Periode : Agustus 2023
Week 1 Week 2 Week 3 Week 4
1 Number Of Employee 719 711 - - 719
2 Manhours 34,150 32650 - - 66,800
3 First Aid - 1 - - 1
4 Nearmiss - 1 - - 1
5 Incident - - - - -
Cidera Ringan - - - - -
Cidera Berat - - - - -
Fatality - - - - -
6 Kejadian Berbahaya - - - - -
7 Property Damage - - - -
8 Day Lost - - - - -
9 Frequency Rate (FR) - - - - -
10 Severity Rate (SR) - - - - -
SAFETY PERFORMANCE
PT. Bima Cakra Perkasa Mineralindo
No Description
WEEK ON AGUSTUS 2023
MTD
Inspeksi Genset
Inspeksi Jetty
Inspeksi Lab &
Preparasi
Inspeksi Tambang Inspeksi Eyewash Inspeksi Dapur
KATEGORI REVIEWWEEKLY TANGGAL KETERANGAN
InspeksiKantor&Gudang 11Agustus2023 Close
InspeksiJettydanInspeksiFuelStorage 12Agustus2023 Close
InspeksiJalanHaulingdanInspeksiWorkshop 13Agustus2023 Close
InspeksiGenset,InspeksiMess&Kantin,danInspeksiToilet 14Agustus2023 Close
InspeksiLab&Preparasi 15Agustus2023 Close
InspkesiTambang,InspeksiP2H,danInspeksiAPD 16Agustus2023 Close
InspeksiKIMPERdanInspeksiSpeedGun 16Agustus2023 Close
SAFETY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 Induksi Karyawan Baru Office HSE
2 Training APAR Safety TBM LEADER TEAM
P5M Safety TBM LEADER TEAM 31 17 55%
General Safety TBM Safety TBM LEADER TEAM 4 2 50%
Pembuatan Rambu/Sign Bord All Lokasi LEADER TEAM
Safety Meeting(internal) Office Leader&Crew 4 2 50%
Safety Committee All Lokasi All Dept
Tertib Lalu LintasTambang All Lokasi All Dept
Tambang Tambang HSE &LEADER 5 2 40%
Hauling Hauling HSE &LEADER 4 2 50%
Jetty Jetty HSE &LEADER 4 2 50%
APAR All Lokasi HSE &LEADER 4 2 50%
Genset Genset Room HSE &LEADER 4 2 50%
Laboratorium &Preparasi LAB HSE &LEADER 5 2 40%
Workshop Workshop HSE &LEADER 4 2 50%
Fuel Storage Fuel Station HSE &LEADER 4 2 50%
Kantordan Gudang Kantor HSE &LEADER 4 2 50%
Mess Mess HSE &LEADER 4 2 50%
Dapur Mess HSE &LEADER 4 2 50%
P2H All Lokasi HSE &LEADER 5 2 40%
APD All Lokasi HSE &LEADER 5 2 40%
ID &Kimper All Lokasi HSE &LEADER 5 2 40%
Toilet Mess HSE &LEADER 4 2 50%
Eye Wash All Lokasi HSE &LEADER 5 2 40%
SPEED GUN All Lokasi HSE &LEADER 16 2 13%
Fatique All Lokasi HSE &LEADER 8 3 38%
Target Actual %
Actual
Activity
RENCANA KERJA HARIANDEPARTEMENHSE ( SUB DEPT.SAFETY)
PT BIMA CAKRA PERKASA MINERALINDO
SITE LAROENAI
NO PROGRAM KERJA TARGET LOKASI / AREA PIC
1-Aug-23
Komunikasi Kerja
Inspeksi umum terencana
3
4
5 Inspeksi Umum Tidak terencana
No Description
WEEK ON JULI 2023
MTD
Week 1 Week 2 Week 3
Week 4 Week 5
PERUSAHAAN
PERTAMBANGAN
JASA PERTAMBANGAN
PERUSAHAAN
PERTAMBANGAN
JASA PERTAMBANGAN
PERUSAHAAN
PERTAMBANGAN
JASA
PERTAMBANGAN
PERUSAHAAN
PERTAMBANGAN
JASA
PERTAMBANGA
N
PERUSAHAAN
PERTAMBANGAN
JASA
PERTAMBANGAN
1
Number Of Employee /
Jumlah Karyawan
719 711 1430
2 Manhours / Jam kerja 34.150 32.650 66800
3 Total Surat Sakit (spell) 4 20 0 19 45
4
Total hari kerja hilang
pekerja yang sakit
(Tidak Termasuk
Kecelakaan)
4 28 0 29
66
5
Total Kejadian Akibat
Penyakit Tenaga Kerja
(KAPTK)
0 0 0 0
0
6
Pemeriksaan Kesehatan
Kerja 0
- Layak bekerja (fit to
work)
0 5 0 4 9
- Layak kerja dengan
catatan (fit with note)
0 1 0 1 2
- Tidak layak kerja
(unfit)
0 0 0 0 0
Total Pemeriksaan
Kesehatan pekerja
0 6 0 5 11
7
Total pekerja yang
sakit
(tidak termasuk
kecelakaan)
7 66 7 92
172
8
Jumlah Pekerja yang
Diduga PAK
0 0 0 0 0
9
Jumlah Pekerja yang
0 0 0 0
Untuk Klasifikasi Penyakit Tertinggi Adalah Disease Of Respiratory System 36%,
Kedua Disease Of Circulatory System 14% dan Ketiga Disease Of Git System 12%
Classification Of Disease Qty
1 DISEASE OF RESPIRATORY SYSTEM / URTI ( J00-J99 ) 35
2 DISEASE OF CIRCULATORY SYSTEM ( I00 - I99 ) 14
3 DISEASE OF GIT SYSTEM (A00 - A69 ) 12
4 DISEASE OF MUSCULOSKELETAL SYSTEM (M00 - M99 ) 5
5 ENDOCRINE, NUTRITIONAL&METABOLIC DISEASES (E00-E89) 2
6 DISEASE OF SKIN 11
7
SYMPTOMS, SIGN AND ABNORMAL CLINICAL AND LABORATORY
FINDINGS
2
8 DISEASE OF MOUTH & TEETH SYSTEM 9
9 DISEASE OF EAR, NOSE & THROAT SYSTEM 7
10 DISEASE OF EYE & ADNEXA 2
INSPEKSI PEMAKAIAN
KOTAK P3K
INSPEKSI OBAT OBATAN &
BAHAN HABIS PAKAI
HEALTH TALK “TB PARU”
PEMERIKSAAN FATIQUE TES &
ALKOHOL CEK
STERILISASI PERALATAN
MEDIS SETELAH PEMAKAIN
Dilakukan kegiatan
penanaman di lahan
reklamasi Ares sebanyak
5 batang sisipan dan 85
batang tanaman pionir
Revegetasi lahan Ares sampai dengan
Week 2 Agustus 2023
Penanaman LCC
107 kg = 2.67 Ha
Pioneer = Sengon (693)
Sisipan = Jambu Mete (85), nyatoh (5),
ketapang (28), sawo (7), jati (10)
LCC = minimal 30 kg/Ha
Pioneer = 625 bibit/Ha
Sisipan (Lokal dan MPTS) = 156 bibit/Ha
Revegetasi lahan Salwa sampai dengan
Week 2 Agustus 2023
Penanaman LCC
384 kg = 9.6 Ha
Pioneer = Sengon (2.561), lamtoro (189)
dan traebesi (10)
Sisipan = Pinus (271), bitti (143), nyatoh (5),
jabon merah (19), jati (221), jambu mete (65),
sawo (30)
SETPOND SP 01 SETPOND SP 02 SETPOND SP 03 SETPOND SP 04
LOCATION Rostov LOCATION Segmen F LOCATION Ares LOCATION Anggrek
DATE 11 Agustus - 17 Agustus DATE 11 Agustus - 17 Agustus DATE 11 Agustus - 17 Agustus DATE 11 Agustus - 17 Agustus
pH TSS pH TSS pH TSS pH TSS
NF NF 6,1 5 NF NF 6,1 4
NF NF 6,1 9 NF NF N/A N/A
NF NF 6,1 8 NF NF 6,1 5
NF NF N/A N/A NF NF N/A N/A
NF NF N/A N/A NF NF N/A N/A
NF NF N/A N/A NF NF N/A N/A
NF NF N/A N/A NF NF N/A N/A
SETPOND SP 05A SETPOND SP 05B SETPOND Pos 1 SETPOND SP RT
LOCATION Stockpile Jetty 1 LOCATION Stockpile Jetty 2 LOCATION Pos 1 LOCATION Ruang Tunggu
DATE 11 Agustus - 17 Agustus DATE 11 Agustus - 17 Agustus DATE 11 Agustus - 17 Agustus DATE 11 Agustus - 17 Agustus
pH TSS pH TSS pH TSS pH TSS
6,2 13 NF NF 6,1 8 6,1 8
6,6 39 NF NF 6,2 17 6,3 14
6,6 60 NF NF 6,2 14 6,1 8
N/A N/A NF NF 6,3 34 6,1 6
N/A N/A NF NF 6,4 36 6,5 63
6,3 26 6,3 30 6,3 27 6,2 15
N/A N/A N/A N/A N/A N/A N/A N/A
MONITORING HARIAN SETTLING POND
Outlet Outlet Outlet Outlet
Outlet Outlet Outlet Outlet
Penambahan limbah
b3 minggu ini
sebanyak 1.08 ton
sisa limbah di TPS
sebanyak 4.15 ton
INSPEKSI TPS LIMBAH
B3
PEMBUATAN PUPUK
ORGANIK
PENGENDALIAN
PENCEMARAN AIR
PENYEMAIAN BENIH DAN
PEMELIHARAAN BIBIT
DISINFEKTAN
OB MOVEMENT
Note:
- OBaveragehauling distanceis 1.2 km
- OBMovementon Week32 is Achieved.
- OB on Aug 15th didn’t achieved due to bad
weather condition. Continue rain both day
and night shift. Rain at day shift start early
shift until 2 p.m. and at shift, rain start from
1 a.m. untilthe end of shift.
- OB on Aug 16th at early shift preparation
activity was focused on Front-road-WD.
Maintenance. 2 Graders at early shift was
focused maintenanceat Jettyarea.
- Another problem continue front-road-WD.
Maintenance both loading point and
dumping point area so tonnage of
productionnot maximal.
- IndependenceDay on August 17th.
ORE PRODUCTION
Note:
- Ore average hauling distance is 1.5 km(ETO)
and 7 km (EFO)
- Ore Production on Week 32 is Not Achieved.
- Ore on Aug 14th didn’t achieved due to bad
weather condition. At day shift, slippery at
early shift due to rain last night and also
heavy fog until 9:00 Wita. At night shift,
closed earlier at 4:25 Wita due to rain.
- Ore on Aug 15th didn’t achieved due to heavy
rain (Frequency 13 times with total rainfall
34.5 mm). Closed earlier at night shift at 2
a.m.
- Another problem material on Moskow
Tengah are wet so bucket were decrease in
order material not fallen to the ground.
- Independence day on August 17th .
ORE PRODUCT
PlanTon = 5,200 wmt
PlanNi = 1.53%
Act Sumproduct Ni= 1.46 %
PlanTon = 1,000 wmt
PlanNi = 1.82
Act Sumproduct Ni= 1.81 %
PlanTon = - wmt
PlanNi = -
Act Sumproduct Ni= - %
PlanTon = 15,400 wmt
PlanNi = 1.32
Act Sumproduct Ni= 1.21 %
Sumproduct Ni= 1.54 %
Sumproduct Ni= 1.83 %
WEEK 32
MTD AUGUST
Sumproduct Ni= - %
Sumproduct Ni= 1.17 %
18,297
44,672
BARGING REVIEW
Note:
- Activity barging on week 32 Achieved.
- No problem major on week 32.
- On week 32, 3 slots barging are active
(continue barge come to site).
TOTAL MOVEMENT REVIEW
TOTAL TARGET ORE + OB 354.100 wmt
MTD ACTUAL 132.553 wmt
REMAINING TARGET 221.547 wmt
DAYS LEFT 13 days
17.042 per day
8.521 per shift
TOTAL TARGET BARGING 140.000 wmt
MTD ACTUAL 102.560 wmt
REMAINING TARGET 37.440 wmt
DAYS LEFT 13 days
2.880 per day
1.440 per shift
REMAINING PRODUCTION
TO TARGET
REMAINING PRODUCTION
TO TARGET
Achievement Percentage Weekly:
PLAN MOVEMENT : 91,600MT
ACTUAL MOVEMENT : 116,962MT
Gain : 25,362 MT
ACHIEVEMENT : 128 %
PLAN ACT PLAN ACT PLAN ACT PLAN ACT PLAN ACT PLAN ACT PLAN ACT PLAN ACT
ROSTER
TOTAL DAYS AND SHIFTS :
MOHH (hrs) 168,0 168,0
Refueling (hrs) 0,5 0,3 0,3 0,3 0,5 0,3 0,5 0,3 0,5 0,4 0,5 0,5 0,0 0,0 2,8 2,1
Rest and Meal (hrs) 2,0 2,0 1,0 2,0 2,0 2,0 2,0 2,0 2,0 2,0 2,0 2,0 0,0 0,0 11,0 12,0
Front - Road - WD Maintenance (hrs) 2,0 1,9 2,0 1,0 2,0 2,9 2,0 2,0 2,0 2,0 2,0 3,2 0,0 0,0 12,0 13,0
Change Shift (hrs) 2,0 2,0 11,0 9,0 2,0 2,0 2,0 2,0 2,0 2,0 2,0 2,0 0,0 0,0 21,0 19,0
Friday Pray/ Pray (hrs) 1,0 1,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 1,0 1,0
Holidays and Shutdown (hrs) 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 24,0 24,0 24,0 24,0
Rain (hrs) 3,0 0,3 2,0 0,4 3,0 1,3 3,0 1,4 3,0 7,9 3,0 0,6 0,0 0,0 17,0 11,9
Slippery (hrs) 3,0 1,0 2,0 0,1 3,0 0,8 3,0 1,4 3,0 1,6 3,0 2,6 0,0 0,0 17,0 7,6
Total Working Hours 10,5 15,5 5,7 11,2 11,5 14,7 11,5 14,9 11,5 8,1 11,5 13,1 0,0 0,0 62,2 77,5
11-Aug-23 12-Aug-23 13-Aug-23 14-Aug-23 15-Aug-23 16-Aug-23 17-Aug-23 WEEK 32
24,0 24,0 24,0 24,0 24,0 24,0 24,0
WORKING HOURS
ACHIEVEMENTPERCENTAGE:
125%
OPERATINGEFFECTIVITY
102 %
%𝑇𝑀𝑀
%𝑊𝐻
=
TOTAL PLAN WORKINGHOURS:
62.2 HOURS
TOTAL ACTUAL WORKINGHOURS:
77.5 HOURS
*Notes(Workinghour didn’t Achieved):
1. On Aug15th workinghour 8.1 hours becauseWeatherIssue (Continue rainboth Pit and JettyArea).
WEATHER REVIEW
TOTAL RAINFALL : 39.5 mm
Cloudy –
Light Rain
Cloudy –
Light Rain
Cloudy –
Light Rain
Cloudy –
Light Rain
Light –
Heavy Rain
Cloudy –
Light Rain
Sunny -
Cloudy
GAIN AND LOSS WATERFALL
No Reason Loss Root Cause
1
- EXC Loading 3007 - Exca loading breakdown pkl 19:18 - 19:50 Wita sehingga kegiatan dihentikan menunggu EXC loading selesai dikerjakan.
2
- Kegiatan Ore - Continue maintenance area dumpingan ketika selesai hujan.
- Bucket muatan dikurangi jika material basah dikarenakan menghindari material terjatuh di tanah.
- Jumlah DT yang belum maksimal di 2 jam pertama awal shift (gantungan/DT breakdown pendingan); sebelum dan sesudah istirahat dan mendekati
akhir shift
Loss Physical Avaibility
Loss Productivity
GAIN AND LOSS WATERFALL
No Reason Loss Root Cause
1
- Waiting Barge - Tgl 12 agustus (Long Shift), Tongkang BG. Marcopolo completed pkl 16:00 wita dan setelah itu menunggu tongkang selanjutnya untuk mengisi sehingga
tidak ada tongkang yang mengisi setelahnya.
- Tgl 12 agustus (Long Shift), Tongkang BG. Pacific completed pkl 21:35 wita.
- Tgl 16 agustus (Night Shift), Tongkang BG. Kaltara Mulia completed pkl 03:40 wita, sehingga dari pkl 03:40 - 06:00 Wita slot tongkang kosong.
- Tgl 16 agustus (Night Shift), Tongkang BG. Anwari completed pkl 20:30 wita. Tongkang selanjutnya sandar di Jetty pkl 01:00 Wita.
2
- EXC Loading 3006 - Exca loading di ETO Mataram breakdown pkl 19:00 - 20:00 Wita sehingga kegiatan belum dapat dimulai pada awal shift di ETO Mataram.
No Barge
Loss Physical Avaibility
EQUIPMENT PERFORMANCE
REVIEW
ACTUAL PA DT :
91%
PLAN PA DT :
86%
ACTUAL PA
EXCAVATOR :
96%
PLAN PA
EXCAVATOR :
92%
PLAN UA
EXCAVATOR :
38%
ACTUAL UA
EXCAVATOR:
38%
PLAN UA DT :
34%
ACTUAL UA DT :
27%
ACTUAL PA ADT :
83%
PLAN PA ADT :
86%
PLAN UA ADT :
37%
ACTUAL UA ADT:
33%
FUEL CONSUMPTION REVIEW
(TOTALLY)
Consumption Level:
- %FR : 79 %
- %FR : 77 %
Plan Fuel Cons.: 96,478 liter
Total Fuel Cons.: 95,495liter
%𝐹𝐶
%𝑊𝐻
%𝐹𝐶
%𝑇𝑀𝑀
• %FR > 100%= Inefficient
• %FR < 100%= Efficient
FR KUMULATIF
(ORE)
PLAN WTD : 4.86
Actual WTD : 5.22
FR KUMULATIF
(OB+ ORE + BARGING+ QUARRY+ OBOUTPIT)
PLAN WTD : 1.08
Actual WTD : 0.82
FR KUMULATIF
(OB + ORE + QUARRY)
PLAN WTD : 1.54
Actual WTD : 1.28
*Fuel Consumption actual doesn’t include for GeneratorMess & Office
FUEL CONSUMPTION REVIEW (PER
UNIT)
Total FC Excavator : 48,115 Liters
Plan : 43,078 Liters
Total FC Dump Truck : 33,725 Liters
Plan : 34,683 Liters
Total FC Dozer : 2,520 Liters
Plan : 4,783 Liters
Total FC Grader : 2,336 Liters
Plan : 1,953 Liters
Total FC ADT : 3,155 Liters
Plan : 4,968 Liters
Total FC Vibro : 1,259 Liters
Plan : 1,410 Liters
MINING ACTIVITY
CRACK RAMP DOOR MHR MAINTENANCE FOG
FRONT MAINTENANCE WATERING SLIPPERY
PRODUCTION CALENDAR 2023
EWH Plan:
79.70hours
Working Time
Day Shift 07.00– 18.00
NightShift 18.00– 06.00
Long shift 07.00– 22.00
Working Terms & Condition
Based on our historical data, work
effectivity, and work efficiency, we decided
if in one shift there are 2 hours of rain with
high rain frequency, our activity will be
closed.
Working Hours Details:
• Rain and Slippery is based on rainfall trends in
the past few years and weather forecast from
BMKGfor the next week.
• Refuelingis usuallydone in the rest hours
EWH Plan Ratio:
47.4%
WORKING HOURS (W33)
EQUIPMENT PERFORMANCE PLAN
Physical Avaibility (PA)
- XE490 : 0 % - Grader : 46 %
- XE370 : 92 % - Vibro : 92 %
- XE215 : 84 % - WT : 92 %
- ADT : 92 % - FT : 92 %
- DT : 86 % - WL : 92 %
- Dozer : 69 % - TL : 66 %
Support Allocation :
2 exca pc 200 : Maintenance WD Ares
1 exca pc 200 : Maintenance WD Anggrek Ban
1 exca pc 200 : Road Construction
6 exca pc 200 : Inside Barge
1 exca pc 300 : Maintenance Stockpile
1 exca pc 300 : Berm Construction & Maintenance
1 exca pc 300 : Berm Maintenance WD Rostov
1 exca pc 300 : Rampdoor Setting
EQUIPMENT REQUIREMENT
FLEET PLAN PRODUCTION
Estimated Fuel Consumption
132,582 liters
FUEL RATIO CUMMULATIVE
0.92
FUEL CONSUMPTION (W33)
RESERVE AREA UPL 2023
TOPOGRAFI, 16 AGUSTUS 2023.
PIT MOSKOW (W33)
RESERVE WEEKLY 33 AREA MOSKOW UTARA
W34
W36
W43 W44
3 4
Topografi update 16 Agustus 2023
Design W33
A A’
A A’
SECTION PIT MOSKOW UTARA
Target Ore
13,700 MT
Overburden
24,900 MT
Total Movement
38,600 MT
PRODUCTION
TARGET
MOSKOW UTARA
RESERVE WEEKLY33 AREA MOSKOW TENGAH
W44 4
Topografi update 16 Agustus 2023
Design W33
A A’
A
A’
SECTION PIT MOSKOW TENGAH
Target Ore
14,900 MT
Overburden
41,700 MT
Total Movement
56,600 MT
PRODUCTION
TARGET
MOSKOW TENGAH
Target Ore
28,600 MT
Overburden
66,600 MT
Quarry
11,100 MT
Total Movement
106,300 MT
PRODUCTION
TARGET
SUMMARY OF MATERIAL MOVEMENTS
W4 W13
7
DAY 5
DAY 7
DAY 0
DAY 5
DAY 1 DAY 3
DAY 4
DAY 2
DAY 6 DAY 7
SEQUENCE PIT NORTH MOSKOW & MOSKOW TENGAH (W33)
RECONCILE MOSKOW UTARA
Note
 DF (%) memiliki nilai minus (-) menunjukkan kadar actual lebih rendah daripada block model
 DF (%) memiliki nilai plus (+) menunjukkan bahwa kadar actual lebih tinggi daripada block model
CHECK SAMPLE MOSKOW UTARA
CHECK SAMPLE MOSKOW UTARA
Ni Co MgO Sima
0.82 0.02 22.07 1.84 Low
0.43 0.02 21.79 1.81 Low
0.57 0.02 20.93 1.87 Low
0.47 0.02 21.07 1.72 Low
0.47 0.03 27.19 1.42 Low
13.08.23 P.MOSCOW UTARA TESPIT 32 5 M ELV 487 DPL 21 30
Sampel ID Type
13.08.23 P.MOSCOW UTARA TESPIT 32 1 M ELV 487 DPL 21 30
13.08.23 P.MOSCOW UTARA TESPIT 32 2 M ELV 487 DPL 21 30
13.08.23 P.MOSCOW UTARA TESPIT 32 3 M ELV 487 DPL 21 30
13.08.23 P.MOSCOW UTARA TESPIT 32 4 M ELV 487 DPL 21 30
Parameters (%)
TP 32
Ni Co Fe S iO 2 Ca
O
Mg
O
Al2
O 3
S ima
1
.60 0.02 1
2.1
6 40.02 0.32 23.69 1
.42 1
.69
1
.1
2 0.02 1
1
.76 40.57 0.58 20.98 3.01 1
.93
0.47 0.02 1
0.68 41
.04 0.30 24.70 1
.35 1
.66
0.44 0.02 9.46 38.96 0.66 26.20 0.84 1
.49
0.86 0.02 1
1
.36 40.23 0.95 22.85 1
.87 1
.76
1
.99 0.02 1
2.53 43.51 0.1
3 21
.96 2.02 1
.98
0.48 0.02 9.80 38.05 0.61 22.43 1
.94 1
.70
0.64 0.02 1
0.57 39.01 0.58 23.1
6 1
.37 1
.68
1
.03 0.02 1
1
.32 38.80 1
.09 1
7.86 1
.74 2.1
7
1
.87 0.02 1
1
.58 41
.99 0.29 23.44 1
.68 1
.79
1
.31 0.02 1
2.54 37.39 0.88 21
.28 2.22 1
.76
1
.35 0.02 1
1
.94 38.57 1
.1
7 20.94 2.71 1
.84
0.78 0.02 1
2.36 35.1
2 1
.1
7 1
7.51 2.30 2.01
0.31 0.01 7.94 39.1
6 0.84 26.87 1
.60 1
.46
0.47 0.01 8.32 40.50 0.76 28.37 1
.41 1
.43
0.40 0.01 8.90 40.62 0.38 27.62 1
.25 1
.47
0.42 0.01 8.32 38.01 0.61 27.1
4 0.90 1
.40
0.37 0.01 8.32 38.41 1
.50 25.97 3.34 1
.48
0.28 0.01 7.67 39.02 1
.89 26.1
0 4.20 1
.50
0.49 0.01 9.01 38.24 0.67 26.45 1
.30 1
.45
1
.55 0.01 9.40 39.28 0.25 28.42 1
.36 1
.38
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 21LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 16 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 17 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 18 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 19 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 20 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 11LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 12 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 13 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 14 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 15 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 06 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 07 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 08 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 09 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 10 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 01LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 02 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 03 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 04 LV 488 DP L 2130
15.08.23 P .MOSCOW UTARA MEN OUT FL CS 05 LV 488 DP L 2130
S a mpe l ID P a ra me te rs (%)
SECTION MOSKOW UTARA
C
A
B
D
REKOMENDASI AREA MOSKOW UTARA
Secara sebaran isopach, sebaran material
saprolite (cut off 1.55 up) memiliki ketebalan 3 – 6
meter di area Moskow Utara
Lanjut expose OB ke
area utara
Area limonit
Plan Arah Penambangan
1. Melanjutkan Kupas OB di area utara
2. Sebaran Isopach Ore Thickness Saprolit menunjukan ketebalan 3 – 6 Meter di area Moskow
Utara
3. Area saprolite ditandai warna kuning
3. Area transisi limonit ditunjukkan warna merah mengarah ke bagian utara
Area saprolit
Ton Ni Fe SiO2 MgO SiMa Ton Ni Fe SiO2 MgO SiMa Ton Ni Fe SiO2 MgO SiMa
OB/IB/BR (Waste) 19067 OB/IB/BR (Waste) 5500 OB/IB/BR (Waste) 11750
Low Ni 6355 1.21 35.67 12.76 6.04 2.15 Low Ni 6750 1.26 41.79 8.44 2.58 3.07 Low Ni 13750 1.23 40.66 9.61 2.54 3.76
LGS 1328 1.73 26.01 24.74 12.53 1.97 LGS LGS 1000 1.71 13.90 36.66 21.18 1.73
MGS MGS MGS 250 1.84 12.01 36.50 24.99 1.46
HGS HGS HGS
Total High Ni 1328 1.73 26.01 24.74 12.53 1.97 Total High Ni 0 0.00 0.00 0.00 0.00 0.00 Total High Ni 1250 1.73 13.52 36.63 21.94 1.68
Total Ore 7683 1.30 34.00 14.83 7.16 2.12 Total Ore 6750 1.26 41.79 8.44 2.58 3.27 Total Ore 15000 1.28 38.40 11.86 4.15 3.58
Total Move 26750 Total Move 12250 Total Move 26750
Ni Fe SiO2 MgO SiMa Ni Fe SiO2 MgO SiMa
-4.59 -17.17 33.87 57.25 -42.99 -2.43 -14.00 24.71 57.98 -74.63 MR Low Ni
100.00 100.00 100.00 100.00 100.00 -0.04 48.02 -48.05 -75.09 15.07 MR High Ni
2.74 -22.92 43.09 63.95 -54.18 1.56 -12.94 20.04 41.98 -68.96 MR Total Ore
Grade Material
Actual (By Survey)
Grade Material
Reserve (By Weekly Design Pit)
Grade Material
Reserve (By UPL)
DF High Ni DF High Ni 0% 106%
DF Total Ore DF Total Ore 114% 51%
Actual VS Weekly Actual VS UPL
DF Low Ni DF Low Ni 94% 46%
Dilution Factor
Actual VS Reserve (Weekly)
Dilution Factor
Actual VS Reserve (UPL)
Mining Recovery
RECONCILE MOSKOW TENGAH
Note
 DF (%) memiliki nilai minus (-) menunjukkan kadar actual lebih rendah daripada block model
 DF (%) memiliki nilai plus (+) menunjukkan bahwa kadar actual lebih tinggi daripada block model
CHECK SAMPLE MOSKOW TENGAH
SECTION MOSKOW TENGAH
C
A
B
D
E
REKOMENDASI AREA MOSKOW TENGAH
Plan Arah Penambangan
1. Melanjutkan stripping OB ke arah Selatan di tandai warna biru
2. Melanjutkan Progres jalan di tandai dengan warna putih
3. Area zona limonite bagian utara di tandai warna merah
4. Area zona transisi saprolit limonit bagian tengah ke selatan di tandai warna kuning
U
U
GEO RECONCILE (ALL PIT)
PENAMPANG MELINTANG
SAYATAN A – B
PIT MOSKOW
A
B
 Week 32
 Pit Moskow (All
Pit)
 Topo Aug 10th
2023
 Topo Aug 16th
2023
 Ultimate Pit
Limit Design
 Section A-B
(DPL
21_181R– DPL
21_39)
 COG High Ni
1.50
 COG Low Ni
1.15
 Nilai DF (%) =
minus (-),
actual < block
model
 Nilai DF (%) =
plus (+), actual
> block model
A
B
PETA MINE OUT UPDATE
RESUME BARGING DAN SISA STOCK WEEK 32 2023
Ni Co Fe SiMa
Initial Tonage
(Truck Count)
Total 1.02 0.11 45.91 2.93 20,739
SISA STOCK AVERAGE ETO SALWA 1.06 0.11 44.42 1.80 6,413
SISA STOCK AVERAGE ETO ARES BARAT 0.97 0.11 47.91 5.04 10,773
SISA STOCK AVERAGE ETO SEGMEN D 1.11 0.11 42.53 1.70 3,553
Total Sisa Stok Ore FE
FOCUSED AREA : PIT MOSCOW WEST COMPARTEMENT
Drill Hole Summary
Plan : 376 holes
Cancel : 62 holes
On Progress : 1 holes
Finished : 275 holes
Remaining : 38 holes
Drilling method are single tube
planned on using 1 unit SJR Rig
Drill Machine.
11 August – 17 August 2023
Finished : 1 hole
DRILLING PROGRESS
DRILLING
SUMMARY
DRILLING
SUMMARY
Total Drilling Progress
Total Depth : 7025.70 m
Avg. Drilling Depth/Rig /Day : 8.01 m
Finished Drill Holes : 275 drill holes
Sample : 7707 Inc
Drilling Progress Resume
Weekly
Total Depth Weekly : 36.50 m
Avg. Drilling Depth/Day : 6.08 m
Avg. Drilling Depth/Rig/Day : 6.08 m
Sample : 42 Inc
DRILLING PRODUCTION CHART
DRILLING
SUMMARY DRILLING ACTIVITY CHART
 17 August 2023
INDONESIAN INDEPENDENCE DAY
DRILLING
SUMMARY ACTIVITIES DOCUMENTATION
P5M Sample Preparation QAQC
SJR Moving by man Preparation for Next Project
Rig 04 SJR Drilling Activity
Preparation for Next Project
DRILLING
RESULT ASSAY RESULT DPL 21-372
(PIT MOSCOW)
OB : 3.00 Meters
IB : 0.00 Meters
Sap Ore : 9.00 Meters
Lim Ore : 10.00 Meters
Waste : 6.00 Meters
Sap Ni Average : 1.87 %
Lim Ni Average : 1.26 %
Lim MgO Average : 1.35 %
Stripping Ratio : 0.16
