Structures for Chemical Plant 2400 MT Period: Apr’11- Aug’12 Location: Singapore Description: Fabrication of Columns, Purlins Layouts, Foot Bridges, Cable Tray Supports and all support structures for Chemical Storage Tanks Role: Asst. Engineer (Production) Title: Victoria Project- Additions &Alternations at Victoria Concert Hall & Theater Singapore 2400 MT Period: Aug’12- Sep’13 Location: Singapore Description: Fabrication of roof structures, Columns, Purlins, Roof Truss, Balcony Hanging Platforms, Seating Platforms Glass Lifts & Architectural Spiral Stairs cases & Clock Tower Role: Production Engineer Title: National Art Gallery-National Art Gallery 3000 MT Period: Jan’11- Feb’14 Location: Singapore Description: Fabrication of Columns, King Post, Trusses, Floor by Floor Supports, Staircases &Hand Rails Role: Production Engineer Title: Changi Hospital- Additions & Alternation forChangi Hospital 400 MT Period: Dec’13- Feb’14 Location: Singapore Description: Fabrication of Roof structures, Columns, Link Bridges, Tank &Solar Panel Structures Role: Production Engineer Title: Singapore Sports Hub-Moving Tier for Singapore National Stadium 3000 MT Period: Aug’13- Feb’14 Location: Singapore Description: Fabrication of Moving Tier Trusses with Special Parts & Damper Legs and Movable Platform with Mechanical parts for its movement, Cricket Tier Structural Beams and Infill Panels with different shapes Role: Production Engineer Title: SentosaProject-2- Sentosa Island’s New Cable Car Station 400 MT Period: Dec’13- Feb’14 Location: Singapore Description: Fabrication of Station Roof and tower for cable car station and link ways with few new resort hotels Role: Production Engineer Title: SKY Wall Ware Houses , 300MT Period: May’15- till today Location: Qatar, New Description: Fabrication of Roof trusses, columns, support beams, braces and handrails and cable trays Role: Operation Engineer