PROFESSIONAL SUMMARY
Civil Engineer with more than 7 years of experience in quality assurance, quality control management, construction
management, supervising, superintendent and field engineer.
Key Skills
 Site supervision, Reviewing and implementing approved drawing and submittals on field, coordinating, managing
a team, quality control, safety, quality assurance evaluating bids and claims, managing timeline, cost estimation,
coordinating with contractors/sub-contractors/clients/vendors
 Experience in reinforced multistory buildings, taxi way, road pavement, bridge, wastewater treatment plant, water
well, water tank, K-Span building, remodeling, renovation, demolition, rehabilitation
 Knowledge of IBC, ACI, IPC, NEC and other construction relevant codes and standards
 Software skills: AutoCAD, Civil 3D, Outlook & MS Office, Computer literate
 Languages: English, Farsi, & Pashto
PROFESSIONAL EXPERIENCE
Quality Control Engineer 07/2016 – 01/2017
Kabul Municipality Kabul, Afghanistan, Gov.
 Field inspection, Prepared daily reports, attended meetings, monitored project production, material and quality
 Review drawings and submittals and doing tests (Field density test, slump, cylinder, flexural, air content)
 Ensured that deficient and non-compliant work is documented and corrected by the contractor
 Security Guard 08/2015 – 06/2016
 United Protective Services (Houston, TX)
 Monitor and authorize entrance and departure of employees, visitors, and other persons to guard against theft
 Write reports of daily activities and irregularities, such as equipment or property damage.
 Answer telephone calls and call police or fire departments in cases of emergency
Quality Control Engineer/ Superintendent 08/2014 – 03/2015
Gilbane Federal.INC (US Government Contractor), Kabul, Afghanistan
 Prepared daily reports, attended meetings, monitored project production and quality, implemented QC and safety
standards on field, created redlines, evaluated change order claims, material tracking, etc
 Review shop drawings and submittals and applied American codes and standards (IBC, ACI, IPC, IMC, NEC)
Field work and tests (Field density test, slump, cylinder, flexural, air content…)
 Worked closely with the Project Manager and Quality Control manager to ensure timely and quality completion of
construction process, cost estimation.
Project:
 Ministry of Defense HQ: Five story palace include, water well, water tank, WWTP, asphalt road, power plant,
HVAC, firefighting system. location, Kabul, Afghanistan, budget: USD $150M
Quality Assurance Engineer
VERSAR.Inc, Kabul, Afghanistan 10/2010 _ 08/2014
 Inspection of Steel structures, concrete structures, Plumbing works, Road works, Mechanical and electrical
activities base on drawings, Prepared daily report, RFI, logged project( status, issues, security, deficiencies, and
photos)
 Determined deliverables, inspections, , materials, and projects documents are listed and completed as planned
 Identified critical issues affecting the contract performance, schedule, and/or human health/safety
 Reviewed copies of shop drawings, SOS, SOW, Submittals and ensured contractor maintained accurate.
 Monitored the implementation of construction, plumbing, electrical and mechanical activities base on the approved
Quality Assurance Plan, SOS, SOW and US Standard Codes
 Attended three phases of inspection (Preparatory, Initial and Follow up) meetings as US Air force representative
 Verified adequacy and calibration of test equipment before start operation on the field.
Projects:
 Ministry of Defense HQ: 5 story palace including water well, water tank, WWTP, asphalt road, power plant,
HVAC, firefighting system location, Kabul, Afghanistan, budget: USD $150M
 Kabul Commander Police Center: 4 story building, incl. Water tower, guard towers; Afghanistan, Kabul, US
Government project, budget: USD $17M
 Narcotic Police: Generator house, Medical clinic, , shoot house, Asphalt road. budget: USD $11M
 Kabul International airport: Taxi way, K-spans, Headquarters, Open bay barracks, Clinic, DFAC, Asphalt road,
Parking lot, Generator house, warehouse, WWTP, water well, USD $28M budget
EDUCATION
BSc in Civil Engineering, Kabul University, Afghanistan, partnership with Kansas State University 2009
PROFESSIONAL DEVELOPMENT/AFFILIATIONS
 CQM (Construction Quality Control Management), OSHA certificates.

