SlideShare a Scribd company logo
1 of 8
Download to read offline
Midhun Mohan
Senior Project Engineer
(Mechanical Construction Projects) (B.Tech Mechanical Engineering)
Current Location : ZAMBIA (AFRICA)
Contact info.
Mobile : 0026-0962886999, 0026-0971502813 (Zambia)
E-mail Id : midhun9487@gmail.com
**Contact through e- mail preferred .
PROFILE
Construction Project Engineer with 07 years experience executing Mechanical construction projects from Pre-site
activity stages to project completion by maintaining the industry-leading quality standards. Highly skilled in
leading cross-functional teams, liaising with Client, contractors and external agencies and ensuring on time
completion of Project Milestones. Able to Excel in demanding environments and introduce best practices.
 Expertise in Managing Projects, providing technical directions to the teams, technical supervising ,
conducting reviews, establishing schedules, maintaining budgets, and creating contingency plans.

 Knowledge and Experience in using MS project

 Have good experience in Engineering level site execution and installations of piping, structural, Tanks,
Technological Equipment etc

 Co-ordination and controlling sub-contractor .

 Project review meetings, milestone review and liaise with client

 Project Billing and Contractors Bill verifications and approval

 Preparing the procurement BOQ and related documents.

 Excellent communication, analytical and presentation abilities.

 Completed course on MS Project
MAJOR PROJECTS EXECUTED
1. Decommissioning and relocating of 60 m3
Plywood plant
Which includes Construction of New Plant starting from Civil, mechanical structural and
piping, installation of machinery including steam boiler, furnace, 12 platen and 8 platen press with
full assembly of Hydraulic power pack and all associated systems, 5 stage and 4 stage drier, 8 feet
and 4 feet veneer peelers etc, till commissioning in WOOD PROCESSING INDUSTRIES, Zambia
– 2015
2. Bus Bar installation for copper refinery tank houses in MOPANI COPPER MINES, Zambia – 2014
82 Ton demolition of old busbar
75 Ton New Busbar installation



3. ABS Electrolyte circulation piping for the copper refinery tank houses in MOPANI COPPER
MINES, Zambia – 2014
 Fabrication and installation of 2295 meters of ABS piping.
4. 2536 TPD New Sulfuric Acid Plant in MOPANI COPPER MINES, Zambia – 2013- 2014
 Fabrication and installation of approximately 3000 Ton of Structural Steel which includes
Pipe racks, MCC building, Misc. Structural structure and racks, 65 meter height PRJS
structural steel building at GAS cleaning Plant.

 Fabrication and installation of 27200 inch dia. And 52000 inch meter of Piping, both CS and
SS

 Fabrication and installation of 18500 inch dia. And 22000 inch meter of RTRP piping

 Fabrication and installation of Two Acid Storage tanks of 4330 Cubic meter per tank
Storage capacity and Weighing 400 Ton together.

 Fabrication and installation of 55 meter tall Acid plant Stack weighing 80 Ton.

 480 Ton Equipment installation including Pre-heater, Pumps and Motors, Booster blower,
Main SO2 Blower etc.

 Fabrication and installation of two settler tanks and its associated structure , approximately
90 Ton

5. Smelter Upgrade Project PS-3 CONVERTER in MOPANI COPPER MINES, Zambia – 2013
 Fabrication and installation of 480 Ton structural steel

 110 Ton Equipment installations including SS Evaporative Cooling Tower , SS Dust
Chamber and Converter Hood.

 Fabrication and installation of 48 Ton off-gas Ducting (2.4 meter dia.)

6. After Settler Tank Project in MOPANI COPPER MINES, Zambia – 2013
 Fabrication and installation of 67 Ton SS rectangular shaped After settler tank.

7. Smelter Upgrade Project PS-2 CONVERTER in MOPANI COPPER MINES, Zambia – 2012
 Fabrication and installation of 320 Ton Structural steel

 150 Ton Equipment installations including SS Evaporative cooling tower and Dust
Chamber, Converter Hood, ID fan and FRP cooling tower.

 Installation of 125 Ton of Off-gas Ducting (2.4 meter dia.)

8. Smelter Upgrade Project PS-1 CONVERTER in MOPANI COPPER MINES, Zambia – 2011
 Fabrication and installation of 420 Ton Structural Steel

 150 Ton Equipment installations including SS Evaporative Cooling tower and Dust
chamber, Converter Hood, ID fan and FRP cooling tower.

 Installation of 90 Ton of Off-Gas ducting (2.4 meter dia.)