Hole ID Easting Northing Elevation Dip Azimuth
DPL 21-372 415028,14 9662445,63 524,70 -90 0
Start (Date)
Finish
(Date)
EOH (m)
Core
Loss (m)
Core
Length (m)
Core Recovery
(%)
10 Aug 2023 14 Aug 2023 28.00 1.60 26.40 94.29 %
From
(m)
To (m)
Material
Zone
Material
Class
Ni Co Fe SiO2 CaO MgO Al2O3 Sima
0,00 1,00 LIM OB 0,54 0,08 42,40 1,73 0,04 1,09 14,67 1,59
1,00 2,00 LIM OB 0,54 0,07 35,88 1,62 0,04 0,80 21,89 2,03
2,00 3,00 LIM OB 0,60 0,09 36,98 0,50 0,16 0,03 6,94 16,67
3,00 4,00 LIM LGL 1,04 0,14 46,11 1,75 0,05 0,91 14,34 1,92
4,00 5,00 LIM MGL 1,10 0,12 46,84 1,82 0,05 1,58 8,72 1,15
5,00 6,00 LIM HGL 1,30 0,11 45,59 2,07 0,05 0,79 7,92 2,62
6,00 7,00 LIM HGL 1,37 0,11 45,80 2,12 0,05 1,11 9,89 1,91
7,00 8,00 LIM HGL 1,37 0,10 44,57 1,89 0,04 1,14 11,34 1,66
8,00 9,00 LIM MGL 1,26 0,11 45,58 2,10 0,05 1,45 9,22 1,45
9,00 10,00 LIM MGL 1,27 0,11 44,70 1,86 0,04 1,56 9,84 1,19
10,00 11,00 LIM MGL 1,21 0,11 46,79 2,41 0,06 2,17 8,08 1,11
11,00 12,00 LIM MGL 1,26 0,11 42,31 2,34 0,05 1,40 12,62 1,67
12,00 13,00 LIM HGL 1,43 0,11 41,64 4,38 0,05 1,35 12,44 3,24
13,00 14,00 LIM LGS 1,64 0,15 44,69 4,65 0,05 1,50 9,78 3,10
14,00 15,00 LIM MGS 1,83 0,11 40,45 10,24 0,12 2,55 7,21 4,02
15,00 16,00 LIM LGS 1,74 0,06 25,56 24,99 0,35 7,48 4,37 3,34
16,00 16,75 SAP LGS 1,62 0,03 13,65 36,66 1,04 20,77 3,12 1,77
16,75 17,00 SAP LGS 1,19 0,02 8,71 37,50 1,04 28,50 2,53 1,32
17,00 18,00 BLD MGS 1,85 0,03 14,95 33,01 0,95 18,53 3,28 1,78
18,00 19,00 SAP LGS 1,71 0,03 14,10 37,34 0,72 19,28 4,19 1,94
19,00 20,00 SAP HGS 2,11 0,05 23,29 28,54 0,36 8,40 5,88 3,40
20,00 21,00 SAP HGS 2,66 0,05 24,58 27,49 0,35 10,22 5,30 2,69
21,00 22,00 SAP MGS 1,81 0,02 10,31 35,60 0,46 24,95 2,06 1,43
22,00 22,20 SAP WS 1,36 0,02 9,89 36,40 0,46 25,92 2,03 1,40
22,20 22,70 BLD WS 1,12 0,02 8,49 37,49 0,67 29,67 1,16 1,26
22,70 23,00 SAP WS 1,36 0,02 9,89 36,40 0,46 25,92 2,03 1,40
23,00 23,60 BLD WS 1,09 0,02 8,79 37,93 0,65 28,96 1,54 1,31
23,60 24,00 SAP WS 0,85 0,02 8,19 38,65 0,66 31,21 1,15 1,24
24,00 25,00 BLD WS 1,29 0,02 8,33 38,52 0,73 30,88 1,55 1,25
25,00 26,00 BLD WS 0,92 0,02 7,96 38,72 1,75 30,17 1,77 1,28
26,00 27,00 SAP WS 1,33 0,02 9,95 37,65 0,68 27,57 1,65 1,37
27,00 28,00 BLD WS 0,61 0,01 7,11 36,68 0,81 31,62 0,89 1,16
DPL 21-372
DRILLING
RESULT SAPROLITE ORE THICKNESS DISTRIBUTION MAP
PIT MOSCOW WEST COMPARTEMENT
1 Finished Hole on Week
19 of 2023 (DPL 21-372)
is considered potential of
limonite and saprolite
ore (stripping ratio less
than 3).
DRILLING
RESULT LIMONITE ORE THICKNESS DISTRIBUTION MAP
PIT MOSCOW WEST COMPARTEMENT
DRILLING
SUMMARY DRILLING PLAN WEEK 20
Drilling Plan
Friday Saturday Sunday Monday Tuesday Wednesday Thursday
18-Aug-23 19-Aug-23 20-Aug-23 21-Aug-23 22-Aug-23 23-Aug-23 24-Aug-23
Drilling DPL 21-374 (Drill Plan)
Drilling DPL 21-373 (Drill Plan)
Activity
Outline
Presentation
Activity Review
01
Survey Topographic
02
Production Agustus 2023
03
Geotech Monitoring
04
Activity Photos
05
Activity Plan
06
Activity Review
Hari/Tanggal Tim Lokasi Kegiatan Progres Kendala
Jumat/11/08/2023 A WD Anggrek, Moscow Tengah Update Topografi Wastedump Anggrek Ban, Update Topografi Pit Moscow tengah & Drone Pix4D di area Moscow Selesai Tidak Ada
B WD Rostov, Salwa & Jetty Update Topografi Wastedump Rostov, Update Stockpile di ETO Salwa, EFO Jety, dan pad ETO Salwa Selesai Tidak Ada
Sabtu/12/08/2023 A WD Ares & Moscow Utara Update Topografi Wastedump Ares, Update Topografi Moscow Utara Selesai Tidak Ada
B Mataram & Jetty Update Stockopname Mataram bawah, Drone Pix4D di EFO Jetty Selesai Tidak Ada
Minggu/13/08/2023 A Moscow Tengah & WD Ares Update Topografi Moscow Tengah, Drone Pix4D di Wastedump Ares Selesai Man Power
B Salwa, Jetty & Rostov Update Stockopname Di ETO Salwa, Update jalan ETO Salwa, EFO Jetty dan Wastedump Rosrov Selesai Man Power
Senin/14/08/2023 A Moscow Utara dan Tengah Update Topografi Moscow Utara & Tengah, Drone Pix4D di Area Moscow Selesai Tidak Ada
B WD Ares dan Moscow Barat Update Topografi WD Ares, Resurvey DrillHole Moscow Barat Selesai Tidak Ada
Selasa/15/08/2023 A Moscow Tengah dan Utara Update Topografi Moscow Tengah & Utara, Drone Pix4D Moscow Utara & Tengah Selesai Tidak Ada
B Moscow Utara dan Jetty Stakeout Titik bor di Moscow Utara, Update Pad Dome di EFO Jetty Selesai Tidak Ada
Rabu/16/08/2023 A Moscow Tengah dan Utara Update Topografi Weekly Moscow Tengah & Utara Selesai Tidak Ada
B Jetty Update Stockpile di EFO Jetty lt 3 Selesai Tidak Ada
Kamis/17/08/2023 A - Libur Nasional 17 Agustus 2023 Libur Nasional Libur Nasional
B - Libur Nasional 17 Agustus 2024 Libur Nasional Libur Nasional
SURVEY TOPOGRAPHIC WORKING
AREA
Pit Moscow Tengah
Pit Moscow Utara
Moscow Barat
Wastedump Rostov
SURVEY TOPOGRAPHIC WORKING
AREA
Wastedump Ares
PRODUCTION AGUSTUS 2023
Note : Pengukuran tanggal 1 – 16 Agustus 2023
Kode Stock Lokasi Ni Co Fe SiO2 CaO MgO Al2O3 Sima Kriteria
Tonase by Truck
Count (Ton)
Tonase by
Survey (Ton)
Selisih
(Ton)
Deviasi
010823/EFO JETY/P. MOSKOW TENGAH/DOME 99 Ni EFO JETTY LT 3 1.71 0.05 19.90 27.79 0.53 15.94 6.16 1.74 High Ni 665 647.6 -17.4 -3%
020823/GABUNGAN/EFO JETY/P. MOSKOW/DOME 100 TENGAH+42 UTARA Ni EFO JETTY LT 1 1.59 0.05 19.98 28.61 0.58 14.45 3.41 1.98 High Ni 2380 2,030.4 -349.6 -17%
020823/GABUNGAN/EFO JETY/P. MOSKOW/DOME 98 TENGAH+41 AB UTARA Ni EFO JETTY LT 2 1.54 0.05 20.40 27.36 0.63 14.66 3.82 1.87 High Ni 2905 2,534.9 -370.1 -15%
020823/GABUNGAN/EFO JETY/P. MOSKOW TENGAH/DOME 101+102AB+103 Ni EFO JETTY LT 4 1.75 0.06 24.97 23.55 0.43 12.87 4.28 1.83 High Ni 3623 3,596.2 -26.3 -1%
030823/GABUNGAN/EFO JETY/P. MOSKOW UTARA/DOME 43+44 Ni EFO JETTY LT 5 1.44 0.05 19.40 29.27 0.64 15.44 3.90 1.90 High Ni 2688 2,456.2 -231.8 -9%
030823/EFO JETY/P. MOSKOW TENGAH/DOME 180 Low Ni EFO JETTY LT 5 1.09 0.06 36.88 10.35 0.18 5.04 9.03 2.05 Low Ni 630 533.4 -96.6 -18%
030823/EFO JETY/P. MOSKOW TUTARA/DOME 93+ 94B+45 Ni EFO JETTY LT 3 1.68 0.07 25.78 22.55 0.44 12.55 4.10 1.80 High Ni 3658 3,498.7 -158.8 -5%
040823/GABUNGAN/EFO JETY/P. MOSKOW/DOME 100 TENGAH+42+46 UTARA Ni EFO JETTY LT 1 1.58 0.05 20.39 28.12 0.56 14.15 3.74 1.99 High Ni 3346 3,163.3 -182.8 -6%
030823/GABUNGAN/EFO JETY/P. MOSKOW/DOME 93AB+94+96 TENGAH+45 UTARA Ni EFO JETTY LT 3 1.68 0.07 25.78 22.55 0.44 12.55 4.10 1.80 High Ni 3658 3529.2 -128.3 -4%
060823/EFO JETY/P. MOSKOW TENGAH/DOME 181 Low Ni EFO JETTY LT 3 1.02 0.06 37.47 10.83 0.12 4.29 10.08 2.52 Low Ni 105 94.07 -10.9 -12%
070823/EFO JETY/P. MOSKOW TENGAH/DOME 182 Low Ni EFO JETTY LT 3 1.15 0.05 30.43 16.67 0.36 7.97 6.81 2.09 Low Ni 210 195.35 -14.7 -7%
080823/PENURUNAN/ETO MATARAM/P. MOSKOW/DOME 54+55+56+57+58+59+60+61+62+63+64+66 UTARA+142+143+144+147+150 TENGAH Low Ni
EFO JETTYLT 3 1.25 0.08 39.61 8.61 0.12 3.97 6.87 2.17 High Ni 490 412.7 -77.3 -19%
080823/ETO MATARAM/P.MOSCOW/DOME 181+182+183+85 EFO JETTY LT 3 1.12 0.06 30.38 18.53 0.36 9.09 6.67 2.04 Low Ni 854 676.9 -177.1 -26%
100823/ETO SALWA/P. MOSKOW UTARA/DOME 48 Ni ETO SALWA NI 1.70 0.07 27.38 22.71 0.21 12.45 2.85 1.82 High Ni 963 829.2 -133.3 -16%
100823/EFO JETY/P. MOSKOW TENGAH/DOME 184 Low Ni EFO JETTY LT 3 1.24 0.06 32.99 14.48 0.21 6.92 8.05 2.09 Low Ni 798 759.3 -38.8 -5%
110823/ETO MATARAM/P. MOSKOW TENGAH/DOME 185 Low Ni ETO MATARAM 1.27 0.05 29.10 19.10 0.35 10.74 5.73 1.78 Low Ni 315 309.0 -6.0 -2%
120823/ETO SALWA/P. MOSKOW UTARA/DOME 49 A Ni ETO SALWA NI 1.22 0.03 16.05 32.60 0.75 16.66 3.06 1.96 High Ni 875 751.1 -123.9 -17%
120823/ETO SALWA/P. MOSKOW UTARA/DOME 49 B Ni ETO SALWA NI 1.75 0.05 20.83 28.66 0.26 17.18 2.20 1.67 High Ni 560 494.3 -65.7 -13%
120823/GABUNGAN/EFO JETY/P. MOSKOW/DOME 98 TENGAH+41 AB+50 UTARA Ni EFO JETTY LT 2 1.62 0.06 23.89 25.10 0.43 12.88 2.96 1.95 High Ni 2126 2,100.0 -25.8 -1%
150823/EFO JETY/P. MOSKOW UTARA/DOME 89 Low Ni EFO LT 3 1.11 0.09 46.64 4.04 0.08 2.5 7.1 1.62 Low Ni 438 399 -38.9 -10%
160823/EFO JETY/P. MOSKOW UTARA/DOME 90 Low Ni EFO LT 3 1.42 0.08 39.07 12.14 0.06 7.76 4.12 1.56 Low Ni 559.0 511.3 -47.7 -9%
160823/EFO JETY/P. MOSKOW UTARA/DOME 91 Low Ni EFO LT 5 1.19 0.09 45.78 4.67 0.05 2.66 5.21 1.76 Low Ni 665.0 733.0 68.0 9%
150823/GABUNGAN/EFO JETY/P. MOSKOW/DOME 181+182+183+184 TENGAH+85+86+87+88 UTARA Low Ni EFO LT 3 1.17 0.07 39.90 9.37 0.25 5.10 7.05 1.84 Low Ni 2,546.0 2,336.3 -209.8 -9%
080823/PENURUNAN/ETO ARES/P. ATHENA/DOME 41+42+43+44+45+46+47+48+49+50+51+52+53+59 Nico EFO LT 5 1.01 0.08 40.11 7.62 0.11 3.77 8.57 2.02 Low Ni 280.0 226.3 -53.8 -24%
160823/EFO JETTY/DOME 76+110B(sisa) EFO LT 5 644.1 644.1 100%
160823/ETO MATARAM/P. MOSKOW TENGAH/DOME 186 Low Ni ETO MATARAM 1.31 0.06 28.69 20.24 0.43 12.20 5.22 1.66 Low Ni 665.0 704.1 39.1 6%
160823/ETO MATARAM/P. MOSKOW TENGAH/DOME 187 Low Ni ETO MATARAM 1.02 0.06 32.12 15.85 0.46 7.21 5.20 2.20 Low Ni 1,015.0 950.7 -64.3 -7%
PRODUCTION ORE PT. BIMA CAKRA PERKASA MINERALINDO - SITE LAROENAI AGUSTUS 2023
PLAY LOAD STUDY DT
No Kode
Bcm
Survey
Ton
Survey
1 DT-1-033 11.20 20.05
2 DT-1-027 10.54 18.86
3 DT-1-014 9.60 17.18
4 DT-1-086 8.90 15.59
5 DT-1-046 12.06 21.59
10.46 18.65
PAYLOAD STUDY DT ORE
PIT MOSCOW UTARA 16 AGUSTUS 2023
Average
No Kode
Bcm
Survey
Ton
Survey
1 DT-1-058 9.44 16.90
2 DT-1-016 10.36 18.53
3 DT-1-082 9.25 16.55
4 DT-1-001 8.59 15.38
5 DT-1-011 9.93 17.77
9.51 17.03
PAYLOAD STUDY DT ORE
BARGING DARI ETO SALWA 16 AGUSTUS
2023
Average
GEOTECH MONITORING
ACTIVITY PHOTOS
Update Topografi Wastedump Resurvey dan Stakeout Titik
Bor
Pengukuran Dome Produksi
ACTIVITY PLAN
18/08/23 19/08/23 20/08/23 21/08/23 22/08/23 23/08/23 24/08/23
1 Wastedump Topographic Update
2 Pit Topographic Update
3 Geotech Monitoring
4 Stake Out Pit Limit Weekly/Monthly
5 Drone Photo & Pix4D
6 Stock Opname Dome Ore
7 Payload Study Dump Truck
8 Sample Check Geology
9 Quarry Topographic Update
10 Drill Hole Exploration
ACTIVITY PLAN ON NEXT WEEK
No Activity
Date
Review Incoming Sample Nickel Ore
Total incoming Nickel Ore samples in lab & prep :
1. BCPM 486 Samples
2. Exploration Project 60 Samples
3. PT.MMS 22 Samples
Average are 189 Samples
Grand Total are 568 Samples
Weekly Check, Service Schedule and
Equipment in Laboratory & Preparation
Radiation Protection
Hasil Pengukuran :
Ξ Rata-rata laju paparan alat pengukuran
Epsilon 3 : 0.004 mR/jam = 0.04 µSv/jam
Ξ Rata-rata laju paparan alat pengukuran
Epsilon 4 : 0.003 mR/jam = 0.03 µSv/jam
*Laju dosis ≤ 10 µSv/jam pada jarak 1 m
dari permukaan luar kabin
Source : PERKA BAPETEN Nomor 6 Tahun
2009 pasal 32
Paparan Pekerja Radiasi 1 Jan–17 Agust 23:
Moh.Fadli Arbi : 0.027 mSv/Tahun
Muh.Ardiansyah : 0.051 mSv/Tahun
Nur Alif Awalia : 0.058 mSv/Tahun
Dicky Rastyandi : 0.054 mSv/Tahun
Moh Irsal Efendy : 0.003 mSv/Tahun
*Nilai batas dosis (NBD) ≤ 20 mSv/Tahun
untuk perkerja radiasi
Source : PERKA BAPETEN Nomor 4 Tahun
2013
Review Sample Standard
Data Visualization of Oreas vs BCPM
Epsilon 3 & 4
Review Quality
Review CoA
Review CoA
Documentation
House Keeping of Warehouse
Activity in Wet and Final Preparations Activity in Laboratory Xray and Limestone
Weekly Check In Laboratory & Preparation Weekly Inspection
WEEK
DAY
ARMADA
1 TB Cathay 28 / BG CSF 3003 10000 2 41% 92% 100% Full away on Aug 1st, 2023 - 16.15 LT
2
TB Mitra Anugerah 51 / BG
Anwari
7500 1 22% 59% 84% 99% 100% Full away on Aug 4th, 2023 - 15.30 LT
3
TB. Maju Daya 29 / BG.
Marcopolo 382
8500 3 4% 42% 66% 73% 95% 100% Full away on Aug 8th, 2023 - 14.25 LT
4
TB. Avengers / BG. Captain
Marvel
10000 2 18% 49% 56% 70% 82% 99.9% 100% Full away on Aug 10th, 2023 - 18.10 LT
5 TB. Cathay 28 / BG. CSF 3003 7500 1 3% 24% 44% 93% 100% Full Away on Aug 8th, 2023 - 16.40 LT
6
TB. Mitra Caraka 1 / BG. Iron
Man 8
10000 3 0% 19% 55% 69% 82% 89% 100% Full away on Aug 14th, 2023 - 01.30 LT
7 TB. Trinity 309 / BG. Pacific 306 10500 1 0% 10% 49% 68% 88% 100% Full away on Aug 12th, 2023 - 23.15 LT
8
TB. Maju Daya 29 / BG.
Marcopolo 382
8500 2 28% 84% 100% Full away on Aug 12th, 2023 - 22.30 LT
9
TB. Buma Pearl / BG. Kaltara
Mulia
10000 2 0% 0% 0% 0% 0% 0% 34% 53% 76% 100% Full Away on Aug 17th, 2023 - 16.00 LT
10
TB Mitra Anugerah 51 / BG
Anwari
10000 1 0% 30% 70% 90% 100% Full Away on Aug 17th, 2023 - 14.00 LT
11
TB. Avengers / BG. Captain
Marvel
10000 3 0% 8% 44% 66% 87% 87% On progress about 87%
12
TB. Maju Daya 29 / BG.
Marcopolo 382
8500 1 0% 0% 13% 13% On progress about 13%
13
TB. Mitra Caraka 1 / BG. Iron
Man 8
10000 2 0% 0% 0% In position jetty
WEEK NO
CAPACI
TY
SLOT REMARKS
28 29 30 31 1 2 5 6 9 25 26 27
3 10 18 19
16 23 24
Approval by,
SPV/SPT
42,392.926
TOTAL
102,560.470
GRAND TOTAL
60,167.544
W2 W3 W4
11 12 13 14 15 31
20 21 22 29 30
28
17
7 8
JULY W1
4
I
II
Monitoring Shipment
= High Ni
= Low Ni
W1 W2 W3 W4 W5 Ritase WMT
1 TB Cathay 28 / BG CSF 3003 7,500 7,542.655 320 7,542.655
PT HNC -
Morowali
Completed
Full away on Aug 1st, 2023 - 16.15
LT
Low-Ni
2 TB Mitra Anugerah 51 / BG Anwari 10,000 10,040.302 513 10,040.302
PT HNC -
Morowali
Completed
Full away on Aug 4th, 2023 - 15.30
LT
Low-Ni
3
TB. Maju Daya 29 / BG. Marcopolo
382
8,500 8,531.775 428 8,531.775
PT HNC -
Morowali
Completed
Full away on Aug 8th, 2023 - 14.25
LT
Low-Ni
4 TB. Avengers / BG. Captain Marvel 10,000 10,031.713 542 10,031.713
PT HNC -
Morowali
Completed
Full away on Aug 10th, 2023 - 18.10
LT
Low-Ni
5 TB. Cathay 28 / BG. CSF 3003 7,500 7,530.081 377 7,530.081
PT HNC -
Morowali
Completed
Full Away on Aug 8th, 2023 - 16.40
LT
Low-Ni
6 TB. Mitra Caraka 1 / BG. Iron Man 8 10,000 6,948.901 3,085.133 526 10,034.034
PT HNC -
Morowali
Completed
Full away on Aug 14th, 2023 - 01.30
LT
Low-Ni
7 TB. Trinity 309 / BG. Pacific 306 10,500 7,173.198 3,357.479 523 10,530.677
PT HNC -
Morowali
Completed
Full away on Aug 12th, 2023 - 23.15
LT
Low-Ni
8
TB. Maju Daya 29 / BG. Marcopolo
382
8,500 2,368.919 6,162.159 388 8,531.078 PT LSI - Morowali Completed
Full away on Aug 12th, 2023 - 22.30
LT
Hi-Ni
9 TB. Buma Pearl / BG. Kaltara Mulia 10,000 - 10,028.232 493 10,028.232
PT HNC -
Morowali
Completed
Full Away on Aug 17th, 2023 - 16.00
LT
Low-Ni
10 TB. Mitra Anugerah 51 / BG Anwari 10,000 10,030.815 472 10,030.815 PT LSI - Morowali Completed
Full Away on Aug 17th, 2023 - 14.00
LT
Hi-Ni
11 TB. Avengers / BG. Captain Marvel 10,000 8,657.752 404 8,657.752 PT LSI - Morowali On Progress On progress about 87% Hi-Ni
12
TB. Maju Daya 29 / BG. Marcopolo
382
8,500 1,071.356 150 1,071.356
PT HNC -
Morowali
On Progress On progress about 13% Low-Ni
13 TB. Mitra Caraka 1 / BG. Iron Man 8 10,000 - 39 -
PT HNC -
Morowali
On Progress On progress about 9% Low-Ni
60,167.544 42,392.926 - - -
Destination Mark Info & Problem Remarks
TOTAL 102,560.470
No Shipment
Plan
(Wmt)
Actual per Week (Wmt) Summary
Shipment (per Week)
Shipment Chart
Info / Issue
1. Not possible to using BG. Kaltara Mulia’s rampdoor cause theirs rampdoor has an
extremely condition (not safe)
2. Changes a rampdoor of BG. Iron Man 8 cause there is any crack while barging in
progress
3. Not activity on August 17th, 2023 due to Republik Indonesia independence day
Total Hi-Ni 27,219.645
Total Lo-Ni 75,340.825
GRAND TOTAL 102,560.470
SHIPMENT by Grade
Plan progress
No.
Stowage Plan
(MT)
1 10,000
2
3
10,000
Total
-
Aug 18th, 2023
TB Mitra Anugerah 51 / BG Anwari
Ship Name E T A
Summary Barging
Plan TCoB
Date Time Date Time Date Time Date Time {MT} {MT}
1 TB Cathay 29 / BG CSF 3003 30/07/2023 12.00 30/07/2023 15.00 01/08/2023 15.00 01/08/2023 16.15 78 H 30 M 133 H 30 M 7,500 7,542.655 PT HNC - Morowali
2 TB Mitra Anugerah 51 / BG Anwari 31/07/2023 04.50 31/07/2023 08.30 04/08/2023 13.40 04/08/2023 15.30 71 H 0 M 92 H 50 M 10,000 10,040.302 PT HNC - Morowali
3 TB. Maju Daya 29 / BG. Marcopolo 382 03/08/2023 23.30 04/08/2023 04.35 08/08/2023 11.30 08/08/2023 15.00 102 H 55 M 111 H 30 M 8,500 8,531.775 PT HNC - Morowali
4 TB. Avengers / BG. Captain Marvel 04/08/2023 16.30 04/08/2023 20.05 10/08/2023 08.10 10/08/2023 18.10 132 H 5 M 145 H 40 M 10,000 10,031.713 PT HNC - Morowali
5 TB. Cathay 28 / BG. CSF 3003 04/08/2023 23.30 05/08/2023 02.45 08/08/2023 14.00 08/08/2023 16.40 83 H 15 M 89 H 10 M 7,500 7,530.081 PT HNC - Morowali
6 TB. Mitra Caraka 1 / BG. Iron Man 8 08/08/2023 15.10 08/08/2023 16.15 13/08/2023 16.40 14/08/2023 01.30 108 H 25 M 130 H 20 M 10,000 10,034.034 PT HNC - Morowali
7 TB. Trinity 309 / BG. Pacific 306 08/08/2023 17.15 08/08/2023 21.00 12/08/2023 21.35 12/08/2023 23.15 96 H 35 M 102 H 0 M 10,500 10,530.677 PT HNC - Morowali
8 TB. Maju Daya 29 / BG. Marcopolo 382 10/08/2023 17.30 10/08/2023 20.25 12/08/2023 16.00 12/08/2023 22.30 43 H 35 M 53 H 0 M 8,500 8,531.078 PT. LSI - Morowali
9 TB. Buma Pearl / BG. Kaltara Mulia 12/08/2023 22.00 13/08/2023 08.25 17/08/2023 03.50 17/08/2023 16.00 91 H 25 M 114 H 0 M 10,000 10,028.232 PT HNC - Morowali
10 TB. Mitra Anugerah 51 / BG. Anwari 12/08/2023 23.00 13/08/2023 09.00 16/08/2023 22.00 17/08/2023 14.00 85 H 0 M 111 H 0 M 10,000 10,030.815 PT. LSI - Morowali
11 TB. Avengers / BG. Captain Marvel 13/08/2023 20.30 13/08/2023 23.30 H M H M 10,000 8,657.752 PT. LSI - Morowali
12 TB. Maju Daya 29 / BG. Marcopolo 382 16/08/2023 23.50 17/08/2023 02.35 H M H M 8,500 1,071.356 PT HNC - Morowali
13 TB. Mitra Caraka 1 / BG. Iron Man 8 17/08/2023 05.45 H M H M 10,000 - PT HNC - Morowali
889 H 85 M 1080 H 180 M 121,000 102,560.470
Departure Loading Duration
(Hrs)
Total Duration (Hrs) Consignee
TOTAL
No. Name of Ship
Comm.Loading Comp. Loading
In Position Jetty
Loading Duration 425.00 35.42 8.85
Total Duration 510.33 42.53 10.63
Average Barging Duration (week)
Total Hour
Shift
Total Shift Average / Bg
No. Ship Name
1 Barging Target
2 Barging Total Actual
3 Balance / Remain 37,439.530
140,000
102,560.470
Noted
Metrik Tons
Balance Hi-Ni (7,219.645)
Balance Lo-Ni 44,659.175
Total Balance 37,439.530
BALANCE by Grade
BERITA ACARA
Activity Documentation
Safety Talks
Barging
Requesting logs
Unloading new
Rampdoor
Loading Spoil Unloading Material
LONG TERM BREAKDOWN
NO NO UNIT PROBLEM PLAN/ACTION REMAKS DATE BREAK DOWN
TOTAL BREAK
DOWN
(%) PROGRESS
DELAYS
延误
1 DT 1-025
ACCIDENT, COMPLETED UNIT,
TRUNION CANIBAL ( PART
READY)
CABIN (READY), ENGINE (READY), TRANSMISI
(READY), INSTALL TRUNION
WAITING MAN POWER, INSTALL TRUNION 03-Nov-2021 653 Days 50% MANPOWER
2 DT 1-040
ACCIDENT CABIN AND FRAME
BODY BROKEN
ON PROGRESS REPAIR BODY CABIN ON PROGRESS REPAIR BODY CABIN BY WELDER 08-Aug-2023 10 Days 10% WAITING PART
3 DT 1-034 FRONT HUB WHEEL BROKEN ORDER PART XCMG WAITING PART FROM SITE OBI 28-Jun-2023 51 Days 0% WAITING PART
4 EXC 2-018
DISPLAY ERROR, HARNESS
SHORT
ORDER PART XCMG
WAITING PART ETA. 26 AGUSTUS 2023 CHINA TO JAKARTA, NOTE: JAKARTA
TO SITE (EST. OCTOBER)
01-Oct-2022 321 Days 0% WAITING PART
5 EXC 10-002 ENGINE NOISE ENGINE NOISE ENGINE OVER HOUL, WELDING IN KENDARI 29-Aug-2022 354 Days 50% IN PROGRES MEKANIK
6 DZ 4-003
INEJCTOR NO. 1,2,3,4,5,6
BROKEN
PART READY SITE WAITING MAN POWER 16-Jun-2022 428 Days 0% MANPOWER
7 DZ 4-001
SEAL, BEARING OUTPUT SHAFT
TORQUE CONVERTER BROKEN
WAITING PART WAITING PART 14-Aug-2023 4 Days 0% MANPOWER
8 MG 5-002
FINAL DRIVE RH KANIBAL TO
MG 5001
ORDER PART XCMG
WAITING PART ETA 26 AGUSTUS 2023 CHINA TO JAKARTA, NOTE: JAKARTA
TO SITE (EST OKTOBER).
11-Nov-2022 280 Days 60% WAITING PART
9 MG 5-004 BRAKE SYSTEM PROBLEM ORDER PART XCMG
WAITING PART ETA 26 AGUSTUS 2023 CHINA TO JAKARTA, NOTE: JAKARTA
TO SITE (EST OKTOBER).
15-Mar-2023 156 Days 0% WAITING PART
10 LV 13 ENGINE CANT RUNNING
TRABLESHOOT ENGINE, PLAN BLOCK ENGINE SEND TO
KENDARI FOR REPAIR (BUBUT), WAITING VENDOR
BENGKEL BUBUT
WAITING PART 23-Aug-2022 360 Days 0% WAITING PART
11 ADT 02
SWITCH SENSOR PRESSURE AIR
SYSTEM ABNORMAL
ORDER PART XCMG WAITING PART, ESTIMATION AGUSTUS 07-Aug-2023 11 Days 0% WAITING PART
UNIT POPULATION
UNIT POPULATION UNIT SPARE
TIPE UNIT RFU BD Grand Total TIPE UNIT RFU BD Grand Total
ARTICULATED DUMP TRUCK 3 1 4 DUMP TRUCK 2 2
BULLDOZER 2 2 4 EXCAVATOR 2 1 3
DUMP TRUCK 54 3 57 VIBRO 1 1
EXCAVATOR 40 2 42 Grand Total 3 3 6
MOTOR GRADER 2 2 4
FUEL TRUCK 3 3
WATER TRUCK 2 2
SERVICE TRUCK 1 1
MANHAUL 1 1
LIGHT VEHICLE 20 1 21
MINI BUS 2 2
VIBRO 2 2
WHEEL LODER 2 2
Grand Total 134 11 145
REVIEW SERVICE & WEEKLY ,
DAILY CHECK UNIT
DAILY & WEEKLY CHECK REVIEW SERVICE UNIT
2 UNIT BELUM TERCAPAI HM/KM
PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL
PM 1000 HM 1 1 0 0 0 0 0 0 0 0
PM 2000 HM 1 1 0 0 1 1 0 0 0 0
PM 500 HM 3 3 1 1 1 1 0 0 0 0
PM 5.000 KM 0 0 0 0 0 0 7 7 2 0
PM 10.000 KM 0 0 0 0 0 0 5 5 0 0
PM 40.000 KM 0 0 0 0 0 0 4 0 0 0
Grand Total 5 5 1 1 2 2 16 12 2 0
INTERVAL SERVICE
EXC WL DZ LV
DT
PLAN 27
ACTUAL 25
93%
WEEK TYPE UNIT TOTAL UNIT
PLAN WEEKLY
CHECK
DONE WEEKLY
CHECK
DONE WEEKLY
CHECK (%)
REMAKS
ALL ARTICULATED DUMP TRUCK 24 17 1 6%
ALL BULLDOZER 24 -4 2 -50%
ALL EXCAVATOR 266 238 143 60%
ALL COMPACTOR 14 14 0 0%
ALL MOTOR GRADER 4 0 2 0%
ALL WHEEL LOADER 2 2 0 0%
ALL DUMP TRUCK 60 55 27 49%
ALL FUEL TRUCK 3 3 1 33%
ALL SERVICE TRUCK 1 1 0 0%
ALL WATER TRUCK 2 2 0 0%
ALL LIGHT VEHICLE 20 19 8 42%
ALL MINI BUS 0 2 0 0%
WEEKLY CHECK
DAILY CHECK
6%
-50%
60%
0% 0% 0%
49%
33%
0% 0%
42%
0%
ARTICULATED
DUMP TRUCK
BULLDOZER EXCAVATOR COMPACTOR MOTOR
GRADER
WHEEL
LOADER
DUMP TRUCK FUEL TRUCK SERVICE
TRUCK
WATER
TRUCK
LIGHT
VEHICLE
MINI BUS
DONE WEEKLY CHECK (%)
COST MAINTENANCE
• SPARE PART
* ADT 04 SPARE PART RESPIRATOR
• TYRE
*R 9-001 REPLACE NEW TYRE
• TYRE
* DT 1-083 REPLACE NEW TYRE
CATEGORY SPARE PART TYRE LUBRICANT CONSUMABLE GREASE TOOLS Grand Total
DUMP TRUCK 54,984,281 75,713,992 46,391,000 4,864,600 1,956,240 183,910,113
EXCAVATOR 53,445,866 17,983,500 8,785,000 13,351,338 93,565,704
ARTICULATED DUMP TRUCK 18,990,764 17,978,000 89,800 37,058,564
LIGHT VEHICLE 18,613,523 292,000 857,000 244,530 20,007,053