More Related Content

What's hot (20)

CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)
 
RESUME_ARP
RESUME_ARPRESUME_ARP
RESUME_ARP
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 
2016 j
2016 j2016 j
2016 j
 
kenan Alnamous CV
kenan Alnamous CVkenan Alnamous CV
kenan Alnamous CV
 
S.D.Parson CV-Resume - 2016
S.D.Parson CV-Resume - 2016S.D.Parson CV-Resume - 2016
S.D.Parson CV-Resume - 2016
 
Rotating Equipment Engineer
Rotating Equipment  EngineerRotating Equipment  Engineer
Rotating Equipment Engineer
 
Nabi Rasool.CV
Nabi Rasool.CVNabi Rasool.CV
Nabi Rasool.CV
 
Gary Hall CV 2015
Gary Hall  CV 2015Gary Hall  CV 2015
Gary Hall CV 2015
 
SENIOR LAND SURVEYOR
SENIOR LAND SURVEYORSENIOR LAND SURVEYOR
SENIOR LAND SURVEYOR
 
BhaskarNeogi - Resume
BhaskarNeogi - ResumeBhaskarNeogi - Resume
BhaskarNeogi - Resume
 
Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16
 
RESJC2015
RESJC2015RESJC2015
RESJC2015
 
Shazia-Resume
Shazia-ResumeShazia-Resume
Shazia-Resume
 
Lokman's Resume-Rotating Equipment
Lokman's Resume-Rotating EquipmentLokman's Resume-Rotating Equipment
Lokman's Resume-Rotating Equipment
 
Land surveyor
Land surveyorLand surveyor
Land surveyor
 
CV-Padmanabh
CV-PadmanabhCV-Padmanabh
CV-Padmanabh
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
5_2016 Resume_ Dan Kilpatrick (1)
5_2016  Resume_ Dan Kilpatrick (1)5_2016  Resume_ Dan Kilpatrick (1)
5_2016 Resume_ Dan Kilpatrick (1)
 
11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick
 

Similar to Purdel Faqeerzada Resume (20)

Romell CV_PE
Romell CV_PERomell CV_PE
Romell CV_PE
 
Wenninger Resume Feb2018
Wenninger Resume Feb2018Wenninger Resume Feb2018
Wenninger Resume Feb2018
 
Resume_Pramod Chaudhari
Resume_Pramod ChaudhariResume_Pramod Chaudhari
Resume_Pramod Chaudhari
 
C.V,,,,,,
C.V,,,,,,C.V,,,,,,
C.V,,,,,,
 
Shakir CV
Shakir CV Shakir CV
Shakir CV
 
CV_E&I QC
CV_E&I QCCV_E&I QC
CV_E&I QC
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
CV 2018 Series
CV 2018 SeriesCV 2018 Series
CV 2018 Series
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
karthik resume 2016-UAE
karthik resume 2016-UAEkarthik resume 2016-UAE
karthik resume 2016-UAE
 
DOCUMENT CONTROLLER CV
DOCUMENT CONTROLLER  CVDOCUMENT CONTROLLER  CV
DOCUMENT CONTROLLER CV
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
My Resume Full
My Resume FullMy Resume Full
My Resume Full
 
JBA_CV_updated
JBA_CV_updatedJBA_CV_updated
JBA_CV_updated
 
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
 
CV of Viswanathan KK
CV of Viswanathan KKCV of Viswanathan KK
CV of Viswanathan KK
 
QC E&I alhassan
QC E&I alhassanQC E&I alhassan
QC E&I alhassan
 
Arun_Resume
Arun_ResumeArun_Resume
Arun_Resume
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 
Latest cv engr. zubair
Latest cv engr. zubairLatest cv engr. zubair
Latest cv engr. zubair
 