9. Installation of sewage treatment plants and its piping in ships, Mumbai, INDIA – 2011
10. Piping @ Mangalore Refinery Phase-3 extension Project, Karnataka, INDIA – 2010
10. Panna Brown Field Piping project at BRITISH GAS offshore platform Mumbai high. INDIA -
2009
CURRENT EMPLOYER
1. M/s Wood Processing Industries Ltd ZAMBIA (AFRICA).
Duration : October 2014 to still continuing.
Designation : Senior Project Engineer
 Installation of Steam Boiler and all technological machines for the Plywood Plant
 Project Planning & Co-ordination

 Providing technical assistance to the team.

 Controlling and managing the Sub Contractors
EMPLOYMENT HISTORY
1. M/s African Mechanical And Superlift Ltd ZAMBIA (AFRICA).
Duration : June 2011 to August 2014
Designation : Senior Project Engineer
Project Planning & Co-ordination , tracking, project review meetings and direct co-ordination
with Client

Providing technical assistance to the team.

Assisting the Site engineers in the execution activities and reviewing the front availability and
manpower rotations including the Resource Rotation plans for each activities of project.

Project Billing and Sub-contractor bill verifications.

Controlling and managing the Sub Contractors

2. M/s. Hi-Point Services (I) pvt ltd. Mumbai ( installation, commissioning and overhauling of
sewage treatment plants and piping in ships)
Duration : February 2011 to June 2011
Designation: Project Engineer (planning and execution)
 Responsible for scheduling and technical requirements in compliance with company and
regulatory standards
 Conduct project review meetings.
3. M/s. Satnam Global Infra Projects Ltd. Manglore ( Construction contractors in PIPING and
MECHANICAL STRUCTURE.)
Duration : September 2010 to January 2011 Designation:
Project Engineer (Planning and Execution)
 Assisted in development and execution of construction and engineering projects ..
 Pre-fabrication planning and co-ordination
4. M/s. Mathew Associates Hook up and weld services. Mumbai ( Construction contractors in
PIPING and MECHANICAL STRUCTURE)
Duration :August 2009 to September 2010
Designation :Project Engineer (Piping)
 Assisted in development and execution of construction and engineering projects .
ACADEMIC CAREER
 B.Tech degree in MECHANICAL ENGINEERING from Mahatma Gandhi University,
KERALA, INDIA (2005 – 2009) with FIRST CLASS (61.5 %).
 AISSCE (All India Senior School Certificate Examination2005) in FIRST CLASS with 64 %.

 AISSE (All India Secondary School Examination-2003) in DISTINCTION with 75.4%
PERSONAL PROFILE
Gender : Male
Date of Birth : 09-04-1987
Marital Status : Married
Nationality : Indian
Language Known : English, Malayalam, Hindi
PASSPORT DETAILS
PASSPORT NO. : J 1279826
DATE OF ISSUE : 17/07/2010
DATE OF EXPIRY : 16/07/2020
REFERENCES
Available upon request.
DECLERATION
I consider myself familiar with the Mechanical Engineering aspects and i am also confident of
my ability to work as a team.
I hereby declare that the information furnished above is true to the best of my knowledge.
Place:
Date: MIDHUN MOHAN







2 | P a g e
| P a g e

More Related Content

What's hot (19)

My Resume.1
My Resume.1My Resume.1
My Resume.1
 
cv nour
cv nourcv nour
cv nour
 
A. Nasir CV(1)
A. Nasir CV(1)A. Nasir CV(1)
A. Nasir CV(1)
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
CV of Purushotham (1)
CV of Purushotham (1)CV of Purushotham (1)
CV of Purushotham (1)
 
Gurunathan resume
Gurunathan resumeGurunathan resume
Gurunathan resume
 
Chandra Sekhar Reddy
Chandra Sekhar ReddyChandra Sekhar Reddy
Chandra Sekhar Reddy
 
CV_of_A_K_Choudhary_with_Photo
CV_of_A_K_Choudhary_with_PhotoCV_of_A_K_Choudhary_with_Photo
CV_of_A_K_Choudhary_with_Photo
 
CV_Raja
CV_RajaCV_Raja
CV_Raja
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 
cv nour
cv nourcv nour
cv nour
 
Ayub M. Mundu CV-December 2015
Ayub M. Mundu CV-December 2015Ayub M. Mundu CV-December 2015
Ayub M. Mundu CV-December 2015
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
Cv of mudassar iqbal
Cv of mudassar iqbalCv of mudassar iqbal
Cv of mudassar iqbal
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Civil-Report on industrial training at URCC
Civil-Report on industrial training at URCCCivil-Report on industrial training at URCC
Civil-Report on industrial training at URCC
 

