Midhun Mohan is a senior project engineer located in Zambia, Africa with over 7 years experience managing mechanical construction projects. He has extensive experience executing projects from planning through completion, including managing teams, budgets, schedules, and subcontractors. Some of the major projects he has worked on involve piping installations, structural work, and equipment installation for industrial plants in Zambia such as wood processing facilities and copper mines. He holds a Bachelor's degree in Mechanical Engineering from India and is seeking new project engineering opportunities.
1. Midhun Mohan
Senior Project Engineer
(Mechanical Construction Projects) (B.Tech Mechanical Engineering)
Current Location : ZAMBIA (AFRICA)
Contact info.
Mobile : 0026-0962886999, 0026-0971502813 (Zambia)
E-mail Id : midhun9487@gmail.com
**Contact through e- mail preferred .
PROFILE
Construction Project Engineer with 07 years experience executing Mechanical construction projects from Pre-site
activity stages to project completion by maintaining the industry-leading quality standards. Highly skilled in
leading cross-functional teams, liaising with Client, contractors and external agencies and ensuring on time
completion of Project Milestones. Able to Excel in demanding environments and introduce best practices.
Expertise in Managing Projects, providing technical directions to the teams, technical supervising ,
conducting reviews, establishing schedules, maintaining budgets, and creating contingency plans.
Knowledge and Experience in using MS project
Have good experience in Engineering level site execution and installations of piping, structural, Tanks,
Technological Equipment etc
Co-ordination and controlling sub-contractor .
Project review meetings, milestone review and liaise with client
Project Billing and Contractors Bill verifications and approval
Preparing the procurement BOQ and related documents.
Excellent communication, analytical and presentation abilities.
Completed course on MS Project
MAJOR PROJECTS EXECUTED
1. Decommissioning and relocating of 60 m3
Plywood plant
Which includes Construction of New Plant starting from Civil, mechanical structural and
piping, installation of machinery including steam boiler, furnace, 12 platen and 8 platen press with
full assembly of Hydraulic power pack and all associated systems, 5 stage and 4 stage drier, 8 feet
and 4 feet veneer peelers etc, till commissioning in WOOD PROCESSING INDUSTRIES, Zambia
– 2015
2. Bus Bar installation for copper refinery tank houses in MOPANI COPPER MINES, Zambia – 2014
82 Ton demolition of old busbar
75 Ton New Busbar installation
3. ABS Electrolyte circulation piping for the copper refinery tank houses in MOPANI COPPER
2. MINES, Zambia – 2014
Fabrication and installation of 2295 meters of ABS piping.
4. 2536 TPD New Sulfuric Acid Plant in MOPANI COPPER MINES, Zambia – 2013- 2014
Fabrication and installation of approximately 3000 Ton of Structural Steel which includes
Pipe racks, MCC building, Misc. Structural structure and racks, 65 meter height PRJS
structural steel building at GAS cleaning Plant.
Fabrication and installation of 27200 inch dia. And 52000 inch meter of Piping, both CS and
SS
Fabrication and installation of 18500 inch dia. And 22000 inch meter of RTRP piping
Fabrication and installation of Two Acid Storage tanks of 4330 Cubic meter per tank
Storage capacity and Weighing 400 Ton together.
Fabrication and installation of 55 meter tall Acid plant Stack weighing 80 Ton.
480 Ton Equipment installation including Pre-heater, Pumps and Motors, Booster blower,
Main SO2 Blower etc.
Fabrication and installation of two settler tanks and its associated structure , approximately
90 Ton
5. Smelter Upgrade Project PS-3 CONVERTER in MOPANI COPPER MINES, Zambia – 2013
Fabrication and installation of 480 Ton structural steel
110 Ton Equipment installations including SS Evaporative Cooling Tower , SS Dust
Chamber and Converter Hood.
Fabrication and installation of 48 Ton off-gas Ducting (2.4 meter dia.)
6. After Settler Tank Project in MOPANI COPPER MINES, Zambia – 2013
Fabrication and installation of 67 Ton SS rectangular shaped After settler tank.
