1. SANKARA SAI KANDRAKOTA
Contact No’s: +919885325448/+91866-2535448/+97430588254
E-Mail:sankarsai.k@gmail.com
Aiming for assignments as Production Engineer/Manager/QC Engineer & Welding Inspectorin
Production, Quality Control &Manufacturing Operations with an organization of high repute,
preferably in the Oil & Gas, Erection, Steel-Structure and Fabrication industries
PROFILE SNAPSHOT
A dynamic professional with above 5 years of experience in Production Operations, Erection and Quality Control
Currently associated withHydrotech Energy WLL,Umm Salal, Qatar as a Operations Engineer
Expertise in rendering technical guidance to the clients & communicating with clients for schedules
Gained exposure in adopting quality control techniques to achieve product excellence at the lowest overall costs;
possess clear understanding of industry & technology trends
Proficient in analyzing processes, identifying improvement areas and implementing techniques for reducing rejection level,
rework and consumption of resources
Well versed with welding technology like SMAW, GTAW, GMAW, SAW, etc.
Innovative and exceptionally creative to foster ideas that impel the organization towards a result-oriented direction
Experience in delegating work schedules &managing work force of multilingual and different nationalities
Impeccable management and leadership skills with abilities to work independently as well as a team
Driven by new challenges and adept at adapting to any cultural and business environments
Skilled in project planning, cost estimation as per clients drawings& preparing costing reports on the basis of work orders
An effective communicator with proven abilities in leading teams and resolving complex technical issues
ORGANIZATIONAL EXPERIENCE
Apr’10~ Feb’14 Yongnam Engineering Sdn. Bhd., Johor Bahru, Malaysia as Production Engineer
Joined as Assistant Engineer; promoted asProduction Engineer in Feb’13
May’14~ Feb’15 NDTCTC , Vizag India as Welding & field Engineer
Joined as Welding Inspector; promoted as field Engineer in sep’14
Since Feb’15 Hydrotech Energy WLL as Operations Engineer
Key Result Areas:
Formulating production plans and accomplishing daily/monthly targets with man and cost parameters
Communicating regularly to follow up with project teams and clients regarding the schedule and timely dispatch of
fabricated items to the sites; documenting costing reports on work order basis
Ensuring complete in-process quality control and continuous improvement in process capabilities
Monitoring & supporting the shop drawings upon receiving for any kind issues before proceeding to fabrication
Organizing & managing required manpowerof multilingual and different nationalities along with machinery &subcontractors
Attending technical discussions with various fabricators and clients on daily and weekly basis
Devising significant solutions &following up technical and supervision teams for making qualitative &effective utilization
of man, machine, method & materials
Monitoring and arranging man power for various projects .
Executing QC works like PWPS & PQR qualification for steel structure works , structure work and NDT activities
Liaising with QS for any of the additional tasks that are to be performed which are not mentioned in contract
Producing & submitting various reports on manpower availability, utilization, maintenance on tools & machinery
available, fabrication progress reports, and final costing & logistics reports for finance
Preparing FieldQualityPlanforrelativejobaccordingto technicalspecification ; preparing WPS & PQR for Structural & other jobs
Witnessing& supervising in Welding, Heat treatment of Structural & Piping Works
Evaluating radiographic films acceptance according to AWS
Executing Ultrasonic Testing Acceptance according to jobs applicable code (UT procedure AWS)
Documenting daily, weekly & monthly inspection / testing reports and managing all the documents related to the contract
Painting DFT Inspection, Weld Visual Inspection of Pressure Parts & others jobs and surface checking before painting
Carrying out alignment inspection of structure & equipment
Conducting audit on welder performance and project quality audit
Adhering to the implementation of all Industrial and safety rule & regulation
2. Highlights:
Created a new of format to monitor daily work monitoring / discussion sheet for supervisors &workshop/factory heads
for resolving problems in a fast and efficient manner
Appreciated by the General Manager(Yongnam Engineering Sdn. Bhd., Johor Bahru, Malaysia) for good control over
fabrication status according to client’s schedule and for planning of fabrication in a smooth and fast manner without
disturbing other projects/departments and for good communication with clients & QC Departments
Displayed exceptional working skills and received appreciations from the managers for weekly and monthly basis reviews
Recognized for outstanding commitment of schedules provided by clients
Achieving difficult schedules in proper time by communicating with clients time to time.
Prepared costing calming report for additional work projects which was around 1,000,000 S$ for the Sentosa Project
Received an increment in Feb’11 and have continued to receive the same twice every year since then
Sound knowledge of Welder Qualification as per AWS D1.1.