Viewers also liked

Fast-track rehabilitation for elective colonic surgery in Germany
Fast-track  rehabilitation for elective colonic surgery in GermanyFast-track  rehabilitation for elective colonic surgery in Germany
Fast-track rehabilitation for elective colonic surgery in Germanyfast.track
 
Curriculum and ins. liabilities and risk management
Curriculum and ins. liabilities and risk managementCurriculum and ins. liabilities and risk management
Curriculum and ins. liabilities and risk managementANDREW GABIONZA
 
christopher watkins cover letter 2016
christopher watkins cover letter 2016christopher watkins cover letter 2016
christopher watkins cover letter 2016Chris Watkins
 
Subh e baharan.hindi (सुब्हे बहारां)
Subh e baharan.hindi (सुब्हे बहारां)Subh e baharan.hindi (सुब्हे बहारां)
Subh e baharan.hindi (सुब्हे बहारां)Ilyas Qadri Ziaee
 
Domain 1, 3 and PLC
Domain 1, 3 and PLCDomain 1, 3 and PLC
Domain 1, 3 and PLCericaupton
 
YMP leaflet
YMP leafletYMP leaflet
YMP leafletCoco Yu
 
Boeing Financial analysis
Boeing Financial analysisBoeing Financial analysis
Boeing Financial analysis?? ?
 
Chris cheeseman, BT - FCCG interim report recommendations
Chris cheeseman, BT - FCCG interim report recommendationsChris cheeseman, BT - FCCG interim report recommendations
Chris cheeseman, BT - FCCG interim report recommendationstechUK
 
Introduction to SSTL
Introduction to SSTLIntroduction to SSTL
Introduction to SSTLtechUK
 
MICROBLOGS TWITTER EN LA ADMINISTRACION
MICROBLOGS TWITTER EN LA ADMINISTRACIONMICROBLOGS TWITTER EN LA ADMINISTRACION
MICROBLOGS TWITTER EN LA ADMINISTRACIONpierangelaZ
 

Viewers also liked (19)

Fast-track rehabilitation for elective colonic surgery in Germany
Fast-track  rehabilitation for elective colonic surgery in GermanyFast-track  rehabilitation for elective colonic surgery in Germany
Fast-track rehabilitation for elective colonic surgery in Germany
 
Curriculum and ins. liabilities and risk management
Curriculum and ins. liabilities and risk managementCurriculum and ins. liabilities and risk management
Curriculum and ins. liabilities and risk management
 
Poverty - G2
Poverty - G2Poverty - G2
Poverty - G2
 
Twt bid
Twt bidTwt bid
Twt bid
 
christopher watkins cover letter 2016
christopher watkins cover letter 2016christopher watkins cover letter 2016
christopher watkins cover letter 2016
 
dam build
dam builddam build
dam build
 
Subh e baharan.hindi (सुब्हे बहारां)
Subh e baharan.hindi (सुब्हे बहारां)Subh e baharan.hindi (सुब्हे बहारां)
Subh e baharan.hindi (सुब्हे बहारां)
 
Domain 1, 3 and PLC
Domain 1, 3 and PLCDomain 1, 3 and PLC
Domain 1, 3 and PLC
 
qualities
qualitiesqualities
qualities
 
YMP leaflet
YMP leafletYMP leaflet
YMP leaflet
 
Ppt
PptPpt
Ppt
 
Boeing Financial analysis
Boeing Financial analysisBoeing Financial analysis
Boeing Financial analysis
 
Lifes A Bicycle Presentation to CAPA Feb 2017
Lifes A Bicycle Presentation to CAPA Feb 2017Lifes A Bicycle Presentation to CAPA Feb 2017
Lifes A Bicycle Presentation to CAPA Feb 2017
 
Chris cheeseman, BT - FCCG interim report recommendations
Chris cheeseman, BT - FCCG interim report recommendationsChris cheeseman, BT - FCCG interim report recommendations
Chris cheeseman, BT - FCCG interim report recommendations
 
Introduction to SSTL
Introduction to SSTLIntroduction to SSTL
Introduction to SSTL
 
Vitamin Deficiency
Vitamin DeficiencyVitamin Deficiency
Vitamin Deficiency
 
World war 2 (1)
World war 2 (1)World war 2 (1)
World war 2 (1)
 
Tina Samaniego Resource Guide
Tina Samaniego Resource GuideTina Samaniego Resource Guide
Tina Samaniego Resource Guide
 