MOTOR GRADER 756,962 9,102,000 446,000 50,600 97,812 10,453,374
BULLDOZER 8,670,515 10,414,000 586,872 19,671,387
WATER TRUCK 36,500 36,500
MANHAUL 74,000 74,000
FUEL TRUCK 15,000 48,906 63,906
SERVICE TRUCK 80,000 80,000
TOWER LIGHT 8,000 8,000
VIBRO 97,812 97,812
WHEEL LODER 1,312,234 17,100,000 2,850,000 110,000 48,906 21,421,140
OTHERS 476,000 14,222,000 55,000 14,753,000
Grand Total 156,774,144 101,915,992 96,830,500 29,192,500 16,432,416 55,000 401,200,552
FUEL CONSUMPTION
No TYPE UNIT LITER HM/KM FC UOM
1 DUMP TRUCK XCMG 33,723.97 13318 2.53 -
2 XDA40 3,154.98 184 17.15 L/HM
3 DOZER 2,519.88 148.4 16.98 L/HM
4 EXCAVATOR XCMG 215C 25,102.76 1062.5 23.63 L/HM
5 EXCAVATOR XCMG 370CA 21,516.51 848.3 25.36 -
6 EXC VOLVO RENTAL 854.82 39.9 21.42 L/HM
7 EXCAVATOR MINI 84.66 17.2 4.92 -
8 MOTOR GRADER GR252 1,116.97 52.5 21.28 -
9 MOTOR GRADER SPARE 1,219.30 59.1 20.63 L/HM
10 COMPACTOR XCMG 1,259.27 89.3 14.10 L/HM
11 LIGHT VEHICLE MMP 2,174.15 116623 0.02 -
12 SERVICE TRUCK 121.80 107 1.14 L/KM
13 WATER TRUCK 323.69 138 2.35 L/KM
14 FUEL TRUCK XCMG 876.89 0 - -
15 TOWER LAMP 476.87 407 1.17 L/HM
16 MESIN JACRO 20.01 0 - L/HM
17 MANHAUL 105.28 161 0.65 L/KM
18 EXCAVATOR XCMG RENTAL 1,792.18 74.1 24.19 -
19 WHEEL LOADER XCMG RENTAL 876.48 52.2 16.79 L/HM
20 WHEEL LOADER SDLG RENTAL 596.62 41.1 14.52 L/HM
FUEL CONSUMTION WEEK 33
4,177
97,917
102,094
GRAND TOTAL
Total (Liter) MMP
Total (Liter) BCPM
AVERAGE FUEL CONSUMPTION 15,284.0 LITRES
TOTAL FUEL MASUK 242,869.0 LITRES
259,828.5 LITRES
104,775 LITRES
TOTAL FUEL CONSUMPTION AUG_2022
FUEL STOCK 18-Aug-23
ALBUM WEEKLY
08
MG 5-001 REPLACE TYRE NO 3 EXC 2-006 REPLACE ROTARY
EXC R3-001 REPLACE NEW
FUSE
EXC 2-005 REPLACE TRACK
SHOE 2 EA DT 1-014 SERVICE PM 5000 KM FT 7-001 WEEKLY CHECK
Program
Training
Center
Dokumentasi
Inclass New Hire & Inclass Kimper Expired
Orientasi, Inspeksi, Coaching , Verifikasi Skill
Assessment New Hire, Penambambahan Simper
& Pengajuan Simper
Rencana Kerja Next Week
ASSESSMENT
TRAINING
CENTER
Assessment New Hire, Penambambahan Simper &
Pengajuan Simper
Post Test : Menguji
Pengetahuan (Knowledge)
Para Kandidat mengenai unit
yang akan di operasikan
Practical Test : Melihat
Skill / Kemampuan kandidat
dalam Teknik pengoprasian
unit .
TOTAL : 3 ORANG
DUMP TRUCK LV
1
2
ASSESSMENT
LULUS
TIDAK LULUS
Selesai Post Test &
Practical Test
Menunggu hasil
MCU
(Fit langsung
pengajuan Simper)
Pengajuan Simper
Ke Dept. HSE
Berita Acara ke
HRD Hasil Test
Lulus / Tidak Lulus
Flowchart Pengajuan
Simper
PENGAJUAN
CETAK
KIMPER
Pengajuan Cetak
Kimper
Total : 6 Kimper
BULLDOZER DUMP TRUCK LV
NEW HIRE 1
KIMPER EXPIRED 1 1 3
1 1
3
1
ORIENTASI :
 Pengenalan Area
 Observasi Area Kerja
 Mengoprasikan Unit di Dampingi
Pengemudi Senior, serta di Awasi Trainer
• Orientasi New Hire : 30
Jam HM
• Orientasi Master & Skill
Up : 250 Jam HM
TOTAL ORIENTASI : 6 ORANG
ORIENTASI
NAMA UNIT JABATAN
GEDE BUDA ARIASA Dump Truck Driver DT
ARMAN Excavator Opt. Excavator
MUH SALEH Dump Truck Driver DT
Excavator
Dump Truck
Rock Breaker
Motor Grader
Bulldozer
Compactor
WHELL LOADER
Dump Truck
Excavator
Bulldozer
Motor Grader
ADT
Compactor
WHEEL LOADER
Manhaul
RUSDIN MANDALIMA ADT Driver DT
JOKO PRIYANTO
EDVRIANUS EDWIN WONGKAR
MASTER BII UM
MASTER BII UM
2 2 2
4
3
1
2
1
2
ORIENTASI
INCLASS
Tujuan Inclass :
• Opt/driver dapat lebih
memahami cara
mengoperasikan unit sesuai
dengan SOP
• Dapat lebih memahami
komponen-komponen unit
• Opt/driver dapat
mengidentifikasi resiko
bahaya di area kerja
• Membangun Jiwa
Kepemimpinan
Materi :
• Tentang Bagaimana
Melakukan Pekerjaan
Menggunakan Unit
Excavator Yang Sesuai
Dengan Prosedur
• P5m, P2h (Langkah Dan
Tujuan), Memahami 4 M,
Cara Pengoperasian &
Review Accident
• LEADERSHIP
TOTAL : 22
NEW HIRE
KIMPER EXP
INCLASS LEADERSHIP
NEW HIRE
KIMPER EXP
INCLASS LEADERSHIP
Plan Kerja Training Center
• Interview Online
• Interview Offline
• Post Test
• Practical Test
As Per Request by HR
• Inclas Pasca Insiden
• Inclas Opt & Driver
• Orientasi Opt & Driver New Hire
Continue
• Coaching
• Verification Skill
• Inspeksi
Continue
• Support Man Power
• Moving
As Per Request by
Dept
• Skill Up
• Penambahan Simper
• Pengajuan Simper
As Per Request by
Dept
TRAINING IN CLASS & ORIENTATION
SUPPORT RECRUITMENT
MONITORING
SUPPORT TC
SKILL UP
1.
2.
3.
4.
5.
MONITORING
ORIENTASI
P5M PRACTICAL TEST
INCLASS LEADERSHIP INTERVIEW & POST TEST
MONITORING CUT & FILL
INCLASS
DOKUMENTASI
Org. Chart BCPM
MANPOWER
UPDATE
BCPM Dan MMP
Explorasi Project
EMPLOYEE
ACTIVE
Status New Employess
Employess
Resign/Layoff
Mutation
PKWT 0 0 0
New Employess :
Tidak Ada
Employess Resign:
Tidak Ada
Mutation:
Tidak Ada
THL 0 0 0
New Employess :
Tidak Ada
Employess Resign/Layoff:
Tidak Ada
Mutation:
Tidak Ada
TOTAL 0 0 0
Keterangan
PT. BIMA CAKRA PERKASA MINERALINDO
Status
New
Employess
Employess
Resign/Layoff
Mutation
PKWT 2 4 0
New Employess :
1. Muh. Saleh, Driver DT - New Joiner
2. Muhammad Rimawan Mahardan, Operation
Foreman - New Joiner
Employess Resign/Layoff:
1. Burhanuddin, Operator Excavator - Tidak Melanjutkan
Kontrak
2. Budi Ardi Setiawan, IT Foreman - Tidak Melanjutkan
Kontrak
3. Abd. Qadar, Operator Excavator - Resign
4. Liber Taufiki, Operator Excavator - PHK
Mutation:
Tidak Ada
THL 1 0 0
New Employess :
1. Aksel Saputra Salawa, Helper Fuelman - New Joiner
Employess Resign/Layoff:
Tidak Ada
Mutation:
Tidak Ada
TOTAL 3 4 0
Keterangan
PT. MITRA MINERAL PERKASA
ATTENDACE RATIO (AR) & TURN OVER RATIO
(TOR)
Notes:
Average Attendance Ratio for All Departments in this week 79,03 %
Notes:
In 11 Agustus – 17 Agustus 2023, total 680
employees, New Hire 3 employees, Resign 4
employees, Turn Over 0,59%
AGGREMENT
SEPTEMBER
NIK
BARU
NAME
COMPANY
PROJECT
LOCATION
CLASSIFICATION
Division
DEPARTMENT
SECTION
POSITION
20000296 Moh. Jefri Labau PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff Operation HSE Safety Safety Support
20000512 Sahrul PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff Operation Shipping Shipping Shipping Crew
21000587 Asdin PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff Operation HSE Safety Safety Support
21001018 Imran Rahim PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff HRGA HRGA - Project GA Project GA Crew
21001278 Hilma Rahim PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff Operation HSE Safety Safety Admin (K3)
21001503 Ashari Asmin Pratama PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff HRGA HRGA - Project GA Project GA Electrician Crew
21001329 Isran I. Hairudin PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff Operation Shipping Shipping Shipping Crew
22002626 Nurahirman PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff HRGA HRGA - Project GA Project GA Electrician Crew
22002662 Firman PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff HRGA HRGA - Project GA Project GA Electrician Crew
22002894 Sardy PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff HRGA HRGA - Project GA Project GA Electrician Crew
22003006 Norma PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff HRGA HRGA - Project GA Project Housekeeper
20000277 Rians PT. Mitra Mineral Perkasa BCPM Supervisor Operation Production Production Production Supervisor
20000291 Hendrik Laenda PT. Mitra Mineral Perkasa BCPM Foreman HRGA HRGA - Project GA Project GA Electrician Foreman
20000299 Rosul Palosan PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Wheel Loader
20000310 Asman L. PT. Mitra Mineral Perkasa BCPM Non staff Operation Production Production Production Foreman Act
20000306 Agus Sinarbawa PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator
20000308 Irwan Wahyuddin Latif PT. Mitra Mineral Perkasa BCPM Foreman Procurement Purchasing Purchasing Purchasing Supervisor Act
AGGREMENT
SEPTEMBER
21000730 Alfred Kalib Aptopal PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Dozer
21000733 Aminuddin PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
21000740 Rahmad Abdull Jalil Hi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator
21000748 Abd. Rasyid PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Water Truck
21000785 Wisnu Perdana PT. Mitra Mineral Perkasa BCPM Non staff FAT Finance Finance Finance Admin
21000805 Fairus Mubakri PT. Mitra Mineral Perkasa BCPM Non Staff Procurement Purchasing Purchasing Purchasing Admin
21000817 Vony Yun Asmayanti PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Time Keeper
21000819 Ahmad PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Compactor
21001234 Rizkia Fitrajaya Nugraha PT. Mitra Mineral Perkasa BCPM Foreman HRGA HRGA - Project GA Project GA Project Facilities Foreman
21001236 Muhammad Yusri PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
21001255 Diki Wahyudi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
21001279 Basrianto PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Wheel Loader
21001293 Mochtar Gani PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator ADT
21001301 Supriadi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
21001302 Aguslan Safrin PT. Mitra Mineral Perkasa BCPM Non Staff Plant Plant Welder Welder
21001307 Numbeng PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
21001319 Amelia Yustin PT. Mitra Mineral Perkasa BCPM Foreman Technical Mine Engineering MCC MCC Foreman
22001950 Ilham PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator
22001978 Jonisius A. Napa PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator
22002021 La Ode Sarman PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator
22002022 Paulus PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator
22002057 Awi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Production Admin
AGGREMENT
SEPTEMBER
Pengumpulan UPK Karyawan Paling Lambat Tanggal 20 September 2023
22002061 Adi Rusman PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
21001343 Jamaludin PT. Mitra Mineral Perkasa BCPM Non Staff HRGA HRGA - Project GA Project GA Crew
22002098 Abd. Gaffar PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
22002100 Rizky Aditia PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
22002101 Darno PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator
22002873 Sujarman PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
22002875 Refi Widya Putra PT. Mitra Mineral Perkasa BCPM Foreman Operation Production Production Production Foreman
22002897 Suriadi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
22002958 Irfan Sukri PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
22002961 Masrin PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
22002068 Alfian PT. Mitra Mineral Perkasa BCPM Non Staff HRGA HRGA - Project GA Project GA Crew
22002980 Ikhsan PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
22002982 Zulkifli Rais PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
22002985 Habib Aswan Alhabsyi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Master A2B
22002987 Teguh Prasetio PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
22002988 Ebenheiser Kiding PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
22002989 Emang PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
22002990 Irwan PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
23003654 Fiki Fajry PT. Mitra Mineral Perkasa BCPM Supervisor HRGA HRGA - Project HR Project HR Project Supervisor
EMPLOYEE
CONTRACT
NIK
BARU
NAME
COMPANY
PROJECT
LOCATION
CLASSIFICATION
Division
DEPARTMENT
SECTION
POSITION
20000228 Abidin PT. Bima Cakra Perkasa Mineralindo BCPM Foreman External Relation & Permit External & Government Relation External & Government Relation External Relation Foreman
19000103 Aspin PT. Mitra Mineral Perkasa BCPM Foreman Operation Lab & Preparation Preparation Preparation Foreman
NIK
BARU
NAME
COMPANY
PROJECT
LOCATION
CLASSIFICATION
Division
DEPARTMENT
SECTION
POSITION
22001751 Irwan Dg Manaba PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
22002732 Sahrul PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator
22002739 Albimaun PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator
22002740 Ruslin PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator
NIK
BARU
NAME
COMPANY
PROJECT
LOCATION
CLASSIFICATION
Division
DEPARTMENT
SECTION
POSITION
20000311 Andrik Hadi Susanto PT. Mitra Mineral Perkasa BCPM Foreman Operation Production Production Production Foreman
20000314 Asdar Raga Putra PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Pit Control
20000412 Ilyas Rahman PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Pit Control
20000424 Liliani Astri S. Horoma PT. Mitra Mineral Perkasa BCPM Non Staff Operation Geology & QA QC Geology Geology QA & QC Admin
20000547 Jumardin Edy PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator ADT
20000565 Andika Setiawan PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator
21000702 Arifuddin PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
21001205 Henri Sampe PT. Mitra Mineral Perkasa BCPM Foreman Operation Geology & QA QC QA & QC Geology QA & QC Foreman
21001208 Rendi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
21001211 Thalya Angeline Lapik PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Production Admin
21001217 Fadli PT. Mitra Mineral Perkasa BCPM Non Staff Plant Plant Logistic Driver Fuel Truck
22002762 Wandi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck
22002844 Moh Ilham Ramba PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Wheel Loader
WARNING LETTER
Month Counseling Reprimand letter SP-1 SP-2 SP-3 SP -1 & Terakhir PHK
January 4 Case 3 1
February 5 Case 1 1 3
March 4 Case 2 1 1
April 48 Case 10 22 11 1 1 3
May 65 Case 20 3 20 13 2 3 4
June 28 Case 11 8 1 6 1 1
July 47 Case 30 4 8 1 3 1
August 11 Case 1 3 3 1 2 1
September 0 Case
October 0 Case
November 0 Case
December 0 Case
Warning Letter
Case
MANPOWER REQUEST & VACANT
MPR 368
Vacant 47
On Progress 42
Done 321
Total Penghuni Mess Site BCPM
Mess Bawah
New Mess Portable
House
Mess Lama
Total Penghuni Mess
Mess Portable House
(Atas)
11
50
92
92
245
REVIEW
ACTIVITY
Perbaikan
Saluran Pipa Air
Bersih
Perapihan
Container
Pembuatan Office
IT
Perluasan
Genset Room
Pembuatan
Gudang Pipa
Pemasangan Stop
Kontak Office GA
Perbaikan Jalur Kabel
Gudang HSE
Service AC Kamar
A07
Perbaikan Freezer
Rutinitas Pembersihan
Sampah Area Site BCPM
SUMMARY
MK
Note
B : Breakfast
L : Lunch
D : Dinner
S : Supper
NO. DATE
MEAL CONSUMTION
MEAL REQUEST (Pack Meal) MEAL COUNT SHEET (Canteen)
TOTAL
B L D S B L D
1 11-Aug-23 162 365 167 185 117 118 123 1.237
2 12-Aug-23 166 355 358 0 117 118 123 1.237
3 13-Aug-23 163 368 149 216 117 118 123 1.254
4 14-Aug-23 168 373 141 202 117 118 123 1.242
5 15-Aug-23 169 374 143 211 117 118 123 1.255
6 16-Aug-23 173 380 139 221 117 118 123 1.271
7 17-Aug-23 175 368 16 0 117 118 545 1.339
TOTAL 8.835
108
Site
Facility
Pengerjaan Office IT
Pembuatan Sekat Ruang Kelas
FTO
Progress 30%
Material Ready
Pembuatan Tempat Jemuran
Pengajuan Budget Periode
September
Renovasi Lab Shelter FTO
Hold (Issue External)
1. Penambahan gudang sample
2. Instalasi pipa RO
3. Renovasi office (On progress)
Rencana Kerja
Shelter Produksi
Menunggu Antrian
FINANCE BUDGET VS REALISASI
100% 100%
76%
49%
BCPM MMP
FINANCE SUMARY RAB
Note :
- Budget Juli 2023, RFM Juli,
PO terbit di Ags 2023
(Enviro)
- Ongkos Kirim Barang No
Plan Budget di Ags 2023 (FA
& PA)
Note :
- Part Mesin Bor, PO HO,
Kategori No Budget di Ags
2023 (Geology Projek)
RFM BASED ON DEPARTEMENT
- RFM baru yang masuk untuk pembelian LOCAL terbanyak dari BCPM
HRGA dan MMP PLANT, untuk pembelian HO dari MMP PLANT
- In Proses : 53.33%, Executed : 46.67%
RFM Qty Item RFM Qty Item RFM Qty Item
BCPM-HSE - - 2 11 - -
BCPM-Lab & Prep 2 10 2 10 - -
BCPM-Shipping 1 1 - - 2 2
MMP-Eksplorasi Project - - - - 1 1
MMP-HSE - - 1 2 - -
MMP-Lab & Prep 1 8 1 8 - -
MMP-PLANT 7 14 11 32 5 6
11 33 17 63 8 9
BCPM-HRGA 8 34 1 1 14 49
BCPM-HSE 1 1 - - 1 1
MMP-Geology QA & C 1 3 1 3 - -
MMP-HRGA 2 2 - - 2 2
MMP-Lab & Prep 2 13 1 1 2 14
MMP-PLANT 8 27 8 28 4 9
22 80 11 33 23 75
33 113 28 96 31 84
Total HO
LOCAL
Total Local
Grand Total
Company Department
New Request Week - 3 In Process Executed (PO)
HO
RFM BASED ON CATEGORY
Category RFM Qty Item RFM Qty Item RFM Qty Item
Alat Reparasi Tire 2 2 2 2 - -
APD 1 1 2 2 - -
Jasa Logistik - - - - 1 1
Kebutuhan Enviro - - 1 1 - -
Kebutuhan Geo/Eksplor - - - - 1 1
Kebutuhan Shipping 1 1 - - 1 1
Lab Chemicals 2 10 2 10 - -
Lab Peralatan 1 7 1 7 - -
Oli dan Grease - - 1 4 - -
Safety Sign/Alat - - 2 11 - -
Solar - - 1 1 - -
Spare Part DT - XCMG 1 1 - - 1 1
Spare Part Innova - - - - 2 3
Spare Part LV - Hilux 2 6 3 9 - -
Support Grease - - 1 2 - -
Tire Vibro - - - - 1 1
Workshop dan Elektrikal 2 5 3 14 1 1
12 33 19 63 8 9
Generator dan Part 1 1 - - 1 1
Jasa/Service 2 2 1 1 1 1
Kebutuhan Geo/Eksplor 1 3 1 3 - -
Kebutuhan Kantin 1 1 - - 1 1
Kebutuhan Konstruksi 3 26 - - 3 26
Kebutuhan Mess 5 7 1 1 8 11
Lab Peralatan 2 13 1 1 2 14
Makanan dan Minuman - - - - 1 5
Medical dan Obat - - - - 1 1
Safety Sign/Alat 1 1 - - 1 1
Seragam - - - - 1 5
Workshop dan Elektrikal 7 26 7 27 4 9
23 80 11 33 24 75
35 113 30 96 32 84
Proses
New Request Week - 3 In Process Executed (PO)
HO
Sub Total
LC
Sub Total
Grand Total
RFM BASED ON PURCHASE &
PROSES CATEGORY
Rutin & Non Rutin
Normal & Urgent
Category RFM Qty Item RFM Qty Item RFM Qty Item
Non-Routine 5 13 8 34 3 3
Routine 6 20 9 29 5 6
11 33 17 63 8 9
Non-Routine 7 8 3 3 9 15
Routine 15 72 8 30 14 60
22 80 11 33 23 75
33 113 28 96 31 84
Sub Total
Proses
New Request Week - 3 In Process Executed (PO)
HO
Sub Total
LC
Grand Total
New Request Week - 3
Category RFM Qty Item RFM Qty Item RFM Qty Item
Normal 8 30 16 62 3 4
Urgent 3 3 1 1 5 5
11 33 17 63 8 9
Normal 18 75 10 32 18 69
Urgent 4 5 1 1 5 6
22 80 11 33 23 75
33 113 28 96 31 84
Sub Total
Grand Total
Proses
Executed
HO
Sub Total
LC
In Process
URGENT ORDER
Requisition
Number
Item Name Item Category Project
Qty
Requisition
Unit
Lokasi
Purchase
Requisition
Approved Date
Routine Urgent Urgent Note Req Status Persentase
5870-3621 Mata Shock 1 Inchi x 33 mm Workshop dan Elektrikal MMP-PLANT 4 Pcs LOKAL 15/08/2023 Non-Routine Urgent Terjadi Kerusakan pada alat pembuka Tyre Dump Truck sehingga dapat menghambat pekerjaan tim tyreman
In Proses
5896-3630 42431-0K120 Brake Drum RH/LH Hilux Spare Part LV - Hilux MMP-PLANT 4 Pcs HO 16/08/2023 Routine Urgent Unit Berpotensi Backlog In Proses
5918-3582 Timer Wash Mesin Cuci LG Kebutuhan Mess BCPM-HRGA 3 Pcs LOKAL 15/08/2023 Non-Routine Urgent Karna ada beberapa mesin cuci yang sudah tidak berfungsi. Purchase
5918-3582 Switch Timer Mesin Cuci LG Kebutuhan Mess BCPM-HRGA 3 Pcs LOKAL 15/08/2023 Non-Routine Urgent Karna ada beberapa mesin cuci yang sudah tidak berfungsi. Purchase
5813-3629 Kayu Balok 5 x 5 cm Panjang 4 m Safety Sign/Alat BCPM-HSE 1 Kubik LOKAL 16/08/2023 Routine Urgent Stock Kosong, Sementara akan ada penambahan dan pergantian tiang rambu Purchase
5946-3590 Rantai Baja 16mm - Studless Kebutuhan Shipping BCPM-Shipping 19 Meter HO 14/08/2023 Non-Routine Urgent Stock Rantai Baja 16 mm tidak mencukupi untuk Rampdoor Baru Purchase
5806-3577 Jasa Pengecekkan Rem, Mesin dan Penyetelan Rem Depan Innova Hitam DT 1450 FF
Jasa/Service MMP-HRGA 1 Paket LOKAL 12/08/2023 Non-Routine Urgent
karena ketika pengeraman bergetar sehingga akan berbahaya dijalan jika tidak
dicheck
Purchase
5894-3597 Seal Shaft Transmision DT 8-94178-22 merk NOK Spare Part DT - XCMG MMP-PLANT 20 Pcs HO 12/08/2023 Routine Urgent Stock digudang Logitic Menipis, Mengantisipasi Unit Mengalami Breakdown Purchase
75%
25%
External Relation
Kegiatan 12 Agustus – 18 Agustus
NO Deskripsi Kegiatan
1 Koordinasi dengan PASI OPS KODIM 1311 Morowali
2 Penyaluran Bantuan PPM Kesehatan Desa Buleleng
3 Penandatanganan PPM Infrastruktur Desa Buleleng
4 Upacara HUT RI ke 78 tingkat Kecamatan
5 Upacara HUT RI ke 78 tingkat Kabupaten
6 SK Permohonan GANIS atas nama Farhan Dwi Gusnadi pada SIGANISHUT
7
Survey kayu kebutuhan shipping dan Engineering serta pengecekan lokasi Pengolahan Kayu
oleh Masyarakat
8 Penyaluran Bantuan kegiatan 17 Agustus ke Karang Taruna Facu Juara Desa Laroenai
EXTERNAL RELATION (PERMIT ISSUES)
PERMIT ISSUE PROGRESS
Izin Spektrum Frekuensi Radio
(Radio Frequency Spectrum Permit)
On process registration to OSS System
(handled by Legal team);
Izin Radiasi
(Radiation Permit)
Complete the technical requirements
(Handle by Legal Team - HO)
• Evaluasi Dokumen
Izin Penimbunan BBC
(Liquid Fuel Storage Permit)
Complete the technical requirements
(Handle by Legal Team - HO)
Persetujuan Kesesuaian Kegiatan Pemanfaatan Ruang
Laut- PKKPRL
(Approval of Conformity of Marine Spatial Utilization
Activities)
(Handle by Permit Team - HO)
EXTERNAL ISSUE
EXTERNAL ISSUES :
• Penggunaan Listrik perusahaan oleh masyarakat (an. Jumran).
Masih dalam proses pendekatan oleh Tim External ke masyarakat yang bersangkutan untuk sosialisasi
pemutusan listrik perusahaan;
• Bentangan kabel listrik yang berada di area mesjid dan sementara di koordinasikan di Desa
External Relation
Upacara HUT RI 78 di Kecamatan
Bungku Pesisir dan Kabupaten
Morowali
Koordinasi Stakeholder
PROGRAM PEMBERDAYAAN MASYARAKAT
Pemberian Makanan Tambahan Periode Agustus
80 Paket Buleleng Inti Desa Buleleng
40 Paket untuk Trans 1 dan Trans 2 Desa Buleleng
PROGRAM PEMBERDAYAAN MASYARAKAT
Penandatanganan Perjanjian Kerja Program PPM Infrastruktur Tanggul Pura Desa
Buleleng
Forestry Compliance
Survei Kebutuhan Kayu Shipping dan Engginering Penerbitan Data Buku Ukur Tahap Pertama
• Persetujuan Penugasan Oleh BPHL Wilayah XII Palu
• Penerbitan SK Penempatan GANIS PKB PT Bima Cakra
Perkasa Mineralindo
THANK YOU