7. Smelter Upgrade Project PS-2 CONVERTER in MOPANI COPPER MINES, Zambia – 2012
Fabrication and installation of 320 Ton Structural steel
150 Ton Equipment installations including SS Evaporative cooling tower and Dust
Chamber, Converter Hood, ID fan and FRP cooling tower.
Installation of 125 Ton of Off-gas Ducting (2.4 meter dia.)
8. Smelter Upgrade Project PS-1 CONVERTER in MOPANI COPPER MINES, Zambia – 2011
Fabrication and installation of 420 Ton Structural Steel
150 Ton Equipment installations including SS Evaporative Cooling tower and Dust
chamber, Converter Hood, ID fan and FRP cooling tower.
Installation of 90 Ton of Off-Gas ducting (2.4 meter dia.)
9. Installation of sewage treatment plants and its piping in ships, Mumbai, INDIA – 2011
10. Piping @ Mangalore Refinery Phase-3 extension Project, Karnataka, INDIA – 2010
3. 10. Panna Brown Field Piping project at BRITISH GAS offshore platform Mumbai high. INDIA -
2009
CURRENT EMPLOYER
1. M/s Wood Processing Industries Ltd ZAMBIA (AFRICA).
Duration : October 2014 to still continuing.
Designation : Senior Project Engineer
Installation of Steam Boiler and all technological machines for the Plywood Plant
Project Planning & Co-ordination
Providing technical assistance to the team.
Controlling and managing the Sub Contractors
EMPLOYMENT HISTORY
1. M/s African Mechanical And Superlift Ltd ZAMBIA (AFRICA).
Duration : June 2011 to August 2014
Designation : Senior Project Engineer
Project Planning & Co-ordination , tracking, project review meetings and direct co-ordination
with Client
Providing technical assistance to the team.
Assisting the Site engineers in the execution activities and reviewing the front availability and
manpower rotations including the Resource Rotation plans for each activities of project.
Project Billing and Sub-contractor bill verifications.
Controlling and managing the Sub Contractors
2. M/s. Hi-Point Services (I) pvt ltd. Mumbai ( installation, commissioning and overhauling of
sewage treatment plants and piping in ships)
Duration : February 2011 to June 2011
Designation: Project Engineer (planning and execution)
Responsible for scheduling and technical requirements in compliance with company and
regulatory standards
Conduct project review meetings.
3. M/s. Satnam Global Infra Projects Ltd. Manglore ( Construction contractors in PIPING and
MECHANICAL STRUCTURE.)
Duration : September 2010 to January 2011 Designation:
Project Engineer (Planning and Execution)
Assisted in development and execution of construction and engineering projects ..
4. Pre-fabrication planning and co-ordination
4. M/s. Mathew Associates Hook up and weld services. Mumbai ( Construction contractors in
PIPING and MECHANICAL STRUCTURE)
Duration :August 2009 to September 2010
Designation :Project Engineer (Piping)
Assisted in development and execution of construction and engineering projects .
ACADEMIC CAREER
B.Tech degree in MECHANICAL ENGINEERING from Mahatma Gandhi University,
KERALA, INDIA (2005 – 2009) with FIRST CLASS (61.5 %).
AISSCE (All India Senior School Certificate Examination2005) in FIRST CLASS with 64 %.
AISSE (All India Secondary School Examination-2003) in DISTINCTION with 75.4%
PERSONAL PROFILE
Gender : Male
Date of Birth : 09-04-1987
Marital Status : Married
Nationality : Indian
Language Known : English, Malayalam, Hindi
PASSPORT DETAILS
PASSPORT NO. : J 1279826
DATE OF ISSUE : 17/07/2010
DATE OF EXPIRY : 16/07/2020
REFERENCES
Available upon request.
DECLERATION
I consider myself familiar with the Mechanical Engineering aspects and i am also confident of
my ability to work as a team.
I hereby declare that the information furnished above is true to the best of my knowledge.
Place:
Date: MIDHUN MOHAN