MICROBLOGS TWITTER EN LA ADMINISTRACION
MICROBLOGS TWITTER EN LA ADMINISTRACIONMICROBLOGS TWITTER EN LA ADMINISTRACION
MICROBLOGS TWITTER EN LA ADMINISTRACION
 

Similar to Senior Mechanical Engineer Zambia

Similar to Senior Mechanical Engineer Zambia (20)

MANOGARN RESUMEN (3).pdf
MANOGARN RESUMEN (3).pdfMANOGARN RESUMEN (3).pdf
MANOGARN RESUMEN (3).pdf
 
Mech cv 1
Mech cv 1Mech cv 1
Mech cv 1
 
Farman Ali Rao
Farman Ali RaoFarman Ali Rao
Farman Ali Rao
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
Arun_Resume
Arun_ResumeArun_Resume
Arun_Resume
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
V.BASKAR CV
V.BASKAR CVV.BASKAR CV
V.BASKAR CV
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
 
satheesh Resume
satheesh Resumesatheesh Resume
satheesh Resume
 
Resume
ResumeResume
Resume
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
Cv melwin samuel w lt
Cv melwin samuel w ltCv melwin samuel w lt
Cv melwin samuel w lt
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Cv melwin samuel w lt
Cv melwin samuel w ltCv melwin samuel w lt
Cv melwin samuel w lt
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
Khizer CV 2016
Khizer CV 2016Khizer CV 2016
Khizer CV 2016
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 