More Related Content

Similar to REVIEW WEEKLY 32 AND PLAN WEEK 33 SITE PROJECT BCPM.pptx

Placement Presentation - Steven Panayiotou
Placement Presentation - Steven PanayiotouPlacement Presentation - Steven Panayiotou
Placement Presentation - Steven PanayiotouSteven Panayiotou
 
Determination of Work Index of Arufu Lead Ore, Nasarawa State, North-Central ...
Determination of Work Index of Arufu Lead Ore, Nasarawa State, North-Central ...Determination of Work Index of Arufu Lead Ore, Nasarawa State, North-Central ...
Determination of Work Index of Arufu Lead Ore, Nasarawa State, North-Central ...theijes
 
Finishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdfFinishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdfMizan Rahman
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)hepemod733
 
APRIL -23 TO Feb 24 FINAL PPT (3).pptx
APRIL  -23 TO  Feb 24 FINAL PPT (3).pptxAPRIL  -23 TO  Feb 24 FINAL PPT (3).pptx
APRIL -23 TO Feb 24 FINAL PPT (3).pptxnkarthik21
 
APRIL -23 TO Feb 24 FINAL PPT (3).pptx
APRIL  -23 TO  Feb 24 FINAL PPT (3).pptxAPRIL  -23 TO  Feb 24 FINAL PPT (3).pptx
APRIL -23 TO Feb 24 FINAL PPT (3).pptxnkarthik21
 
REDUCTION OF RE SLEEVING TIME IN LD2
REDUCTION OF RE SLEEVING TIME IN LD2 REDUCTION OF RE SLEEVING TIME IN LD2
REDUCTION OF RE SLEEVING TIME IN LD2 Chandra sekhar sahoo
 
site selection and environmental aspects of hazardous w 2
site selection and environmental aspects of hazardous w 2site selection and environmental aspects of hazardous w 2
site selection and environmental aspects of hazardous w 2Arvind Kumar
 
EHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectEHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectTapas Das
 
MPI Power Project October - Current Overview
MPI Power Project October - Current OverviewMPI Power Project October - Current Overview
MPI Power Project October - Current Overviewfasawe oluwafemi
 
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Symposium
 
PRODUCTION OPTIMIZATION USING SURFACTANT STIMULATION HUFF & PUFF AND CONTINUE...
PRODUCTION OPTIMIZATION USING SURFACTANT STIMULATION HUFF & PUFF AND CONTINUE...PRODUCTION OPTIMIZATION USING SURFACTANT STIMULATION HUFF & PUFF AND CONTINUE...
PRODUCTION OPTIMIZATION USING SURFACTANT STIMULATION HUFF & PUFF AND CONTINUE...Andi Anriansyah
 
Finishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfFinishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfMizan Rahman
 
Informe mensual enero 2021
Informe mensual enero 2021Informe mensual enero 2021
Informe mensual enero 2021JorgeElias50
 

Similar to REVIEW WEEKLY 32 AND PLAN WEEK 33 SITE PROJECT BCPM.pptx (20)

Accelerate performance
Accelerate performanceAccelerate performance
Accelerate performance
 
Placement Presentation - Steven Panayiotou
Placement Presentation - Steven PanayiotouPlacement Presentation - Steven Panayiotou
Placement Presentation - Steven Panayiotou
 
Determination of Work Index of Arufu Lead Ore, Nasarawa State, North-Central ...
Determination of Work Index of Arufu Lead Ore, Nasarawa State, North-Central ...Determination of Work Index of Arufu Lead Ore, Nasarawa State, North-Central ...
Determination of Work Index of Arufu Lead Ore, Nasarawa State, North-Central ...
 
Finishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdfFinishing Manual Lithe Group.pdf
Finishing Manual Lithe Group.pdf
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
Review Week 1 Oktober 2022.pptx
Review Week 1 Oktober 2022.pptxReview Week 1 Oktober 2022.pptx
Review Week 1 Oktober 2022.pptx
 
APRIL -23 TO Feb 24 FINAL PPT (3).pptx
APRIL  -23 TO  Feb 24 FINAL PPT (3).pptxAPRIL  -23 TO  Feb 24 FINAL PPT (3).pptx
APRIL -23 TO Feb 24 FINAL PPT (3).pptx
 
APRIL -23 TO Feb 24 FINAL PPT (3).pptx
APRIL  -23 TO  Feb 24 FINAL PPT (3).pptxAPRIL  -23 TO  Feb 24 FINAL PPT (3).pptx
APRIL -23 TO Feb 24 FINAL PPT (3).pptx
 
REDUCTION OF RE SLEEVING TIME IN LD2
REDUCTION OF RE SLEEVING TIME IN LD2 REDUCTION OF RE SLEEVING TIME IN LD2
REDUCTION OF RE SLEEVING TIME IN LD2
 
site selection and environmental aspects of hazardous w 2
site selection and environmental aspects of hazardous w 2site selection and environmental aspects of hazardous w 2
site selection and environmental aspects of hazardous w 2
 
EHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectEHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West Project
 
DCR 08-10-2015
DCR 08-10-2015DCR 08-10-2015
DCR 08-10-2015
 
Internship Report
Internship ReportInternship Report
Internship Report
 
F KRUGER diving cv
F KRUGER diving cvF KRUGER diving cv
F KRUGER diving cv
 
MPI Power Project October - Current Overview
MPI Power Project October - Current OverviewMPI Power Project October - Current Overview
MPI Power Project October - Current Overview
 
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
 
PRODUCTION OPTIMIZATION USING SURFACTANT STIMULATION HUFF & PUFF AND CONTINUE...
PRODUCTION OPTIMIZATION USING SURFACTANT STIMULATION HUFF & PUFF AND CONTINUE...PRODUCTION OPTIMIZATION USING SURFACTANT STIMULATION HUFF & PUFF AND CONTINUE...
PRODUCTION OPTIMIZATION USING SURFACTANT STIMULATION HUFF & PUFF AND CONTINUE...
 
Daftar aset 2020
Daftar aset 2020Daftar aset 2020
Daftar aset 2020
 
Finishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdfFinishing Manual Chaity Group.pdf
Finishing Manual Chaity Group.pdf
 
Informe mensual enero 2021
Informe mensual enero 2021Informe mensual enero 2021
Informe mensual enero 2021
 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 