ACADEMIC QUALIFICATIONS
B.Tech. inMechanicalEngineeringfromNimraCollegeof Engineering& Technology,JNT University, Kakinada in 2009 with 60%
12th(Intermediate)from Geetanjali Jr. College (SVSR&MM), BIE Andhra Pradesh, Vijayawada in 2005 with 76%
10th from Gowtham EM High School, SSC Board,Vijayawada in 2003 with 65%
CERTIFICATIONS
Cswip 3.1 Certified Welding Inspector from TWI in 2014
Successfully completed certification courses in:
o AutoCAD
o Pro/E
o Ansys
o Safety Awareness
o First-Aid
TRAININGS ATTENDED
VTPS for over planning, working & maintaining the Thermal Power Plant
At Machlipatam Diesel Power Plant
On New metals for Impeller at HAL Bangalore –Engine Division in graduation 4th Year
OTHER ACCOLADES
Acknowledged with the President Award for Boy Scouting from SCR –Railways
Served as the leader for all events organized in college like annual functions & technical meets in the years of 2007 &2008
IT SKILLS
Well versed with:
o MS Office, Word and Excel
o Lean Process Development
o Pro/E
o AutoCAD
o Microsoft Access
o Uni Graphics (NX5)
o Ansys
3. PERSONAL DETAILS
Date of Birth: 6th August, 1988
Languages Known: English, Hindi, Telugu, Tamil and Bhasha Malayu
Present Address: D.No.18-8-39, 5thLine,KedareswaraRaoPeta, Vijayawada-520003, Andhra Pradesh
Permanent Address: D.No.18-8-39, 5thLine,KedareswaraRaoPeta, Vijayawada-520003, Andhra Pradesh
Passport Details: Passport No. Z2430727 valid till 22/04/2023
Religion: Hindu
Marital Status: Unmarried
Current CTC/&/Expected CTC 5500 Qatari Riyals /month/&/8000QR/month
No. of Dependents: 4
Notice period 0 to 10 days
(Refer to the annexure for project details)
ANNEXURE
Title: Crane Mat Decking- Marina Bay Crossing -395 MT
Period: Apr’10 -May’10
Location: Singapore
Description: Fabrication of temporary flat form for crane mat decking (Vehicle Access Control System on Marina Coastal
Expressway)
Role: Asst. Engineer (Work Shop)
Title: Crystal Pavilion- South and North Crystal Pavilion of Marina Bay Sands, Singapore 2100 MT
Period: Apr’10 –Oct’10
Location: Singapore
Description: Fabrication of crystal pavilion structure which included roof beams, columns, and bracings. North & South
pavilionconsisted of complete built –up box structures for trusses.
Role: Asst. Engineer (Work Shop)
Title: International Cruise Terminal-ICT Ship Terminal, Singapore -2300 MT
Period: Oct’10 -Jun’11
Location: Singapore
Description: Fabrication of Trusses for Car Parks, Roof Screens, Main Terminal, Walk Ways and Purlins
Role: Asst. Engineer (Work Shop)
Title: GorgonProject- Barrow Island LNG Plant Safety Ladders – 500 MT
Period: Oct’11-Feb’11
Location: Indonesia
Description: Fabrication of staircase (52 sets), Plat Forms, Ladders, Hand rails &Gratings for Barrow Island
Role: Asst. Engineer (Work Shop)
Title: Mumbai Airport- ChatrapathiShivaji International Airport (MAIL), Mumbai – 4000 MT
Period: Oct’10 –Jul’11
Location: India
Description: Fabrication of steel structures like mega columns, wing truss and peripheral truss for the new extension
terminal, which is an ongoing major project.
Role: Asst. Engineer (Work Shop)
Title: Sentosa IR- Resorts World Sentosa, Singapore–500 MT
Period: Dec’10-Jan’11
Location: Singapore
Description: Fabrication of roof structures, canopy, columns, Purlins Layouts, Foot bridges, Mullion Tanks, Trek Pavilions,
Tree Top Walks, Posts, walkways, Eco ponds and all other steel structures
Role: Asst. Engineer (Production)
Title: Jurong Island (Rotary)-Jurong Island Structures for Chemical Plant 4000 MT
4. Period: Feb’11- Oct’12
Location: Singapore
Description: Fabrication of Columns, Purlins Layouts, Foot Bridges, Cable Tray supports &all Support Structures for
Chemical Storage Tanks
Role: Asst. Engineer(Production)
Title: Jurong Island(Haileck)-Jurong Island Structures for Chemical Plant 2400 MT
Period: Apr’11- Aug’12
Location: Singapore
Description: Fabrication of Columns, Purlins Layouts, Foot Bridges, Cable Tray Supports and all support structures for
Chemical Storage Tanks
Role: Asst. Engineer (Production)
Title: Victoria Project- Additions &Alternations at Victoria Concert Hall & Theater Singapore 2400 MT
Period: Aug’12- Sep’13
Location: Singapore
Description: Fabrication of roof structures, Columns, Purlins, Roof Truss, Balcony Hanging Platforms, Seating Platforms
Glass Lifts & Architectural Spiral Stairs cases & Clock Tower
Role: Production Engineer
Title: National Art Gallery-National Art Gallery 3000 MT
Period: Jan’11- Feb’14
Location: Singapore
Description: Fabrication of Columns, King Post, Trusses, Floor by Floor Supports, Staircases &Hand Rails
Role: Production Engineer
Title: Changi Hospital- Additions & Alternation forChangi Hospital 400 MT
Period: Dec’13- Feb’14
Location: Singapore
Description: Fabrication of Roof structures, Columns, Link Bridges, Tank &Solar Panel Structures
Role: Production Engineer
Title: Singapore Sports Hub-Moving Tier for Singapore National Stadium 3000 MT
Period: Aug’13- Feb’14
Location: Singapore
Description: Fabrication of Moving Tier Trusses with Special Parts & Damper Legs and Movable Platform with Mechanical
parts for its movement, Cricket Tier Structural Beams and Infill Panels with different shapes
Role: Production Engineer
Title: SentosaProject-2- Sentosa Island’s New Cable Car Station 400 MT
Period: Dec’13- Feb’14
Location: Singapore
Description: Fabrication of Station Roof and tower for cable car station and link ways with few new resort hotels
Role: Production Engineer
Title: SKY Wall Ware Houses , 300MT
Period: May’15- till today
Location: Qatar, New
Description: Fabrication of Roof trusses, columns, support beams, braces and handrails and cable trays
Role: Operation Engineer