Purdel Faqeerzada Resume

  • 1. M. Purdel Faqeerzada 3112 14th ave, Apt 3, Oakland, CA  purdel8200@gmail.com  (510) 350-6356 Permanent Resident (Green card holder). No Visa Sponsorship required. Open to relocation. PROFESSIONAL SUMMARY Civil Engineer with more than 7 years of experience in quality assurance, quality control management, construction management, supervising, superintendent and field engineer. Key Skills  Site supervision, Reviewing and implementing approved drawing and submittals on field, coordinating, managing a team, quality control, safety, quality assurance evaluating bids and claims, managing timeline, cost estimation, coordinating with contractors/sub-contractors/clients/vendors  Experience in reinforced multistory buildings, taxi way, road pavement, bridge, wastewater treatment plant, water well, water tank, K-Span building, remodeling, renovation, demolition, rehabilitation  Knowledge of IBC, ACI, IPC, NEC and other construction relevant codes and standards  Software skills: AutoCAD, Civil 3D, Outlook & MS Office, Computer literate  Languages: English, Farsi, & Pashto PROFESSIONAL EXPERIENCE Quality Control Engineer 07/2016 – 01/2017 Kabul Municipality Kabul, Afghanistan, Gov.  Field inspection, Prepared daily reports, attended meetings, monitored project production, material and quality  Review drawings and submittals and doing tests (Field density test, slump, cylinder, flexural, air content)  Ensured that deficient and non-compliant work is documented and corrected by the contractor  Security Guard 08/2015 – 06/2016  United Protective Services (Houston, TX)  Monitor and authorize entrance and departure of employees, visitors, and other persons to guard against theft  Write reports of daily activities and irregularities, such as equipment or property damage.  Answer telephone calls and call police or fire departments in cases of emergency Quality Control Engineer/ Superintendent 08/2014 – 03/2015 Gilbane Federal.INC (US Government Contractor), Kabul, Afghanistan  Prepared daily reports, attended meetings, monitored project production and quality, implemented QC and safety standards on field, created redlines, evaluated change order claims, material tracking, etc  Review shop drawings and submittals and applied American codes and standards (IBC, ACI, IPC, IMC, NEC) Field work and tests (Field density test, slump, cylinder, flexural, air content…)  Worked closely with the Project Manager and Quality Control manager to ensure timely and quality completion of construction process, cost estimation. Project:  Ministry of Defense HQ: Five story palace include, water well, water tank, WWTP, asphalt road, power plant, HVAC, firefighting system. location, Kabul, Afghanistan, budget: USD $150M Quality Assurance Engineer VERSAR.Inc, Kabul, Afghanistan 10/2010 _ 08/2014  Inspection of Steel structures, concrete structures, Plumbing works, Road works, Mechanical and electrical activities base on drawings, Prepared daily report, RFI, logged project( status, issues, security, deficiencies, and photos)  Determined deliverables, inspections, , materials, and projects documents are listed and completed as planned  Identified critical issues affecting the contract performance, schedule, and/or human health/safety  Reviewed copies of shop drawings, SOS, SOW, Submittals and ensured contractor maintained accurate.  Monitored the implementation of construction, plumbing, electrical and mechanical activities base on the approved Quality Assurance Plan, SOS, SOW and US Standard Codes  Attended three phases of inspection (Preparatory, Initial and Follow up) meetings as US Air force representative  Verified adequacy and calibration of test equipment before start operation on the field. Projects:  Ministry of Defense HQ: 5 story palace including water well, water tank, WWTP, asphalt road, power plant, HVAC, firefighting system location, Kabul, Afghanistan, budget: USD $150M  Kabul Commander Police Center: 4 story building, incl. Water tower, guard towers; Afghanistan, Kabul, US Government project, budget: USD $17M  Narcotic Police: Generator house, Medical clinic, , shoot house, Asphalt road. budget: USD $11M  Kabul International airport: Taxi way, K-spans, Headquarters, Open bay barracks, Clinic, DFAC, Asphalt road, Parking lot, Generator house, warehouse, WWTP, water well, USD $28M budget EDUCATION BSc in Civil Engineering, Kabul University, Afghanistan, partnership with Kansas State University 2009 PROFESSIONAL DEVELOPMENT/AFFILIATIONS  CQM (Construction Quality Control Management), OSHA certificates.