REVIEW WEEKLY 32 AND PLAN WEEK 33 SITE PROJECT BCPM.pptx

  • 1.
  • 2. Periode : Agustus 2023 Week 1 Week 2 Week 3 Week 4 1 Number Of Employee 719 711 - - 719 2 Manhours 34,150 32650 - - 66,800 3 First Aid - 1 - - 1 4 Nearmiss - 1 - - 1 5 Incident - - - - - Cidera Ringan - - - - - Cidera Berat - - - - - Fatality - - - - - 6 Kejadian Berbahaya - - - - - 7 Property Damage - - - - 8 Day Lost - - - - - 9 Frequency Rate (FR) - - - - - 10 Severity Rate (SR) - - - - - SAFETY PERFORMANCE PT. Bima Cakra Perkasa Mineralindo No Description WEEK ON AGUSTUS 2023 MTD
  • 3.
  • 4. Inspeksi Genset Inspeksi Jetty Inspeksi Lab & Preparasi Inspeksi Tambang Inspeksi Eyewash Inspeksi Dapur KATEGORI REVIEWWEEKLY TANGGAL KETERANGAN InspeksiKantor&Gudang 11Agustus2023 Close InspeksiJettydanInspeksiFuelStorage 12Agustus2023 Close InspeksiJalanHaulingdanInspeksiWorkshop 13Agustus2023 Close InspeksiGenset,InspeksiMess&Kantin,danInspeksiToilet 14Agustus2023 Close InspeksiLab&Preparasi 15Agustus2023 Close InspkesiTambang,InspeksiP2H,danInspeksiAPD 16Agustus2023 Close InspeksiKIMPERdanInspeksiSpeedGun 16Agustus2023 Close SAFETY
  • 5. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 Induksi Karyawan Baru Office HSE 2 Training APAR Safety TBM LEADER TEAM P5M Safety TBM LEADER TEAM 31 17 55% General Safety TBM Safety TBM LEADER TEAM 4 2 50% Pembuatan Rambu/Sign Bord All Lokasi LEADER TEAM Safety Meeting(internal) Office Leader&Crew 4 2 50% Safety Committee All Lokasi All Dept Tertib Lalu LintasTambang All Lokasi All Dept Tambang Tambang HSE &LEADER 5 2 40% Hauling Hauling HSE &LEADER 4 2 50% Jetty Jetty HSE &LEADER 4 2 50% APAR All Lokasi HSE &LEADER 4 2 50% Genset Genset Room HSE &LEADER 4 2 50% Laboratorium &Preparasi LAB HSE &LEADER 5 2 40% Workshop Workshop HSE &LEADER 4 2 50% Fuel Storage Fuel Station HSE &LEADER 4 2 50% Kantordan Gudang Kantor HSE &LEADER 4 2 50% Mess Mess HSE &LEADER 4 2 50% Dapur Mess HSE &LEADER 4 2 50% P2H All Lokasi HSE &LEADER 5 2 40% APD All Lokasi HSE &LEADER 5 2 40% ID &Kimper All Lokasi HSE &LEADER 5 2 40% Toilet Mess HSE &LEADER 4 2 50% Eye Wash All Lokasi HSE &LEADER 5 2 40% SPEED GUN All Lokasi HSE &LEADER 16 2 13% Fatique All Lokasi HSE &LEADER 8 3 38% Target Actual % Actual Activity RENCANA KERJA HARIANDEPARTEMENHSE ( SUB DEPT.SAFETY) PT BIMA CAKRA PERKASA MINERALINDO SITE LAROENAI NO PROGRAM KERJA TARGET LOKASI / AREA PIC 1-Aug-23 Komunikasi Kerja Inspeksi umum terencana 3 4 5 Inspeksi Umum Tidak terencana
  • 6. No Description WEEK ON JULI 2023 MTD Week 1 Week 2 Week 3 Week 4 Week 5 PERUSAHAAN PERTAMBANGAN JASA PERTAMBANGAN PERUSAHAAN PERTAMBANGAN JASA PERTAMBANGAN PERUSAHAAN PERTAMBANGAN JASA PERTAMBANGAN PERUSAHAAN PERTAMBANGAN JASA PERTAMBANGA N PERUSAHAAN PERTAMBANGAN JASA PERTAMBANGAN 1 Number Of Employee / Jumlah Karyawan 719 711 1430 2 Manhours / Jam kerja 34.150 32.650 66800 3 Total Surat Sakit (spell) 4 20 0 19 45 4 Total hari kerja hilang pekerja yang sakit (Tidak Termasuk Kecelakaan) 4 28 0 29 66 5 Total Kejadian Akibat Penyakit Tenaga Kerja (KAPTK) 0 0 0 0 0 6 Pemeriksaan Kesehatan Kerja 0 - Layak bekerja (fit to work) 0 5 0 4 9 - Layak kerja dengan catatan (fit with note) 0 1 0 1 2 - Tidak layak kerja (unfit) 0 0 0 0 0 Total Pemeriksaan Kesehatan pekerja 0 6 0 5 11 7 Total pekerja yang sakit (tidak termasuk kecelakaan) 7 66 7 92 172 8 Jumlah Pekerja yang Diduga PAK 0 0 0 0 0 9 Jumlah Pekerja yang 0 0 0 0
  • 7. Untuk Klasifikasi Penyakit Tertinggi Adalah Disease Of Respiratory System 36%, Kedua Disease Of Circulatory System 14% dan Ketiga Disease Of Git System 12% Classification Of Disease Qty 1 DISEASE OF RESPIRATORY SYSTEM / URTI ( J00-J99 ) 35 2 DISEASE OF CIRCULATORY SYSTEM ( I00 - I99 ) 14 3 DISEASE OF GIT SYSTEM (A00 - A69 ) 12 4 DISEASE OF MUSCULOSKELETAL SYSTEM (M00 - M99 ) 5 5 ENDOCRINE, NUTRITIONAL&METABOLIC DISEASES (E00-E89) 2 6 DISEASE OF SKIN 11 7 SYMPTOMS, SIGN AND ABNORMAL CLINICAL AND LABORATORY FINDINGS 2 8 DISEASE OF MOUTH & TEETH SYSTEM 9 9 DISEASE OF EAR, NOSE & THROAT SYSTEM 7 10 DISEASE OF EYE & ADNEXA 2
  • 8. INSPEKSI PEMAKAIAN KOTAK P3K INSPEKSI OBAT OBATAN & BAHAN HABIS PAKAI HEALTH TALK “TB PARU” PEMERIKSAAN FATIQUE TES & ALKOHOL CEK STERILISASI PERALATAN MEDIS SETELAH PEMAKAIN
  • 9. Dilakukan kegiatan penanaman di lahan reklamasi Ares sebanyak 5 batang sisipan dan 85 batang tanaman pionir
  • 10. Revegetasi lahan Ares sampai dengan Week 2 Agustus 2023 Penanaman LCC 107 kg = 2.67 Ha Pioneer = Sengon (693) Sisipan = Jambu Mete (85), nyatoh (5), ketapang (28), sawo (7), jati (10) LCC = minimal 30 kg/Ha Pioneer = 625 bibit/Ha Sisipan (Lokal dan MPTS) = 156 bibit/Ha Revegetasi lahan Salwa sampai dengan Week 2 Agustus 2023 Penanaman LCC 384 kg = 9.6 Ha Pioneer = Sengon (2.561), lamtoro (189) dan traebesi (10) Sisipan = Pinus (271), bitti (143), nyatoh (5), jabon merah (19), jati (221), jambu mete (65), sawo (30)
  • 11. SETPOND SP 01 SETPOND SP 02 SETPOND SP 03 SETPOND SP 04 LOCATION Rostov LOCATION Segmen F LOCATION Ares LOCATION Anggrek DATE 11 Agustus - 17 Agustus DATE 11 Agustus - 17 Agustus DATE 11 Agustus - 17 Agustus DATE 11 Agustus - 17 Agustus pH TSS pH TSS pH TSS pH TSS NF NF 6,1 5 NF NF 6,1 4 NF NF 6,1 9 NF NF N/A N/A NF NF 6,1 8 NF NF 6,1 5 NF NF N/A N/A NF NF N/A N/A NF NF N/A N/A NF NF N/A N/A NF NF N/A N/A NF NF N/A N/A NF NF N/A N/A NF NF N/A N/A SETPOND SP 05A SETPOND SP 05B SETPOND Pos 1 SETPOND SP RT LOCATION Stockpile Jetty 1 LOCATION Stockpile Jetty 2 LOCATION Pos 1 LOCATION Ruang Tunggu DATE 11 Agustus - 17 Agustus DATE 11 Agustus - 17 Agustus DATE 11 Agustus - 17 Agustus DATE 11 Agustus - 17 Agustus pH TSS pH TSS pH TSS pH TSS 6,2 13 NF NF 6,1 8 6,1 8 6,6 39 NF NF 6,2 17 6,3 14 6,6 60 NF NF 6,2 14 6,1 8 N/A N/A NF NF 6,3 34 6,1 6 N/A N/A NF NF 6,4 36 6,5 63 6,3 26 6,3 30 6,3 27 6,2 15 N/A N/A N/A N/A N/A N/A N/A N/A MONITORING HARIAN SETTLING POND Outlet Outlet Outlet Outlet Outlet Outlet Outlet Outlet
  • 12. Penambahan limbah b3 minggu ini sebanyak 1.08 ton sisa limbah di TPS sebanyak 4.15 ton
  • 13. INSPEKSI TPS LIMBAH B3 PEMBUATAN PUPUK ORGANIK PENGENDALIAN PENCEMARAN AIR PENYEMAIAN BENIH DAN PEMELIHARAAN BIBIT DISINFEKTAN
  • 14. OB MOVEMENT Note: - OBaveragehauling distanceis 1.2 km - OBMovementon Week32 is Achieved. - OB on Aug 15th didn’t achieved due to bad weather condition. Continue rain both day and night shift. Rain at day shift start early shift until 2 p.m. and at shift, rain start from 1 a.m. untilthe end of shift. - OB on Aug 16th at early shift preparation activity was focused on Front-road-WD. Maintenance. 2 Graders at early shift was focused maintenanceat Jettyarea. - Another problem continue front-road-WD. Maintenance both loading point and dumping point area so tonnage of productionnot maximal. - IndependenceDay on August 17th.
  • 15. ORE PRODUCTION Note: - Ore average hauling distance is 1.5 km(ETO) and 7 km (EFO) - Ore Production on Week 32 is Not Achieved. - Ore on Aug 14th didn’t achieved due to bad weather condition. At day shift, slippery at early shift due to rain last night and also heavy fog until 9:00 Wita. At night shift, closed earlier at 4:25 Wita due to rain. - Ore on Aug 15th didn’t achieved due to heavy rain (Frequency 13 times with total rainfall 34.5 mm). Closed earlier at night shift at 2 a.m. - Another problem material on Moskow Tengah are wet so bucket were decrease in order material not fallen to the ground. - Independence day on August 17th .
  • 16. ORE PRODUCT PlanTon = 5,200 wmt PlanNi = 1.53% Act Sumproduct Ni= 1.46 % PlanTon = 1,000 wmt PlanNi = 1.82 Act Sumproduct Ni= 1.81 % PlanTon = - wmt PlanNi = - Act Sumproduct Ni= - % PlanTon = 15,400 wmt PlanNi = 1.32 Act Sumproduct Ni= 1.21 % Sumproduct Ni= 1.54 % Sumproduct Ni= 1.83 % WEEK 32 MTD AUGUST Sumproduct Ni= - % Sumproduct Ni= 1.17 % 18,297 44,672
  • 17. BARGING REVIEW Note: - Activity barging on week 32 Achieved. - No problem major on week 32. - On week 32, 3 slots barging are active (continue barge come to site).
  • 18. TOTAL MOVEMENT REVIEW TOTAL TARGET ORE + OB 354.100 wmt MTD ACTUAL 132.553 wmt REMAINING TARGET 221.547 wmt DAYS LEFT 13 days 17.042 per day 8.521 per shift TOTAL TARGET BARGING 140.000 wmt MTD ACTUAL 102.560 wmt REMAINING TARGET 37.440 wmt DAYS LEFT 13 days 2.880 per day 1.440 per shift REMAINING PRODUCTION TO TARGET REMAINING PRODUCTION TO TARGET Achievement Percentage Weekly: PLAN MOVEMENT : 91,600MT ACTUAL MOVEMENT : 116,962MT Gain : 25,362 MT ACHIEVEMENT : 128 %
  • 19. PLAN ACT PLAN ACT PLAN ACT PLAN ACT PLAN ACT PLAN ACT PLAN ACT PLAN ACT ROSTER TOTAL DAYS AND SHIFTS : MOHH (hrs) 168,0 168,0 Refueling (hrs) 0,5 0,3 0,3 0,3 0,5 0,3 0,5 0,3 0,5 0,4 0,5 0,5 0,0 0,0 2,8 2,1 Rest and Meal (hrs) 2,0 2,0 1,0 2,0 2,0 2,0 2,0 2,0 2,0 2,0 2,0 2,0 0,0 0,0 11,0 12,0 Front - Road - WD Maintenance (hrs) 2,0 1,9 2,0 1,0 2,0 2,9 2,0 2,0 2,0 2,0 2,0 3,2 0,0 0,0 12,0 13,0 Change Shift (hrs) 2,0 2,0 11,0 9,0 2,0 2,0 2,0 2,0 2,0 2,0 2,0 2,0 0,0 0,0 21,0 19,0 Friday Pray/ Pray (hrs) 1,0 1,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 1,0 1,0 Holidays and Shutdown (hrs) 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 24,0 24,0 24,0 24,0 Rain (hrs) 3,0 0,3 2,0 0,4 3,0 1,3 3,0 1,4 3,0 7,9 3,0 0,6 0,0 0,0 17,0 11,9 Slippery (hrs) 3,0 1,0 2,0 0,1 3,0 0,8 3,0 1,4 3,0 1,6 3,0 2,6 0,0 0,0 17,0 7,6 Total Working Hours 10,5 15,5 5,7 11,2 11,5 14,7 11,5 14,9 11,5 8,1 11,5 13,1 0,0 0,0 62,2 77,5 11-Aug-23 12-Aug-23 13-Aug-23 14-Aug-23 15-Aug-23 16-Aug-23 17-Aug-23 WEEK 32 24,0 24,0 24,0 24,0 24,0 24,0 24,0 WORKING HOURS ACHIEVEMENTPERCENTAGE: 125% OPERATINGEFFECTIVITY 102 % %𝑇𝑀𝑀 %𝑊𝐻 = TOTAL PLAN WORKINGHOURS: 62.2 HOURS TOTAL ACTUAL WORKINGHOURS: 77.5 HOURS *Notes(Workinghour didn’t Achieved): 1. On Aug15th workinghour 8.1 hours becauseWeatherIssue (Continue rainboth Pit and JettyArea).
  • 20. WEATHER REVIEW TOTAL RAINFALL : 39.5 mm Cloudy – Light Rain Cloudy – Light Rain Cloudy – Light Rain Cloudy – Light Rain Light – Heavy Rain Cloudy – Light Rain Sunny - Cloudy
  • 21. GAIN AND LOSS WATERFALL No Reason Loss Root Cause 1 - EXC Loading 3007 - Exca loading breakdown pkl 19:18 - 19:50 Wita sehingga kegiatan dihentikan menunggu EXC loading selesai dikerjakan. 2 - Kegiatan Ore - Continue maintenance area dumpingan ketika selesai hujan. - Bucket muatan dikurangi jika material basah dikarenakan menghindari material terjatuh di tanah. - Jumlah DT yang belum maksimal di 2 jam pertama awal shift (gantungan/DT breakdown pendingan); sebelum dan sesudah istirahat dan mendekati akhir shift Loss Physical Avaibility Loss Productivity
  • 22. GAIN AND LOSS WATERFALL No Reason Loss Root Cause 1 - Waiting Barge - Tgl 12 agustus (Long Shift), Tongkang BG. Marcopolo completed pkl 16:00 wita dan setelah itu menunggu tongkang selanjutnya untuk mengisi sehingga tidak ada tongkang yang mengisi setelahnya. - Tgl 12 agustus (Long Shift), Tongkang BG. Pacific completed pkl 21:35 wita. - Tgl 16 agustus (Night Shift), Tongkang BG. Kaltara Mulia completed pkl 03:40 wita, sehingga dari pkl 03:40 - 06:00 Wita slot tongkang kosong. - Tgl 16 agustus (Night Shift), Tongkang BG. Anwari completed pkl 20:30 wita. Tongkang selanjutnya sandar di Jetty pkl 01:00 Wita. 2 - EXC Loading 3006 - Exca loading di ETO Mataram breakdown pkl 19:00 - 20:00 Wita sehingga kegiatan belum dapat dimulai pada awal shift di ETO Mataram. No Barge Loss Physical Avaibility
  • 23. EQUIPMENT PERFORMANCE REVIEW ACTUAL PA DT : 91% PLAN PA DT : 86% ACTUAL PA EXCAVATOR : 96% PLAN PA EXCAVATOR : 92% PLAN UA EXCAVATOR : 38% ACTUAL UA EXCAVATOR: 38% PLAN UA DT : 34% ACTUAL UA DT : 27% ACTUAL PA ADT : 83% PLAN PA ADT : 86% PLAN UA ADT : 37% ACTUAL UA ADT: 33%
  • 24. FUEL CONSUMPTION REVIEW (TOTALLY) Consumption Level: - %FR : 79 % - %FR : 77 % Plan Fuel Cons.: 96,478 liter Total Fuel Cons.: 95,495liter %𝐹𝐶 %𝑊𝐻 %𝐹𝐶 %𝑇𝑀𝑀 • %FR > 100%= Inefficient • %FR < 100%= Efficient FR KUMULATIF (ORE) PLAN WTD : 4.86 Actual WTD : 5.22 FR KUMULATIF (OB+ ORE + BARGING+ QUARRY+ OBOUTPIT) PLAN WTD : 1.08 Actual WTD : 0.82 FR KUMULATIF (OB + ORE + QUARRY) PLAN WTD : 1.54 Actual WTD : 1.28 *Fuel Consumption actual doesn’t include for GeneratorMess & Office
  • 25. FUEL CONSUMPTION REVIEW (PER UNIT) Total FC Excavator : 48,115 Liters Plan : 43,078 Liters Total FC Dump Truck : 33,725 Liters Plan : 34,683 Liters Total FC Dozer : 2,520 Liters Plan : 4,783 Liters Total FC Grader : 2,336 Liters Plan : 1,953 Liters Total FC ADT : 3,155 Liters Plan : 4,968 Liters Total FC Vibro : 1,259 Liters Plan : 1,410 Liters
  • 26. MINING ACTIVITY CRACK RAMP DOOR MHR MAINTENANCE FOG FRONT MAINTENANCE WATERING SLIPPERY
  • 28. EWH Plan: 79.70hours Working Time Day Shift 07.00– 18.00 NightShift 18.00– 06.00 Long shift 07.00– 22.00 Working Terms & Condition Based on our historical data, work effectivity, and work efficiency, we decided if in one shift there are 2 hours of rain with high rain frequency, our activity will be closed. Working Hours Details: • Rain and Slippery is based on rainfall trends in the past few years and weather forecast from BMKGfor the next week. • Refuelingis usuallydone in the rest hours EWH Plan Ratio: 47.4% WORKING HOURS (W33)
  • 29. EQUIPMENT PERFORMANCE PLAN Physical Avaibility (PA) - XE490 : 0 % - Grader : 46 % - XE370 : 92 % - Vibro : 92 % - XE215 : 84 % - WT : 92 % - ADT : 92 % - FT : 92 % - DT : 86 % - WL : 92 % - Dozer : 69 % - TL : 66 % Support Allocation : 2 exca pc 200 : Maintenance WD Ares 1 exca pc 200 : Maintenance WD Anggrek Ban 1 exca pc 200 : Road Construction 6 exca pc 200 : Inside Barge 1 exca pc 300 : Maintenance Stockpile 1 exca pc 300 : Berm Construction & Maintenance 1 exca pc 300 : Berm Maintenance WD Rostov 1 exca pc 300 : Rampdoor Setting EQUIPMENT REQUIREMENT
  • 31. Estimated Fuel Consumption 132,582 liters FUEL RATIO CUMMULATIVE 0.92 FUEL CONSUMPTION (W33)
  • 32. RESERVE AREA UPL 2023 TOPOGRAFI, 16 AGUSTUS 2023. PIT MOSKOW (W33)
  • 33. RESERVE WEEKLY 33 AREA MOSKOW UTARA W34 W36 W43 W44 3 4 Topografi update 16 Agustus 2023 Design W33 A A’ A A’ SECTION PIT MOSKOW UTARA
  • 34. Target Ore 13,700 MT Overburden 24,900 MT Total Movement 38,600 MT PRODUCTION TARGET MOSKOW UTARA
  • 35. RESERVE WEEKLY33 AREA MOSKOW TENGAH W44 4 Topografi update 16 Agustus 2023 Design W33 A A’ A A’ SECTION PIT MOSKOW TENGAH
  • 36. Target Ore 14,900 MT Overburden 41,700 MT Total Movement 56,600 MT PRODUCTION TARGET MOSKOW TENGAH
  • 37. Target Ore 28,600 MT Overburden 66,600 MT Quarry 11,100 MT Total Movement 106,300 MT PRODUCTION TARGET SUMMARY OF MATERIAL MOVEMENTS
  • 38. W4 W13 7 DAY 5 DAY 7 DAY 0 DAY 5 DAY 1 DAY 3 DAY 4 DAY 2 DAY 6 DAY 7 SEQUENCE PIT NORTH MOSKOW & MOSKOW TENGAH (W33)
  • 39. RECONCILE MOSKOW UTARA Note  DF (%) memiliki nilai minus (-) menunjukkan kadar actual lebih rendah daripada block model  DF (%) memiliki nilai plus (+) menunjukkan bahwa kadar actual lebih tinggi daripada block model
  • 41. CHECK SAMPLE MOSKOW UTARA Ni Co MgO Sima 0.82 0.02 22.07 1.84 Low 0.43 0.02 21.79 1.81 Low 0.57 0.02 20.93 1.87 Low 0.47 0.02 21.07 1.72 Low 0.47 0.03 27.19 1.42 Low 13.08.23 P.MOSCOW UTARA TESPIT 32 5 M ELV 487 DPL 21 30 Sampel ID Type 13.08.23 P.MOSCOW UTARA TESPIT 32 1 M ELV 487 DPL 21 30 13.08.23 P.MOSCOW UTARA TESPIT 32 2 M ELV 487 DPL 21 30 13.08.23 P.MOSCOW UTARA TESPIT 32 3 M ELV 487 DPL 21 30 13.08.23 P.MOSCOW UTARA TESPIT 32 4 M ELV 487 DPL 21 30 Parameters (%) TP 32 Ni Co Fe S iO 2 Ca O Mg O Al2 O 3 S ima 1 .60 0.02 1 2.1 6 40.02 0.32 23.69 1 .42 1 .69 1 .1 2 0.02 1 1 .76 40.57 0.58 20.98 3.01 1 .93 0.47 0.02 1 0.68 41 .04 0.30 24.70 1 .35 1 .66 0.44 0.02 9.46 38.96 0.66 26.20 0.84 1 .49 0.86 0.02 1 1 .36 40.23 0.95 22.85 1 .87 1 .76 1 .99 0.02 1 2.53 43.51 0.1 3 21 .96 2.02 1 .98 0.48 0.02 9.80 38.05 0.61 22.43 1 .94 1 .70 0.64 0.02 1 0.57 39.01 0.58 23.1 6 1 .37 1 .68 1 .03 0.02 1 1 .32 38.80 1 .09 1 7.86 1 .74 2.1 7 1 .87 0.02 1 1 .58 41 .99 0.29 23.44 1 .68 1 .79 1 .31 0.02 1 2.54 37.39 0.88 21 .28 2.22 1 .76 1 .35 0.02 1 1 .94 38.57 1 .1 7 20.94 2.71 1 .84 0.78 0.02 1 2.36 35.1 2 1 .1 7 1 7.51 2.30 2.01 0.31 0.01 7.94 39.1 6 0.84 26.87 1 .60 1 .46 0.47 0.01 8.32 40.50 0.76 28.37 1 .41 1 .43 0.40 0.01 8.90 40.62 0.38 27.62 1 .25 1 .47 0.42 0.01 8.32 38.01 0.61 27.1 4 0.90 1 .40 0.37 0.01 8.32 38.41 1 .50 25.97 3.34 1 .48 0.28 0.01 7.67 39.02 1 .89 26.1 0 4.20 1 .50 0.49 0.01 9.01 38.24 0.67 26.45 1 .30 1 .45 1 .55 0.01 9.40 39.28 0.25 28.42 1 .36 1 .38 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 21LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 16 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 17 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 18 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 19 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 20 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 11LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 12 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 13 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 14 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 15 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 06 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 07 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 08 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 09 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 10 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 01LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 02 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 03 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 04 LV 488 DP L 2130 15.08.23 P .MOSCOW UTARA MEN OUT FL CS 05 LV 488 DP L 2130 S a mpe l ID P a ra me te rs (%)
  • 43. REKOMENDASI AREA MOSKOW UTARA Secara sebaran isopach, sebaran material saprolite (cut off 1.55 up) memiliki ketebalan 3 – 6 meter di area Moskow Utara Lanjut expose OB ke area utara Area limonit Plan Arah Penambangan 1. Melanjutkan Kupas OB di area utara 2. Sebaran Isopach Ore Thickness Saprolit menunjukan ketebalan 3 – 6 Meter di area Moskow Utara 3. Area saprolite ditandai warna kuning 3. Area transisi limonit ditunjukkan warna merah mengarah ke bagian utara Area saprolit
  • 44. Ton Ni Fe SiO2 MgO SiMa Ton Ni Fe SiO2 MgO SiMa Ton Ni Fe SiO2 MgO SiMa OB/IB/BR (Waste) 19067 OB/IB/BR (Waste) 5500 OB/IB/BR (Waste) 11750 Low Ni 6355 1.21 35.67 12.76 6.04 2.15 Low Ni 6750 1.26 41.79 8.44 2.58 3.07 Low Ni 13750 1.23 40.66 9.61 2.54 3.76 LGS 1328 1.73 26.01 24.74 12.53 1.97 LGS LGS 1000 1.71 13.90 36.66 21.18 1.73 MGS MGS MGS 250 1.84 12.01 36.50 24.99 1.46 HGS HGS HGS Total High Ni 1328 1.73 26.01 24.74 12.53 1.97 Total High Ni 0 0.00 0.00 0.00 0.00 0.00 Total High Ni 1250 1.73 13.52 36.63 21.94 1.68 Total Ore 7683 1.30 34.00 14.83 7.16 2.12 Total Ore 6750 1.26 41.79 8.44 2.58 3.27 Total Ore 15000 1.28 38.40 11.86 4.15 3.58 Total Move 26750 Total Move 12250 Total Move 26750 Ni Fe SiO2 MgO SiMa Ni Fe SiO2 MgO SiMa -4.59 -17.17 33.87 57.25 -42.99 -2.43 -14.00 24.71 57.98 -74.63 MR Low Ni 100.00 100.00 100.00 100.00 100.00 -0.04 48.02 -48.05 -75.09 15.07 MR High Ni 2.74 -22.92 43.09 63.95 -54.18 1.56 -12.94 20.04 41.98 -68.96 MR Total Ore Grade Material Actual (By Survey) Grade Material Reserve (By Weekly Design Pit) Grade Material Reserve (By UPL) DF High Ni DF High Ni 0% 106% DF Total Ore DF Total Ore 114% 51% Actual VS Weekly Actual VS UPL DF Low Ni DF Low Ni 94% 46% Dilution Factor Actual VS Reserve (Weekly) Dilution Factor Actual VS Reserve (UPL) Mining Recovery RECONCILE MOSKOW TENGAH Note  DF (%) memiliki nilai minus (-) menunjukkan kadar actual lebih rendah daripada block model  DF (%) memiliki nilai plus (+) menunjukkan bahwa kadar actual lebih tinggi daripada block model
  • 47. REKOMENDASI AREA MOSKOW TENGAH Plan Arah Penambangan 1. Melanjutkan stripping OB ke arah Selatan di tandai warna biru 2. Melanjutkan Progres jalan di tandai dengan warna putih 3. Area zona limonite bagian utara di tandai warna merah 4. Area zona transisi saprolit limonit bagian tengah ke selatan di tandai warna kuning U U
  • 48. GEO RECONCILE (ALL PIT) PENAMPANG MELINTANG SAYATAN A – B PIT MOSKOW A B  Week 32  Pit Moskow (All Pit)  Topo Aug 10th 2023  Topo Aug 16th 2023  Ultimate Pit Limit Design  Section A-B (DPL 21_181R– DPL 21_39)  COG High Ni 1.50  COG Low Ni 1.15  Nilai DF (%) = minus (-), actual < block model  Nilai DF (%) = plus (+), actual > block model A B
  • 49. PETA MINE OUT UPDATE
  • 50. RESUME BARGING DAN SISA STOCK WEEK 32 2023 Ni Co Fe SiMa Initial Tonage (Truck Count) Total 1.02 0.11 45.91 2.93 20,739 SISA STOCK AVERAGE ETO SALWA 1.06 0.11 44.42 1.80 6,413 SISA STOCK AVERAGE ETO ARES BARAT 0.97 0.11 47.91 5.04 10,773 SISA STOCK AVERAGE ETO SEGMEN D 1.11 0.11 42.53 1.70 3,553 Total Sisa Stok Ore FE
  • 51. FOCUSED AREA : PIT MOSCOW WEST COMPARTEMENT Drill Hole Summary Plan : 376 holes Cancel : 62 holes On Progress : 1 holes Finished : 275 holes Remaining : 38 holes Drilling method are single tube planned on using 1 unit SJR Rig Drill Machine. 11 August – 17 August 2023 Finished : 1 hole DRILLING PROGRESS DRILLING SUMMARY
  • 52. DRILLING SUMMARY Total Drilling Progress Total Depth : 7025.70 m Avg. Drilling Depth/Rig /Day : 8.01 m Finished Drill Holes : 275 drill holes Sample : 7707 Inc Drilling Progress Resume Weekly Total Depth Weekly : 36.50 m Avg. Drilling Depth/Day : 6.08 m Avg. Drilling Depth/Rig/Day : 6.08 m Sample : 42 Inc DRILLING PRODUCTION CHART
  • 53. DRILLING SUMMARY DRILLING ACTIVITY CHART  17 August 2023 INDONESIAN INDEPENDENCE DAY
  • 54. DRILLING SUMMARY ACTIVITIES DOCUMENTATION P5M Sample Preparation QAQC SJR Moving by man Preparation for Next Project Rig 04 SJR Drilling Activity Preparation for Next Project