Senior Mechanical Engineer Zambia

  • 1. Midhun Mohan Senior Project Engineer (Mechanical Construction Projects) (B.Tech Mechanical Engineering) Current Location : ZAMBIA (AFRICA) Contact info. Mobile : 0026-0962886999, 0026-0971502813 (Zambia) E-mail Id : midhun9487@gmail.com **Contact through e- mail preferred . PROFILE Construction Project Engineer with 07 years experience executing Mechanical construction projects from Pre-site activity stages to project completion by maintaining the industry-leading quality standards. Highly skilled in leading cross-functional teams, liaising with Client, contractors and external agencies and ensuring on time completion of Project Milestones. Able to Excel in demanding environments and introduce best practices.  Expertise in Managing Projects, providing technical directions to the teams, technical supervising , conducting reviews, establishing schedules, maintaining budgets, and creating contingency plans.   Knowledge and Experience in using MS project   Have good experience in Engineering level site execution and installations of piping, structural, Tanks, Technological Equipment etc   Co-ordination and controlling sub-contractor .   Project review meetings, milestone review and liaise with client   Project Billing and Contractors Bill verifications and approval   Preparing the procurement BOQ and related documents.   Excellent communication, analytical and presentation abilities.   Completed course on MS Project MAJOR PROJECTS EXECUTED 1. Decommissioning and relocating of 60 m3 Plywood plant Which includes Construction of New Plant starting from Civil, mechanical structural and piping, installation of machinery including steam boiler, furnace, 12 platen and 8 platen press with full assembly of Hydraulic power pack and all associated systems, 5 stage and 4 stage drier, 8 feet and 4 feet veneer peelers etc, till commissioning in WOOD PROCESSING INDUSTRIES, Zambia – 2015 2. Bus Bar installation for copper refinery tank houses in MOPANI COPPER MINES, Zambia – 2014 82 Ton demolition of old busbar 75 Ton New Busbar installation    3. ABS Electrolyte circulation piping for the copper refinery tank houses in MOPANI COPPER
  • 2. MINES, Zambia – 2014  Fabrication and installation of 2295 meters of ABS piping. 4. 2536 TPD New Sulfuric Acid Plant in MOPANI COPPER MINES, Zambia – 2013- 2014  Fabrication and installation of approximately 3000 Ton of Structural Steel which includes Pipe racks, MCC building, Misc. Structural structure and racks, 65 meter height PRJS structural steel building at GAS cleaning Plant.   Fabrication and installation of 27200 inch dia. And 52000 inch meter of Piping, both CS and SS   Fabrication and installation of 18500 inch dia. And 22000 inch meter of RTRP piping   Fabrication and installation of Two Acid Storage tanks of 4330 Cubic meter per tank Storage capacity and Weighing 400 Ton together.   Fabrication and installation of 55 meter tall Acid plant Stack weighing 80 Ton.   480 Ton Equipment installation including Pre-heater, Pumps and Motors, Booster blower, Main SO2 Blower etc.   Fabrication and installation of two settler tanks and its associated structure , approximately 90 Ton  5. Smelter Upgrade Project PS-3 CONVERTER in MOPANI COPPER MINES, Zambia – 2013  Fabrication and installation of 480 Ton structural steel   110 Ton Equipment installations including SS Evaporative Cooling Tower , SS Dust Chamber and Converter Hood.   Fabrication and installation of 48 Ton off-gas Ducting (2.4 meter dia.)  6. After Settler Tank Project in MOPANI COPPER MINES, Zambia – 2013  Fabrication and installation of 67 Ton SS rectangular shaped After settler tank.  7. Smelter Upgrade Project PS-2 CONVERTER in MOPANI COPPER MINES, Zambia – 2012  Fabrication and installation of 320 Ton Structural steel   150 Ton Equipment installations including SS Evaporative cooling tower and Dust Chamber, Converter Hood, ID fan and FRP cooling tower.   Installation of 125 Ton of Off-gas Ducting (2.4 meter dia.)  8. Smelter Upgrade Project PS-1 CONVERTER in MOPANI COPPER MINES, Zambia – 2011  Fabrication and installation of 420 Ton Structural Steel   150 Ton Equipment installations including SS Evaporative Cooling tower and Dust chamber, Converter Hood, ID fan and FRP cooling tower.   Installation of 90 Ton of Off-Gas ducting (2.4 meter dia.)  9. Installation of sewage treatment plants and its piping in ships, Mumbai, INDIA – 2011 10. Piping @ Mangalore Refinery Phase-3 extension Project, Karnataka, INDIA – 2010
  • 3. 10. Panna Brown Field Piping project at BRITISH GAS offshore platform Mumbai high. INDIA - 2009 CURRENT EMPLOYER 1. M/s Wood Processing Industries Ltd ZAMBIA (AFRICA). Duration : October 2014 to still continuing. Designation : Senior Project Engineer  Installation of Steam Boiler and all technological machines for the Plywood Plant  Project Planning & Co-ordination   Providing technical assistance to the team.   Controlling and managing the Sub Contractors EMPLOYMENT HISTORY 1. M/s African Mechanical And Superlift Ltd ZAMBIA (AFRICA). Duration : June 2011 to August 2014 Designation : Senior Project Engineer Project Planning & Co-ordination , tracking, project review meetings and direct co-ordination with Client  Providing technical assistance to the team.  Assisting the Site engineers in the execution activities and reviewing the front availability and manpower rotations including the Resource Rotation plans for each activities of project.  Project Billing and Sub-contractor bill verifications.  Controlling and managing the Sub Contractors  2. M/s. Hi-Point Services (I) pvt ltd. Mumbai ( installation, commissioning and overhauling of sewage treatment plants and piping in ships) Duration : February 2011 to June 2011 Designation: Project Engineer (planning and execution)  Responsible for scheduling and technical requirements in compliance with company and regulatory standards  Conduct project review meetings. 3. M/s. Satnam Global Infra Projects Ltd. Manglore ( Construction contractors in PIPING and MECHANICAL STRUCTURE.) Duration : September 2010 to January 2011 Designation: Project Engineer (Planning and Execution)  Assisted in development and execution of construction and engineering projects ..
  • 4.  Pre-fabrication planning and co-ordination 4. M/s. Mathew Associates Hook up and weld services. Mumbai ( Construction contractors in PIPING and MECHANICAL STRUCTURE) Duration :August 2009 to September 2010 Designation :Project Engineer (Piping)  Assisted in development and execution of construction and engineering projects . ACADEMIC CAREER  B.Tech degree in MECHANICAL ENGINEERING from Mahatma Gandhi University, KERALA, INDIA (2005 – 2009) with FIRST CLASS (61.5 %).  AISSCE (All India Senior School Certificate Examination2005) in FIRST CLASS with 64 %.   AISSE (All India Secondary School Examination-2003) in DISTINCTION with 75.4% PERSONAL PROFILE Gender : Male Date of Birth : 09-04-1987 Marital Status : Married Nationality : Indian Language Known : English, Malayalam, Hindi PASSPORT DETAILS PASSPORT NO. : J 1279826 DATE OF ISSUE : 17/07/2010 DATE OF EXPIRY : 16/07/2020 REFERENCES Available upon request. DECLERATION I consider myself familiar with the Mechanical Engineering aspects and i am also confident of my ability to work as a team. I hereby declare that the information furnished above is true to the best of my knowledge. Place: Date: MIDHUN MOHAN
  • 6. 2 | P a g e
  • 7.
  • 8. | P a g e