  • 55. DRILLING RESULT ASSAY RESULT DPL 21-372 (PIT MOSCOW) OB : 3.00 Meters IB : 0.00 Meters Sap Ore : 9.00 Meters Lim Ore : 10.00 Meters Waste : 6.00 Meters Sap Ni Average : 1.87 % Lim Ni Average : 1.26 % Lim MgO Average : 1.35 % Stripping Ratio : 0.16 Hole ID Easting Northing Elevation Dip Azimuth DPL 21-372 415028,14 9662445,63 524,70 -90 0 Start (Date) Finish (Date) EOH (m) Core Loss (m) Core Length (m) Core Recovery (%) 10 Aug 2023 14 Aug 2023 28.00 1.60 26.40 94.29 % From (m) To (m) Material Zone Material Class Ni Co Fe SiO2 CaO MgO Al2O3 Sima 0,00 1,00 LIM OB 0,54 0,08 42,40 1,73 0,04 1,09 14,67 1,59 1,00 2,00 LIM OB 0,54 0,07 35,88 1,62 0,04 0,80 21,89 2,03 2,00 3,00 LIM OB 0,60 0,09 36,98 0,50 0,16 0,03 6,94 16,67 3,00 4,00 LIM LGL 1,04 0,14 46,11 1,75 0,05 0,91 14,34 1,92 4,00 5,00 LIM MGL 1,10 0,12 46,84 1,82 0,05 1,58 8,72 1,15 5,00 6,00 LIM HGL 1,30 0,11 45,59 2,07 0,05 0,79 7,92 2,62 6,00 7,00 LIM HGL 1,37 0,11 45,80 2,12 0,05 1,11 9,89 1,91 7,00 8,00 LIM HGL 1,37 0,10 44,57 1,89 0,04 1,14 11,34 1,66 8,00 9,00 LIM MGL 1,26 0,11 45,58 2,10 0,05 1,45 9,22 1,45 9,00 10,00 LIM MGL 1,27 0,11 44,70 1,86 0,04 1,56 9,84 1,19 10,00 11,00 LIM MGL 1,21 0,11 46,79 2,41 0,06 2,17 8,08 1,11 11,00 12,00 LIM MGL 1,26 0,11 42,31 2,34 0,05 1,40 12,62 1,67 12,00 13,00 LIM HGL 1,43 0,11 41,64 4,38 0,05 1,35 12,44 3,24 13,00 14,00 LIM LGS 1,64 0,15 44,69 4,65 0,05 1,50 9,78 3,10 14,00 15,00 LIM MGS 1,83 0,11 40,45 10,24 0,12 2,55 7,21 4,02 15,00 16,00 LIM LGS 1,74 0,06 25,56 24,99 0,35 7,48 4,37 3,34 16,00 16,75 SAP LGS 1,62 0,03 13,65 36,66 1,04 20,77 3,12 1,77 16,75 17,00 SAP LGS 1,19 0,02 8,71 37,50 1,04 28,50 2,53 1,32 17,00 18,00 BLD MGS 1,85 0,03 14,95 33,01 0,95 18,53 3,28 1,78 18,00 19,00 SAP LGS 1,71 0,03 14,10 37,34 0,72 19,28 4,19 1,94 19,00 20,00 SAP HGS 2,11 0,05 23,29 28,54 0,36 8,40 5,88 3,40 20,00 21,00 SAP HGS 2,66 0,05 24,58 27,49 0,35 10,22 5,30 2,69 21,00 22,00 SAP MGS 1,81 0,02 10,31 35,60 0,46 24,95 2,06 1,43 22,00 22,20 SAP WS 1,36 0,02 9,89 36,40 0,46 25,92 2,03 1,40 22,20 22,70 BLD WS 1,12 0,02 8,49 37,49 0,67 29,67 1,16 1,26 22,70 23,00 SAP WS 1,36 0,02 9,89 36,40 0,46 25,92 2,03 1,40 23,00 23,60 BLD WS 1,09 0,02 8,79 37,93 0,65 28,96 1,54 1,31 23,60 24,00 SAP WS 0,85 0,02 8,19 38,65 0,66 31,21 1,15 1,24 24,00 25,00 BLD WS 1,29 0,02 8,33 38,52 0,73 30,88 1,55 1,25 25,00 26,00 BLD WS 0,92 0,02 7,96 38,72 1,75 30,17 1,77 1,28 26,00 27,00 SAP WS 1,33 0,02 9,95 37,65 0,68 27,57 1,65 1,37 27,00 28,00 BLD WS 0,61 0,01 7,11 36,68 0,81 31,62 0,89 1,16 DPL 21-372
  • 56. DRILLING RESULT SAPROLITE ORE THICKNESS DISTRIBUTION MAP PIT MOSCOW WEST COMPARTEMENT 1 Finished Hole on Week 19 of 2023 (DPL 21-372) is considered potential of limonite and saprolite ore (stripping ratio less than 3).
  • 57. DRILLING RESULT LIMONITE ORE THICKNESS DISTRIBUTION MAP PIT MOSCOW WEST COMPARTEMENT
  • 58. DRILLING SUMMARY DRILLING PLAN WEEK 20 Drilling Plan Friday Saturday Sunday Monday Tuesday Wednesday Thursday 18-Aug-23 19-Aug-23 20-Aug-23 21-Aug-23 22-Aug-23 23-Aug-23 24-Aug-23 Drilling DPL 21-374 (Drill Plan) Drilling DPL 21-373 (Drill Plan) Activity
  • 59. Outline Presentation Activity Review 01 Survey Topographic 02 Production Agustus 2023 03 Geotech Monitoring 04 Activity Photos 05 Activity Plan 06
  • 60. Activity Review Hari/Tanggal Tim Lokasi Kegiatan Progres Kendala Jumat/11/08/2023 A WD Anggrek, Moscow Tengah Update Topografi Wastedump Anggrek Ban, Update Topografi Pit Moscow tengah & Drone Pix4D di area Moscow Selesai Tidak Ada B WD Rostov, Salwa & Jetty Update Topografi Wastedump Rostov, Update Stockpile di ETO Salwa, EFO Jety, dan pad ETO Salwa Selesai Tidak Ada Sabtu/12/08/2023 A WD Ares & Moscow Utara Update Topografi Wastedump Ares, Update Topografi Moscow Utara Selesai Tidak Ada B Mataram & Jetty Update Stockopname Mataram bawah, Drone Pix4D di EFO Jetty Selesai Tidak Ada Minggu/13/08/2023 A Moscow Tengah & WD Ares Update Topografi Moscow Tengah, Drone Pix4D di Wastedump Ares Selesai Man Power B Salwa, Jetty & Rostov Update Stockopname Di ETO Salwa, Update jalan ETO Salwa, EFO Jetty dan Wastedump Rosrov Selesai Man Power Senin/14/08/2023 A Moscow Utara dan Tengah Update Topografi Moscow Utara & Tengah, Drone Pix4D di Area Moscow Selesai Tidak Ada B WD Ares dan Moscow Barat Update Topografi WD Ares, Resurvey DrillHole Moscow Barat Selesai Tidak Ada Selasa/15/08/2023 A Moscow Tengah dan Utara Update Topografi Moscow Tengah & Utara, Drone Pix4D Moscow Utara & Tengah Selesai Tidak Ada B Moscow Utara dan Jetty Stakeout Titik bor di Moscow Utara, Update Pad Dome di EFO Jetty Selesai Tidak Ada Rabu/16/08/2023 A Moscow Tengah dan Utara Update Topografi Weekly Moscow Tengah & Utara Selesai Tidak Ada B Jetty Update Stockpile di EFO Jetty lt 3 Selesai Tidak Ada Kamis/17/08/2023 A - Libur Nasional 17 Agustus 2023 Libur Nasional Libur Nasional B - Libur Nasional 17 Agustus 2024 Libur Nasional Libur Nasional
  • 61. SURVEY TOPOGRAPHIC WORKING AREA Pit Moscow Tengah Pit Moscow Utara Moscow Barat Wastedump Rostov
  • 63. PRODUCTION AGUSTUS 2023 Note : Pengukuran tanggal 1 – 16 Agustus 2023 Kode Stock Lokasi Ni Co Fe SiO2 CaO MgO Al2O3 Sima Kriteria Tonase by Truck Count (Ton) Tonase by Survey (Ton) Selisih (Ton) Deviasi 010823/EFO JETY/P. MOSKOW TENGAH/DOME 99 Ni EFO JETTY LT 3 1.71 0.05 19.90 27.79 0.53 15.94 6.16 1.74 High Ni 665 647.6 -17.4 -3% 020823/GABUNGAN/EFO JETY/P. MOSKOW/DOME 100 TENGAH+42 UTARA Ni EFO JETTY LT 1 1.59 0.05 19.98 28.61 0.58 14.45 3.41 1.98 High Ni 2380 2,030.4 -349.6 -17% 020823/GABUNGAN/EFO JETY/P. MOSKOW/DOME 98 TENGAH+41 AB UTARA Ni EFO JETTY LT 2 1.54 0.05 20.40 27.36 0.63 14.66 3.82 1.87 High Ni 2905 2,534.9 -370.1 -15% 020823/GABUNGAN/EFO JETY/P. MOSKOW TENGAH/DOME 101+102AB+103 Ni EFO JETTY LT 4 1.75 0.06 24.97 23.55 0.43 12.87 4.28 1.83 High Ni 3623 3,596.2 -26.3 -1% 030823/GABUNGAN/EFO JETY/P. MOSKOW UTARA/DOME 43+44 Ni EFO JETTY LT 5 1.44 0.05 19.40 29.27 0.64 15.44 3.90 1.90 High Ni 2688 2,456.2 -231.8 -9% 030823/EFO JETY/P. MOSKOW TENGAH/DOME 180 Low Ni EFO JETTY LT 5 1.09 0.06 36.88 10.35 0.18 5.04 9.03 2.05 Low Ni 630 533.4 -96.6 -18% 030823/EFO JETY/P. MOSKOW TUTARA/DOME 93+ 94B+45 Ni EFO JETTY LT 3 1.68 0.07 25.78 22.55 0.44 12.55 4.10 1.80 High Ni 3658 3,498.7 -158.8 -5% 040823/GABUNGAN/EFO JETY/P. MOSKOW/DOME 100 TENGAH+42+46 UTARA Ni EFO JETTY LT 1 1.58 0.05 20.39 28.12 0.56 14.15 3.74 1.99 High Ni 3346 3,163.3 -182.8 -6% 030823/GABUNGAN/EFO JETY/P. MOSKOW/DOME 93AB+94+96 TENGAH+45 UTARA Ni EFO JETTY LT 3 1.68 0.07 25.78 22.55 0.44 12.55 4.10 1.80 High Ni 3658 3529.2 -128.3 -4% 060823/EFO JETY/P. MOSKOW TENGAH/DOME 181 Low Ni EFO JETTY LT 3 1.02 0.06 37.47 10.83 0.12 4.29 10.08 2.52 Low Ni 105 94.07 -10.9 -12% 070823/EFO JETY/P. MOSKOW TENGAH/DOME 182 Low Ni EFO JETTY LT 3 1.15 0.05 30.43 16.67 0.36 7.97 6.81 2.09 Low Ni 210 195.35 -14.7 -7% 080823/PENURUNAN/ETO MATARAM/P. MOSKOW/DOME 54+55+56+57+58+59+60+61+62+63+64+66 UTARA+142+143+144+147+150 TENGAH Low Ni EFO JETTYLT 3 1.25 0.08 39.61 8.61 0.12 3.97 6.87 2.17 High Ni 490 412.7 -77.3 -19% 080823/ETO MATARAM/P.MOSCOW/DOME 181+182+183+85 EFO JETTY LT 3 1.12 0.06 30.38 18.53 0.36 9.09 6.67 2.04 Low Ni 854 676.9 -177.1 -26% 100823/ETO SALWA/P. MOSKOW UTARA/DOME 48 Ni ETO SALWA NI 1.70 0.07 27.38 22.71 0.21 12.45 2.85 1.82 High Ni 963 829.2 -133.3 -16% 100823/EFO JETY/P. MOSKOW TENGAH/DOME 184 Low Ni EFO JETTY LT 3 1.24 0.06 32.99 14.48 0.21 6.92 8.05 2.09 Low Ni 798 759.3 -38.8 -5% 110823/ETO MATARAM/P. MOSKOW TENGAH/DOME 185 Low Ni ETO MATARAM 1.27 0.05 29.10 19.10 0.35 10.74 5.73 1.78 Low Ni 315 309.0 -6.0 -2% 120823/ETO SALWA/P. MOSKOW UTARA/DOME 49 A Ni ETO SALWA NI 1.22 0.03 16.05 32.60 0.75 16.66 3.06 1.96 High Ni 875 751.1 -123.9 -17% 120823/ETO SALWA/P. MOSKOW UTARA/DOME 49 B Ni ETO SALWA NI 1.75 0.05 20.83 28.66 0.26 17.18 2.20 1.67 High Ni 560 494.3 -65.7 -13% 120823/GABUNGAN/EFO JETY/P. MOSKOW/DOME 98 TENGAH+41 AB+50 UTARA Ni EFO JETTY LT 2 1.62 0.06 23.89 25.10 0.43 12.88 2.96 1.95 High Ni 2126 2,100.0 -25.8 -1% 150823/EFO JETY/P. MOSKOW UTARA/DOME 89 Low Ni EFO LT 3 1.11 0.09 46.64 4.04 0.08 2.5 7.1 1.62 Low Ni 438 399 -38.9 -10% 160823/EFO JETY/P. MOSKOW UTARA/DOME 90 Low Ni EFO LT 3 1.42 0.08 39.07 12.14 0.06 7.76 4.12 1.56 Low Ni 559.0 511.3 -47.7 -9% 160823/EFO JETY/P. MOSKOW UTARA/DOME 91 Low Ni EFO LT 5 1.19 0.09 45.78 4.67 0.05 2.66 5.21 1.76 Low Ni 665.0 733.0 68.0 9% 150823/GABUNGAN/EFO JETY/P. MOSKOW/DOME 181+182+183+184 TENGAH+85+86+87+88 UTARA Low Ni EFO LT 3 1.17 0.07 39.90 9.37 0.25 5.10 7.05 1.84 Low Ni 2,546.0 2,336.3 -209.8 -9% 080823/PENURUNAN/ETO ARES/P. ATHENA/DOME 41+42+43+44+45+46+47+48+49+50+51+52+53+59 Nico EFO LT 5 1.01 0.08 40.11 7.62 0.11 3.77 8.57 2.02 Low Ni 280.0 226.3 -53.8 -24% 160823/EFO JETTY/DOME 76+110B(sisa) EFO LT 5 644.1 644.1 100% 160823/ETO MATARAM/P. MOSKOW TENGAH/DOME 186 Low Ni ETO MATARAM 1.31 0.06 28.69 20.24 0.43 12.20 5.22 1.66 Low Ni 665.0 704.1 39.1 6% 160823/ETO MATARAM/P. MOSKOW TENGAH/DOME 187 Low Ni ETO MATARAM 1.02 0.06 32.12 15.85 0.46 7.21 5.20 2.20 Low Ni 1,015.0 950.7 -64.3 -7% PRODUCTION ORE PT. BIMA CAKRA PERKASA MINERALINDO - SITE LAROENAI AGUSTUS 2023
  • 64. PLAY LOAD STUDY DT No Kode Bcm Survey Ton Survey 1 DT-1-033 11.20 20.05 2 DT-1-027 10.54 18.86 3 DT-1-014 9.60 17.18 4 DT-1-086 8.90 15.59 5 DT-1-046 12.06 21.59 10.46 18.65 PAYLOAD STUDY DT ORE PIT MOSCOW UTARA 16 AGUSTUS 2023 Average No Kode Bcm Survey Ton Survey 1 DT-1-058 9.44 16.90 2 DT-1-016 10.36 18.53 3 DT-1-082 9.25 16.55 4 DT-1-001 8.59 15.38 5 DT-1-011 9.93 17.77 9.51 17.03 PAYLOAD STUDY DT ORE BARGING DARI ETO SALWA 16 AGUSTUS 2023 Average
  • 66. ACTIVITY PHOTOS Update Topografi Wastedump Resurvey dan Stakeout Titik Bor Pengukuran Dome Produksi
  • 67. ACTIVITY PLAN 18/08/23 19/08/23 20/08/23 21/08/23 22/08/23 23/08/23 24/08/23 1 Wastedump Topographic Update 2 Pit Topographic Update 3 Geotech Monitoring 4 Stake Out Pit Limit Weekly/Monthly 5 Drone Photo & Pix4D 6 Stock Opname Dome Ore 7 Payload Study Dump Truck 8 Sample Check Geology 9 Quarry Topographic Update 10 Drill Hole Exploration ACTIVITY PLAN ON NEXT WEEK No Activity Date
  • 68. Review Incoming Sample Nickel Ore Total incoming Nickel Ore samples in lab & prep : 1. BCPM 486 Samples 2. Exploration Project 60 Samples 3. PT.MMS 22 Samples Average are 189 Samples Grand Total are 568 Samples
  • 69. Weekly Check, Service Schedule and Equipment in Laboratory & Preparation
  • 70. Radiation Protection Hasil Pengukuran : Ξ Rata-rata laju paparan alat pengukuran Epsilon 3 : 0.004 mR/jam = 0.04 µSv/jam Ξ Rata-rata laju paparan alat pengukuran Epsilon 4 : 0.003 mR/jam = 0.03 µSv/jam *Laju dosis ≤ 10 µSv/jam pada jarak 1 m dari permukaan luar kabin Source : PERKA BAPETEN Nomor 6 Tahun 2009 pasal 32 Paparan Pekerja Radiasi 1 Jan–17 Agust 23: Moh.Fadli Arbi : 0.027 mSv/Tahun Muh.Ardiansyah : 0.051 mSv/Tahun Nur Alif Awalia : 0.058 mSv/Tahun Dicky Rastyandi : 0.054 mSv/Tahun Moh Irsal Efendy : 0.003 mSv/Tahun *Nilai batas dosis (NBD) ≤ 20 mSv/Tahun untuk perkerja radiasi Source : PERKA BAPETEN Nomor 4 Tahun 2013
  • 71. Review Sample Standard Data Visualization of Oreas vs BCPM Epsilon 3 & 4
  • 75. Documentation House Keeping of Warehouse Activity in Wet and Final Preparations Activity in Laboratory Xray and Limestone Weekly Check In Laboratory & Preparation Weekly Inspection
  • 76. WEEK DAY ARMADA 1 TB Cathay 28 / BG CSF 3003 10000 2 41% 92% 100% Full away on Aug 1st, 2023 - 16.15 LT 2 TB Mitra Anugerah 51 / BG Anwari 7500 1 22% 59% 84% 99% 100% Full away on Aug 4th, 2023 - 15.30 LT 3 TB. Maju Daya 29 / BG. Marcopolo 382 8500 3 4% 42% 66% 73% 95% 100% Full away on Aug 8th, 2023 - 14.25 LT 4 TB. Avengers / BG. Captain Marvel 10000 2 18% 49% 56% 70% 82% 99.9% 100% Full away on Aug 10th, 2023 - 18.10 LT 5 TB. Cathay 28 / BG. CSF 3003 7500 1 3% 24% 44% 93% 100% Full Away on Aug 8th, 2023 - 16.40 LT 6 TB. Mitra Caraka 1 / BG. Iron Man 8 10000 3 0% 19% 55% 69% 82% 89% 100% Full away on Aug 14th, 2023 - 01.30 LT 7 TB. Trinity 309 / BG. Pacific 306 10500 1 0% 10% 49% 68% 88% 100% Full away on Aug 12th, 2023 - 23.15 LT 8 TB. Maju Daya 29 / BG. Marcopolo 382 8500 2 28% 84% 100% Full away on Aug 12th, 2023 - 22.30 LT 9 TB. Buma Pearl / BG. Kaltara Mulia 10000 2 0% 0% 0% 0% 0% 0% 34% 53% 76% 100% Full Away on Aug 17th, 2023 - 16.00 LT 10 TB Mitra Anugerah 51 / BG Anwari 10000 1 0% 30% 70% 90% 100% Full Away on Aug 17th, 2023 - 14.00 LT 11 TB. Avengers / BG. Captain Marvel 10000 3 0% 8% 44% 66% 87% 87% On progress about 87% 12 TB. Maju Daya 29 / BG. Marcopolo 382 8500 1 0% 0% 13% 13% On progress about 13% 13 TB. Mitra Caraka 1 / BG. Iron Man 8 10000 2 0% 0% 0% In position jetty WEEK NO CAPACI TY SLOT REMARKS 28 29 30 31 1 2 5 6 9 25 26 27 3 10 18 19 16 23 24 Approval by, SPV/SPT 42,392.926 TOTAL 102,560.470 GRAND TOTAL 60,167.544 W2 W3 W4 11 12 13 14 15 31 20 21 22 29 30 28 17 7 8 JULY W1 4 I II Monitoring Shipment = High Ni = Low Ni
  • 77. W1 W2 W3 W4 W5 Ritase WMT 1 TB Cathay 28 / BG CSF 3003 7,500 7,542.655 320 7,542.655 PT HNC - Morowali Completed Full away on Aug 1st, 2023 - 16.15 LT Low-Ni 2 TB Mitra Anugerah 51 / BG Anwari 10,000 10,040.302 513 10,040.302 PT HNC - Morowali Completed Full away on Aug 4th, 2023 - 15.30 LT Low-Ni 3 TB. Maju Daya 29 / BG. Marcopolo 382 8,500 8,531.775 428 8,531.775 PT HNC - Morowali Completed Full away on Aug 8th, 2023 - 14.25 LT Low-Ni 4 TB. Avengers / BG. Captain Marvel 10,000 10,031.713 542 10,031.713 PT HNC - Morowali Completed Full away on Aug 10th, 2023 - 18.10 LT Low-Ni 5 TB. Cathay 28 / BG. CSF 3003 7,500 7,530.081 377 7,530.081 PT HNC - Morowali Completed Full Away on Aug 8th, 2023 - 16.40 LT Low-Ni 6 TB. Mitra Caraka 1 / BG. Iron Man 8 10,000 6,948.901 3,085.133 526 10,034.034 PT HNC - Morowali Completed Full away on Aug 14th, 2023 - 01.30 LT Low-Ni 7 TB. Trinity 309 / BG. Pacific 306 10,500 7,173.198 3,357.479 523 10,530.677 PT HNC - Morowali Completed Full away on Aug 12th, 2023 - 23.15 LT Low-Ni 8 TB. Maju Daya 29 / BG. Marcopolo 382 8,500 2,368.919 6,162.159 388 8,531.078 PT LSI - Morowali Completed Full away on Aug 12th, 2023 - 22.30 LT Hi-Ni 9 TB. Buma Pearl / BG. Kaltara Mulia 10,000 - 10,028.232 493 10,028.232 PT HNC - Morowali Completed Full Away on Aug 17th, 2023 - 16.00 LT Low-Ni 10 TB. Mitra Anugerah 51 / BG Anwari 10,000 10,030.815 472 10,030.815 PT LSI - Morowali Completed Full Away on Aug 17th, 2023 - 14.00 LT Hi-Ni 11 TB. Avengers / BG. Captain Marvel 10,000 8,657.752 404 8,657.752 PT LSI - Morowali On Progress On progress about 87% Hi-Ni 12 TB. Maju Daya 29 / BG. Marcopolo 382 8,500 1,071.356 150 1,071.356 PT HNC - Morowali On Progress On progress about 13% Low-Ni 13 TB. Mitra Caraka 1 / BG. Iron Man 8 10,000 - 39 - PT HNC - Morowali On Progress On progress about 9% Low-Ni 60,167.544 42,392.926 - - - Destination Mark Info & Problem Remarks TOTAL 102,560.470 No Shipment Plan (Wmt) Actual per Week (Wmt) Summary Shipment (per Week)
  • 78. Shipment Chart Info / Issue 1. Not possible to using BG. Kaltara Mulia’s rampdoor cause theirs rampdoor has an extremely condition (not safe) 2. Changes a rampdoor of BG. Iron Man 8 cause there is any crack while barging in progress 3. Not activity on August 17th, 2023 due to Republik Indonesia independence day
  • 79. Total Hi-Ni 27,219.645 Total Lo-Ni 75,340.825 GRAND TOTAL 102,560.470 SHIPMENT by Grade Plan progress No. Stowage Plan (MT) 1 10,000 2 3 10,000 Total - Aug 18th, 2023 TB Mitra Anugerah 51 / BG Anwari Ship Name E T A Summary Barging Plan TCoB Date Time Date Time Date Time Date Time {MT} {MT} 1 TB Cathay 29 / BG CSF 3003 30/07/2023 12.00 30/07/2023 15.00 01/08/2023 15.00 01/08/2023 16.15 78 H 30 M 133 H 30 M 7,500 7,542.655 PT HNC - Morowali 2 TB Mitra Anugerah 51 / BG Anwari 31/07/2023 04.50 31/07/2023 08.30 04/08/2023 13.40 04/08/2023 15.30 71 H 0 M 92 H 50 M 10,000 10,040.302 PT HNC - Morowali 3 TB. Maju Daya 29 / BG. Marcopolo 382 03/08/2023 23.30 04/08/2023 04.35 08/08/2023 11.30 08/08/2023 15.00 102 H 55 M 111 H 30 M 8,500 8,531.775 PT HNC - Morowali 4 TB. Avengers / BG. Captain Marvel 04/08/2023 16.30 04/08/2023 20.05 10/08/2023 08.10 10/08/2023 18.10 132 H 5 M 145 H 40 M 10,000 10,031.713 PT HNC - Morowali 5 TB. Cathay 28 / BG. CSF 3003 04/08/2023 23.30 05/08/2023 02.45 08/08/2023 14.00 08/08/2023 16.40 83 H 15 M 89 H 10 M 7,500 7,530.081 PT HNC - Morowali 6 TB. Mitra Caraka 1 / BG. Iron Man 8 08/08/2023 15.10 08/08/2023 16.15 13/08/2023 16.40 14/08/2023 01.30 108 H 25 M 130 H 20 M 10,000 10,034.034 PT HNC - Morowali 7 TB. Trinity 309 / BG. Pacific 306 08/08/2023 17.15 08/08/2023 21.00 12/08/2023 21.35 12/08/2023 23.15 96 H 35 M 102 H 0 M 10,500 10,530.677 PT HNC - Morowali 8 TB. Maju Daya 29 / BG. Marcopolo 382 10/08/2023 17.30 10/08/2023 20.25 12/08/2023 16.00 12/08/2023 22.30 43 H 35 M 53 H 0 M 8,500 8,531.078 PT. LSI - Morowali 9 TB. Buma Pearl / BG. Kaltara Mulia 12/08/2023 22.00 13/08/2023 08.25 17/08/2023 03.50 17/08/2023 16.00 91 H 25 M 114 H 0 M 10,000 10,028.232 PT HNC - Morowali 10 TB. Mitra Anugerah 51 / BG. Anwari 12/08/2023 23.00 13/08/2023 09.00 16/08/2023 22.00 17/08/2023 14.00 85 H 0 M 111 H 0 M 10,000 10,030.815 PT. LSI - Morowali 11 TB. Avengers / BG. Captain Marvel 13/08/2023 20.30 13/08/2023 23.30 H M H M 10,000 8,657.752 PT. LSI - Morowali 12 TB. Maju Daya 29 / BG. Marcopolo 382 16/08/2023 23.50 17/08/2023 02.35 H M H M 8,500 1,071.356 PT HNC - Morowali 13 TB. Mitra Caraka 1 / BG. Iron Man 8 17/08/2023 05.45 H M H M 10,000 - PT HNC - Morowali 889 H 85 M 1080 H 180 M 121,000 102,560.470 Departure Loading Duration (Hrs) Total Duration (Hrs) Consignee TOTAL No. Name of Ship Comm.Loading Comp. Loading In Position Jetty Loading Duration 425.00 35.42 8.85 Total Duration 510.33 42.53 10.63 Average Barging Duration (week) Total Hour Shift Total Shift Average / Bg No. Ship Name 1 Barging Target 2 Barging Total Actual 3 Balance / Remain 37,439.530 140,000 102,560.470 Noted Metrik Tons Balance Hi-Ni (7,219.645) Balance Lo-Ni 44,659.175 Total Balance 37,439.530 BALANCE by Grade
  • 81. Activity Documentation Safety Talks Barging Requesting logs Unloading new Rampdoor Loading Spoil Unloading Material
  • 82. LONG TERM BREAKDOWN NO NO UNIT PROBLEM PLAN/ACTION REMAKS DATE BREAK DOWN TOTAL BREAK DOWN (%) PROGRESS DELAYS 延误 1 DT 1-025 ACCIDENT, COMPLETED UNIT, TRUNION CANIBAL ( PART READY) CABIN (READY), ENGINE (READY), TRANSMISI (READY), INSTALL TRUNION WAITING MAN POWER, INSTALL TRUNION 03-Nov-2021 653 Days 50% MANPOWER 2 DT 1-040 ACCIDENT CABIN AND FRAME BODY BROKEN ON PROGRESS REPAIR BODY CABIN ON PROGRESS REPAIR BODY CABIN BY WELDER 08-Aug-2023 10 Days 10% WAITING PART 3 DT 1-034 FRONT HUB WHEEL BROKEN ORDER PART XCMG WAITING PART FROM SITE OBI 28-Jun-2023 51 Days 0% WAITING PART 4 EXC 2-018 DISPLAY ERROR, HARNESS SHORT ORDER PART XCMG WAITING PART ETA. 26 AGUSTUS 2023 CHINA TO JAKARTA, NOTE: JAKARTA TO SITE (EST. OCTOBER) 01-Oct-2022 321 Days 0% WAITING PART 5 EXC 10-002 ENGINE NOISE ENGINE NOISE ENGINE OVER HOUL, WELDING IN KENDARI 29-Aug-2022 354 Days 50% IN PROGRES MEKANIK 6 DZ 4-003 INEJCTOR NO. 1,2,3,4,5,6 BROKEN PART READY SITE WAITING MAN POWER 16-Jun-2022 428 Days 0% MANPOWER 7 DZ 4-001 SEAL, BEARING OUTPUT SHAFT TORQUE CONVERTER BROKEN WAITING PART WAITING PART 14-Aug-2023 4 Days 0% MANPOWER 8 MG 5-002 FINAL DRIVE RH KANIBAL TO MG 5001 ORDER PART XCMG WAITING PART ETA 26 AGUSTUS 2023 CHINA TO JAKARTA, NOTE: JAKARTA TO SITE (EST OKTOBER). 11-Nov-2022 280 Days 60% WAITING PART 9 MG 5-004 BRAKE SYSTEM PROBLEM ORDER PART XCMG WAITING PART ETA 26 AGUSTUS 2023 CHINA TO JAKARTA, NOTE: JAKARTA TO SITE (EST OKTOBER). 15-Mar-2023 156 Days 0% WAITING PART 10 LV 13 ENGINE CANT RUNNING TRABLESHOOT ENGINE, PLAN BLOCK ENGINE SEND TO KENDARI FOR REPAIR (BUBUT), WAITING VENDOR BENGKEL BUBUT WAITING PART 23-Aug-2022 360 Days 0% WAITING PART 11 ADT 02 SWITCH SENSOR PRESSURE AIR SYSTEM ABNORMAL ORDER PART XCMG WAITING PART, ESTIMATION AGUSTUS 07-Aug-2023 11 Days 0% WAITING PART
  • 83. UNIT POPULATION UNIT POPULATION UNIT SPARE TIPE UNIT RFU BD Grand Total TIPE UNIT RFU BD Grand Total ARTICULATED DUMP TRUCK 3 1 4 DUMP TRUCK 2 2 BULLDOZER 2 2 4 EXCAVATOR 2 1 3 DUMP TRUCK 54 3 57 VIBRO 1 1 EXCAVATOR 40 2 42 Grand Total 3 3 6 MOTOR GRADER 2 2 4 FUEL TRUCK 3 3 WATER TRUCK 2 2 SERVICE TRUCK 1 1 MANHAUL 1 1 LIGHT VEHICLE 20 1 21 MINI BUS 2 2 VIBRO 2 2 WHEEL LODER 2 2 Grand Total 134 11 145
  • 84. REVIEW SERVICE & WEEKLY , DAILY CHECK UNIT DAILY & WEEKLY CHECK REVIEW SERVICE UNIT 2 UNIT BELUM TERCAPAI HM/KM PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PM 1000 HM 1 1 0 0 0 0 0 0 0 0 PM 2000 HM 1 1 0 0 1 1 0 0 0 0 PM 500 HM 3 3 1 1 1 1 0 0 0 0 PM 5.000 KM 0 0 0 0 0 0 7 7 2 0 PM 10.000 KM 0 0 0 0 0 0 5 5 0 0 PM 40.000 KM 0 0 0 0 0 0 4 0 0 0 Grand Total 5 5 1 1 2 2 16 12 2 0 INTERVAL SERVICE EXC WL DZ LV DT PLAN 27 ACTUAL 25 93% WEEK TYPE UNIT TOTAL UNIT PLAN WEEKLY CHECK DONE WEEKLY CHECK DONE WEEKLY CHECK (%) REMAKS ALL ARTICULATED DUMP TRUCK 24 17 1 6% ALL BULLDOZER 24 -4 2 -50% ALL EXCAVATOR 266 238 143 60% ALL COMPACTOR 14 14 0 0% ALL MOTOR GRADER 4 0 2 0% ALL WHEEL LOADER 2 2 0 0% ALL DUMP TRUCK 60 55 27 49% ALL FUEL TRUCK 3 3 1 33% ALL SERVICE TRUCK 1 1 0 0% ALL WATER TRUCK 2 2 0 0% ALL LIGHT VEHICLE 20 19 8 42% ALL MINI BUS 0 2 0 0% WEEKLY CHECK DAILY CHECK 6% -50% 60% 0% 0% 0% 49% 33% 0% 0% 42% 0% ARTICULATED DUMP TRUCK BULLDOZER EXCAVATOR COMPACTOR MOTOR GRADER WHEEL LOADER DUMP TRUCK FUEL TRUCK SERVICE TRUCK WATER TRUCK LIGHT VEHICLE MINI BUS DONE WEEKLY CHECK (%)
  • 85. COST MAINTENANCE • SPARE PART * ADT 04 SPARE PART RESPIRATOR • TYRE *R 9-001 REPLACE NEW TYRE • TYRE * DT 1-083 REPLACE NEW TYRE CATEGORY SPARE PART TYRE LUBRICANT CONSUMABLE GREASE TOOLS Grand Total DUMP TRUCK 54,984,281 75,713,992 46,391,000 4,864,600 1,956,240 183,910,113 EXCAVATOR 53,445,866 17,983,500 8,785,000 13,351,338 93,565,704 ARTICULATED DUMP TRUCK 18,990,764 17,978,000 89,800 37,058,564 LIGHT VEHICLE 18,613,523 292,000 857,000 244,530 20,007,053 MOTOR GRADER 756,962 9,102,000 446,000 50,600 97,812 10,453,374 BULLDOZER 8,670,515 10,414,000 586,872 19,671,387 WATER TRUCK 36,500 36,500 MANHAUL 74,000 74,000 FUEL TRUCK 15,000 48,906 63,906 SERVICE TRUCK 80,000 80,000 TOWER LIGHT 8,000 8,000 VIBRO 97,812 97,812 WHEEL LODER 1,312,234 17,100,000 2,850,000 110,000 48,906 21,421,140 OTHERS 476,000 14,222,000 55,000 14,753,000 Grand Total 156,774,144 101,915,992 96,830,500 29,192,500 16,432,416 55,000 401,200,552
  • 86. FUEL CONSUMPTION No TYPE UNIT LITER HM/KM FC UOM 1 DUMP TRUCK XCMG 33,723.97 13318 2.53 - 2 XDA40 3,154.98 184 17.15 L/HM 3 DOZER 2,519.88 148.4 16.98 L/HM 4 EXCAVATOR XCMG 215C 25,102.76 1062.5 23.63 L/HM 5 EXCAVATOR XCMG 370CA 21,516.51 848.3 25.36 - 6 EXC VOLVO RENTAL 854.82 39.9 21.42 L/HM 7 EXCAVATOR MINI 84.66 17.2 4.92 - 8 MOTOR GRADER GR252 1,116.97 52.5 21.28 - 9 MOTOR GRADER SPARE 1,219.30 59.1 20.63 L/HM 10 COMPACTOR XCMG 1,259.27 89.3 14.10 L/HM 11 LIGHT VEHICLE MMP 2,174.15 116623 0.02 - 12 SERVICE TRUCK 121.80 107 1.14 L/KM 13 WATER TRUCK 323.69 138 2.35 L/KM 14 FUEL TRUCK XCMG 876.89 0 - - 15 TOWER LAMP 476.87 407 1.17 L/HM 16 MESIN JACRO 20.01 0 - L/HM 17 MANHAUL 105.28 161 0.65 L/KM 18 EXCAVATOR XCMG RENTAL 1,792.18 74.1 24.19 - 19 WHEEL LOADER XCMG RENTAL 876.48 52.2 16.79 L/HM 20 WHEEL LOADER SDLG RENTAL 596.62 41.1 14.52 L/HM FUEL CONSUMTION WEEK 33 4,177 97,917 102,094 GRAND TOTAL Total (Liter) MMP Total (Liter) BCPM AVERAGE FUEL CONSUMPTION 15,284.0 LITRES TOTAL FUEL MASUK 242,869.0 LITRES 259,828.5 LITRES 104,775 LITRES TOTAL FUEL CONSUMPTION AUG_2022 FUEL STOCK 18-Aug-23
  • 87. ALBUM WEEKLY 08 MG 5-001 REPLACE TYRE NO 3 EXC 2-006 REPLACE ROTARY EXC R3-001 REPLACE NEW FUSE EXC 2-005 REPLACE TRACK SHOE 2 EA DT 1-014 SERVICE PM 5000 KM FT 7-001 WEEKLY CHECK
  • 88. Program Training Center Dokumentasi Inclass New Hire & Inclass Kimper Expired Orientasi, Inspeksi, Coaching , Verifikasi Skill Assessment New Hire, Penambambahan Simper & Pengajuan Simper Rencana Kerja Next Week
  • 89. ASSESSMENT TRAINING CENTER Assessment New Hire, Penambambahan Simper & Pengajuan Simper Post Test : Menguji Pengetahuan (Knowledge) Para Kandidat mengenai unit yang akan di operasikan Practical Test : Melihat Skill / Kemampuan kandidat dalam Teknik pengoprasian unit . TOTAL : 3 ORANG DUMP TRUCK LV 1 2 ASSESSMENT LULUS TIDAK LULUS
  • 90. Selesai Post Test & Practical Test Menunggu hasil MCU (Fit langsung pengajuan Simper) Pengajuan Simper Ke Dept. HSE Berita Acara ke HRD Hasil Test Lulus / Tidak Lulus Flowchart Pengajuan Simper PENGAJUAN CETAK KIMPER Pengajuan Cetak Kimper Total : 6 Kimper BULLDOZER DUMP TRUCK LV NEW HIRE 1 KIMPER EXPIRED 1 1 3 1 1 3 1
  • 91. ORIENTASI :  Pengenalan Area  Observasi Area Kerja  Mengoprasikan Unit di Dampingi Pengemudi Senior, serta di Awasi Trainer • Orientasi New Hire : 30 Jam HM • Orientasi Master & Skill Up : 250 Jam HM TOTAL ORIENTASI : 6 ORANG ORIENTASI NAMA UNIT JABATAN GEDE BUDA ARIASA Dump Truck Driver DT ARMAN Excavator Opt. Excavator MUH SALEH Dump Truck Driver DT Excavator Dump Truck Rock Breaker Motor Grader Bulldozer Compactor WHELL LOADER Dump Truck Excavator Bulldozer Motor Grader ADT Compactor WHEEL LOADER Manhaul RUSDIN MANDALIMA ADT Driver DT JOKO PRIYANTO EDVRIANUS EDWIN WONGKAR MASTER BII UM MASTER BII UM 2 2 2 4 3 1 2 1 2 ORIENTASI
  • 92. INCLASS Tujuan Inclass : • Opt/driver dapat lebih memahami cara mengoperasikan unit sesuai dengan SOP • Dapat lebih memahami komponen-komponen unit • Opt/driver dapat mengidentifikasi resiko bahaya di area kerja • Membangun Jiwa Kepemimpinan Materi : • Tentang Bagaimana Melakukan Pekerjaan Menggunakan Unit Excavator Yang Sesuai Dengan Prosedur • P5m, P2h (Langkah Dan Tujuan), Memahami 4 M, Cara Pengoperasian & Review Accident • LEADERSHIP TOTAL : 22 NEW HIRE KIMPER EXP INCLASS LEADERSHIP NEW HIRE KIMPER EXP INCLASS LEADERSHIP
  • 93. Plan Kerja Training Center • Interview Online • Interview Offline • Post Test • Practical Test As Per Request by HR • Inclas Pasca Insiden • Inclas Opt & Driver • Orientasi Opt & Driver New Hire Continue • Coaching • Verification Skill • Inspeksi Continue • Support Man Power • Moving As Per Request by Dept • Skill Up • Penambahan Simper • Pengajuan Simper As Per Request by Dept TRAINING IN CLASS & ORIENTATION SUPPORT RECRUITMENT MONITORING SUPPORT TC SKILL UP 1. 2. 3. 4. 5.
  • 94. MONITORING ORIENTASI P5M PRACTICAL TEST INCLASS LEADERSHIP INTERVIEW & POST TEST MONITORING CUT & FILL INCLASS DOKUMENTASI
  • 97. EMPLOYEE ACTIVE Status New Employess Employess Resign/Layoff Mutation PKWT 0 0 0 New Employess : Tidak Ada Employess Resign: Tidak Ada Mutation: Tidak Ada THL 0 0 0 New Employess : Tidak Ada Employess Resign/Layoff: Tidak Ada Mutation: Tidak Ada TOTAL 0 0 0 Keterangan PT. BIMA CAKRA PERKASA MINERALINDO Status New Employess Employess Resign/Layoff Mutation PKWT 2 4 0 New Employess : 1. Muh. Saleh, Driver DT - New Joiner 2. Muhammad Rimawan Mahardan, Operation Foreman - New Joiner Employess Resign/Layoff: 1. Burhanuddin, Operator Excavator - Tidak Melanjutkan Kontrak 2. Budi Ardi Setiawan, IT Foreman - Tidak Melanjutkan Kontrak 3. Abd. Qadar, Operator Excavator - Resign 4. Liber Taufiki, Operator Excavator - PHK Mutation: Tidak Ada THL 1 0 0 New Employess : 1. Aksel Saputra Salawa, Helper Fuelman - New Joiner Employess Resign/Layoff: Tidak Ada Mutation: Tidak Ada TOTAL 3 4 0 Keterangan PT. MITRA MINERAL PERKASA
  • 98. ATTENDACE RATIO (AR) & TURN OVER RATIO (TOR) Notes: Average Attendance Ratio for All Departments in this week 79,03 % Notes: In 11 Agustus – 17 Agustus 2023, total 680 employees, New Hire 3 employees, Resign 4 employees, Turn Over 0,59%
  • 99. AGGREMENT SEPTEMBER NIK BARU NAME COMPANY PROJECT LOCATION CLASSIFICATION Division DEPARTMENT SECTION POSITION 20000296 Moh. Jefri Labau PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff Operation HSE Safety Safety Support 20000512 Sahrul PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff Operation Shipping Shipping Shipping Crew 21000587 Asdin PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff Operation HSE Safety Safety Support 21001018 Imran Rahim PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff HRGA HRGA - Project GA Project GA Crew 21001278 Hilma Rahim PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff Operation HSE Safety Safety Admin (K3) 21001503 Ashari Asmin Pratama PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff HRGA HRGA - Project GA Project GA Electrician Crew 21001329 Isran I. Hairudin PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff Operation Shipping Shipping Shipping Crew 22002626 Nurahirman PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff HRGA HRGA - Project GA Project GA Electrician Crew 22002662 Firman PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff HRGA HRGA - Project GA Project GA Electrician Crew 22002894 Sardy PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff HRGA HRGA - Project GA Project GA Electrician Crew 22003006 Norma PT. Bima Cakra Perkasa Mineralindo BCPM Non Staff HRGA HRGA - Project GA Project Housekeeper 20000277 Rians PT. Mitra Mineral Perkasa BCPM Supervisor Operation Production Production Production Supervisor 20000291 Hendrik Laenda PT. Mitra Mineral Perkasa BCPM Foreman HRGA HRGA - Project GA Project GA Electrician Foreman 20000299 Rosul Palosan PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Wheel Loader 20000310 Asman L. PT. Mitra Mineral Perkasa BCPM Non staff Operation Production Production Production Foreman Act 20000306 Agus Sinarbawa PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator 20000308 Irwan Wahyuddin Latif PT. Mitra Mineral Perkasa BCPM Foreman Procurement Purchasing Purchasing Purchasing Supervisor Act
  • 100. AGGREMENT SEPTEMBER 21000730 Alfred Kalib Aptopal PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Dozer 21000733 Aminuddin PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 21000740 Rahmad Abdull Jalil Hi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator 21000748 Abd. Rasyid PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Water Truck 21000785 Wisnu Perdana PT. Mitra Mineral Perkasa BCPM Non staff FAT Finance Finance Finance Admin 21000805 Fairus Mubakri PT. Mitra Mineral Perkasa BCPM Non Staff Procurement Purchasing Purchasing Purchasing Admin 21000817 Vony Yun Asmayanti PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Time Keeper 21000819 Ahmad PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Compactor 21001234 Rizkia Fitrajaya Nugraha PT. Mitra Mineral Perkasa BCPM Foreman HRGA HRGA - Project GA Project GA Project Facilities Foreman 21001236 Muhammad Yusri PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 21001255 Diki Wahyudi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 21001279 Basrianto PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Wheel Loader 21001293 Mochtar Gani PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator ADT 21001301 Supriadi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 21001302 Aguslan Safrin PT. Mitra Mineral Perkasa BCPM Non Staff Plant Plant Welder Welder 21001307 Numbeng PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 21001319 Amelia Yustin PT. Mitra Mineral Perkasa BCPM Foreman Technical Mine Engineering MCC MCC Foreman 22001950 Ilham PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator 22001978 Jonisius A. Napa PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator 22002021 La Ode Sarman PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator 22002022 Paulus PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator 22002057 Awi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Production Admin
  • 101. AGGREMENT SEPTEMBER Pengumpulan UPK Karyawan Paling Lambat Tanggal 20 September 2023 22002061 Adi Rusman PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 21001343 Jamaludin PT. Mitra Mineral Perkasa BCPM Non Staff HRGA HRGA - Project GA Project GA Crew 22002098 Abd. Gaffar PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 22002100 Rizky Aditia PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 22002101 Darno PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator 22002873 Sujarman PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 22002875 Refi Widya Putra PT. Mitra Mineral Perkasa BCPM Foreman Operation Production Production Production Foreman 22002897 Suriadi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 22002958 Irfan Sukri PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 22002961 Masrin PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 22002068 Alfian PT. Mitra Mineral Perkasa BCPM Non Staff HRGA HRGA - Project GA Project GA Crew 22002980 Ikhsan PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 22002982 Zulkifli Rais PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 22002985 Habib Aswan Alhabsyi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Master A2B 22002987 Teguh Prasetio PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 22002988 Ebenheiser Kiding PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 22002989 Emang PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 22002990 Irwan PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 23003654 Fiki Fajry PT. Mitra Mineral Perkasa BCPM Supervisor HRGA HRGA - Project HR Project HR Project Supervisor
  • 102. EMPLOYEE CONTRACT NIK BARU NAME COMPANY PROJECT LOCATION CLASSIFICATION Division DEPARTMENT SECTION POSITION 20000228 Abidin PT. Bima Cakra Perkasa Mineralindo BCPM Foreman External Relation & Permit External & Government Relation External & Government Relation External Relation Foreman 19000103 Aspin PT. Mitra Mineral Perkasa BCPM Foreman Operation Lab & Preparation Preparation Preparation Foreman NIK BARU NAME COMPANY PROJECT LOCATION CLASSIFICATION Division DEPARTMENT SECTION POSITION 22001751 Irwan Dg Manaba PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 22002732 Sahrul PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator 22002739 Albimaun PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator 22002740 Ruslin PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator NIK BARU NAME COMPANY PROJECT LOCATION CLASSIFICATION Division DEPARTMENT SECTION POSITION 20000311 Andrik Hadi Susanto PT. Mitra Mineral Perkasa BCPM Foreman Operation Production Production Production Foreman 20000314 Asdar Raga Putra PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Pit Control 20000412 Ilyas Rahman PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Pit Control 20000424 Liliani Astri S. Horoma PT. Mitra Mineral Perkasa BCPM Non Staff Operation Geology & QA QC Geology Geology QA & QC Admin 20000547 Jumardin Edy PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator ADT 20000565 Andika Setiawan PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Excavator 21000702 Arifuddin PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 21001205 Henri Sampe PT. Mitra Mineral Perkasa BCPM Foreman Operation Geology & QA QC QA & QC Geology QA & QC Foreman 21001208 Rendi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 21001211 Thalya Angeline Lapik PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Production Admin 21001217 Fadli PT. Mitra Mineral Perkasa BCPM Non Staff Plant Plant Logistic Driver Fuel Truck 22002762 Wandi PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Driver Dump Truck 22002844 Moh Ilham Ramba PT. Mitra Mineral Perkasa BCPM Non Staff Operation Production Production Operator Wheel Loader
  • 103. WARNING LETTER Month Counseling Reprimand letter SP-1 SP-2 SP-3 SP -1 & Terakhir PHK January 4 Case 3 1 February 5 Case 1 1 3 March 4 Case 2 1 1 April 48 Case 10 22 11 1 1 3 May 65 Case 20 3 20 13 2 3 4 June 28 Case 11 8 1 6 1 1 July 47 Case 30 4 8 1 3 1 August 11 Case 1 3 3 1 2 1 September 0 Case October 0 Case November 0 Case December 0 Case Warning Letter Case
  • 104. MANPOWER REQUEST & VACANT MPR 368 Vacant 47 On Progress 42 Done 321
  • 105. Total Penghuni Mess Site BCPM Mess Bawah New Mess Portable House Mess Lama Total Penghuni Mess Mess Portable House (Atas) 11 50 92 92 245
  • 106. REVIEW ACTIVITY Perbaikan Saluran Pipa Air Bersih Perapihan Container Pembuatan Office IT Perluasan Genset Room Pembuatan Gudang Pipa Pemasangan Stop Kontak Office GA Perbaikan Jalur Kabel Gudang HSE Service AC Kamar A07 Perbaikan Freezer Rutinitas Pembersihan Sampah Area Site BCPM
  • 107. SUMMARY MK Note B : Breakfast L : Lunch D : Dinner S : Supper NO. DATE MEAL CONSUMTION MEAL REQUEST (Pack Meal) MEAL COUNT SHEET (Canteen) TOTAL B L D S B L D 1 11-Aug-23 162 365 167 185 117 118 123 1.237 2 12-Aug-23 166 355 358 0 117 118 123 1.237 3 13-Aug-23 163 368 149 216 117 118 123 1.254 4 14-Aug-23 168 373 141 202 117 118 123 1.242 5 15-Aug-23 169 374 143 211 117 118 123 1.255 6 16-Aug-23 173 380 139 221 117 118 123 1.271 7 17-Aug-23 175 368 16 0 117 118 545 1.339 TOTAL 8.835
  • 108. 108 Site Facility Pengerjaan Office IT Pembuatan Sekat Ruang Kelas FTO Progress 30% Material Ready Pembuatan Tempat Jemuran Pengajuan Budget Periode September Renovasi Lab Shelter FTO Hold (Issue External) 1. Penambahan gudang sample 2. Instalasi pipa RO 3. Renovasi office (On progress) Rencana Kerja Shelter Produksi Menunggu Antrian
  • 109. FINANCE BUDGET VS REALISASI 100% 100% 76% 49% BCPM MMP
  • 110. FINANCE SUMARY RAB Note : - Budget Juli 2023, RFM Juli, PO terbit di Ags 2023 (Enviro) - Ongkos Kirim Barang No Plan Budget di Ags 2023 (FA & PA) Note : - Part Mesin Bor, PO HO, Kategori No Budget di Ags 2023 (Geology Projek)
  • 111. RFM BASED ON DEPARTEMENT - RFM baru yang masuk untuk pembelian LOCAL terbanyak dari BCPM HRGA dan MMP PLANT, untuk pembelian HO dari MMP PLANT - In Proses : 53.33%, Executed : 46.67% RFM Qty Item RFM Qty Item RFM Qty Item BCPM-HSE - - 2 11 - - BCPM-Lab & Prep 2 10 2 10 - - BCPM-Shipping 1 1 - - 2 2 MMP-Eksplorasi Project - - - - 1 1 MMP-HSE - - 1 2 - - MMP-Lab & Prep 1 8 1 8 - - MMP-PLANT 7 14 11 32 5 6 11 33 17 63 8 9 BCPM-HRGA 8 34 1 1 14 49 BCPM-HSE 1 1 - - 1 1 MMP-Geology QA & C 1 3 1 3 - - MMP-HRGA 2 2 - - 2 2 MMP-Lab & Prep 2 13 1 1 2 14 MMP-PLANT 8 27 8 28 4 9 22 80 11 33 23 75 33 113 28 96 31 84 Total HO LOCAL Total Local Grand Total Company Department New Request Week - 3 In Process Executed (PO) HO
  • 112. RFM BASED ON CATEGORY Category RFM Qty Item RFM Qty Item RFM Qty Item Alat Reparasi Tire 2 2 2 2 - - APD 1 1 2 2 - - Jasa Logistik - - - - 1 1 Kebutuhan Enviro - - 1 1 - - Kebutuhan Geo/Eksplor - - - - 1 1 Kebutuhan Shipping 1 1 - - 1 1 Lab Chemicals 2 10 2 10 - - Lab Peralatan 1 7 1 7 - - Oli dan Grease - - 1 4 - - Safety Sign/Alat - - 2 11 - - Solar - - 1 1 - - Spare Part DT - XCMG 1 1 - - 1 1 Spare Part Innova - - - - 2 3 Spare Part LV - Hilux 2 6 3 9 - - Support Grease - - 1 2 - - Tire Vibro - - - - 1 1 Workshop dan Elektrikal 2 5 3 14 1 1 12 33 19 63 8 9 Generator dan Part 1 1 - - 1 1 Jasa/Service 2 2 1 1 1 1 Kebutuhan Geo/Eksplor 1 3 1 3 - - Kebutuhan Kantin 1 1 - - 1 1 Kebutuhan Konstruksi 3 26 - - 3 26 Kebutuhan Mess 5 7 1 1 8 11 Lab Peralatan 2 13 1 1 2 14 Makanan dan Minuman - - - - 1 5 Medical dan Obat - - - - 1 1 Safety Sign/Alat 1 1 - - 1 1 Seragam - - - - 1 5 Workshop dan Elektrikal 7 26 7 27 4 9 23 80 11 33 24 75 35 113 30 96 32 84 Proses New Request Week - 3 In Process Executed (PO) HO Sub Total LC Sub Total Grand Total
  • 113. RFM BASED ON PURCHASE & PROSES CATEGORY Rutin & Non Rutin Normal & Urgent Category RFM Qty Item RFM Qty Item RFM Qty Item Non-Routine 5 13 8 34 3 3 Routine 6 20 9 29 5 6 11 33 17 63 8 9 Non-Routine 7 8 3 3 9 15 Routine 15 72 8 30 14 60 22 80 11 33 23 75 33 113 28 96 31 84 Sub Total Proses New Request Week - 3 In Process Executed (PO) HO Sub Total LC Grand Total New Request Week - 3 Category RFM Qty Item RFM Qty Item RFM Qty Item Normal 8 30 16 62 3 4 Urgent 3 3 1 1 5 5 11 33 17 63 8 9 Normal 18 75 10 32 18 69 Urgent 4 5 1 1 5 6 22 80 11 33 23 75 33 113 28 96 31 84 Sub Total Grand Total Proses Executed HO Sub Total LC In Process
  • 114. URGENT ORDER Requisition Number Item Name Item Category Project Qty Requisition Unit Lokasi Purchase Requisition Approved Date Routine Urgent Urgent Note Req Status Persentase 5870-3621 Mata Shock 1 Inchi x 33 mm Workshop dan Elektrikal MMP-PLANT 4 Pcs LOKAL 15/08/2023 Non-Routine Urgent Terjadi Kerusakan pada alat pembuka Tyre Dump Truck sehingga dapat menghambat pekerjaan tim tyreman In Proses 5896-3630 42431-0K120 Brake Drum RH/LH Hilux Spare Part LV - Hilux MMP-PLANT 4 Pcs HO 16/08/2023 Routine Urgent Unit Berpotensi Backlog In Proses 5918-3582 Timer Wash Mesin Cuci LG Kebutuhan Mess BCPM-HRGA 3 Pcs LOKAL 15/08/2023 Non-Routine Urgent Karna ada beberapa mesin cuci yang sudah tidak berfungsi. Purchase 5918-3582 Switch Timer Mesin Cuci LG Kebutuhan Mess BCPM-HRGA 3 Pcs LOKAL 15/08/2023 Non-Routine Urgent Karna ada beberapa mesin cuci yang sudah tidak berfungsi. Purchase 5813-3629 Kayu Balok 5 x 5 cm Panjang 4 m Safety Sign/Alat BCPM-HSE 1 Kubik LOKAL 16/08/2023 Routine Urgent Stock Kosong, Sementara akan ada penambahan dan pergantian tiang rambu Purchase 5946-3590 Rantai Baja 16mm - Studless Kebutuhan Shipping BCPM-Shipping 19 Meter HO 14/08/2023 Non-Routine Urgent Stock Rantai Baja 16 mm tidak mencukupi untuk Rampdoor Baru Purchase 5806-3577 Jasa Pengecekkan Rem, Mesin dan Penyetelan Rem Depan Innova Hitam DT 1450 FF Jasa/Service MMP-HRGA 1 Paket LOKAL 12/08/2023 Non-Routine Urgent karena ketika pengeraman bergetar sehingga akan berbahaya dijalan jika tidak dicheck Purchase 5894-3597 Seal Shaft Transmision DT 8-94178-22 merk NOK Spare Part DT - XCMG MMP-PLANT 20 Pcs HO 12/08/2023 Routine Urgent Stock digudang Logitic Menipis, Mengantisipasi Unit Mengalami Breakdown Purchase 75% 25%
  • 115. External Relation Kegiatan 12 Agustus – 18 Agustus NO Deskripsi Kegiatan 1 Koordinasi dengan PASI OPS KODIM 1311 Morowali 2 Penyaluran Bantuan PPM Kesehatan Desa Buleleng 3 Penandatanganan PPM Infrastruktur Desa Buleleng 4 Upacara HUT RI ke 78 tingkat Kecamatan 5 Upacara HUT RI ke 78 tingkat Kabupaten 6 SK Permohonan GANIS atas nama Farhan Dwi Gusnadi pada SIGANISHUT 7 Survey kayu kebutuhan shipping dan Engineering serta pengecekan lokasi Pengolahan Kayu oleh Masyarakat 8 Penyaluran Bantuan kegiatan 17 Agustus ke Karang Taruna Facu Juara Desa Laroenai
  • 116. EXTERNAL RELATION (PERMIT ISSUES) PERMIT ISSUE PROGRESS Izin Spektrum Frekuensi Radio (Radio Frequency Spectrum Permit) On process registration to OSS System (handled by Legal team); Izin Radiasi (Radiation Permit) Complete the technical requirements (Handle by Legal Team - HO) • Evaluasi Dokumen Izin Penimbunan BBC (Liquid Fuel Storage Permit) Complete the technical requirements (Handle by Legal Team - HO) Persetujuan Kesesuaian Kegiatan Pemanfaatan Ruang Laut- PKKPRL (Approval of Conformity of Marine Spatial Utilization Activities) (Handle by Permit Team - HO)
  • 117. EXTERNAL ISSUE EXTERNAL ISSUES : • Penggunaan Listrik perusahaan oleh masyarakat (an. Jumran). Masih dalam proses pendekatan oleh Tim External ke masyarakat yang bersangkutan untuk sosialisasi pemutusan listrik perusahaan; • Bentangan kabel listrik yang berada di area mesjid dan sementara di koordinasikan di Desa
  • 118. External Relation Upacara HUT RI 78 di Kecamatan Bungku Pesisir dan Kabupaten Morowali Koordinasi Stakeholder
  • 119. PROGRAM PEMBERDAYAAN MASYARAKAT Pemberian Makanan Tambahan Periode Agustus 80 Paket Buleleng Inti Desa Buleleng 40 Paket untuk Trans 1 dan Trans 2 Desa Buleleng
  • 120. PROGRAM PEMBERDAYAAN MASYARAKAT Penandatanganan Perjanjian Kerja Program PPM Infrastruktur Tanggul Pura Desa Buleleng
  • 121. Forestry Compliance Survei Kebutuhan Kayu Shipping dan Engginering Penerbitan Data Buku Ukur Tahap Pertama • Persetujuan Penugasan Oleh BPHL Wilayah XII Palu • Penerbitan SK Penempatan GANIS PKB PT Bima Cakra Perkasa Mineralindo

Editor's Notes

  1. Target Ore belum
  2. \
  3. \
  4. \